["What is the total amount of federal assistance dollars contributed to the project?","The expenses for all such tests shall be borne by the aforementioned manufacturer or distributor.","Homeownership Affordable Housing Unit is located.","The portions of the building intended to be used as a lodging house.","The receipt of a fee or any other form of compensation for storage services is not necessary to qualify as a commercial storer of PCB waste.","The light source shall be energized only when the sign is displaying an active message.","If the agency elects to terminate the conditional designation of a community group, the agency shall notify the community group of such termination in writing.","Remember to include the state and county or country of origin in the Flag.","When cleaning troughs, the interior sills should also be cleaned, even if they were not originally contaminated, to minimize contamination of the sills during cleaning of the troughs.","This alerts the receiving custodian the official seal is underneath, and to take care when removing the protective paper.","City or with a net lessee which has entered into a net lease with the City for the building in which such dwelling unit is located.","The Summary Results section lists all of the areas that failed the clearance examination.","The letters shall be solvent resistant, a minimum of \u00bcinch in height, and permanently affixed to the post.","In corner applications a continuous base is used.","If the relocatee prefers relocating into a rooming unit, the relocatee shall be referred to rooming units if any are available.","Records copied on FDA forms must be accurate and legible.","Always place a time limit on voluntary embargoes using your best estimate of how long it will take to complete the analysis and reach a divisiondecision.","If there is a question about accurate identification of the lot or records, determine all facts and establish identification as clearly as possible.","The fiber supplier shall submit independent laboratory data to support ARSresults.","After the Higgins family moved into the partially abated, vacant Federal Street property, KKI approached Ms.","Bidder shall include proof of compliance with the Act with the bid when requested.","Si desean rechazar los protectores para perillas de cocina, los inquilinos deben tildar la opcion correspondiente en este formulario.","This certificate is valid indefinitely.","Evidence of marked containers distributed throughout the lot indicative of a representative sample.","The key to ensuring that orthophosphate reduces lead and copper levels is for PWSs to maintain proper orthophosphate levels.","New York City Civil Court.","The cabinet will be completely wired so that the only requirement to make a field location completely operational is to attach field power and ground wiring.","Deformed steel bars are referred to in the Plans and Specifications by number: for example, No.","Department of Buildings of the City of New York.","In subsequent years, only a risk assessment report is required.","Do you see those, different data points, different numbers?","The aggregate shall be approved by the Materials Laboratory before it is used.","Bidder does not own any real or personal property in Jefferson County prior to the award of any bid.","Department of Housing Preservation and Development of the City of New York or any successor agency or department thereto.","When the order is received, identify the sample item, all accompanying material such as pamphlets, brochures, etc.","With the exception of seed and water, field mixing of additives or components is not acceptable.","Department of Buildings, except handrails may be hardwood.","At such time as the agency issues an RFP for selection of one or more community groups, the agency shall place advertisements in The City Record and such other publications as the agency shall deem appropriate.","This can include lead paint, mold, moisture, and pests like mice and cockroaches.","For the purposes of this paragraph, and under the terms of the bond, the surety shall become liable on the bond obligation when the owner or operator fails to perform as guaranteed by the bond.","Administrative Code and by the Department pursuant to these rules.","EPA and HUD Real Estate Notification and Disclosure Rule and who is affected?","The thirdparty environmental consultant hired for the project shall clearly understand the proposed scope of work for the project which will inform the review by providing context.","Clearance has not been achieved until such cleanup has been satisfactorily completed.","There are no laboratory facilities at MPN II.","Therefore, if the employees of a federal agency are performing renovations, the agency must be a certified firm and must follow the RRP Rule when performing the renovation.","Directorvity of various lead basepaint In other words, the purpose of the experiment was to determinewhetherc background.","Armstead signed enteringin the Study.","An SDS will also have short statements describing precautions thatusers should take when working with the chemical.","Thus, for example, repairing a hole in a wall after a broken water pipe has been repaired would be subject to the rule, as would repainting any waterstained walls or ceilings resulting from the pipe break.","Household Factor established by HPD, based on the family size adjustment percentages established by HUD.","At what point is the wind too strong to allow work to continue?","Si tal ni\u00f1o empieza a residir en la unidad, el due\u00f1o del edificio esta requerido hacer una inspeci\u00f3n visual anualmente de la unidad para determinar la presencia peligrosa de plomo en la pintura.","Names of applicants on such waiting lists shall appear in chronological order, by apartment size, by date of application receipt or by order of selection by lottery, as applicable.","This provides an unbroken, documented chain of custody.","The laboratory would \ufb01nd it insect infested, and the district would merely report the same thing back to the complainant.","In order to be eligible pursuant to this paragraph the building being altered or improved must be an existing dwelling.","HPD, at its discretion, may electronically notify the Department of Finance of the abatement amount in lieu of the issuance of a Tax Abatement Certificate.","Administrative Code of the City of New York for any eligible work that was carried out with the substantial assistance of grants, loans or subsidies from any Federal, State, or local governmental agency or instrumentality.","Household, from all sources for the twelve month period prior to the Income Qualification Date.","Approval of a chemical waste landfill will be in writing and will be signed by the Regional Administrator.","GMP deviations, should contain records obtained thatdocument the deviations encountered.","The unit shall be mounted on vibration dampened fittings.","Records should not be accepted by email from outside USFDA.","Paint film stabilization of both frame and sash encapsulation of exterior frame with a Liquid Encapsulant Coating plus sash liners.","An employee of an accredited laboratory, having quality assurance responsibilities.","HPD representatives will inspect to see that the damaged property has been restored to satisfactory condition, after which time the checks shall be released to the housing company.","Radiopharmaceuticals for Sterility Submit samples to WEAC.","RRPM was utilized pursuant to this chapter and that a current RRPM compliance statement has been filed with the Department.","This procedure must be followed each time the official seal on a sample is broken.","Any carpet damage or cleaning due to leaking trash bags will result in additional carpet cleaning at no cost to County.","The floor coverings must be maneuverable for a manual wheelmentioned doors must be levered.","Review of projects containing more than one hundred fifty dwelling units.","Principal instructors that advertise, provide training, and use the logo must do so under the name of theaccredited training provider for whom they work.","Surcharge billing, collection and remittance.","Whenever the only window in a room is a room, the total window area of such skylightof the total floor area of such room.","ESTIMATED VALUEEnter the estimated wholesale value of the lot remaining after sampling.","The field examination and the report of findings will serve as the analysis.","Such declaration shall be binding upon such owner, and his or her successors and assigns.","Not eligible if brickwork is covered by cement wash or other coating.","My refusal to be photographed is grounded upon a sincerely held religious belief.","Private right of action for tenants or other aggrieved persons.","Significant Environmental Lead Hazard Standard.","Act, or for the period any such applicable local law or such Act is in effect, whichever is shorter.","EPA Regional Administrator for the Region in which the PCB Article is stored.","Using the end of the pipette, stir the surface of the sediment until the water becomes cloudy and then collect this water.","Attendance and course completion standards are as follows.","While there is no specific authority for requesting a voluntary embargo on a lot, voluntary embargoes by a dealer shall be encouraged where the lot sampled is clearly adulterated.","An invoice for the required fee for notifications will be sent from the department to the building owner.","Posconstruction radon testing and reporting shall be provided for all rehabilitation projects that include exterior envelope improvements.","Cut the additional sample where indicated or bring the additional sample to the laboratory for examination.","The homeowner and the City of Atlanthave personnel who are not performing their services in an acceptable manner removed from the job site.","Code of Federal Regulations in XML.","The current disposal approval contains an expiration date.","In most cases, firms have at least one certified renovator on staff.","Wire nuts may not be used for any purpose.","This creates a more immediate safety concern than protecting the floor from dust.","The inspector shall carry out his or her inspection together with a representative of the housing company.","When you conduct such exams take care to describe observations of each unit of product examined, any physical subsamples collected which reflect the violative nature of the lot and exhibits which corroborate your report of observations.","Current agency policy does not require the collection of records of interstate movement for the issuance of a Warning Letter.","This certificate is valid forever.","TSCA PCB Coordinated Approval to the persons described in those paragraphs if the conditions listed in this section are met.","Dates of clearance examination.","Housing or the implementing agencontractor shall test the water and sewer lines to ensure they have not been compromised.","To determine the level of rehabilitation assistance remember to take the lower of Federal assistance per unit OR.","Do not disparage the product, its manufacturer, or shipper.","No applications received after the effective date of these Rules will be accepted by the Department without the application fee.","Alternatively, an organization is substantially more likely to decide that a hard drive from a system that processed PII needs sanitization prior to Disposal.","Training courses for all disciplines shall be in accordance with the MAP.","The growth of these fungi may result in a\ufb02atoxin production.","Where a vent or outlet pipe passes through partition or roof constructed wholly or in part of combustible material, a ventilated metal thimble not less than six inches larger in diameter than the pipe shall be provided.","To practice with lapsed licenses and registrations is prohibited.","Occupied Rehabilitation Program Policy Manual am are identified below.","The community group has failed to comply with any term or condition of the conditional designation letter.","There areseveral ways of ensuring that gloves and other clothing are free of dust and debris before leaving the work area.","Windows, doors and ducts in the work area must be closed and covered.","Describe how it is displayed such as: for voluntary pickup; mailed to prospective customers; distributed without being displayed, etc.","Este aviso debe firmarlo el propietario o su representante y establecer que ha cumplido con estos requisitos.","HPD of a certificate of eviction.","Setback thermostats are required.","English translation of the statement.","This promise is evident from the plain language of the agreement.","Such policies shall name the City as a mortgagee and provide that losses thereunder shall be payable to the City as its interest may appear.","If the sampling covers a long period of time you should submit controls which show environmental conditions during the time of sampling.","May or may not be considered a nonconformity.","Major capital improvement or MCI.","The form is available on the Office of Healthy Housing website.","Article II of the Private Housing Finance Law.","Failure to meet city requirements.","If you will be scraping paint, mist the area with water before you begin scraping or sanding.","Swabs are suitable for sampling only very small areas thacannot be accessed any other way.","EPArecognizlead test kits to determine the applicability of the RRP Rule must test each and every component that will be affected in order to determine that the RRP Rule does not apply to a particular renovation.","Transport vehicles are not transfer facilities under this definition, unless they are used for the storage of PCB waste, rather than for actual transport activities.","Commissioner of HPD or his or her designee.","All seams shall be continuously welded.","The area of the service opening shall not exceed one third the are of the chute.","Sterling DA, Lewis RD, Luke DA, Shadel BN.","Where the Housing Authority has entered into a leasing program regarding the rehabilitated building, all tenants eligible for public housing must apply to the Housing Authority to recognize their priority.","Two hard copies of the cabinet wiring diagram and component wiring diagrams shall be furnished with each cabinet and a pdf file of the cabinet wiring and component drawings.","Said administrative charge is to be retained by the mutual housing company.","During the term of the Tenant Interim Lease, one or more rent increases may be necessary to reflect the actual costs of operating a Building.","Contractor shall be responsible for notifying its workers and subcontractors regarding the policy and for enforcement of the policy with same.","An application for a Preliminary Certificate of Eligibility must be made to the Office after the commencement of construction but prior to the issuance of either a Temporary Certificate of Occupancy for all residential areas or a Permanent Certificate of Occupancy.","We have tested for the presence of lead based paint and found the results to be positive.","Certificate of Incorporation Fee.","Volunteers of America, Inc.","The resource you are looking for might have been removed, had its name changed, or is temporarily unavailable.","LLCwill inform he laboory hat teinnotification.","The identification of the minor axis of elliptical reinforcement shall be in accordance with Section.","If needed, the Contractor shall install additional lights to provide fully visible brake lights at all times.","Therefore, for this reason alone, the grant of summary judgment was improper.","When HPD determines that an applicant is eligible, HPD shall advise both the eligible senior citizen and the housing company of the established base rent which the housing company is to charge the senior citizen.","Intermediate rail transporters are not required to sign either the manifest or shipping paper.","Effective Date, Duration of Exemption and Abatement, Implementation Procedure with the Department of Finance.","Install one or more layers of insulation under area of roofing to achieve required thickness.","Collect each subsampleto duplicate from a separate case, if possible.","The Engineer may reject any or all of the timber or lumber that does not comply with the Specifications or has been damaged during shipping or upon delivery.","During the course of initial certification Project Designers must take both the Supervisor course and the Project Designer course.","DSHS licensed inspector must perform the inspection if the project is in a public building.","HPD will calculate the rent levels necessary to cover the projected cost of maintaining and operating the Building in the first year following disposition, as reflected in such statement, and shall implement a Disposition Rent Increase based upon such calculation.","The above instructions apply to the collection of raw material, inline and finished product samples for mold.","The Estate contends, however, that Dr.","Certified and First Class Mail.","Eligible items of work: major capital improvements.","People, especially children, can swallow lead dust as they eat, play, and do other normal handmouth activities.","The device shall provide transient protection between neutral and ground, line and ground, as well as line and neutral.","And all of that was for the benefit of society at large and these children.","This common container option does not permit dilution of the collected oil.","Use a random number generator or random number table to select one of these quarters.","Identify whether the device supports key escrow or backup.","There may be some discomfort but no danger is involved in this procedure.","NO SMOKING OR EATING.","The Agency may require a Sponsor to provide security for its compliance with use restrictions in such types and amounts as are determined by the Agency to be necessary or desirable.","The fact that a result may be foreseeable does not itself impose a duty in negligence terms.","Relocatee by HPD, including Shelter Services.","Lead Based Paint Abatement.","No informedconsent, exculpatory language throughwhichr to waive anyofthe sponsor, the institution or its agents from liability for negligence.","HQS inspector looks for defective paint.","All stairways and steps handrail on each side.","Bid award does not constitute an order or obligation to order by the County.","All funds received by housing companies shall be held by such companies as trust funds to be applied and used for the purpose of carrying out their obligations under the law.","Dielectric fluid removed from mineral oil dielectric fluid electrical equipment may be collected in a common container, provided that no other chemical substances or mixtures are added to the container.","Also see Write Fundamental operations of an information system that results only in the flow of information froman actor to storage media.","Activities such as replacing a piece of glass in a window can disturb paint.","Except when extreme severity of the weather prevents, all windows of sleeping rooms, waterclosets, washrooms and bathrooms shall be kept open not less than one foot at the bottom and one foot at the top at least four hours daily.","Who does the painting?","Notice of Final Selection.","If you do not receive a certificate from EPA before your interim certification expires you cannot conduct leadbased paint activities.","Make sure when scraping or sanding to cover the floor or ground area with plastic to be disposed of.","All rentals, sales and managing agents shall be required to deliver to the housing company and to HPD before their employment shall become effective, a fidelity bond covering all officers and employees handling funds of the housing company.","In the event there is railroad preempt during the pedestrian change interval, during the following two cycles the display shall show the programmed clearance or be blank.","Composites come from two stages: an initial compositing area centered in the area to be sampled, and subsequent compositing areas forming concentric square zones around the initial compositing area.","Only full calendar years from the previous Sale Date will be considered in calculating the Appreciated Price of a Homeownership Affordable Housing Unit.","Do not over fill but leave a small air bubble at top.","If more than one person is involved in collecting the sample, the person preparing and signing the collection record must sign the seal.","Issue a written notice of deficiency explaining why the request for approval is deficient.","KKI, owed to the appellants.","Because these cumulative fines increase in amount with each adjudication of noncompliance, fines can mount quickly.","City to confirm HQS repairs are made.","The site shall be operated and maintained in a manner to prevent safety problems or hazardous conditions resulting from spilled liquids and windblown materials.","Flues inside of building shall be constructed as low temperature chimneys.","HPD shall review the application and any supporting documentation to determine the eligibility of the head of household.","Place the bag in a trash receptacle on site if the firm permits or carry out and dispose of properly at your FDA office.","Examine the entire sample using this procedure.","FOP for AASHTO T The finished product shall be clean, uniform in quality, and free from wood, bark, roots, and other deleterious materials.","Record the number of fruit pieces added where the size of the fruit makes the procedure reasonable.","Asbestos abatement worker training.","This will furnish the solution necessary to \ufb01x the mold.","The Act encourages the purchase of products manufactured or produced in the United States, State of Missouri, and Jefferson County, Missouri.","Work, which materials shall conform in every respect to these Specifications.","Lanphear Bruce P, et al.","The result is a greater or lesser degree ofethical effacement.","Ground areas the foundation walls to eliminate low areas where standing water may collect.","Respondent: I agree, and that was the purpose of this study was to try toeliminate But in terms of defining what that hazard is, the State hasdone.","Standards for Security Categorization of Federal Information and Information Systems, is the critical first step in understanding and managing system information and media.","The owner shall post two notices naming such designated person and his location.","Housing company funds may not be used for the purpose of prepayment of the mortgage debt.","Baltimore City and other communities across the country.","The supplies associated with producing paper printouts are often the most uncontrolled.","Bolts, nuts and washers for Type M mount.","The aluminum siding was nailed over the top of painted wood siding that tested positive for lead.","Contractors, concessionaires, and similar professionals.","No more than eight hours of instruction as described in this paragraph are authorized within a calendar day.","The business cannot be relocated without a substantial loss of its existing patronage.","Such occupant shall have one year from the date of installation to make such reimbursement.","Prior to shipping, arrange appointment for testing at the WSDOT Materials Laboratory.","Does the laboratory have an HVAC system?","Estimate value if you have no documentary reference.","The device vendor may leverage proprietary commandsto interact with the security subsystem.","The minimum clearance area includes the rooms in which work was done.","Protection of occupants and preparation of the worksite as described below.","Cecil further argued that vacuum sampling was not generally accepted in the scientific community because all standards are keyed to wipe sampling, not vacuum sampling.","If the City Manager concludes that the Contractor has failed to comply with nondiscrimination clauses, the remedies set out above may be invoked.","Ordinance provides city with broad authority to enter and inspect and supplements state law provisions allowing tenants to request inspections with additional authority and outreach to encourage them to do so.","If possible, the sampling should be executed by personnel who were not part of theoriginal sanitization action.","The label declares the product to be from a foreign country.","Only the Aggregate Floor Area for which conversion is completed within such three year period shall be considered in calculating the exemption and abatement provided pursuant to the Act.","Do not make time consuming counts of small pieces of fruit or berries.","If HPD electronically notifies the Department of Finance of the abatement amount, such electronic notification shall be deemed to be the equivalent of a Tax Abatement Certificate.","Each ring shall form a true circle with the principle axis of the cross section of the ring metal parallel to the geometric axis of the ring.","Act are granted based upon a Written Agreement, failure to satisfy the conditions contained in such Written Agreement will result in a revocation of any benefits received by the multiple dwelling located in the exclusion area.","The gaskets shall be as described in the Standard Plan when specified.","This choice may be elected by any commercial tenant.","Certification of No Harassment and ending on the date that the Department issues a final determination on such an application.","The applicant must show that his or her method of destroying PCBs will not present an unreasonable risk of injury to health or the environment.","Are renovations performed on detached garages, sheds and other detached outbuildings on the property subject to the RRP Rule?","YES NO disturbing painted surfaces?","The checklist will ensure all tasks have been satisfactory completion and payment authorization.","Seal metal roof panel end laps with triple bead tape the full width of panel.","For more than three containers of the same type, list the containers and assign each container an unique sequential number.","However, it does not provide an exemption for the certification fees of firms or individuals.","Real Property Law of the State of New York shall apply to all housing companies, subject to the restrictions set forth in this section.","Attorney General of the State of New York.","Second if an employee of the landlord does the renovation work, then the landlord must have firm certification and the employee must be a certified renovator.","These rules shall apply only to refuse chutes in new construction and to refuse chutes resulting from the conversion of existing incinerator flues and to existing refuse chutes.","The following parties have reviewed the information above and certify, to the best of their knowledge, that the information provided by the signatory is true and accurate.","Such assistance, when applicable, is the obligation of the Administrator.","This will also minimize exposure to older children and adults who are also adversely impacted by leadbased paint dust exposure.","Provide temporary services during interruptions to existing utilities, as acceptable to Owner and to authorities having jurisdiction.","Metal surfaces in contact with PCBs.","Use the Logo in brochures, advertisements, Web sites, proposals, bills, signs, uniforms, vehicles and other materials promoting or identifying your firm.","No fee adjustment shall be made for a failure to understand, or for a misinterpretation of this document.","This exemption does not exempt a property from a dust sampling required by any other local, state, or federal law or regulation.","FDA will not pay for violative import samples.","Affidavit of Donald Friedman, NYSCEF Doc.","Occupied Rehabilitation Program determines whether a criminal conviction renders a contracts previously granted.","Any important documents that may have been transmitted in the email, such as your exam letter if you are required to take an exam, can also be found in your CDX Inbox.","Analyzes foods when the chemical methodology is under development or unusual equipment or skills are required, such as radioactivity analysis and migration of food additives from food packaging materials.","In such a case, firms must establish containment before deconstruction, and ensure that components to be reused are free of any leadbased paint dust or debris before they are removed from the work area.","The documentation must be maintained as indicated on the hecklist and be available for review by the Administrator and Maineousing upon request and during monitoring visits.","However, it is unnecessary for the same notifications and information to be given out repeatedly during a single renovation.","Such backup or escrowed copies of data, credentials, or keys should be the subject of a separate device sanitization policy.","However, while Styrofoam containers have excellent insulating qualities, they will not withstand shipping abuse unless protected by sturdy outer cartons.","Clostridium botulinumor other toxinproducing microorganisms can grow.","Multiple dwelling or building.","Examinations shall be performed in all dwelling units in accordance with this section.","The maximum lawful occupancy for sleeping purposes of each room shall be shown on a separate line, with a proper designation by room number in order to identify each room.","They are not required elements of an SDS, although some manufacturers choose to include them.","Piling for foundations shall be Douglas Fir.","City of New York has condemned for a public use; such public uses may be schools, libraries, hospitals, parks, playgrounds, road widening, police stations, fire houses, etc.","Agency determines to be necessary or appropriate, including, but not limited to, provisions in any deed, land disposition agreement, regulatory agreement, note, mortgage, security agreement, lien, restrictive declaration, or other legal document.","LATE BIDS: It is the responsibility of the Bidder to deliver his bid or bid modification on or before the date and time of the bid closing to the Department of the County Clerk.","Seals shall be continuous splices.","The Bureau of Housing or the implementing agency will record the total amount of the bid and the date and time the bid was received.","The Agency may issue amendments to the bid solicitation at any time prior to the submission deadline.","They should not be sampled preferentially or excluded when collecting or analyzing the soil.","Use plastic sheeting over the doorways to seal off the area and protect the rest of the house from exposure.","Does the RRP Rule apply to this activity?","ADDENDUM In the event that any addenda to this solicitation is issued, all solicitation terms and conditions will remain in effect unless they are specifically changed in the addendum.","Temperature, fusion pressure, and a graphic representation of the fusion cycle shall be part of the Quality Control records.","Prior to consideration by that court, we granted certiorari to address these similar issues.","All welding shall be equal in strength to the parent metal.","REGISTRATION: ASBESTOS ABATEMENT WORKERS.","The Agency shall further withhold an amount equal to no less than ten percent of the total amount of each progress payment as a retention fund under the mortgage to assure satisfactory progress of the work.","The test load shall be applied and released ten times, and the deflection at the test load and released state shall be recorded for each interval.","The authors would also like to thank Jim Foti for his exceptional editing skills and thorough review of this document his work made this a much better document.","Spoilage in such products is usually due to inadequate heat treatment to kill spoilage organisms.","HPD hearing officer, should a hearing take place, may be determinative as to the factual issues.","Linings and coatings for fittings shall be the same as specified for the adjacent pipe.","Within each area, the specialist lists all painted and varnished components, including repeat components.","CHFA approved list to review environmental reports for conformance to these Guidelines.","Contractor per the Contractor will work diligently to complete the contract causing as minimal disruption to the ctor agrees to keep the premiscourse of the work and to remove all debrequipment that have been removed and replacedherwise specified.","The body of the valves shall be of cast Copper Alloy No.","Contact information on Atlanta Center for Tobacco Analysis website.","IT IS IMPORTANT THAT YOU RETURN THIS FORM TO THE OWNER OR MANAGING AGENT OF YOUR BUILDING TO PROTECT THE HEALTH OF YOUR CHILD.","Notwithstanding any provision of these rules to the contrary, a Taxpayer may waive its right to a Hearing.","The submission date of a mailed certification shall be the postmark date.","Exclusions from moving expenses and losses.","Devices shall be regularly maintained to ensure that they are clean and the reflective sheeting is in good condition.","Offer to rent or sell during initial rent up period.","All individuals, except workers, seeking a license a specific category shall pass the egory.","Gross Household Income must be calculated in accordance with the requirements below.","If any information stated in an application changes at any time before the Department makes a final determination, the Applicant shall promptly update the application with such new information and submit it to the Department.","Mill test certificates verifying the silicon content of the steel shall be submitted to both the galvanizer and the Engineer prior to beginning galvanizing operations.","Means that a dwelling, dwelling unit, or premises contains no lead or contains lead in amounts less than the maximum acceptable environmental lead levels n by the Rhode Island Department of Health.","Existing signs and illumination may be accepted if, in the opinion of the department, such existing signs and illumination serve the intent and purpose of this subdivision.","Lead Abatement Training for Contractors The specialist will make an appointment to inspect the unit as part of the environmental assessment.","The inner boundary of the first subsequent compositing area is the outer boundary of the initial compositing area.","Maryland law constituted contracts creating duties.","This Bid, if accepted, will constitute an Agreement and Contract with Jefferson County, Missouri, upon approval of the County Council and County Executive.","Do not eat, smoke or chew gum while working.","Eligibility and General Conditions.","The effective date of the MOU, with respect to the department, is the same as the effective date of this section.","Occupants shall be instructed by the owner and contractor to avoid entering the work area until final clean up has been completed.","An entire, nonattached freestanding structure on the same property such as a garage, shed, or gazebo?","During the first nine years, the exemption shall equal the amount of the assessed value attributable exclusively to the physical improvement.","New York State Certificate of Incorporation or authorization to do business in the state with proof of payment of current franchise taxes and New York City General Corporation Tax.","Lead safety is largely a function of maintenance: intact leaded paint is typically not hazardous unless it is disturbed by deterioration, friction, or renovation that releases lead dust into the environment.","If otherwise, the legitimacy of the claim to noble purpose would always depend upon the particular institution and the particular community it is serving in a given case.","EPA may require the transferee to apply for a new incinerator approval.","Subcontractor for the period stated above.","Therefore, if the property management company uses its own employees to do the work, the property management company must be a certified firm and one of the employees must be a certified renovator.","Appreciation Index At Resale.","Quality of workmanship and materials shall conform to the rehabilitation design standards promulgated by the Agency.","Homeownership Affordable Housing Unit.","The hearing will be informal.","Under this compositing scheme, composite a maximum of nine samples for each type of bulk PCB remediation waste or porous surface at the cleanup site.","HPD prior to Disposition.","Study consent form constituted a contract?","Community Development Department in order to ensure compliance with all applicable federal, state and local laws.","City Residential Rehabilitation Program.","If your property does not pass either a visual clearance or dust wipe clearance, you must repair the property so it passes clearance before the tenant can move into the unit.","They also include links to states, tribes, and territories authorized by EPA to run their own programs.","The geotextile shall also be free of any treatment or coating which might adversely alter its hydraulic or physical properties after installation.","Payment less retainage is made to the contractor by the Bureau of Housing or the implementing agency.","Obtains combustion air directly from the outside of the building or through a duct leading to the outside.","Including the possibility The minimum capacity of the service supply and the main disconnect switch shall l load required in accordance with the electrical code of the City of Atlanta Building Inspection Department.","All windows located in sleeping rooms accessible from ground level without the aid of mechanical devices shall not be cracked, broken or missing.","An illegal occupant of an apartment shall not be entitled to any protections pursuant to this section.","Upon direction by the Agency, such security deposits when received by the owner shall be immediately submitted to the Agency to be held in escrow by the Agency for the benefit of the tenant.","If no sample number is available, ask the firm to identify the bill with your name as the collector to help the fiscal unit match the bill to the sample record in FACTS.","When a party is under no legal duty to indemnify, a contract assuming that obligation must be strictly construed to avoid reading into it a duty which the parties did not intend to be assumed.","EPA recommends that the firm document and keep record of the conditions.","The Commissioner shall recommend screening for lead in other high risk groups.","People performing hazard control, rehabilitation, maintenance, and associated cleanup work must know which rooms will be sampled for dust.","No indication shall result from external illumination, nor shall one light unit illuminate a second.","It must be clearly understood that the filing of an application does not relieve the applicant of any liability for violation of such rules.","New York City Housing Authority.","Individuals who may be assigned to collect samples should routinely obtain in advance, a supply of FACTS sample numbers, to be used by the collector to identify samples in the \ufb01eld, prior to accessing FACTS to prepare a sample collection record.","Security Wipe, then make sure to select all subcategories of data types for sanitization.","Gasses represent a special sampling situation.","Avoid the use of polyethylene containers as bird excreta may adhere to containers made from this material.","Under these types of circumstances, even where consent is given, albeit inappropriately, policy considerations suggest that there remains a special relationship between researchers and participants to the research study, which imposes a duty of care.","The use of plywood, fiberglass reinforced plastic, fabric rollup signs, and any other previously approved sign materials except aluminum or aluminum composite is prohibited.","Any other facility used for the instruction or housing of students or for the administration of educational or research programs.","The processes described in this document should guide media sanitization decision making regardless of the type of media in use.","Failure to comply with any provision, provide any required documentation, insurance forms or deposits or bonds in exact amounts or any other term or condition that is not in strict conformance shall result in the bid being rejected.","The highest degree of skill and care should be required through all stages of the experiment of those who conduct or engage in the experiment.","Only work specified on the Itemized Cost Breakdown Schedule is eligible for tax benefits.","Eligible Multiple Dwelling that is utilized by the owner or manager of such Eligible Multiple Dwelling and their respective employees for purposes of building administration and to which residential tenants do not normally have access.","In a commercial building the inspection must be performed by an accredited inspector.","If a request for a disposition rent increase is not submitted, the DAMP Program Director may propose a disposition rent increase in accordance with the provisions of this chapter.","Material upon which serious abrasions of galvanizing occur shall not be acceptable.","Tape wrapped around the containemay interfere with assay.","There shall be a clear written description of the organization, including the address of its central officethe names and addresses of its principals, and a statement of intent concerning the courses and services to be offered.","Construction Contract and Renovation.","The caps shall be removed and provided to the Contracting Agency when an alternate control device is required to be installed in the photocell socket.","The only exception to this requirement is when the components make up an integrated whole.","All housing companies shall comply with all applicable Federal, state and local laws, rules and regulations concerning equal opportunity in housing.","Neill as the architect.","General Municipal Law of the State of New York.","PCBs remaining after cleanup to the standards specified in this policy.","Ground granulated blast furnace slag may be tested using samples taken at the job site by the Engineer for submission to the State Materials Laboratory for testing.","The reductions in lead dust was sustained over a long period of time.","CHIPPING, PEELING, CRACKING, and CHALKING PAINT: Identify areas where these conditions are occurring.","Agency determination of feasibility.","Failure to comply with the Plans, Specifications, or instructions of the authorized representative of the Contracting Agency in the manufacture and laying of any curb will be cause for rejection of such curb.","However, impossibility of one work practice does not excuse a firm from complying with other requirements.","Time for filing claims.","LICENSING, TRAINING AND REGISTRATION: INSURANCE REQUIREMENTS Persons required to have insurance must obtain policies for required coverage in the amounts specified in these sections.","Capacity of receptacles shall be based upon an allowance of at least one receptacle of a two cubic foot content for every five living rooms.","HPD shall hold a Tenant meeting prior to making a Final Selection, giving notice to Tenants at least two business days prior to such meeting.","We used Westlaw to identify relevant judicial case law.","The containment of water runoff.","Comments or questions about the website?","Program expenditures are secured by lien to each rehabilitated reement in an amount eqrehabilitation.","Does the RRP Rule apply when oneroom units are converted to tworoom suites?","Designated Person to determine that the Lead Hazard Mitigation Standards have been met.","The date of each visual inspection and the date that leak was discovered, if different from the inspection date.","If cuttings are collected, the requirement to be nursery grown or held in nursery conditions does not apply.","PCB articles and equipment into which the chemical substances or mixtures are processed, are subject to the marking requirements contained elsewhere in this subpart.","An organization may choose to dispose of media by charitable donation, internal or external transfer, or by recycling it in accordance with applicable laws and regulations if the media isobsolete or no longer usable.","Management planners shall attend the inspector and management planner refresher courses.","No decisions relating to the award of a contract or agreement will be made at the opening.","Capitalized terms not specifically defined in this chapter, shall have the meanings set forth in the Zoning Resolution.","They also state that the steam, gas and odor from the flue and duct system prevents them from enjoying their yard and decreases the value of the Seymour Property.","Therefore, no further sampling by halves is necessary.","Renovation, Repair, and Painting program applies to all states, tribes and territories where EPA has not specifically provided authorization for that state, tribe or territory to operate the program themselves.","Lead Free and Lead Safe.","If the device contains removable storage media, ensure that the media is sanitized using appropriate mediadependent procedures.","New York State Housing Finance Agency as obligee with an amount and an insurance company acceptable to the housing company, the New York State Housing Finance Agency, the New York State Division of Housing and Community Renewal and HPD.","The foods are listed in the NOTE: For products not listed, check with your supervisor.","Every lodging house and every part thereof shall be at all times kept clean and free from dirt, filth garbage and rubbish in or on the premises belonging to or connected with the same.","Laboratories accredited under NLLAP shall use proper statementsfor any materials used to market its status as an EPArecognized NLLAP laboratory.","Notification to community board.","Field examine various lots of regulated products and collect official selective samples to document filth or other adulteration.","The beads shall be transparent, clean, colorless glass; smooth and spherically shaped; and free from milkiness, pits, or excessive air bubbles.","Existing Housing Assistance Payments Program under the administration of the Department.","The County shall have the right to review the record checks and drug test results of the Contractors employees who may be upon County premises.","Moreover, in the present cases, the consent forms did not directly informthe, even contemplated, that some level of lead, a harmful substancedepending upon accumulation, might contaminate the blood of the children.","LLCshall notify the laboratory, in writing, of any action at the conclusion of the suspension period.","HPD may retain a third party to make inspections or may rely on inspections made by others.","The individual must complete training, use safe work practices and verify that the work area is clean after completion of renovations.","Existing exterior deteriorated or open masonry joints shall be repointed with a rich grout of cement sand, etc.","Verification of PCB Spill Cleanup by Sampling and Analysis.","All defective lead surfaces and bare soil shall be abated by a CT DPH licensed lead abatement contractor.","Such second means of egress shall be accessible without passing through the first means of egress.","Code Enforcement Office requesting a replacement within five days by certified mail, return receipt requested, or in person on the form prescribed by the Department.","Lead consulting services should provide lead safe options and alternatives to ensure compliance with HUD guidelines as requested.","Detailed written description of the abatement activity including the methods used.","The monitoring capacity of the unit shall be compatible with the controller frame size.","DSHS licensed asbestos project consultant is required to design all asbestos response actions in public buildings.","The judgment that a structure is in danger of imminent collapse or that it is unsafe for anyone to enter shall be made by a professional engineer, registered architect, or governmentofficial.","The balance due, if any, shall be paid when the tenant takes possession of the premises in accordance with the terms of the lease.","However, the general contractor must sign a Certificate of Completion and submittal of an invoice for final payment.","The person must meet the standards prescribed in the applicable licensing section.","Address Labels The use of franked labels and envelopes is no longer allowed.","The size and corrugation shall be as shown in the Plans or in the Specifications.","Fittings for solid wall PVC pipe shall be injection molded, factory welded, or factory solvent cemented.","EPA approved training providers shall be accepted by the department provided that applicants have completed an approved course in Texas asbestos law and rules from a training provider licensed by the department.","If replacement windows are present, only sills and floors are tested.","Code underboth, it is disturbing that we have nottaken it more seriously in areas where there is no question that it has directapplication.","Obtain an Affidavit, from the driver setting forth the facts of the shipment.","Services will be provided on an as needed basis, as required by the City.","Given that courts have yet to rule on the applicability of the federal familial status protections in this regard, there is some uncertainty about interpreting these fair housing protections.","Paint shall be homogeneous, free of contaminant, and of a consistency suitable for use under intended application.","HPD may impose restrictions upon the use of a Building and may require Sponsor to agree to comply with such restrictions as a condition for Disposition or Subsidy.","County from the standpoint of suitability to purpose, quality, service, previous experience, price, ability to deliver, or any other reason deemed to be in the best interest of the County.","These requests will be handled on a casecase basis, but generally applicants must meet the criteria below.","ASSURANCEDemolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.","Identity Proofing failure or opting out of the online process?","COLOR ADDITIVESThe following schedule provides general guidance for collecting samples of foods and cosmetics to determine whether nonpermitted colors are present, rather than to determine the actual level of a particular color.","Using your misting bottle, wet the painted surface before sanding with a wet sanding block, or scraping.","Compliance with labor standards.","The color of the powder coating system polyester finish coat shall be as specified in the Plans or Special Provisions.","Determining the regulatory status of sampled pipe.","The Contractor shall leave no such supplies in hallways or other undesignated areas of the courthouse or other County buildings.","All loans must be subordinated to all Program requirements.","Tenant Association must sign the Tenant Interim Lease and implement the Intake Rent Increase set by HPD.","No other method may be used unless same is acceptable to the Department of Buildings.","The site supervisor must be stated and the DSHS Supervisor License Number is only required for public building projects as defined in TAHPR.","Collect wipe samples after the last transmission of gas through the pipe or during removal from the location it was used to transport natural gas.","Joint ownership of cooperative shares.","The inspector will collect several wipe samples for clearance testing.","Refuse chutes in new construction.","The City of Kenner will review and rate all proposals received.","The Court of Appeals held that a defendant who intended to commit a batterythe pistolpossessed the requisite intent for the second batterythe shootingdespite not specifically intendinexact same battery that occurred.","To do this, it is strongly recommended that, for most jobs, especially those involving abatement, the clearance examiner observe the work at critical phases, as well as at other times.","Specific requirements for surfaces coated or covered with dust, dirt, grime, grease, or another absorbent material.","At the option of the manufacturer, \u00bd of the load may be applied on the bell end of the suspended pipe in lieu of the full load on the center of the suspended pipe.","Fill bottle carefully without splashing and be sure nowater from your hands or other objects enters the bottle.","The foam shall be designed for use in and around electrical equipment, including both insulated and bare conductors.","Unfortunately, secondary prevention does not protect children from the permanent injuries caused by lead poisoning.","He found that there was no governmental statute or regulation, which set up this duty.","Sampling bulk PCB remediation waste and porous surfaces.","Soil testing shall consist of collection of two composite samples.","Attendance and course completion standards.","THE COURT: All right.","Take all samples in the composite at the same depth.","Always use it for pesticide samples.","Any unused blanks should be lined out and strike out the words or letters in parentheses which are not applicable.","For example, a person seeking accreditation as an abatement project designer must pass the written examination for an abatement project designer.","Nor should these guidelines be interpreted as altering or superseding the existing authorities of the Secretary of Commerce, Director of the OMB, or any other Federal official.","QC samples to which two wipes were added as matrix.","All members of the household must be listed on the income affidavit whether or not income was earned.","Due to the difficulty in reliably ensuring that partial sanitization effectively addresses all sensitive data, sanitization of the whole device ispreferred to partial sanitization whenever possible.","Sales and management companies.","You must apply for and receive EPA certification before offering, performing, or claiming to perform renovations covered by the RRP Rule in EPAadministered jurisdictions.","The Department may waive all or part of the foregoing rules and regulations where the circumstances warrant such exemption.","Requests for additional time will be submitted by the contractor with approval from the homethe implementing agency.","Members or officers of the Board of Directors must occupy a dwelling unit at the mutual housing company development represented by such Board of Directors as his or her primary place of residence.","If you work with lead, you could bring it home on your hands or clothes.","All pedestrian signals supplied to any one project shall be from the same manufacturer and type but need not be from the same manufacturer as the vehicle heads.","It is clear from the wording of the applicablefederals requirement of informed consent continues during the duration ofthees to new or changing risks.","County to the Contractor are not lost or misplaced and are not used by unauthorized persons.","Plans or in the Special Provisions.","Requirements for decontaminating spills in other restricted access areas.","ID Card present at the worksite except those persons working in a commercial building which must have their accreditation certificate or card.","The department may place on probation a person whose license or registration is suspended.","Study and would give priority to children under five years of age.","Act or these Rules to provide the requisite percentage of its units as units affordable to and available for occupancy by individuals whose incomes do not exceed a specified limit.","It is preferable to freeze the i paps.","Jefferson County, Missouri, may take this factor into consideration if tie bids are received, in addition to the normal Terms and Conditions of the Invitation for Bid, enclosed herewith as a part of this bid.","In the present case, children, especially young children, living in lower economic circumstances, albeit not as vulnerable as the other examples, are nonetheless, vulnerable as well.","Surface conditions for the validation study.","The lids for the Cable Vaults and Pull Boxes shall be interchangeable and both shall fit the same box as shown in the Standard Plans.","While the Chicago ordinance does not create a mechanism to periodically inspect buildings, it does provide city health officials with broad authority to gain access to virtually any building likely to contain a lead hazard.","Guide for Assessing the Security Controls in Federal Information Systemsand Organizations: Building Effective Security Assessment Plansprovides guidance for assessing security controls, including sanitization, for federal systems based on their overall system securitycategorization.","As part of the sanitizationprocess, in addition to the verification performed on each piece of media following the sanitizationoperation, a subset of media items should be selected at random for secondary verification using a differentverificationtool.","Federal Guidelines, are not recognized in the State of Maryland.","Sites, notwithstanding any provision of these Rules to the contrary, the Sponsor and Site may be selected together by any such method and the Agency may consider the characteristics of the Site in addition to any other selection criteria.","Correct deficiencies in or remove membrane roofing system that does not comply with requirements, repair substrates and repair or reinstall membrane roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.","Compost shall be mature with regard to its suitability for serving as a soil amendment or an erosion control BMP as defined below.","Preliminary drawings must be prepared by a registered architect or professional engineer.","Former Apartment with a Relocatee at the time the Vacate Order was issued.","Unison Transformer Services, Inc.","Do not use canvas bags or take glass jars into railcars.","LLC halllabo, inwriting, reqhat laboratory obtain, omplee and ubmit anppliionion.","HUD income limits, where they differ from HPD, and any other federal law or regulation which may apply unless they are violative of New York State laws.","Informal Reviews When a homeowner requests an informal review, the following procedures will be followed: The Bureau of Housing or the implementing agency will schedule and conduct an informal review at the earliest convenient time after receipt of threquest.","EPA may request other information that it believes necessary to evaluate the application.","Notifications for ordered demolition must be postmarked as soon as practicable, but no later than the following working day after the demolition.","And this testing was done before the family moved in, correct?","If sampling is done after full verification in cases of low risk tolerance then a differentverificationtool than the one used in the original verification should be used.","Under the Program, Buildings are net leased to Tenant Associations and subsequently sold to HDFCs that will thereafter be solely responsible for the operation of such Buildings.","Removal of large structures, including demolition of interior plaster walls.","The waste must not generate leachate through decomposition or other reactions.","Act will be responsible for the maintenance and operation of the units in a habitable condition.","Real estate taxes, assessments, frontage and meter charges and sewer rents accruing during the period of construction, commencing on the date of execution of the loan, where income is inadequate during the period of construction to pay such costs.","Hay is not acceptable.","Any other documentation required or requested by HPD for the purpose of determining eligibility of the applicant for successor tenancy.","PCBs which have not been disposed of, decontaminated, or otherwise cleaned up in accordance with subpart D of this part.","AWWA tapered thread or male iron pipe thread inlets and outlet connections compatible with either copper or polyethylene tubing.","Examination and Approval of Applications.","Refuse rooms shall be used only for receipt of refuse and for refuse compacting equipment.","All sidewalks, service walls driveways and patios shall be kept in a state of maintenance and repair, free from obstruction, defects, uneven joints, tripping hazards, etc.","Capacitors, except those in starting aids, shall be metal cased and hermetically sealed.","Prior to conducting the inspection, the specialist will explain the inspection procedures to the resident and provide safety awareness information for all The specialist will conclude each inspection by discussing preliminary results of the inspection with occupants.","The Agency may issue amendments to the auction brochure at any time prior to the auction.","The dealer does not have to be a firm or company, which is in the business of buying or selling goods.","Food and Drug type guarantee.","PCBs in the container are uniformly distributed throughout the liquid in the container.","Alternative Enforcement Program Fees.","II is found to be ineffective.","Decontamination waste and residues.","The LST Dashboard is a supplement to the LST.","Sponsor, and meet the standards of other lenders, if any.","Federal law before they become obligated under a lease or sales contract.","Branch offices, which perform laboratory analysis, must fulfill the same equipment and operational standards as the main office which has been licensed, and must be separately licensed and accredited in accordance with subsece type of analysis they will be performing.","Import Samples need not be sealed, unless visionpolicy dictates, as long as the integrity of the sample is maintained.","Exposed surfaces of all aluminum members shall be extruded of first class finish material with no serious defects or blemishes.","The Agency may impose restrictions upon the use of a Site and may require a Sponsor to agree to comply with such restrictions as a condition for receiving any Disposition or Assistance.","Information of a proprietary nature may not be available in published product information.","This is entirely consistentwith the principles found in the Nuremberg Code.","It cannot be raised to the level of a standard of duty under the law.","Methodology For Determining the Affordable Housing Fund Contribution.","If paint layering is determined to be significant, it should be recorded with a preserved sample prior to paint removal.","The contractor and homeowner will be notified by the Bureau of Housing or the implementing agency, in writing, which items are authorized to be completed and which items will not be authorized for completion.","Follow the basic principles of aseptic sampling technique.","Usually \u00bd inch around the holes is sufficient to allow manipulation during the lab exam.","Whether money orders, your charge plate numbers, bank checks, or your personal checks should be used for payment.","Repair must begin as soon as contractor has Housing, and received permission from homeowner to begin repairs.","Trace Metals Laboratory supervisor during thetudysponsored the document.","Of the existence of the fence or cap and the requirement to maintain the fence or cap.","Such sweeping holdings are far beyond the question presented in these appeals, and their resolution by the Court, at this time, is inappropriate.","If a subset of units in amultifamily property is being used to clear the entireproperty, the sampling technician must be supervised bya certified paint inspector or risk assessor.","Department of Housing Preservation and Development and any successor agency, or its designee.","We concur with that assessment.","Vacate Order affecting such building or dwelling unit.","Program funds are issued to contractors that perform specified repairs to the dwellings of eligible homeowners.","Product Test Reports: Based on evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified testing agency, for components of roofing system.","Regulatory Agreement with the City or the State or the Housing Trust Fund Corporation is in effect and contemplates construction or rehabilitation of such property for use for housing for persons of low income by a date certain.","HPD to undertake activities in connection with the Third Party Transfer Process within a particular area.","Standard methods of instruction are as follows.","AB INITO, cancelled, terminated or suspended in whole or in part and the Contractor may be declared ineligible for further contracts with the City of Rockville.","Federal, State, or local laws, ordiand hazard reduction.","We make no determination as to whether informed consent in a therapeutic medical context can generate contractual obligations.","Class A multiple dwelling, into a Class A multiple dwelling.","Special product code considerations include environmental samples.","Track Testing and Indirect Tensile Strength do not apply to HMA accepted by commercial evaluation.","Light sanding, performed after damaged material has been removed by sitions between bare substrate and remaining Intact Paint; or exposed layers of Intact Paint; or patching materials and the surrounding surface.","PCBs, as measured or detected by any scientifically acceptable analytical method, may be significant, depending on such factors as the quantity of PCBs involved in the exposure, the likelihood of exposure to humans and the environment, and the effect of exposure.","There shall also be filed such other financial reports or data as the Agency may require.","Contract and this Procedural Guide, the Contract shall govern.","AOAC ADDITIONAL FOOD LABORATORY REQUIREMENTS Laboratories that are seekingcomplianceto the AOAC International Guidelines for Laboratories Performing Microbiological and Chemical Analysis of Food and Pharmaceuticals are expected to meet the criteria defined in Appendix A of the aforementioned document.","Photograph or trace the label if none Note: Besides using tracing paper, it is possible to trace a label on a piece of plastic, similar to a document protector, using either a ball point pen or stylus.","All doors and dead front panels installed in service cabinets shall incorporate a hinge placed in a vertical plane.","All luminaires ballasts shall be located within the luminaire housing.","For example, if the firm can contain the work area and still address the emergency, it should do so.","Each compartment shall be enclosed with a dead front.","Visors shall have attaching ears for installation to the housing door.","Whether plaintiffs attempted to mitigate their damages in this regard is not relevant to the issue of liability.","Visual inspections usually take less than an hour; standard training consists of a free online module that takes approximately one hour to complete.","The number and percentage of children under the age of six who have been screened and tested for lead poisoning, and the number found to have lead poisoning at various levels.","Grandfathered Tenants in Homeownership Affordable Housing.","Real Property Tax Law in accordance with the general principle of law that tax exemption and abatement statutes are to be strictly construed against the taxpayer applying for the tax exemption or abatement.","No vive un ni\u00f1o menor de seis a\u00f1os de edad en la unidad.","UV rays, even if contaminated.","The studio apartments, however, are exempt from the RRP Rule because they fall under the definition of bedroom dwelling: a residential dwelling in which the living area is not separated from the sleeping area.","The sponge should be moist but not dripping wet.","Dry sweeping is prohibited.","Intake Rent Increase or a Disposition Rent Increase, set by HPD from time to time after Selection and before Disposition of a Building.","The windows are built into a bay that projects out from a steeply pitched slate roof.","In addition to the application, a head of household must submit any other documentation necessary to assist HPD in its review.","At a minimum, sample all ends of all pipeline sections to be abandoned in place.","Agency to be necessary or appropriate.","EPA compliant remediation procedures for lead dust abatement as set forth in NYSECF Doc.","Location of affordable units.","The mortgagor shall be required at the closing to execute a construction contract for the performance of the work with a general contractor or tradesman.","Commissioner may grant in writing for a stated period of time for good cause only.","It is consequentlyrelativeence apart from some duty expressly or impliedlyimposed.","Copies of reports of such inspections shall be made available to the owner with recommendations for corrective measures where necessary.","Container sizes for plant material of a larger grade than provided for in the container grown Specifications of the ASNS shall be determined by the volume of the root ball specified in the ASNS for the same size plant material.","RRP Rule, can the required records and documentation be stored electronically rather than as paper copies?","At such time as the agency commences an application process for selection of one or more community groups, the agency shall place advertisements in The City Record and such other publications as the agency shall deem appropriate.","The cost of treating lead hazards.","Safe egress to street or other safe place shall be provided from the termination of such means of egress.","ELECTRONIC PAYMENT OPTION The Vendor ACH Payment Program of the City allows payments to be deposited directly to a designated financial institution account.","First Carbon Accompanies the EIR.","Rehabilitated units where cleanup using a high phosphate wash was not conducted after improvements were completed.","DPH certified lead inspector or lead inspector risk assessor, and shall be employed by a current DPH licensed Lead Consultant in order to perform final clearance activities.","Why do I need a lead inspection?","Other than through the difference that relates to the disclosure of information, the relationship between investigator and subject is unique in terms of the purpose for which information is gathered.","Samples to Administration Laboratories.","Procedures for Performing Lead Abatement Services.","Acts of the Government Unreasonable acts of the Owner Acts of God or of the public enemy The Contractor must promptly notify the Owner and City of Atlanta of the cause of the delay.","All removal and replacement work is performed from the exterior, and we still apply the exterior containment measures as provided in the Rule.","Avoid contaminating the backfilled units.","HUD guidelines and in accordance with the program goals of efficiency, effectiveness, and customer satisfaction.","The buyer and seller cannot close on a homebuyer assistance project until the house passes the clearance examination.","Purge: The capabilities of Android devices are determined by device manufacturers and service providers.","Lead Hazard Reduction Procedures specific lead hazard in the housing unit.","When you apply for recertification, EPA will issue you a certificate that begins on your current expiration date and expires three years from that date.","In a case where the down payment assistance program to secure the initial purchase the property, the City may accept a third lien position.","Substantial Governmental Assistance that have received a Temporary Certificate of Eligibility and Reasonable Cost, within one year of the Completion of Construction.","Sampling locations are the same as for area.","An affidavit by a licensed architect or professional engineer as to the date of commencement of new construction.","Consequently, the application of effective sanitization techniques and tracking of storage media are critical aspects of ensuring that sensitive data is effectively protected by an organization against unauthorized disclosure.","It can at the completion of an abatement job to document that clearance was achieved and the abatement report is complete.","After referring to the LST Dashboard to identify a lab with available capacity, select the appropriate servicing lab via the listed laboratory values.","EPA does not interpret this to be a limitation on the permissible number of training managers.","Participation in the full amortization provisions of this section is voluntary and not mandatory.","Use in and servicing of railroad transformers.","However, all firms share liability for ensuring compliance with the RRP Rule.","Owner Inspections Are there periodic inspections of all dwellings by the owner?","All dwelling units must be leased for permanent residential purposes for a term of not less than one year so long as tax benefits are in effect.","Letters shall be of such width and spacing as will provide the greatest legibility.","PCBs are not household wastes.","Armstead that her next home was lead safe was because one of her children already had an elevated blood lead level.","Thus, KKI argues that there was no indication of a lead hazard in the Federal Street property and thus no duty to inform appellant of the Cyclone samples.","The study apparatus is not standardized.","Court does not have jurisdiction.","Sample size is usually described in your assignment, IOM Sample Schedule, Compliance Program Guidance Manual, or the applicable schedules.","Violators of these laws can be subject to significant fines and penalties.","EPA has reason to believe that final closure has not been completed in accordance with the approved closure plan.","You may modify the original record but must electronically sign each revision.","Substantial Rehabilitation Affordable Housing is currently owned by a housing development fund corporation or other entity designated by HPD.","SQ FT of attic floor area.","LEAD IN OMD WIPACCREDITATION REQUIREMENTSor ted wip, alluirefoiped inthe LQSR ly.","Use ordinary ice or ice packs for holding and transporting unfrozen samples that require refrigeration.","The conductors from the Generator Transfer Switch enclosure to the cabinet circuit breaker shall be enclosed in nylon mesh sleeve.","Duties of a Relocatee.","Hovnanians argue, among other things, that, because they did not have the opportunity to depose Mr.","Mail or Parcel Service Shipments.","Add additional rows as necessary.","Additions of thinning material are not permitted unless recommended by the manufacturer.","Nazi experiments were considered so extreme as to be seen as irrelevant to the United States.","When material is used from a stockpile that has not been tested as provided above, the Specifications for uncompacted void content, fracture, and sand equivalent shall apply at the time of its introduction to the cold feed of the mixing plant.","The burden of proof for establishing equivalent protection rests with the asbestos consultant.","Certification to certify, as offeror of the shipment, that the waste has been properly packaged, marked and labeled and is in proper condition for transportation.","The study documents were concealed or destroyed and have not survived.","Soft swells yield to manual pressure, but no impression canbe mademanually on hard swells.","How do I calculate the area of the paint that is affected for purposes of the minor repair and maintenance provision?","Lead dust wipe samples may be taken on window sills, wells and floors at the discretion of the inspector.","Building to an HDFC.","Aggregate Floor Area of Ineligible Space in Eligible Multiple Dwellings in the Eligible Site.","Department assigned to coordinate and direct the furnishing of relocation services to a particular relocatee.","YES NO Is a unit that is subject to abatement requirements listed or eligible for listing on the National Register of Historic Places, or does it contribute to a National Register Historic District?","PCB storage capacity which the facility shall not exceed during its PCB waste storage operations.","This fee schedule variation is not applicable in the Major System Repairprogram.","Program certified laboratory shall perform the testing.","With the authorization of the Condominium Association or the board of the Cooperative Corporation, the Administering Agent will submit to HPD a request for a drawdown, with supporting information.","Notes: Verification must be performed for each technique within Clear and Purge, except degaussing.","Select composite sampling areas from the initial compositing area and subsequent compositing areas such that all grid points in the initial compositing area and subsequent compositing areas are part of a composite or individual sample.","Please Sign in blue or red ink to avoid confusion.","Unreported Opinion Harford Sands, Inc.","Homeownership Affordable Housing Units.","Act for each rental dwelling unit contained within the multiple dwelling.","The effective date of the SCRIE subsidy for all other applications shall be the first day of the month following the receipt of the application and shall be based only upon the most recent increase in maximum rent.","If HPD finds a Claimant to be ineligible, it will issue a notice of ineligibility.","Based Paint Risk Assessor Pass an accredited inspector course.","In addition, to qualify as a minor repair and maintenance activity, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces.","Foods have been classi\ufb01ed into three food Categories for regulatory sampling purposes.","Terminal connection shall permit external adjustment about the mounting axis in five degree increments.","Commissioner, the Commissioner shall take prompt action to ensure that the child obtains a confirmation test.","All molded members and trim shall be mitered or coped at corners.","We may stabilize deteriorated paint, which includes the correction of moisture leaks or other obvious causes of paint deterioration.","Interim carpet cleaning may be requested in areas subject to extreme traffic and wear.","If live infestation is noted, place all subs from the lot sampled in large plastic whirlpakbags and freeze or place in a cooler on dry ice.","Housing or the implementing agent is authorized to negotiate contract changes on behalf of the homeowner.","Intact Paint loose, delaminating, flaking, peeling, and does not show evidence of teeth marks or water damage.","Pipe shall be considered flexible conduit.","Sealing and Protection of Vacant and Unguarded Buildings.","One exception was the St.","Amount and Duration of Tax Exemption.","Administering Agent for services rendered in accordance with the Program.","Designated Person may complete an Affidavit of Completion of Visual Inspection on forms approved by HRC.","Payments due to the City in accordance with this subparagraph shall be deemed a tax lien and may be enforced in any manner authorized for the collection of delinquent taxes on real property.","The protest must contain a statement of the basis for the challenge.","Managing agent agreement renewals must be submitted to HPD for written approval.","In addition, the Certificate of Conformance is renewed every two years, when there is no change in tenants it extends for two more years by an affidavit signed by the landlord.","For many years, EPA has recommended the use of personal protective equipment as a way to protect workers and to help ensure that leaded dust and debris does not leave renovation or abatement work sites.","Department in order to submit a Dismissal Request.","The studs shall be placed one anchor in each corner, one at the middle of each width and two equally spaced on each length of the box.","Private Housing Finance Law or pursuant to the mortgage closing documents applicable to each development, including, without limitations, the terms and conditions of the Subordinate Mortgage and of the Disbursement Agreement.","Failure to execute the Affidavit shall result in the bid being rejected.","Twice Yearly: City Hall Office, Council Chambers, Okanogan Public Library, Hallways, and Entrances ONLY: Shampoo Carpets.","An application shall be deemed to be complete when the completed application, the fee, and the necessary supporting documentation have been received and acknowledged as sufficient by HPD.","Such requirements may include a fixed period of time for which the approval is valid.","The Contractor shall commit to a minimum number of manhours as outlined above.","The Tenant Association will comply with the terms of these Rules, the Tenant Interim Lease, and all HPD directives with regard to the leasing or occupancy of vacant dwelling units.","Okanogan City Hall and Okanogan Public Library, including but not necessarily limited to: Every Two Weeks: City Hall Office and Council Chambers, and Hallways and Entrances Only: Empty all wastebaskets and dispose of contents as directed.","It is essential to show the violative condition of the shipment was known to the consignee before the delivery or proffered delivery.","If the overwrite command is not supported, the Secure Erase or the Clear procedure could alternatively be applied following Cryptographic Erase.","CO alarm goes off, that CO alarms have a useful life limitation and that the owner has a duty to replace such alarms upon the expiration of such useful life.","Refinanced housing companies must meet insurance requirements of HUD, HDC and HPD.","Standard Setting, High Viscosity, Epoxy Adhesive.","Rhode Island must have filed all required state tax returns and paid all taxes due the state or must have entered into a written installment agreementto pay delinquent state taxes that is satisfactory to the Tax Administrator.","Multiple Dwelling Law and to the applicable provisions of these rules.","Where a mistake is discovered before the bid opening, the bid may be modified or withdrawn by written or electronic notice received by the purchasing agent prior to the time set for bid opening.","Administrators shall be required to ensure that all appropriate contracts and or agreements have been properly executed by all of the parties theretobefore any Program dollars are released.","It appears that this study was also partiallymotivated, by he reaction of property owners in Baltimore Cityto the cost of lead dust abatement.","Instead, KKI relied on the results obtained from the dustwipenformed her that there was no area in her house where the leadlevel was higher than what might have been found in a completely renovated house.","He uses workers trained in Because of the way he allocated the costs, the window replacement is rehabilitation permitted to perform the friction treatments since that is an interim controls method.","Said notice shall be deemed to have been received on the business day immediately following the day of mailing.","DAY OF INSPECTION: Arrive a bit early to look the dwelling unit over again.","Type X reflective sheeting.","Department may require concerning the rehabilitation or improvement and the management of the multiple dwelling, and shall have full power to audit the books of the owner with respect to such matters.","If a child under six years of age resides in the unit, you should also inform the owner immediately at the address below if you notice any peeling paint or deteriorated subsurfaces in the unit during the year.","Fees or charges attributable to the examination and insurance of title.","Examples include windowsills, baseboards, and trim.","If the statement is long and complex, break it down into logical paragraphs.","Tenant and the procedures to apply for such assistance.","PCB waste and the results of those efforts.","HPD, that specified lists of eligible persons be used, or may direct any other Tenant selection method be used.","Removing building components such as walls, ceilings, plumbing, or windows.","However, should any work involve structural changes, then plans are required to be filed in the Department of Buildings and such changes shall be subject to all other Rules and Regulations applicable thereto.","Indeed, the Form states We understand that your house had special repairs done in order to reduce exposure to lead in paint and dust.","Misuse of credentials for a government system is a federal offense.","If the tape manufacturer recommends the use of a surface primer or adhesive, use a type approved by the pavement marking manufacturer.","Do not collect rodents or animal tissues unless specifically instructed.","Repairs, demolition, or any other work performed by a city agency or by a contractor pursuant to a contract with a city agency.","When the size of the fish or lakes of origin in a shipment are not specified, the shipment will be treated as a single lot.","Remove and submit an identical label from an empty container if available.","Do you claim an exception to any specification in this bid?","Nationally Recognized Testing Laboratory.","If necessary, EPA will address failure to comply with these Logo Guidelines.","Si el propietario ofrece moqueta o mobiliario, debe limpiar y aspirar a conciencia antes de la ocupaci\u00f3n.","Missouri laborers or laborers from nonrestrictive states are not available, or are incapable of performing the particular type of work involved, if so certified by the contractor and approved by the County.","Dust containment generally includes temporarily turning off HVAC systems, sealing vents, and installing plastic sheeting over doors to rooms in which work is being done.","City of New York and assigned to HPD for management.","Plants must meet Washington State Department of Agriculture plant quarantines and have a certificate of inspection.","The thread shall be of contrasting color to that of the geotextile itself.","Laboratories often separate composite samples and analyze each wipe separately because their equipment and sample preparation procedures are set up for individual wipes, rather than analyzing the composited samples together.","The determination by the Appeals Committee of any objections by a tenant to a rent restructuring shall be final.","NOTE: Any bid received by the Administrator after the bid deadline shall be returned unopened to the bidder.","Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.","HPD, and immediately upon notification by the housing company or HPD that the contractor has materially breached his or her contract.","The developer must obtain the prior written approval of the Department to substitute another qualified managing agent if, during the term of the contract, the relationship with the original manager is severed for any reason.","Temporary Certificate of Occupancy.","Examine suspected urine stains with ultraviolet light in as near total darkness as possible.","How can employees of these stores and their customers manage lead hazards associated with these older building materials?","Accordingly, for this reason alone, the grant of summary judgment was improper.","This includes both Community Development Block Grant and HOME funding.","Temporary access to the work area when occupants not relocated.","In addition, the owner shall make such records available to the occupant of such dwelling unit upon request.","Contractor shall provide said insurance at its own expense.","Administering Agent must approve such refinancing.","This procedure should be reserved for emergencies and high priority situations.","If more than one type applies, choose one and indicate the other in remarks.","Characterization of natural gas pipeline systems by PCB concentration in condensate.","Subsamples of small portions of the product from directly beneath holes.","The dust samples collected by dust wipemethodologyuly and November showed areas above the clearance levels and KKI didinform Ms.","It shall also not apply to housing designated for senior citizens or the disabled, unless such succeeding family member would have qualified for an apartment as an original tenant.","No facsimile or electronic bids shall be accepted and shall be rejected.","It is thus a matter to be resolved, if necessary, on remand.","Occupied Rehabilitation Program Policy Appendices shall be placed in decorative metal raceways.","Do not breathe dusts or mists.","Dust samples taken from windows, floors and other surfaces where lead dust collects, pass laboratory analysis.","The Clear pattern should be at least two passes, to include a pattern in the first pass and its complement in the second pass.","The jury found in favor of KKI on all remaining claims.","The liquid may be turbid and a whitish deposit may be visible on the product or in the bottom of the jar.","The agency shall amend the advertisement accordingly and shall place such amended advertisement in The City Record, the publications in which the original advertisement appeared, and such other publications as the agency shall deem appropriate.","Please provide the facility.","Contract or affirm the Contract and hold the Vendor responsible for damages.","Other signs of system malfunction include wastewater overflowing outlet baffle and backup into building sewer or riser.","The Agency recognizes that the existence of this policy will inevitably result in attempts to apply the standards to situations within the scope of other statutory authorities.","Sand interior enamel surfaces lightly between coats.","EPA may require as a condition of the approval that the owner or operator submit periodic progress reports.","Any schedules or plans for complying with the approval requirements of these regulations.","Use in mining equipment.","Act, not inclusive of charges for parking or electricity, gas, cooking fuel and other utilities other than heat and hot water.","Liquidtype auxiliary materials shall meet VOC limits of authorities having jurisdiction.","Sample integrity is maintained the same as Of\ufb01cial Samples.","Autun moves for summary judgment on its cross claim for contractual indemnification insofar as asserted against Signature, JG and Mitchell, all of whom oppose the motion.","In that regard, the district appears to understand the necessity of protecting tenants.","The amount, form and substance of such bond shall be subject to approval by both the housing company and HPD.","All areas where children spend their time should be visually inspected.","Use asterisks to indicate any omissions.","LED Conventional Roadway Luminaires is available at www.","Unit price for each inspection and assessment.","The Tenant Association will be required to provide a statement either supporting or opposing the successor tenant application.","Any damage to the structited to plumbing, doors, floors, partitions, etc.","The producer of the chemically treated products shall supply a written certification that the BMPs were utilized, including a description and appropriate documentation of the BMPs used.","The Tenant has unreasonably refused the DAMP Lessee or HPD access to the housing accommodation for the purpose of making necessary inspections, repairs or improvements required by law or authorized or required by HPD.","The parties disagree as to the validity of the figures presented by these samples.","RRP Rule work practice standards as well as the standards for asbestos abatement.","Monday through Friday including holidays which fall on those days.","Upon such review, the displaced person may submit any and all additional material in writing for consideration in the matter.","Where and at such time as the agency deems it to be necessary or desirable, a community group may be selected via an application process.","Fold the wipe in half with the sample side folded in and repeat the wiping procedure within the marked surface area on one side of the folded wipe.","What is the amount of federal assistance dollars per unit?","Strengthen or add new supports when required during progress of selective demolition.","Each airline has a numerical code description, indicated by the \ufb01rst two digits of the number.","Repair tears, voids, and lapped seams in roofing that does not meet requirements.","It should be noted that, under EPA regulations pertaining to abatement and renovation, an abatement or renovation contractor may select and pay the clearance examiner.","Any extension of time will be documented by a change order.","Check in your Junk or Spam folders for an email from lead.","The time and place for such conference, if any, shall be indicated in the bid solicitation.","For a DOC sample, leave this blank.","Only vent connections serving appliances located in one story of a building may be made to any flue.","The manufacturer must submit a certified test report, including test data developed by an approved testing laboratory, which demonstrates that the guide post complies with the requirements of these Specifications.","Division of Alternative Management Programs.","SPITTING FORBIDDEN EXCEPT IN PROPER RECEPTACLES.","Where an invoice does not list lakes of origin of boxes of fish in a shipment, fish of the same size and kind will be considered to comprise a single lot.","YES NO Will a currently vacant unit remain vacant until it is demolished?","Fahrenheit or charring the paint.","The concrete patching material may be shrinkage compensated.","All STOP, YIELD, DO NOT ENTER, WRONG WAY, FREEWAY ENTRANCE, and HIGHWAY ENTRANCE signs shall be constructed entirely of Type III or IV reflective sheeting.","Notification to New York City Department of Finance.","Does my firm need to be a certified firm under the RRP Rule?","Appendix Dcontains considerations for selecting a storage device implementing Cryptographic Erase.","As a quality control step, test at least one contaminated surface to determine the PCB concentration to verify that there are measurable surface levels of PCBs resulting from the contamination before soaking the surface in the decontamination solvent.","The apartment leased to the Tenant shall be occupied for residential purposes only, subject only to applicable laws, the lease and these Rules.","At each change of tenant, thoroughly clean all interior horizontal surfaces of the dwelling, except ceilings, using methods recommended by the Department.","Governmental assistance to affordable units.","The Agency reserves the right to approve or reject any tenant applicant and the owner agrees to be bound by its decision.","The tape shall also be capable of being inlaid into fresh hot mix asphalt during the final rolling process.","Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective.","Street and Battery Place; running westerly along the center line of Battery Place to the intersection of Battery Place and West Street; and running northerly along the center line of West Street to the intersection of West Street and Murray Street.","That housing, however, is already subject to a visual inspection requirement for covered households.","Notwithstanding the foregoing, an application process may be terminated by the Agency at any time without advertisement.","The three letters, which next follow indicate the point of origin.","Live stake cuttings shall have a straight top cut immediately above a bud.","Certificate of Compliance shall include certified mill test reports and test reports performed on the finished bolt confirming that all of the materials provided meet the requirements of the applicable AASHTO or ASTM Specification.","Carefully dispose of the drop cloth.","Any bid addendum must be clearly marked as an addendum, dated, signed by the contractorandbe included with thebid submission.","If enclosed in an outer wrapping, said wrapping shall be similarly marked.","Base shall be satisfactorily caulked to weather seal.","Unless otherwise specified in this part, any person conducting the chemical analysis of PCBs shall do so using gas chromatography.","Media sanitization and information disposition activity is usuallymost intense during the disposal phase of the system life cycle.","To meet both objectives, it is necessary to collect samples of food and feed for pesticide residue analysis.","Label A display of written, printed, or graphic matter upon the immediate container of an article.","The Agency may reject an application if it determines that such requirements are not met.","Eisual evaluation of the dry film shall reveal no cracks.","This term includes filters from control devices, friable asbestos waste material, and bags or other similar packaging contaminated with asbestos.","Inve that Kennedy Kriegerowedtiff in this case that would arise to civil liability.","Ashley, Policy and Standards Division, US Department of Housing and Urban Development, pers.","Risk Assessmentand concludes on the date the project is completed and passes final clearance.","Unable to Recommend Sale.","City, amount or type of Assistance required, rental or sale prices, income levels of prospective residents, number and size of units produced, and any other factors which the Agency deems appropriate.","The material shall meet the requirements for grading and quality when placed in hauling vehicles for delivery to the roadway, or during manufacture and placement into a temporary stockpile.","The breach of obligations imposed onresearchersby gence incases We reiterate as well that, given the facts and circumstancesofgenuine disputes of material factsconcerning the relationship and duties of the parties, and compliance with the regulations.","Consent and approval shall be in written form and bear the signature of the Commissioner, Deputy Commissioner, Superintendent or the person designated to sign such consent by the Commissioner, Deputy Commissioner or Superintendent.","All fees imposed pursuant to this section that remain unpaid by the owner shall constitute a debt recoverable from the owner and a lien upon the building and lot, and upon the rents and other income thereof.","In either event, the defaulting Contractor or his surety shall be liable to the City for costs to the City in excess of the defaulted contract prices.","Nor shall any application be reported as being satisfactorily completed unless all new appliances have been installed in compliance with these rules and all existing appliances have been made to conform with them.","While these situations may not always require more stringent cleanup measures, the Agency is excluding these scenarios because they will always involve significant factors that may not be adequately addressed by cleanup standards based upon typical spill characteristics.","Multiple Dwelling Law, shall comply with the applicable provisions of these rules.","Preparedlion Standrd proma reerial othhat uor ibion.","In homes receiving HUD assistance, paint stabilization must be done by workers who are specially trained in lead safe work practices.","Capacity: The usable capacity of bags shall not exceed four cubic feet.","Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete.","If a request for price increase is submitted after the initial term, the unit price may be increased only upon approval of a written request.","Springers result from moderate positive pressure in the can.","Harris lived in the house, correct?","Are all units federally assisted?","Such notice may be combined with other annual notices required to be provided to tenants.","Composite samples consist of more than one sample gauze extracted and chemically analyzed together resulting in a single measurement.","In fact, we pay lip service precisely because we often silently suspect that consent cannot and does not always justify.","Commissioner of the Department of Finance of the City of New York.","Annotated Code of Maryland which ordains that any person convicted of bribery in furtherance of obtaining a contract from the state or any subdivision of the State of Maryland shall be disqualified from entering into a contract with the City.","If the waste was sent back to the generator, why and when.","The unit shall monitor conflicting signal indications at the field connection terminals.","Handle and store roofing materials and place equipment in a manner to avoid permanent deflection of deck.","The actual moving cost.","Lead Hazard Mitigation, if those requirements were not met by the previous owner at the time of transfer, provided that the neys after assuming ownership to determine conformity with the lead hazard control standards.","Rehabilitation includes repairs necessary to correct the results of deferred maintenance, the replacement of principal fixtures and components, improvements to increase the efficient use of energy, and installation of security devices.","Type VII, VIII, IX and Type X Fluorescent Orange reflective sheeting shall consist of unmetallized microprismatic lens formed in a synthetic resin and encapsulated by a flexible, transparent, weatherproof plastic having a smooth outer surface.","The use of waste oil that contains any detectable concentration of PCB as a sealant, coating, or dust control agent is prohibited.","This is a key effortin reducing the prevalence of childhood lead poisoning, particularly lead poisoning caused by housing contaminated by renovation activities.","Some States, Indian Tribes and local governments have issued standards for clearance that may differ somewhat from the Federal requirements.","Media Plural of medium.","While requests for voluntary holds are generally granted, a dealer may act or suggest an alternative approach.","Bureau of Housing or the implementing agency may notify the recipient, in writithe right to foreclose on the property.","YARD within public ribe repaired.","Once a propertywasintervention level of I, II, or III.","No welded connections, other than shop welding, for top rails will be permitted.","Existing exterior masonry shall be repaired in a workmanlike manner.","The area indicating the letter shape that is not reflectorized shall be white for maximum daytime contrast with the sign background.","HDC will advise the owner of the refinanced project and HUD of the reasons for the disapproval.","For investigations focusing on Salmonellae, this is the area where environmental contamination is most likely to directly affect safety of the product.","HPD may require a Third Party to provide security for its compliance with use restrictions in such types and amounts as are determined by HPD to be necessary or desirable.","Board members have a fiduciary responsibility to the shareholders of the corporation.","It is also important to continue to promote blood lead testing and mapping the geographic distribution of EBLs over time to track progress, identify potential opportunities for improvement of the law, and target enforcement of the law.","All line samples must be collected aseptically.","Each member of the committee shall be informed of a committee meeting at least ten working days before the meeting.","This section identifies the safety, health, and environmental regulations specific for the product that is not indicated anywhere else on the SDS.","The actual reasonable expense of searching for a substitute business site.","PCB Transformer located in other than a sidewalk vault or of removing a higher secondary voltage network PCB Transformer or a lower secondary voltage network PCB Transformer, located in a sidewalk vault, from service.","All disputes or claims shall be submitted to the arbitrator, regardless of the extent of completion of the Program related work.","Interior and exterior areas being cleared should be free of deteriorated paint that is or may be hazard.","Payment Application Forms: The Contractor is required under the Contract Documents to use official original AIA documents.","Pay particular attention to the collection of floor sweepings or the dry contents of vacuum cleaner bags or tanks.","The certification shall be signed by the owner or operator and by an independent registered professional engineer.","How the heck does anyoneunderstand what they mean?","State and local government agencies, and noprofits; and rent for target housing or public or commercial building space.","HEADNOTES: Headnote: These two cases concern negligence actions involving children who allegedly developed elevated levels of lead dust in their blood while participating in a research study with Kennedy Krieger Institute.","The dispute log must clearly document the nature of the dispute, contacts made with the parties involved, and actions taken to resolve the dispute.","Attorney General of the State of New York of the filing of the offering plan pertaining to the proposed transfer from the mutual company to a private cooperative or condominium corporation.","New keyed cylinder outside, thumb turn inside including escutcheon trim and strike plates, keyed be keyless from the inside.","Unnecessary samples waste both operational and administrative resources.","If visible soil or residue is present, sample the surface by vigorously rubbing the sponge over the designated area until the soil or residue is removed.","RESPONSIBILITYCollect every sample as if you will be required to testify in court about everything you did concerning each and every event surrounding the sample collection.","When media is repurposed or reaches end of life, the organization executes the system life cycle sanitization decision for the information on the media.","There is no upper limit to the number of samples required or allowed.","Provide recent proficiency testing results that show a pattern of successful participation.","PCBs within the short period of time required for cleanup of spills under this policy.","This alternate application requires a minimum of two coats of paint.","The following procedures will be followed only after the homeowner has been allowed to exercise their rights as outlined in section XXIV.","Thefollowing fields must be completed to save the sample information; Sample Class; Sampling Division; Collector; Collection Date; Sample Basis; Sample Type; FIS Sample Number; Sample Description; Product Code; Product Description; Resp.","Occupied Rehabilitation Program Policy Appendices develop a work specification, keeping in mind the budget constraints of the program.","The asbestos abatement activity stop date is the date upon which air monitoring clearance has been achieved.","Portability means that a senior citizen with a valid SCRIE subsidy may move within a development, and in addition, certificates issued by the Department for the Aging and HPD are interchangeable under conditions set forth in the law.","Dashboard, except as directed by the Compliance Program Guidance Manual, assignment or your supervisor.","EBL child when owner fails to comply.","Secondary prevention inspection by Health Dept; referral to city for enforcement; permit required for abatement.","Existing gravel driveways manecessary.","For planning and transition purposes, Federal agencies may wish to closely follow the development of these new publications by NIST.","What is the appropriate target housing?","No private dwelling shall be eligible for tax exemption pursuant to this chapter if it is receiving tax exemption under any other provision of law.","Internal connecting wires shall be the same as required for lacing wire.","The sanitization operation should take only minutes with Cryptographic Erase beingsupported.","Paper shredders can be used to Destrflexible media such as diskettes once the media are physically removed from their outer containers.","TAHPR requires that a DSHS licensed laboratory perform the analysis of samples from public buildings.","Provide metal Z closures at highside eave, rake edges, rake walls and each side of ridge and hip caps.","Lead in paint, house dust and outside soil are major sources of lead exposure for children.","OPERATIONS: RECORD KEEPING Record retention.","The Engineer may elect to be present at any or all material testingoperations.","The Agency may waive any of this chapter where the nature of the installation, alteration, improvement or rehabilitation or other circumstances warrant such exception.","Well, briefly, the samples were logged in.","State of Maryland Deposit Insurance Fund Corporation, the circuit court held another very lengthy trial, lasting over sixty days.","Lead contaminated dust clearance test.","To facilitate that purpose, the landlords agreeing to permit their properties to be included inthe rent the properties to tenants who had youngchildren.","That is no longer the case.","These supervisory hours are not included in the minimum required cleaning hours.","The articles herein are provided for general purposes only.","How should leadcontaining wastes from RRP renovations be handled and disposed?","PCB waste in accordance with the instructions included with the form and subpart K of this part.","Only persons working on abatement job sites who are engaged in activities described as inspections, leadhazard screens, risk assessments or abatements are required to be certified in the appropriate disciplines.","Occupants such as squatters and licensees are not Tenants.","Unit must be in conformance with local code standards for boarding houses, or other dwellings for congregate living.","Emergency renovations are NOT exempt from tcleaning and cleaning verification requirements.","The interior space of a building used or to be used for occupancy, including schools, hospitals, prisons and similar buildings.","Flash penetrations and fieldformed inside and outside corners with cured or uncured sheet flashing.","Lease terminations and renewals.","Many items used will contain multiple forms of media that may require different methods of sanitization.","MATERIALSUse repair materials identical to existing materials.","DO NOT MIX CHEMICALS.","HDFC, and HPD, before it becomes effective.","Guidelines for nonresponsibility determinations.","Shall completely enclose all area below finish lip of tub.","License number of truck, bus, RR car, airplane, etc.","Cabinets may be finished inside with an approved finish coat of exterior white enamel.","The proceeds of capital assessments shall be deposited in a blocked bank account and all withdrawals from such account shall be subject to the written approval of HPD.","State, EPA recommends that the training provider confer with the authorized State to determine whether the State allows the advertising or teaching of courses not accredited by that State, requires notification of training, or imposes any other requirements.","If a contractor is unable to bid, the Administratormust provide the contractor with a Refusal to Bid form.","In order to receive consideration, all inquiries shall be in writing and directed to the housing company, which shall note the date of receipt thereon.","If the dealer still objects, accede to his wishes, but record the facts in your regulatory notes.","City which is rented or leased to be occupied, or is occupied, as the residence of three or more families living independently of each other, and for which a loan application is made under the program.","The department may enter any regulated school building to inspect and investigate conditions to determine compliance.","Administratorshall pay the ontractor in consideration of the completion of the lead hazard reduction work and the Healthy Homes Intervention work, as applicable, by the Contractor as described inthe Lead Hazard Reduction Contract or the Healthy Homes Intervention Contract.","Loads on anchorage members due to bracket reaction placed for maximum bending moment produced in member.","Unlike the lead concentration analysis in dust testing, the results of the blood testing were typically available to KKI in a matter of days.","Final Certificate of Eligibility, such owner will register these rental units with the New York State Division of Housing and Community Renewal no later than fifteen calendar days after such fifteen month period.","Do not use tape on very small containers such as ampoules, which must be snapped or broken to remove the contents for analysis.","All iron or steel material shall be galvanized.","All disciplines shall receive refresher training annually for reaccreditation.","Fire Department of the City of New York.","Do not open container unless absolutely necessary.","Each member shall have one vote.","If yes, where are dirty work clothes places and cleaned?","Thickness, where the Length is the longest axis, Width is the second longest axis, and Thickness is the shortest.","Both labels shall be engraved phenolic name plates.","Rather, the problems with that program are indicative of systemic problems with genetic research and informed consent as a protection of the autonomy of research subjects.","Use stick on labels to identify sub bags.","SPECIAL REPORTING AND PRECAUTIONS Report coding of cans and shipping cases.","Housing Maintenance Code, may be required to complete a course of training relating to building operation and maintenance, approved by the Department, prior to discharge of the building from the Alternative Enforcement Program.","Nipples for Type L, LE, P, Q, R, and S mounts.","Further, EPA requires the collection and testing of field blanks and replicates.","Submit Field Weight Sheet with the printed FACTS Collection Record.","Thelaoratorhallmainprofiieinat leaone o be iniial aion.","HPD, issued on the basis of an Application, that a Property is eligible for the Tax Benefit.","Trim surface of insulation where necessary at roof drains so completed surface is flush and does not restrict flow of water.","Cost will depend on the number of samples taken.","For waste which is land disposed, the waste is regulated based on how readily the waste is released from disposal to the environment, in particular by leaching out from the land disposal unit.","If the clearance area is an interior space, the paint must be repaired and the work area cleaned before collection of clearance dust samples because the paint repair might contaminate the area.","State air emissions permit which includes a standard for PCBs.","The conduit system shall be designed so that straight sections and fittings will assemble without the need for lubricants or cement.","Environmental Sampling for Detection of Salmonellae, CFSAN Guidance.","Record the clearance area agreed to with the client.","On the other end of the spectrum, a party may have extensive capabilities and be able to apply state of the art laboratory techniques.","Spaces between the studs behind such plates shall be filled in solidly with timber secured to the studs.","All witnesses at the hearing shall be sworn to tell the truth.","The submission of any application shall be accompanied by certified check, bank check, electronic payment, or money order in the amount of the Fee made payable to Department of Finance.","Routing Records Accompanying Sample Collection Record Forward Collection Record from FACTS and original records through your supervisor to the divisionoffice compliance branch most likely to take regulatory action.","Apply lap sealant and seal exposed edges of sheet flashing terminations.","Consolidated notifications of small operations.","This may limit the targeting options available to local policy makers.","The information requested shall be set forth in a form of affidavit prescribed by HPD.","Such costs must be approved by HPD.","As with other types of media, the choice of sanitization technique is based on environmentspecific considerations.","HPD will provide a Relocatee with a copy of these Rules in English and Spanish and such other language as it deems necessary.","Occupants may not enter work site during lead hazard reduction activities.","If no stamps are available purchase them from the post office and claim reimbursement onyour voucher.","HPD and an Administering Agent concerning the rights, responsibilities and compensation of such Administering Agent.","Administrative Code, and in one and two family residences not heated by a central heating system.","Sponsor in connection with a Project.","For chemotherapeutics, make sure that shipping conditions ensure that microbial populations remain inactive and do not have the opportunity to degrade the analyte.","The appropriate DSHS Regional or Local Program inspector must be notified by phone of all start or stop date changes.","Fahrenheit, or those that that operate high enough to char the paint.","This applies to properties regardless of if a lead inspection has ever been performed.","The Contractor shall perform nightly and daytime cleaning as outlined in this specification.","If a child under six years of age does not reside in the unit now, but does come to reside in it at any time during the year, you must inform the owner in writing immediately.","Remove goggles and respirator; wipe outside of goggles and respirator with terdampened paper towel.","To be collected from as many random sites in the lot as possible.","HPD may impose additional restrictions upon the use of such property and may require a Third Party to agree to comply with such restrictions.","What if people consent to activities and results which are repugnant, or even evil?","Optionally: Instead of one write pass, use three total write passes of a pseudorandom pattern, leveraging the invert option so that the second write pass is the inverted version of the pattern specified.","The collection and disposal of refuse within any building or on any premises shall be performed as deemed necessary to provide for the safety, health and well being of the occupants of buildings and of the public.","The test shall be performed with the coupler having a oneinch unengaged segment between the two coupled bars.","Nothing in those documents evidences that KKI intended to produce a harmful contact with the children.","HPD may require a Sponsor to provide security for its compliance with use restrictions in such types and amounts as are determined by HPD to be necessary or desirable.","If any sample site selected coincides with a previous sampling site, restart the sample selection process until all resampling sites are different from any previous sampling sites.","If any information stated in an application changes at any time before HPD makes a final determination, the applicant shall promptly update the application with such new information and submit it to HPD.","Such rules shall be promulgated whenever the Agency determines, for any good and sufficient reason, that additional rules are necessary or desirable in order to facilitate the orderly progress of Agency initiatives to achieve the City Housing Goals.","The Director shall inform an issuer in writing of a nonresponsibility determination and the reasons therefor.","Floor area and spaces to be serviced may change during the contracted period.","Under asphalt as part of a road bed.","HPD shall serve a notice of hearing by regular mail upon the applicant and any other individual or entity as determined by HPD.","Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer.","Building means the gross square footage within the dwelling unit measured from the interior faces of the demising partitions or party walls.","Handled, identified, and sealed in such a manner as to maintain its integrity as evidence, with a clear record of its chain of custody.","The training provider shall maintain all required records for a minimum of three years.","If you choose to do the testing, some EPArecognized lead laboratories will send you a kit that allows you to collect samples and send them back to the lab for analysis.","The Affordable Housing Fund contribution shall be held by HDC or such other depositary as HPD designates.","One from an interior window sill or window trough, if present, alternating between rooms.","Best Yet Packing Co.","That such determinations of compliance are being maintained.","All exterior wood components will have a minimum of two continuous coats ofwill have any deteriorated paint.","If no other coating is specified in the Contract Provisions the exterior of all cabinets shall be bare metal.","Capital assessments by a mutual housing company.","The names and addresses of all persons who attend the approved training program shall be maintained as a public record that the Commissioner shall provide to the Department of Housing and Community Development.","Finish flashing and trim with same finish system as adjacent metal roof panels.","The deadline for submissions shall be a reasonable period of time after the advertisement first appears and shall be stated in the RFQ.","Due to the dilapidated nature of the site, DOB will continue working with the developer to determine the immediate next steps to help ensure the safety of the site and prevent work site incidents.","Calculate the area of painted surface disrupted based on the surface area of the component that is disrupted.","Certain asbestos training courses require the successful completion of other training courses as a condition for admission.","Affordable Housing Units that are not purchased by Eligible Buyers may be rented in accordance with the rental provisions of the Program on or after the date of issuance of a Completion Notice for New Construction Affordable Housing containing such unit.","Suchlegalections, might additionally be warranted because of the likelyconflict the goal of the research experimenter and the health of the humansubject, exclusively, when such research is commercialized.","These interferences may be from chemicals or other attributes preexisting in the waste material, resulting from the PCB contamination source, or resulting from treatment to remove or destroy PCBs.","Media Sanitizationaddressing is one thousand.","HUD leadsafe work practices training or accredited abatement supervisor or worker training?","Have dust sampling done.","The required information consists of: Recommendations of suitable extinguishing equipment, and information about extinguishing equipment that is not appropriate for a particular situation.","Schedules will be provided by the training providers as a part of their instruction.","All Risk Property Policy.","ITS Field Wiring Charts.","Slots shall be notched at the base to hold the coupler firmly in the open position.","Engineer prior to installation.","CONTRACTOR describing such defaults or violation.","Presterilized plastic or metal tools should be used.","This can be done by using the Examination Label, Do not use industrial or permanent type markers on sample containers which allow penetration by ink.","If the total of twelve determinations contains only one short volume unit, be guided by the significance of the average shortage as related to the individual program guideline.","The sample is being stored by the sample collector before transport to a laboratory for testing.","Upon arrival at a County facility, a Contractor lead employee for the work crew shall check the checklist to assure all cleaning items have been satisfactorily completed.","Grievance procedures prepared by the housing company relating to the submetering of electrical charges shall be submitted to HPD for review and approval before such procedures are implemented by the housing company.","Several enforcement strategies are embodied in the Philadelphia law.","Preparation of written specifications to render house lead safe, including scope of work to be performed, necessary materials, labor, time and cost estimate of same.","Do not collect sample from a faucet with leaks around handle.","Maintain in a clean condition during construction.","Retrofill the transformer with fluid containing known PCB levels according to the following table.","If no more painted surfaces will be disturbed, then cleaning may take place after either removal of all components, or after all new surfaces have been installed.","Wearing disposable gloves, work suits, booties, and head coverings.","The name of a contact person at the facility be provided for inspection purposes, even if the building or facility is vacant.","In addition, all of these excluded situations require practicable, immediate actions to contain the area of contamination.","The Agency shall mail an Order to all parties named in such Order.","Verbal changes in the scope ofwork will not be allowed.","We answer in the affirmative.","Department of Buildings of the City.","Occupant Protection and Temporary Relocamost jobs that require lead hazard reduction, appropriate actions will be taken to protect project.","When it comes to children involved in nontherapeutic research, with the potential for health risks to the subject children in Maryland, we will not defer to science to be the sole determinant of the ethicality or legality of such experiments.","The hearing regarding a proposed administrative penalty may be consolidated with another hearing on an administrative penalty.","Survey results are shared with the Contractor for follow up improvements or concerns.","Remove roofdrain plugs when no work is taking place or when rain is forecast.","Anyone who has user access to the FACTS system has access to the electronic records contained therein, including sample collection records.","The sanitization operation may take as long as several hours depending on the media size.","GENERAL REQUIREMENTS cement shall be accomplished in a workmanlike manner.","Contain and collect all cleaning solutions for proper disposal.","Lead poisoning has been linked to juvenile delinquency and behavioral problems.","The agency or the city may retain syndication funds in an escrow account pending disbursement.","Under the surveillance of the Engineer, the test cylinders shall be molded, cured, and tested in accordance with the procedures established by the State Materials Laboratory.","Markers shall be white or yellow.","In these cases, the clearance area may be limited to the rooms in which work has been done.","Such interim evaluation period shall commence upon transfer of the property to the Third Party and shall continue upon the transfer of the property to any subsequent Third Party.","Failure to initiate and continue attempts to secure disposal throughout the total time the waste is in storage shall automatically disqualify the notifier from receiving an automatic extension under this section.","ORGANOLEPTIC EXAMINATIONSExamination of many products may be conducted on the spot without \ufb01xed laboratory equipment.","Abandoned wells and cisternsabandoned well or cistern on the premises shall close and fill them in a proper manner.","Determine how the labeling is made available to the public.","Temporary Certificate of Occupancy or a Certificate of Occupancy.","There are no required procedures for collecting a sample.","Any such new multiple dwelling shall comply with all other applicable statutory and regulatory requirements.","Utilities and service lines.","Grower Smith has violative residues of disulfon and permethrin on kale.","Acts of God or the public enemy, riots, strikes, fires, explosions, accidents, governmental actions of any kind or any other causes of a similar character beyond its control and without its fault or negligence.","We are interested in finding out how well the two levels of repair worked.","The receptacle shall establish contact pressure with the pin through the use of a tinned copper or copper beryllium sleeve spring and shall be equipped with a disposable mounting pin.","Reinsert the plastic liner into the soil recovery probe and reassemble the Collect the remaining core samples of the composite using the same method.","Until the ground level is reached.","The owner shall submit to the Agency, prior to renting, a Tenant Selection Review Form prescribed by the Agency.","Request for written agreement.","Please consult the applicable regulations when determining compliance.","HDFC copies of the applications, letters granting or denying rental assistance, Interim Payment Agreements entered into, and letters extending or terminating Interim Payment Agreements.","Such package may not be opened either by an FDA employee or by an employee of the common carrier at the request of an FDA employee except as provided below.","This section indicates when the SDS was prepared or when the last known revision was made.","The report will determine the physical condition of the property and all appurtenant equipment.","There are two kinds of composite sampling procedures depending on the original source of contamination of the site.","Private Housing Finance Law are subject to the written approval of HPD.","Floodplains, shorelands, and groundwater recharge areas shall be avoided.","NCCI forms then a copy of the endorsements is to be attached to the respective Certificate of Insurance.","STUYVESANT: The area bounded by Myrtle Avenue; Broadway; Ralph Avenue; Atlantic Avenue; and Nostrand Avenue.","The Commissioner of HPD may periodically review whether a parcel of class one or class two real property remains a Distressed Property.","Survey of Current Business.","Does this also mean that my employees would only have to be trained on cleaning and cleaning verification guidelines?","Liability insurance shall include pollution liability for asbestos exposure.","Successor need not have occupied the Homeownership Affordable Housing Unit with the Homeowner.","Examples of devices used for incineration include rotary kilns, liquid injection incinerators, cement kilns, and high temperature boilers.","Fittings for any particular fence shall be those furnished by the manufacturer of the fence.","Such service shall continue to be available only by contract with the Department of Sanitation and subject to such conditions as the Department of Sanitation may impose.","The LED display shall be a module type and shall replace the lens, socket, bail, and reflector and be directly connected to the terminal strip in the signal head.","Plant material which is root bound, as determined by the Engineer, shall be rejected.","Facility Maintenance Manager of any broken dispensers immediately upon identification.","When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict.","Statutory authority not limited.","This occurs either because the media never contained sensitive data or because Sanitization techniques were applied and the media no longer contains sensitive data.","Upon Resale, Homeownership Affordable Housing Units must have the same number and size of rooms as existed at Sale.","Provide information as to the analysis to be made.","PCBs on solid surfaces, a cleanup to numerical surface standards and sampling by a standard wipe test to verify that the numerical standards have been met.","Contractual Coverages for this Contract in any way that would prohibit or limit the reporting of any claim or suit and the subsequent defense and indemnity that would normally be provided by the policy.","Nylon threads will not be allowed.","When improvements are completed, this coverage may be discontinued.","Certificate of Occupancy is issued by the Department of Buildings for lawful residential use.","The fiber optic cables shall be shipped on reels with a drum diameter at least times the diameter of the cable, in order to prevent damage to the cable.","Selecting a portion of the subsample for particle size reduction.","Vacate Order or his or her Family.","If requested by the Contractor, the plasticity index may be increased with the approval of the Engineer.","The letters and the background of the sign shall be of contrasting colors.","EPA Regional Administrator in the appropriate region.","The department may also require additional information and affidavits to be submitted with the application for exemption as provided in such application form.","Please list the addresses and if any action has been taken.","Issuance of letter of no objection to rental and mutual housing companies.","No welded connections, other than shop welding, for top rails, will be permitted.","EDA is executed by the city and the community group.","File a notification and obtain an EPA identification number pursuant to subpart K of this part.","Filth exhibits and other articles taken for exhibit purposes during inspections to demonstrate manufacturing or storage conditions, employee practices, and the like.","Inappropriatevolving children as subjects is not new.","Lighter host vehicles proposed by the Contractor are subject to the approval of the Engineer.","Whether determinations of compliance are based on actual monitoring of PCB levels or on theoretical assessments.","When in doubt, check device manual or call tech support.","Study questionnaire, the KKI quality assurance plan, the Consent Form, and the clearance wipe convince us otherwise.","For each type of box or whenever there is a change to the Cable Vault or Pull Box design, a proof test, as defined in this Specification, shall be performed and new shop drawings submitted.","Homeowner of his or her intent to modify title, along with documentation supporting any such proposed modification and an affirmation that no consideration in connection with such proposed modification has been or will be received.","Certificate of Compliance for the bolts, nuts, and washers prior to installing any of them.","Only one type of wire and protective coating shall be used throughout a structure.","The Maryland Department of the Environment alsocollaborated in the study.","Description of the most important symptoms or effects, and any symptoms that are acute or delayed.","Additional Subjects in Research.","Dust mop, damp mop and disinfect daily.","Its used for the multipurpose business like Marketing, Finance, Stock Market, IT infrastructure, Consultant, Manufacture plant, Services, Retailer, Wholesaler, Online business, Store, IT Firm, Cloth business, and many more business.","Carry all alcohols, fumigants, and other hazardous liquids in approved safety containers.","Containers shall be of high opacity and not transparent.","OR ACRONYM DEFINITION Requirement An essential criterion necessary for accreditation.","Specification; OR, the diffuse day color of the reflective sheeting shall be visually evaluated by comparison with the applicable Highway Color Tolerance Chart.","Repair or remove and replace components of membrane roofing system where test results or inspections indicate that they do not comply with specified requirements.","Actual reasonable expenses in moving.","When testing a work area, does one lead test kit or paint chip sample suffice for any single component?","United States Department of Transportation.","Listed below are the analytes for which certification is offered.","Fiber counts shall be as specified in the Contract.","Renovators conduct millions of jobs each year, ranging from simple drywall repairs to complete kitchen and bath renovations, and from window replacements to building additions.","Requests for such approval must be supported by a detailed description of collection efforts and such other material as may be required by HPD.","Steel Furnace Slag may be used as, or blended uniformly with, naturally occurring materials for aggregates.","GBL after the completion of the shipment.","Protection of exterior wood surfaces dwelling structures shall be properly protected from the elements and from decay e coatings.","The test methods shall be as specified in the WSDOT Materials Manualor the corresponding test method covered by Federal Test Method Standard No.","In other words, a federallyaccredited training provider may provide training in any state, and the resultant certification would enable a person to work in all federal program states.","Your evidence may be used in a subsequent action against the firm, if corrections are not made.","All windows that are intended to open mustbe able to be opened duringthe visual inspection.","Supervisors with either restricted or unrestricted licenses may be employed as asbestos abatement workers.","This does not relieve the contractor from the prime responsibility of full and complete performance under the contract.","Neil failed to perform its contractual duties.","Submit evidence of meeting performance requirements.","The Contractor shall keep the premises clean andebris shall be removed on a continuous daily basis and not be allowed to accumulate.","EPA Abatement Letter mponent replacement is an abatement he window replacement to rehab.","While the RRP rule does not apply to zerobedroom housing, the type of housing described is not zerobedroom housing.","The resin and catalyst components shall be supplied in separate containers.","Project, and any entity substantially controlled by such Sponsor.","EPA recognizes the fact that it may occasionally be impossible for firms to meet all of the cleaning and verification requirements under the Rule for garage floors such as those that are composed of dirt or gravel.","To equitably adjust the monthly fee for cleaning services, the Contractor is to propose a unit price per square foot per month for an increase or decrease in space.","Lead exposure is especially harmful to young children and pregnant women.","Department of Health regional offices listed in the examination schedule.","PCB waste subject to the generator requirements of subpart J of this part.","Hearing Notice, Hearing Notice, or Determination Notice.","Moreover, in nontherapeutic research using children, we hold that the consent of a parent alone cannot make appropriate that which is innately inappropriate.","Watering cores shall be easily removed without removing the housing from the pipe.","They shall require that new chimneys be strapped to the existing walls.","Con Edison, in which case the current emergency phone number used by Con Edison shall be used instead.","ADULTERATION VIOLATIONSSince adulteration samples are collected to confirm the presence of filth or other deleterious material, they are generally either larger or more selective than samples collected for economic or misbranding purposes.","You can submit on behalf of multiple organizations through the same account by selecting or adding the appropriate organization within the application.","The law staggers implementation in two phases.","The DC Department of the Environment, however, frequently uses its authority to assist tenants in relocating whenever the totality of the circumstances suggest an unacceptable risk to tenant safety if they were to remain in place during hazard abatement.","They are exhibits except when they are part of a DOC Sample.","Do not apply bonding adhesive to splice area of roofing membrane.","RRP Rule, and any enforcement action taken would be against the firm.","Individuals requiring sample collection data can query the system and retrieve data, based on the query parameters.","They shall describe the condition of the chimney flue to be used and state whether the draft is satisfactory.","Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.","Use a ballpoint pen.","All documents, correspondence, and data that have been provided by the owner or operator of the facility to any State or local government agency and that pertain to the storage or disposal of PCBs and PCB Items at the facility.","Department of Housing Preservation and Development of the classification of the multiple dwelling in which the appliances are to be installed.","The form of the deformed bar shall be subject to approval by the Engineer.","It asserts that it never did so because it only observed minor cracks in the plaster that did not warrant monitoring.","Upon completion of sanitization decision making, the organization should record the decision and ensure that a process and proper resources are in place to support these decisions.","Hot poured sealant for bituminous pavement is acceptable for installations in joints where cement concrete pavement abuts a bituminous pavement.","To the extent that performance of an RRP requirement would be impossible, the firm is excused from compliance.","Note dealer sample collection in your CR.","Conducting a leach test.","Provide clearance examination reports and backup documents for a fraction of the units when requested to help ensure the quality of the work.","If identified as the probable source of lead absorption or poisoning in a human being, the paint must be removed, covered, or made inaccessible to small children.","As a practical matter, it may be easier or more efficient to provide notice of renovations in multifamily housing common areas by posting signs.","Authorization to be in writing.","The box shall be coal tar painted by the manufacturer using its standard.","Deposits shall be accepted by the housing company by check or money order only, payable to the housing company.","At least one sign shall be visible from the doorway of each room or suite of rooms.","The color of pigmented sealer shall be as specified by the Contracting Agency.","Coordination for shutoff, capping, and continuation of utility services.","Dwellings, all residential buildings, schools and child care facilities.","All such cuspidors or spittoons shall be of durable waterproof material and shall be thoroughly cleaned at least once daily, and shall be at all times maintained in a condition satisfactory to the Department of Housing Preservation and Development.","Occupant Protection Occupants were not permitted to enter the worksite during hazard reduction activities until final clearance was achieved.","IRS or New York State income tax returns.","Where the Agency deems it to be feasible and desirable, a Sponsor may be selected for a Project via public bidding.","Interior painted surfaces shall be examined for the presence of deteriorated paint.","Lot, the existing Garden on such Lot, and the proposed Transfer of such Lot.","Any federal accreditation requirements will be complied with by the provider.","Upon receipt, the preliminary application will be reviewed for completeness and it will be date and time stamped.","The varied size of the case study cities may correlate with technical, financial, and staff resources for inspection, enforcement, and evaluation.","Can a certified firm assign its responsibility to a property management company?","Girdling of the roots, stem, or a major branch.","EPA Certified RRP firm and only use trained and certified workers to do the work.","Qualification for each manufacturer of corrugated polyethylene culvert pipe requires an approved joint system and a formal quality control plan for each plant proposed for consideration.","It is of little moment that an entity is an institutional volunteer in a community.","Organizations should take care in identfying media for sanitization.","Any documentation should be provided.","Police Panel shall contain only one DPDT toggle switch.","Exterior paint may be applied by airless spay painting equipment.","Agency exceeds the rents collected from the property.","Fill in all the blanks in the application form.","Circuit Courts for further proceedings.","All transactions are conducted in a secure environment.","The Contractor shall not provide additional services unless requested by an authorized the designated County representative and confirmed by email.","Ceilings and walls exclusive of doors.","The manufacturer or shipper often provide sales promotion instructions to the dealer.","When a sample is collected by transferring it to sample containers, a sample control must be submitted which consists of an empty sample container that is exposed to the same conditions under which the sample is collected.","There have, however, been very few court decisions involving human experimentation.","Removal of all paint from a component does not exempt the component from the requirements of this section.","In the event of equipment failure or other such catastrophe where a job cannot be completed, the job will not be paid for.","Did EPA intend to prevent the use of EPA and HUD standards for soil samples?","Dust samples shall be taken from each of no more than four rooms.","Discontinuing Mortgage Foreclosure Action; Notice.","The drillings of the connecting flanges on the extensions shall match the drillings of the flanges on the hydrant.","Demonstration testing may also be included as part of the written examination.","Such sheeting shall be taped together with waterproof tape, and taped to the floors or bottom of the walls or baseboards, so as to form a continuous barrier to the penetration of dust.","The first cleaning step required by the RRP rule is to collect all paint chips and debris and, without dispersing any of it, seal this material in a heavyduty bag.","The Department may exclude from the Alternative Enforcement Program any building that previously participated in the program and was discharged within the prior three years as a result of work completed by the Department.","Philadelphia, local ordinances have the flexibility to authorize differing certification standards; however, such local standards apply only to the locally established requirements and do not insulate a property owner from the obligation to comply with separate state or federal standards.","This applies to properties regardless of whether or not a lead inspection has ever been performed.","Do not use plastic bags as this may interfere with the analysis, unless the bags are certified as contaminant free by your district laboratory.","The initial compositing area is based on a square that contains nine grid points, is centered on the grid origin, and has sides two grid intervals long.","Conduit shall be uniform in color, density, and physical properties.","The trial court was incorrect.","First, municipalities generally have the authority to address lead hazards in private housing through their code enforcement or public health laws.","Assure that composite sample areas and individually analyzed samples completely overlay the cleanup site.","Any cards which have been altered may be revoked.","This category shall include fraud and misrepresentation.","Program requirements, as described in this Procedural Guide, will also apply.","Once the lead abatement plan is approved, lead abatement work can begin.","RRPM activities for compensation and that employs or contracts with persons to perform RRPM activities as determined by the Department.","Visors shall be flat black in color inside and shall be flat black or dark green on the outside.","Consult the Policy for a description of the spills it covers and its notification and timing requirements.","To perform surveys, an asbestos inspector must be employed by a licensed asbestos consultant agency or licensed asbestos management planner agency.","Replacement Standard: No landscaping is permitted.","Scrubbers and absorbent pads used in the second rinse of contaminated surfaces may be reused to wash contaminated surfaces.","Ownership of affordable units.","After the shareholder has surrendered possession of the apartment, the housing company will inspect the apartment to determine necessary repairs.","Lead dust comes from deteriorating leadbased paint and leadcontaminated soil that gets tracked into your home.","The maximum quantity for this item is the number of new rooms created in the space where the demolition was done.","Window and rk items shall be cleaned of all stains and foreign matter, metal columns, railings, etc.","The research relationship proffered to the parents of the children the researcherswanted to use as measuring tools, should never have been presented in a nontherapeutic contextin Nothing about the research was designed for treatment of the subjectchildren.","Rochester had elevated blood lead levels.","Any such additional documentation which the Office may require.","The American Industrial Hygiene Association.","This curriculum is not available on the web.","The degree of risk to be taken should never exceed that determined by the humanitarian importance of the problem to be solved by the experiment.","The DAMP Lessee may collect rent from the assignee, subtenant or occupant if the Tenant fails to pay the rent.","The application for the examination and the required fee may be included with the initial license application form or the applicant may register for the exam before applying for the license.","The source and weight of the fly ash or ground granulated blast furnace slag shall be certified on the cement mill test report or cement certificate of analysis and shall be reported as apercent by weight of the total cementitious material.","There should be no visible paint chips, visible surface dust, debris or residue on the surface of the soil near the foundation before clearance soil samples are taken.","Protective measures shall be used removal of a rug, carpet or padding from the dwelling.","The County shall provide the first ID badge at no cost to the Contractor or their employees.","Tere be one or ore systeatic erornts cntributhe bias.","The Agency reserves unto itself the right, at its discretion, to take proceeds of the loan and pay all verified delinquent claims for labor, materials or other services rendered.","These types of spills are subject to final cleanup standards to be established at the discretion of the regional office.","For doublehung windows, we release the jambliner, pull out the sash with the damaged glass, and install the new sash.","PCB waste generated by others or that was removed while servicing the equipment owned by others and brokered for disposal.","Certificate of Conformance number were issued for the rental.","The door shall be hung in such a manner that no screws are exposed on the outside of the door on either the hinges or the hasps.","To facilitate that purpose, the landlords agreeing to permit their properties to be included in the studies were encouraged, if not required, to rent the properties to tenants who had young children.","Chicago is uniquely poised to use secondary prevention as a preventive strategy because of the low threshold it sets for declaring a child lead poisoned.","State Materials Laboratory will be required for each manufacturer of gasketed helically corrugated lock seam steel pipe.","Affidavit is to be furnished to the Mayor and Council of Rockville and, where appropriate, to the State Board of Public Works and to the Attorney General.","There shall be a description of the items of instructional equipment and accessories available for the conductof courses.","These were Burlington, Vermont; Chicago, Illinois; Cleveland, Ohio; Detroit, Michigan; Philadelphia, Pennsylvania; Rochester, New York; San Diego, California; and Washington, DC.","Wood, iron or pipe.","The Office shall issue a Certificate of Eligibility and Reasonable Cost for all approved applications.","EPA firstestimated an absolute cost of complying with the leadsafe work practices required by a rule if a renovator did not use anycontainment, or perform any cleaning, or cleaning verification prior to the rule.","PCB field screening tests usually report less than or greater than a specific numerical PCB concentration.","FOR THE PERSON FILLING OUT THIS FORM: Are you the Owner?","Do not maintain individually.","HPD accepts an application for the Program and, if applicable, the one with which HPD executes a Tenant Interim Lease.","AIHALAP, LLC in the investigation and resolution of any accreditation related complaints regarding the laboratory.","Signs shall be durable and shall be substantially secured to the walls.","Moisture meters may be used as an inspection aid as long as the meter to be used is designed to measure moisture content on the substrate of interest.","Baltimore City Code by having only determined a remediation level before the tenancy in this case began, and then monitoring lead levels at intervals thereafter.","Point from which shipped.","Class A multiple dwelling, the residential portion of which is vacant, to be rented to persons of low and moderate income as defined by this chapter at rents to be determined by this section.","Dust clearance testing must occur each day and at the conclusion of the work.","When all the work is finished, you may want to know ifyour home, child care facility, or school has been cleaned up properly.","The burden of proof shall be on the applicant to show by clear and convincing evidence that the requirements for granting benefits under the Act have been satisfied.","Inspections only examine the presence of leadbased paint anddo not consider deterioration.","Notes: Verification as described in the Verify Methodssubsection must be performed for each technique within Clear and Purge.","The housing company and HPD shall be named as an Additional Insured.","This is not surprising, because local laws are often initiated in response to community concerns about high EBL rates.","It is not always necessary to print paper copies of FACTS sample collection records for those who have access to FACTS.","Any new approval of such future Transfer will be subject to the Garden Review Process.","Occupants were temporarily relocated before and during hazard reduction activities for their protection.","RECEIPT FOR SAMPLESUPPLY IS EXHAUSTED.","All elastomeric pads with steel laminates shall be cast as units in separate molds and bonded and vulcanized under heat and pressure.","In the case of a mutual housing company, it shall be made a part of the minutes.","Office of Code Enforcement, and a telephone number which tenants may call for service and repairs.","XRF report of testing locations.","To become a certified renovator or certified dust sampling technician, an individual must successfully complete the appropriate course accredited by EPA or by an EPAauthorized State or Tribal program.","Something more than the mere commission of a tort is always required for punitive damages.","All such transoms shall be made stationary.","Leachate is collected from the landfill unit and monitored for PCBs.","Environmental monitoring supplies should be brought into the firm using precautions to prevent the transfer of foreign material into the processing area.","Locations include eaves, rakes, corners, bases, framed openings, ridges, fascia, and fillers.","There is no definitivelist of activities that disturb painted surfaces.","The agency may reject an application if it determines that such requirements are not met.","If the developer retains ownership through the end of the affordable housing plan, then the Capital Improvement Escrow Fund is paid to the developer upon expiration of the affordable housing plan.","The exterior, soil and common areas of the building are exempt from inspection requirements.","Lobbies require use of an auto scrubber weekly.","The sample should be submitted the same day it is collected with the subs properly identi\ufb01ed.","Again, environmental factors and media type might cause the level of sanitization to change.","Agency, or any employee of the Agency to whom the Administrator may either herein or by order delegate his authority to carry out his functions, or any person who shall by operation of law be authorized to carry out such functions.","Failure to provide certified income tax returns or other documentation.","Notwithstanding anything to the contrary in this section or these rules, an applicant may waive its right to a hearing before the Office of Administrative Trials and Hearings.","While the Tenants Association has first priority with regard to meeting space, it should not be to the exclusion of all other tenant organizations in the development.","All painted, varnished or poly coated areas within the dwelling unit must be intactandnot peeling, chipping or cracking.","Material finer than No.","The organization may also need to become certified as a firm.","If more than one commodity is in the shipment, describe and enter each separately.","Notifications must be delivered by United States Postal Service, commercial delivery service, or by hand delivery.","New York city building code, as applicable.","The principals of the managing agent shall devote a reasonable percentage of their time in supervising management duties of their subordinate staff.","Location of principal office where work will be performed, preference being given to persons or firms with offices located in the City of Kenner.","Initials ______ LIST OF SUBMITTALS All bid and quotation submittals must be attached to the bid and submitted before the bid opening stated within the invitation for bid.","There is no feeassociated with the submission of an amended certification.","Annual schedule of reasonable costs.","QPL, the result of the testing for Tult shall be greater than or equal to Tult as determined from the product data submitted and approved by the State Materials Laboratory during source material approval.","The circuit court also granted summary judgment for KKI on the intentional misrepresentation and Maryland Consumer Protection Act claims.","Check with your local water treatment authority for local requirements for handling and disposing of waste water.","Packing and crating of personalty.","All curb in which surface checking develops during the first five days after manufacture will be rejected.","If no, is furniture covered during work with plastic?","Fine aggregate shall be washed thoroughly to meet the specifications.","Aould abandon thedoneely complicated life and eventual death or permit thenaturalction based on reason and medical probability inorder to keep both children alive.","If there is no office on site, the documents shall be made available upon request.","Staging can occur through markings, deliberate damage to labeling, placement within the pallets, etc.","Utility Requirements: Locate, identify, disconnect, and seal or cap off indicated utilities serving areas to be selectively demolished.","Occupied Rehabilitation Program Policy Manual The homeowner is required to furnish income and other property related information for eligibility purposes.","Any gymnasium or other facility which is specially designed for athletic or recreational activities for an academic course in physical education.","Each lot will be a separate sample.","An officially sealed sample must sometimes be reopened to prepare it for submission to the laboratory, or for some other legitiate reason.","The EPA and HUD Real Estate Notification and Disclosure Rule requires that sellers and lessors disclose available lead information about common areas so that families can be informed about preventive actions.","The stutter remainedstutterersng problems because of theexperiment.","Once accepted, any changes to the QCP will require a new QCP to be submitted for acceptance.","Enter the number of cases from which subs were weighed and the number of subs weighed from each case.","Requirements for export and import of PCBs and PCB Items for disposal are found in subpart F of this part.","Commercial Rent Appeals Committee established pursuant to these rules.","Please note that the fee is based on the number of options selected, regardless of the number of analytes within theoption.","Copies of any inspection reports shall be made available to the owner with recommendations for corrective measures where necessary.","HHI Contractor shall conduct a final inspection of the punch list items.","Liebelt did not live testimony, but rather, her videotaped deposition testimony was played for the jury.","It is imperative that the certificates show all form numbers and edition dates and that all certificates are in compliance with this Contract.","Samples from the geosynthetic roll will be taken to confirm that the material meets the property values specified.","Persons participating in decontamination activities shall wear or use protective clothing or equipment to protect against dermal contact or inhalation of PCBs or materials containing PCBs.","If a gas meter is to be installed, its location shall be shown.","Retainer members shall be of the same material as the slats.","Containers shall be compatible in all respects, including without limitation dimensions and loading mechanisms, with the collection vehicles which service them.","Links to these state programs are available here.","The sign panel shall be acrylic modified and UV stabilized for outdoor weathering ability.","They had no prior notice of this equipment.","Redevelopment Company that is a corporation operating exclusively for the benefit of the persons or families who are entitled to occupancy in a project of such Redevelopment company by reason of ownership of shares in such Redevelopment Company.","The vaccine is now available for certain groups.","GROSS WEIGHT CASE NO.","Egress must be from a gateway in the front or end rail.","If the agency approves the proposed EDA with modifications, the agency may, but shall not be required to, proceed with the execution of the modified EDA, and no additional public comment procedure shall be required concerning such modifications.","These samples must be handled carefully to avoid defacing or damaging the product.","Partial sanitization, sometimes referred to as selective sanitization, has potential applications in cloud computing and mobile devices.","Advertising for packing, crating and transportation as the head of the Department of Housing Preservation and Development or his designee may require.","Provided existing piers, beams, and footings are in acceptable condition, replace or tighten and fasten shims to satisfy floor and structure conditions.","Descriptions of abatement projects are not acceptable if the personal involvement of the applicant cannot be determined by the reviewer.","Excerpts ofthese are quoted on the reverse of this form.","Finally, we compiled short case study summaries to highlight the innovations, lessons, challenges, and opportunities exemplified by each case.","Thereorehe masureent ucertaincessbe incorped intomethalidationr veriftin eercses.","Any building where industrial or manufacturing operations or processes are conducted and to which access is limited principally to employees and contractors of the facility operator or to invited guests under controlledconditions.","The sections shall be so designed that when assembled, they interlock with one another forming one continuous weathertight unit.","No person shall make a false, untrue or misleading statement or forge the signature of another person on any document or record required to be prepared pursuant to these rules.","Vertical containment or equivalent extra precautions in containing the work area may also be necessary in other situations in order to prevent contamination of other buildings, other areas of the property, or adjacent buildings or properties.","Sanitize A process to render access to Target Data on the media infeasible for a given level of effort.","Proper documentation that all required notification was given must be maintained in all project files.","Provided that a qualification statement has passed all basic requirements, the Agency shall consider such threshold criteria as are established in the RFQ.","Approval of course instructors and guest speakers.","If you are splitting the sample among multiple laboratories for various analyses, enter each laboratory separately.","Consent of parents can never relieve the researcher of this duty.","Bannon further explained that he did not have the calculations that Mr.","Nail holes, splits or scratches shall be puttied or spackled smooth after prime coat.","HPD will from time to time establish intake rent levels, expressed as a minimum dollar amount per zoning room, for all dwelling units in Buildings entering the Program.","The panel shall be mounted on the inside of the front cabinet door.","Signs shall be provided with means for fastening securely to the wall.","Plaintiff Cecil Harris through his mother and that Plaintiff Cecil Harris, through his mother, reasonably relied on that negligent misrepresentation.","Sawdust shall not be used as mulch.","Destroying some types of media.","This is not a study that should ever beconsidered defensible in any era.","Units with an At Risk Occupant.","This paragraph serves as notification to Contractor of the policy and provides the parameters of compliance enforcement.","An exception is import samples.","Training providers must be accredited to provide the specialized, oneday leadsafe work practices training.","That does not mean that all of the firms involved in a project must retain a copy of the records.","Buildings or separate groups of Buildings which are on the same tax block and lot and are completed within the applicable time period, provided that separate Building Permits are in effect for each such filing.","Other records which may be substituted in the absence of an invoice are copies of purchase orders, receiving records, canceled checks, correspondence, etc.","Sometimes additional hazard control work is necessary.","County Authority: A State by State Report.","Notwithstanding any provision of these Rules to the contrary, any allocation of federal benefits, including, but not limited to, rental subsidies and low income housing tax credits, shall be made in accordance with the federal laws and regulations concerning such benefits.","Adequate soil underlining and soil cover shall be provided to prevent excessive stress on the liner and to prevent rupture of the liner.","Other related sample numbers should be listed in the Collection Remarks \ufb01eld.","These regulations require strict enforcement of certain conditions specified below.","HPD, regardless of whether the prior agent was given said increases.","This date should be used to identify the physical sample and any records attached to the CR.","ID in an obscure location, etc.","Eligibility for Relocation Services.","Administrative Code, which do not provide for the offering of leases for fixed terms.","However, the absence of visible emissions is not sufficient evidence of being adequately wet.","Since fines can be assessed administratively, this approach can obviate the need to seek judicial enforcement, that is, in a forum in which a court has the authority to directly order compliance.","SCRIE subsidy and collection or retention of any such amount for a dwelling unit occupied by such eligible head of household shall be deemed a rent overcharge.","Alternative decontamination or sampling approval.","Landlord will hire a licensed Lead Inspector to do another Visual Inspection and to take Dust Wipe Samples.","Information concerning the technical qualifications and experience of the persons responsible for the overall operation of the facility and the employees responsible for handling PCB waste or other wastes.","It was wrong in the first instance.","Notice that although they both follow the same standardized format under GHS, they will still have differences in content and style, because they were written by two different authors.","We are interested in finding out how well the two levels of repair work.","The superintendent may vary the provisions of these rules where strict compliance would produce unnecessary hardship, provided the intent of the law and rules is obtained.","The increased contract unit price shall not apply to orders received by the Contactor prior to the effective date of the approved increased contract unit price.","Lead Disclosure form and Lead Mitigation Law does not change these requirements.","Release forms: The City will obtain release forms from property owners allowing the contractor to test for lead based paint on the premises.","Since you cannot see, taste, or smell lead dissolved in water, testing is the only sure way of telling whether or not there are harmful quantities of lead in your drinking water.","If the postponement is granted, a new date for correction must be set, which shall not exceed fourteen days from the initial date set for correction in the notice of violation.","Proceed with interior work only.","Are Local Laws the Key to Ending Childhood Lead Poisoning?","Notice of Intent to begin marketing the Affordable Housing Units was filed with the Agency no later than nine months prior to the Completion Date.","Please let us know the names and addresses that match of these children so we can carry out the requirements of this section for environmental intervention.","Spanish, and will either be posted in a common area of the Building and affixed to or placed under each dwelling unit door of the Building, or mailed to every occupied dwelling unit in the Building, as determined by HPD.","Occupied Rehabilitation Program waiting list will be maintained in accordance with established policies and procedures.","Aggregate removed from deposits contaminated with various types of wood waste shall be washed, processed, selected, or otherwise treated to remove sufficient wood waste so that the oven dried material retained on a No.","Completely close and seal all joints including, but not limited to, perimeter of frames around doors, windows, and where other type wall materials join dissimilar materials.","KKI did not negligently misrepresent a material fact or that Ms.","The epoxy primer coat and the polyester finish coat materials shall be from the same manufacturer.","Also, NSF International maintains recommendedmaximum dosages of drinking water additives including phosphate products.","All coverages for subcontractors shall be subject to all of the requirements stated herein.","This will permit cursory review and, if necessary, photocopying of the container label and reduce the need to break the seal each time the label is Tissue samples are not routinely collected for microscopic or pathological examination.","CONDITIONSOwner will occupy portions of building immediately adjacent toor underselective demolition area.","Any changes in the ead esign Plan during the walkthrough must be in writing and received by all attending contractors prior to submitting bids.","Procurement Policy and Procedures, Jefferson County Code of Ordinances.","All books, records and financial data pertinent to the requested increase shall be made available to representatives of the Tenants Association in a rental development.","The Court: But that almost assumes that they realize that some of the partial abatements would not be successful.","However, their inclusion in the local law may increase awareness and facilitate enforcement in local court.","Rent regulation generally mandatory.","And these are the surfaces that were wiped.","City inspectors conduct limited risk assessment.","Neill Contract, NYSCEF Doc.","TARE DETERMINATIONWhenever possible, determine a minimum of six tares selected at random.","The innerduct shall have a smooth, nonribbed interior surface, with a factory prelubricated coating.","Immediately following Disposition, the Permanent Owner shall register all units in a Building with the New York State Division of Housing and Community Renewal if required by applicable law.","The Agency may utilize such administrative procedures, consistent with such Laws, as it deems appropriate to effectuate the purposes of such Laws and the City Housing Goals.","In a time of shrinking municipal budgets, political will to implement lead laws may decline.","Designee: Will the Laboratory Director be present during normal laboratory operation hours?","Act as a result of satisfaction of the requirements of this section shall have the ongoing responsibility for insuring the continuing maintenance and operation of the affordable units in a habitable condition.","Special consideration will be given to experience, familiarity with the services to be provided, reputation, quality of work and the level of training and certifications of the respondent.","Course content, hours of instruction, refresher training, etc.","Industrial buildings include buildings used directly in the production of power, the manufacture of products, the mining of raw materials, and the storage of textiles, petroleum products, wood and paper products, chemicals, plastics, and metals.","Note: The dry ice may freeze the edges of the product, so if it is imperative no part of the sample becomes frozen, use coolants other than dry ice.","The agency may perform all responsibilities allowed an individual management planner and may also perform surveys if the appropriate individuals are licensed to do so.","Order determines a willful failure to pay the Prevailing Wage that involves a falsification of payroll records or the kickback of wages or supplements.","Refusal to Sign the Affidavit.","The head of the valve, or handle when applicable, shall be permanently marked to indicate port position.","Department of Finance of the City of New York or any successor agency.","The sales or rental agreement, blanket position bond, and resolution of the Board of Directors of the housing company authorizing the agreement have been approved by HPD.","Upon contract completion, two master keys for the construction core shall be delivered to the Engineer.","Bureau of Housing or the implementing agency will verify that all the requirements for eligibility have been met.","Reject homes with lead hazards to the buyer in advance This policy should also be communicated toe lead safe work practices and that the unit unds for the buyer to fix the hazards.","Legal name of the firm and mailing address.","The department may revoke or suspend instructor approval if field site inspections or classroom audits indicate an instructor is not providing training that meets the requirements of the Model Accreditation Plan or these sections.","Fee Rule for Lead Abatement and Renovation, Repair and Painting Programs?","Such courses will not be accredited by the department.","Federal program state teach a course at a location in an authorized State that would lead to certification in the Federal program?","DAMP shall assist eligible Tenants in applying for existing rental assistance programs.","PCB remediation waste, a uniform placement of concrete, asphalt, or similar material of minimum thickness spread over the area where remediation waste was removed or left in place in order to prevent or minimize human exposure, infiltration of water, and erosion.","Degaussing renders a Legacy Magnetic Device Purged when the strength of the degausser is carefully matched to the media coercivity.","OPERATIONS: ABATEMENT PRACTICES AND PROCEDURES FOR PUBLIC BUILDINGS General provisions.","The Purchaser may remove this contingency at any time without cause.","Measuring Affordable Floor Area.","If both ends bulge, but only one will remain flat when pressed, the can is a springer.","Procedure for obtaining a permit.","Addiionall, labtorhally ALAP, LLCin itingof iiot inlieuubmittingplieraionion.","PCB waste handled prior to effective date of this subpart.","The Agency shall make no warranties, express or implied, with respect to any factual information contained in any RFQ.","Another option is tosearchfor strings across the media or looking for files that are in known locations, such as operating system files likely to be stored in a specific area.","HECPs shall be made of natural plant fibers unaltered by synthetic materials, and in a dry condition, free of noxious weeds, seeds, chemical printing ink, germination inhibitors, herbicide residue, chlorine bleach, rock, metal, plastic, and other materials detrimental to plant life.","It shall be free from various types of wood waste or other extraneous or objectionable materials.","The Occupational Safety and Health Administration of the United States Department of Labor.","Conformance is demonstrated through accreditation by an ILAC recognized signatory.","If the visual exam or inspectional evidence indicates possible problems, such as under processed lots, lots with questionable seam integrity, or abnormal cans, exam the affected lots.","Hinge pins for Type E mount.","Exceptions to Covered Categories of Work.","This example shows how local laws could address gaps created by evolving case law that threaten to reduce tenant protections.","Venue for any court action shall be in Jefferson County, Missouri.","The Contract Plans and the Standard Plans will continue to use an English size designation.","The second affidavit should be appended to the original.","Living Unit to qualify for assistance.","Bureau of Housing or the implementing agency Unusual or extenuating circumstances that may warrant an exception to program policies Notice of Decision Upon conclusion of the informal review, the hearing which to issue a Notice of Decision.","Record Keeping, Subpoenas and Oaths.","The rehab specialist decides to go ahead with the window replacement.","If an application contains a series of Major Capital Improvements, the Commencement of Construction date is that of the first Major Capital Improvement for which benefits are claimed.","Closures: Provide closures at eaves and ridges, fabricated of same metal as metal roof panels.","Empty trash and recycle cans.","Each IRB is required to have at least five members of varying backgrounds; there must be racial, gender, and cultural diversity.","Phase I Site Assessmentinvestigation of the existing and past uses of a site for the purpose of identifying areas on a site at which pollutants may have been released into the environment is required for all projects seeking financing through CHFA.","NEMA control assemblies shall meet or exceed current NEMA TS Environmental Standards.","YOURSELF WORK professional backgrounds may complete their own work.","CE can also be used as a supplement or addition to other sanitization approaches.","The Regional Administrator will consult with the Director, Office of Resource Conservation and Recovery, prior to making such a finding.","The Office shall issue a Certificate of Eligibility for all approved applications.","All other criteria set forth in this section governing rental of dwelling units or sale of shares.","All timber poles shall be gained according to industry standards.","One way to accomplish this is to collect and remove the paint chips and debris from the plastic sheeting at the end of each day, mist the sheeting, and fold it dirty side inward.","The terminals to which field wires are attached shall be permanently identified to facilitate field work.","Program on the grounds of race, color, national origin, creed, age, sex, or sexual orientation.","Root balls of plant materials shall be solidly held together by a fibrous root system and shall be composed only of the soil in which the plant has been actually growing.","The affidavit by the dealer may not be evidence, since the dealer lacks personal knowledge of the point of origin.","The full name and address of the proprietor of the lodging house and of the owner of the premises.","Aluminum end caps shall be painted to match the color of the signal housing.","Approval for shorter notice will be granted, if appropriate, in writing.","Field wire terminals shall be labeled in accordance with the Field Wiring Chart.","HPD shall not invalidate any action taken pursuant to this chapter, nor shall such technical violations give rise to any rights, claims or causes of action against HPD or the City of New York.","The innerducts shall be factory installed in the outerduct.","City may be obligated to pay by reason of any actual or alleged infringement of patents used in the construction and completion of the work herein specified.","Storage and handling requirements and recommendations.","So the only benefit to the parent was the remuneration that was given for entering into this informed consent and allowing their children to be a part of this study?","If singlesurface samples in only one room or on one type of component fail, only that room or component shall be recleaned and be retested until it passes a dust clearance test.","Director, National Program Chemicals Division and must identify the sites of PCB activities and the quantity of PCBs to be manufactured, imported, processed, distributed in commerce, or exported.","The panel shall be mounted, showing and providing detection for inputs and specified controller outputs, at the top of the front rack above the controller unit.","RCRA hazardous waste management and disposal requirements.","When specified, samples must be timely submitted and at no expense to the County.","The post system shall be designed for permanent installation to resist overturning, twisting, and displacement from wind and impact forces.","Implementation of this code merits future study.","The next steps that the owner must take will depend on whether an inspection has already been conducted by HPD.","Lot A batch of chemicals or sampling media manufactured at the same time.","Applicant is also required to disclose promptly during the processing of the application, by an amended certificate, any changes which occur during such processing and to verify the continued accuracy of the certificate at the loan closing.","Ineligible Portions of Real Property.","If the dealer is packaging the product in plastic bags, collect sample in these bags.","In the event a Contractor will be required to perform cleaning services in any area of the building for less than a full month, the Contractor will be paid pro rata according to the number of days expended in the area.","The Summary Results section lists aexamination.","This calculation will commence with beginning working capital or deficit working capital as of the beginning of the projection.","Sample collection data may be entered either from an FDA office or from a remote location in the field using a laptop computer and modem.","Second level of sample selection.","Provide all other information.","The Respondent: There was some remuneration involved as an incentive to get the participants to enroll and continue to follow through.","OEI coordinator, so the information can be updated in the FACTS \ufb01rm table.","This alerts the receiving custodian the of\ufb01cial seal is underneath, and to take care when removing the protective paper.","The Nuremberg Code explicitly recognized the need to place nonpaternalistic limits on the scope of experiments.","Note: If the start date on this notification can not be met, the DSHS Regional or Local Program office be contacted by phone prior to the start date.","Respondent: There was some remuneration involved as an incentive to getthe participants to enroll and continue to follow through.","Remove cesspool and all sewage saturated earth, disinfect site and fill with fresh earth.","Other claims for review of an agency action.","The quantity of mineral oil dielectric fluid burned in the boiler each month.","EPArecognized lead test kits cannot be used on that substrate to comply with the testing requirements of the RRP rule.","When such a condition is found it should be brought to the attention of the Department of Buildings for decision.","Inspection to include a complete Full Risk Assessment report and Clearance report, as applicable, for all inspections conducted.","The department may revoke or suspend approval if field site inspections indicate a training course is not providing training that meets the requirements of the model accreditation plan or these sections.","The answers to these questions vary from one community to another.","Therefore, it is important for individuals to review the specific regulations for the states where they will be working.","The certificate must include the signature of the instructor and the signature of the course director, principal officer, owner, or CEO, and a eceiving the certificate has completed the requisite traininfor asbestos accreditation under TSCA Title II.","All firms remain liable for ensuring compliance with the RRP Rule.","If this choice is taken, no detailed bills need be submitted by the tenant.","If so ordered by the Engineer, the loads shall be dumped on a flat surface for sorting and measuring the individual rocks contained in the load.","New York, a certification that the completed work complies with the requirements of the particular governmental agencies having jurisdiction thereof and that applications seeking the approval of certification of such agencies have been properly filed with or submitted to such agencies.","They did not supervise, direct or control the construction activities and did not dictate the means and methods of construction.","Only one certification, whether electronic or by mail, for any one or group of violations may be submitted to HPD.","The periods of retention referred to in this Section are extended automatically during the course of any unresolved enforcement action regarding the regulated activity or as requested by the Administrator.","Theor may reommolloloof rouineftinghe laboory.","HPD, unless the context clearly indicates reference to an application for a permit submitted to DOB.","HPD to become the legal tenant of such apartment.","The Bureau of Housing or the implementing agency shall purpose to ensure that the administration and e public trust.","Such form shall be placed in the project file.","The security goal of the overwriting process is to replace Target Datawith nonsensitive data.","One of the most important objectives of such review is the review of thepotentialmpact of a research project on the human subjects of theexperiment, especially on vulnerable subjects such as children.","General Business Law of the State of New York.","Balance adjuster for Type Q, R, and S mounts.","Abrasive blasting or sandblasting without HEPA local exhaust control.","Testing of used oil fuel.","Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work.","DEMOLITIOGeneral: Demolish and remove existing construction only to the extent required by new construction and as indicated.","Si un ni\u00f1o de seis a\u00f1os de edad no vive en la unidad ahora, pero viene a vivir en cualquier tiempo durante el a\u00f1o, usted debe de informarle al due\u00f1o por escrito inmediatamente a la direcci\u00f3n prove\u00edda abajo.","When the external drive bay contains an ATA or SCSI hard drive, if the commands can be delivered natively to the device, the device may be sanitized based on the associated mediaspecific guidance.","Tenants in occupancy shall have the first priority for internal transfer.","There may be more than one worksite in a dwelling unit or at a residential property.","Time of detection shall be unlimited.","Department prior to the commencement of any rehabilitation work or the making of a loan for same.","Ground containment measures may stop at the edge of the vertical barrier when using a vertical containment system.","Aggregate Floor Area of the Real Property shall not qualify as Housing Accommodations.","Erasures in bids must be initialed by the bidder.","For instance, may the certified renovator test just one window sill in a room if all will be affected?","Temporary Certificate of Occupancy or a Permanent Certificate of Occupancy.","All damaged, loose, or rotted parts shall be removed and replaced and the finished work shall match adjacent work in design and dimension.","The housing company may remit half of any such charge collected to the managing agent, in accordance with the terms of the applicable contract, to compensate for the additional administrative work.","Destroy: Incinerate by burning the tapes in a licensed incinerator or Shred.","Lead Maintenance course training, might not have to cover basic leadsafe work practices information.","Gates shall have positive type latching devices with provisions for padlocking.","Any person determining PCB concentrations for liquid PCBs must do so on a wet weight basis.","XXALL Wet Floor Caution Signage must be returned to storage after floors are confirmed dry.","Collection, Retention and Disposal of Garbage, Rubbish and Refuse in Multiple Dwellings.","Where there is no paint to disturb, the RRP Rule does not apply.","The City has the right to use and reproduce any documents, materials and data, including confidential information, used in the performance of, or developed as a result of this contract.","Agency to be appropriate upon submission of an application or thereafter.","The rights and remedies of the County provided in this paragraph shall not be exclusive but are in addition to any remedies provided in this Contract or as provided for by law.","Will that be sufficient since I have no employees?","Rutland Avenue may be used to show comparative levels measured by the same means, including themagnitude of such differences.","And there was no hazard in the home.","Contractor and deducted from the monthly invoice.","The resulting media contents vary based on the command used.","Panels shall contain additives designed to be less responsive to fire ignition and flame propagation.","Esto no es aplicable para un renovamiento del contrato de alquiler.","Verify that roof openings and penetrations are in place and set andbraced and that roof drains are securely clamped in place.","Using these criteria, soil is not a hazard at this Mr.","Korfmacher Katrina S, Ayoob Maria, Morley Rebecca.","Relocation programs are typically of short will probably not be required.","No practical purpose would be served by either collecting or If this type sample is desired your supervisor will provide speci\ufb01c instructions and procedures to be followed.","ORGANOLEPTIC EXAMINATIONSExamination of many products may be conducted on the spot without fixed laboratory equipment.","This choice may be selected by commercial tenants only upon prearrangement and consent of the head of the Department of Housing Preservation and Development, or his designee.","They heard a little bit about it before.","Scrubber effluent shall be monitored and shall comply with applicable effluent or pretreatment standards, and any other State and Federal laws and regulations.","Therefore, without such exposure, there is no current human health risk.","Loss of trained employees.","The Taxpayer may submit Comments to HPD during the Comment Period.","HOME rental assistance is not provided to this unit, so ongoing LBP maintenance is not required.","Each containercontained a medical device.","All projects are inspected by program staff.","Article XI of the Private Housing Finance Law in order to purchase a Building pursuant to these Rules.","These factors may mitigate expected exposures and risks or make cleanup to these requirements impracticable.","Certificate of Eligibility and Reasonable Cost.","Certified inspectors or risk assessors are free to conduct representative sampling, so long as the components to be tested are chosen in accordance with documented methodologies, such as the HUD Guidelines.","The department shall be notified of any demolition of a public building whether or not asbestos has been identified.","Occupants of the respective floors shall deposit all garbage, rubbish and refuse only in the receptacles referred to in the foregoing rule, and during the hours indicated therein.","All required records shall be made available, upon request, for inspection and review by the department.","The plan developed under this subdivision shall require that any lead hazards identified through the inspection be addressed.","If a delivered to the labory promptly an haled expeditiously, freeof the FA su i not ssary.","Contractors are also expected to be familiar with, and to comply with, all locally adopted, written property codes, written rehabilitation standards, bid specificationstly adopted by the City of Atlanta.","It also provides the essential contact information of the supplier.","Law does not permit the Revocation of the Tax Benefit.","This exemption does not apply to any work undertaken subsequent to or above and beyond such emergency actions, other than the demolitions noted above.","Insure DOT guidelines are followed when mailing or shipping samples containing fumigant or preservative.","The site shall have monitoring wells and leachate collection.","But in terms of defining what that hazard is, the State has done so in statute and regulation.","WILLIAMSBURG: The area bounded by Metropolitan Avenue; Union Avenue; Conselyea Street; Wood Point Road; Frost Street; Morgan Avenue; Meserole Street; Bushwick Avenue; Flushing Avenue; Union Avenue; Division Avenue; and the East River.","All other LEDs shall be red.","If residents are present, the work area must be sealed off so that leaded dust does not enter the living area.","There may be additional special considerations or requirements as directed by Facilities Management.","Affordable Housing Fund by a certified check or bank check payable to the New York City Housing Development Corporation.","Relocatee and his or her Family formerly resided that is the subject of a Vacate Order.","The use of stove bolts is prohibited.","The Contractor shall mold and test a sufficient number of concrete test cylinders to determine the strength of the concrete as required by the Specifications.","If a Relocatee accepts an offer of Shelter Services, HPD may order a Relocatee to move from one temporary shelter to another if, in the judgment of HPD, this facilitates the work of HPD or reduces the costs of temporary shelter.","Use safety precautions in handling and shipping commensurate with the hazard.","The wet sheeting shall show no apparent loss of reflective performance as compared to dry material.","Manual pressure on the bulged end forces the opposite end out or the same end will spring out with release of pressure.","No compensatory per diem shall be paid to committee members unless required by law.","Rehabilitation Program and will conform to all applicable HUD guidelines.","Plaintiffs contend that the Hovnanians breached this obligation, because their construction project damaged the Seymour Property and the Hovnanians have failed to make the necessary repairs or pay for the damages.","Unreported Opinion far afield from what is really necessary in this case.","How do the record keeping requirements apply to an emergency renovation?","If I sand fivesquare feet of paint on one wall on one day, and fivesquare feet on a different wall in the same room on the next day, are both projects considered minor repair and maintenance?","Duty Junction Boxes, Cable Vaults, and Pull Boxes shall be load tested to pounds.","Deny the request for a TSCA PCB Coordinated Approval.","The identity of the PCB waste affected by the Certificate of Disposal including reference to the manifest number for the shipment.","The product contains two or more dead whole insects in at least \ufb01ve of the immediate containers.","The Agency may charge a fee, in an amount to be determined by the Agency, for a copy of the bid solicitation.","Based on this analysis, we present a series of recommendations for municipalities considering adopting or revising local lead laws in the future.","Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity.","Tenant or Guest during the Lease Term shall be removed by the Tenant before the termination of the lease term at the option of the DAMP Lessee.","The services provided under these specifications shall be performed using the latest methods and practices in current use, by the industry.","Written Agreement and Condition of Stay.","ACCREDITATIONA laboratory that is currently accredited by another ILAC recognized Accreditation Body may transfer their accreditation.","Risk assessment by health department.","The core lock shall be installed with a green construction core.","Existing must be removed from under or within a structure.","Sometimes there is no need to remove an existing carpet before installing the new carpet, but sometimes there is.","Department of Buildings or the issuance of an alteration permit where required.","Potential hazards shall be so stated on the package in accordance with the Federal Hazardous Products Labeling Act and State of Washington, Department of Labor and Industries Regulations for Shipment of Hazardous Products.","HETL State of Maine Health and Environmental Testing Laboratory.","The Agency may terminate any application process in whole or in part at any time.","Based Paint Poisoning Prevention Act may impose a potentially broader litigation obstacle.","The laboratory will con\ufb01rm Use either a Gurley, Troemner, or equivalent balance.","Signs shall be maintained in a clean and legible condition.","PCB Spills Cleanup Policy in subpart G of this part, including a description of the methods for sampling and testing of surrounding soils, and the criteria for determining the extent of removal or decontamination.","Residential building has been converted to an Eligible Multiple Dwelling.","If a project is awarded funding, CHFA will require targeted testing of identified suspect materials as warranted by the proposed scope.","All developments are subject to physical inspection.","Pick up any paint chips or other debris that may have fallen elsewhere.","The agency may test the proposed ASR mitigation measure to verify its effectiveness.","Realign and adjust all supporting members.","Lighting within the sign or in back of the sign shall not be required if other illumination is sufficient to make the sign legible.","Abatementmust be performed by certified abatement contractorscertified paint inspectors and risk assessors.","In the case of a mutual housing company, a Board of Directors Resolution certified and acknowledged by the Secretary of the Corporation setting forth the adoption of the late charge by the Corporation shall be submitted to HPD.","Detroit Property Maintenance Code, Detroit Code of Ordinances, pt.","Deciduous trees that have solitary leaders shall have only the lateral branches thinned by pruning.","Application Preparation: Complete every entry on form.","Link the sample numbers to the assignment for tracking purposes.","The coating serves as a liner that keeps corrosion elements in water from dissolving some of the metal in the drinking water.","Sharing of County badges among Contractor employees is vehemently unauthorized, completely prohibited, and may result in dismissal of the Contractor.","Nominal shall be construed to be the area of the cross section of the shape obtained by multiplying the specified width by thickness.","Lead is particularly harmful to children, in whom it can cause learning and behavior problems and delay physical growth and mental development.","New York City Department of Finance.","The Clear pattern should be at least a single write pass with a fixed data value, such as all zeros.","The Agency may make Dispositions and provide Assistance to Sponsors for the purposes and in accordance with the procedures described in these Rules.","Storing the waste in a covered waste container is one way to meet this requirement ifthe waste container prevents release of dust and debris.","The projected indication shall conform to ITE transmittance and chromaticity standards.","For DOC samples, you must leave this \ufb01eld blank.","In the case of helical corrugated pipe manufactured with a continuous lock seam, an interior nonuniformity over the lock seam equal to the thickness of two culvert sheets is allowable.","Laboratory accreditation and proficiency.","Certain Complaint Samples Injury and illness investigation samples from certain complaints where there is no Federal jurisdiction, or where the alleged violation offers no basis for subsequentregulatory action.","The period of interim approval shall continue until EPA makes a final decision on the storage application at which time such interim approval shall terminate.","Failure to notify HPD or the Tenants Association shall in no event be deemed to afford a defense to litigation.","Sanding without moisture and includes both hand and machine sanding.","Affidavit of James Cohen, NYSCEF Doc.","Compositing samples from surfaces to be used or reused.","Hydrant length, measured from the bottom of the hydrant to the sidewalk ring, shall provide proper cover at each installed location.","Alternate Garden Contact Person.","The inspector course shall consist of at least three days of training.","Steven Leggat, Property Maintenance Division, Buildings, Safety Engineering and Environmental Department, City of Detroit, pers.","The decision of the Bureau of Housing or the implementing agency.","Cost of moving structures, improvements or other real property in which the displaced person reserved ownership.","Benefits for the period after issuance of either a permanent certificate of occupancy for the entire building or a temporary certificate of occupancy for all of the residential areas contained therein.","PCBs shall do so in a disposal facility approved under this part.","STwo samples taken from and representative of the same ion augh allteamplng and al s in anidennner.","The licensing requirement varies by State.","These homes are served by onsite sewage systems also known as septic systems.","We will be working closely with you to help you understand and comply with the new rules.","The decision process is based on the confidentiality of the information, not the type of media.","Dust sampling of exterior locations is not required.","Administrative Code, seeking public comment regarding whether there has been Harassment of the lawful occupants of the Pilot Program Building during the Inquiry Period.","This information may be included on the Certificate of Treatment record.","Another letter, same form, notified Ms.","However intermediate inspections may be made to determine surface checking and hidden air holes if it is impractical to examine for these defects at the final inspection.","Once accepted, any change to the QCP will require a new QCP to be submitted for acceptance.","In the event of conflicts between the MUTCD and the Contract provisions, then the provisions shall govern.","ACBM shall be removed in small sections and containerized while wet.","Use the following procedures to sample bulk PCB remediation waste that is in a single container.","The brokerage agreement shall constitute the complete understanding between the housing company and the broker.","Discretionary Tax Benefit, the period commencing with the submission of an application for such exemption or abatement and ending one year after the date of approval of such exemption or abatement by the City Council.","Nonetheless, the majority appears to have decided the issue of whether such duty of care was, in fact, breached as a matter of law, without a hearing or a trial on the merits.","English and in Spanish, upon moving into temporary shelter and only the provisions of that section relating to termination of temporary shelter benefits and the obligations of a relocatee in temporary shelter shall apply to the relocatee.","Samples should be collected from the equipment itself, particularly equipment mounting and support structures.","We disagreed with thatdetermination.","Tankless water heaters shall be considered a good option as they will save the homeowner money from the moment they are installed.","Such reimbursement procedures shall be administered at the direction of the Bureau of her designee.","All bolts and other hardware which are to be galvanized and which require bending or shaping shall be hot forged to the required shape before galvanizing.","The hardship which will result to the relocatee or the family or household.","Previously Required Required Since the Lead Safe Housing Rule Became Effective Landlords sign the Lead Based Paint Disclosure Form when a request for Lease Approval is submitted for a unit.","Field Manual for Grid Sampling of PCB Spill Sites to Verify Cleanup.","The jurisdiction may have to add this information to the report themselves or request it from the abatement contractor if it is not provided by the clearance examiner.","For those landlords, complete abatement was not deemed economically feasible.","However, thesetechniquemay not always be available becausethe individualperforming the sanitizationmay not have the authentication token needed to access and read the data stored on the drive.","Notarize and execute by a person authorized to sign legal documents on behalf of Contractor.","Environmental compliance by Department of Defense installations overseas is governed by a number of documents.","There are likely to be differences in implementation between, for example, the enhanced Security Erase command for ATA devices from different vendors.","Legends shall be sealed with transparent film resistant to dust, weather, and ultraviolet exposure.","Drawer Shelf, and Controller Unit Supports.","Property Damage Insurance in the amount of not less and subcontractor from claims for property damage which might arise from operations under their contract.","City to a Sponsor in connection with a Project.","However, if the cost of the sample seems excessive, try to persuade the dealer into charging a lower price that is more equitable.","What does this column mean?","Firms must be EPA certified.","Each housing company is required to submit on a timely basis an annual audited financial statement.","Your sample collection should be sufficient to document the extent of the violative conditions and not be limited to this minimum.","Vertical containment or equivalent extra precautions in containing the work area may also be necessary in other situations in order to prevent contamination of other buildings, other areas of thproperty, or adjacent buildings or properties.","The pavements shall be applied following the coating with asphalt.","To correct Priority I defects that must meet City Code requirements.","Conducts laboratory investigations in the broad areas of food additives, allergens, pesticides, dietary supplements, seafood toxins, food defense threat agents, and industrial chemicals that may contaminate CFSAN regulated products.","The Agency may negotiate and dispose of any Site on terms other than those set forth in the advertisement.","Proof of Compliance with the Housing Maintenance Code.","Bolts, dowels, washers, and other hardware, including nails, shall be black or galvanized as specified in the Plans, but if not so specified shall be galvanized when used in treated timber structures.","The repair kit shall be prepackaged and include the split conduit and split couplings necessary to restore the damaged conduit to the original inside dimensions including a water and air tight seal.","While volatility statements are useful, caution should be applied in comparing statements across vendors because vendors may state volatility details differently.","Walls must be capable of affording privacy for the occupants.","Shortly thereafter, the Hovnanians commenced work on their property.","Although use of the tables in this ppendix is recommended here, other methods exist to satisfy the intent of Clear, Purge, and Destroy.","EPA will require further cleanup.","Cabe senalar que el propietario tiene la obligacion de reemplazar los protectores solo dos veces en el periodo de un ano.","Alternate bids and exceptions to bid clauses must be clearly noted on the bid form.","Homeowner Notice of Intent to Sell.","City of Atlanta shall of Atlanta on a monthlfollowing completion of the improvements, the Deed shall be deemed by the City of Atlanta to be forgiven and the City of Atlanta will execute a full release without obligation by the homeowner.","Disintegrate, Pulverize, Melt, and Incinerate.","AWWA tapered thread or female iron pipe thread outlet.","At the time of delivery, the pipe shall be homogeneous throughout, uniform in color, and free ofcracks, holes, foreign materials, blisters, or deleterious faults.","Hook and eye bolts, or other approved means, shall be provided to hold the segments firmly together.","Revision of the form will require an additional fee only if the amount of reportable asbestos to be removed is increased.","Boiling water can concentrate lead levels and increase the amount of lead in water.","The laboratory will confirm both tare and net weights.","The State Building Code already requires landlords to correct any peeling paint, cracked or loose plaster, decayed wood, and other defective surface conditions in a rental unit.","In addition to any other inspections authorized by law, the Department may make periodic inspections of the building so long as any monies remain unpaid on the loan.","Certification of Compliance incorporated in their Bill of Lading.","This item requires an affidavit from an engineer or architect certifying that he has personal knowledge of the installation and that the quantity claimed was installed.","Commissioner of the Department of Sanitation.","Additional documentation for certain alterations or improvements.","Determine if seals are intact and record seal number.","The well opening at the surface shall have a removable cap to provide access and to prevent entrance of rainfall or stormwater runoff.","Office of Tax Incentives of the Department or any successor thereto.","The Agency shall determine which rules, if any, apply to any Program or Project.","After that, we used that approach with many new policies.","The statement may be used to support decisions about which equipment to purchase, based on the ease or difficulty of sanitization.","The TMA shall have an adjustable height so that it can be placed at the correct elevation during usage and to a safe height for transporting.","Services to Individuals Temporarily Displaced by Vacate Orders.","Lead Safety Regulation covering federally assisted housing.","The handgrip portion of handrails shall have a smooth surface with no sharp corners.","Such appeal shall include proof of service of a copy of such appeal upon the housing company.","It is frequently easier and quicker to collect relatively inexpensive units to field strip than it is to photocopy or photograph all accompanying labels.","If families and building owners are aware of the presence of leadbased paint and the proper actions to take, most leadbased paint hazards can be managed.","It is an order for the carrier to move the goods.","Requires regular visual clearance and lead dust wipe clearances by certified personnel.","Media flows in and out of organizational control through recycle binsin paper form, out to vendors for equipment repairs, and hot swapped into other systems in response to hardware or software failures.","Components which are torn, wrinkled, or exhibit poor workmanship, will not be permitted.","Sea Breeze Trucking, Inc.","Exception to Assessed Valuation Limitation to Allow Additional Affordable Housing Units.","Public information meeting for Rental Companies.","EPA also recommends that these materials be stored onsite or transported offsite in a way that prevents access to dust and debris or release of dust and debris.","It is not the possibility, but the probability, of prejudice which is the object of the appellate inquiry.","The location of the lodging house.","The application shall set forth the name, address and telephone number of the owner of record of the property, the holders of existing liens and of the proposed architect, contractor and attorney.","Maintenance of windows and exterior doorsbe not less than three feet, zero inches accommodate handicapped access.","Usted puede solicitar que el due\u00f1o le d\u00e9 una copia de los archivos de la inspecci\u00f3n visual hecha en su unidad.","Fittings for PVC pipe shall be the same as specified for ductile iron pipe.","Bow braces and overhead braces will not be accepted.","VI items have II item if all priority I items have been corrected and the homeowner would like to deduct a priority III thru V item in order to improve accessibility of the home.","In the absence of such documentation by the owner, or visual inspection by the certified individual, the certified individual must test each dwelling unit in order to provide the required certification.","Armed Forces away from home and exposed to hostile fire; andlumpsum payments caused by delays in processing periodic benefits such as welfare, unemployment and social security.","The FDA may have previously taken a sample of the product while in import status, or the product may have been permitted entry without being sampled.","This Dislocation Allowance is not subject to any set off by the Department of Housing Preservation and Development.","All Certificates of Disposal that have been generated or received by the facility during the calendar year.","Terminate and seal top of sheet flashingsand mechanically anchor to substrate through termination bars.","Provide information on the legal owner of the facility.","Stitched Together Across Top Seam.","The Tenant, Occupant or Guest is using or permitting such housing accommodation to be used for an illegal purpose.","Failure to adhere to this policy reduces the efficiency of the operating staff by creating conflicts in control and in the chain of command.","The RRP Rule does not specify the format in which these documents must be kept, but they must be available at the work site.","Destructive techniques also render the device Purged when effectively applied to the appropriate media type, including incineration, shredding, disintegrating, degaussing, and pulverizing.","All geosynthetic that has defects, deterioration, or damage, as determined by the Engineer, will also be rejected.","Department of Housing Preservation and Development setting forth the maximum number of lodgers permitted to be accommodated in such room, and also a copy of these rules and regulations.","Dwelling Unit and of sound construction finished with surfaces that are easily cleanable and that will not impart any toxic or deleterious effect to food.","For applications including the complete demolition of a building, CHFA recommends the applicant follow a similar procedure.","Protest of determination ineligibility.","Guide to Standardized Highway Barrier Hardware published by AASHTO, AGC, and ARTBA.","We would collect dust from bare floors, carpets, windows, air ducts, and possibly upholstered furnishings using a vacuum.","Research is usually described in a formal protocol thatsets forth an objective and a set of procedures designed to reach that objective.","The bottom of the window will be at a reasonable viewing height from the outside floor.","CR should be marked as such.","EPA drafted the regulatory text broadly so as to not limit the use of these future methodologies.","Administratormay consider appropriate, shall be announced by the Administratorat the opening.","The housing resources commission shall not arbitrarily withhold its approval of applications for presumptive compliance.","Tax Incentive Programs Unit of HPD or any successor thereto authorized to administer these Rules.","By concurrent resolution, County Dept of Health must annually report to city the cumulative number of EBL children and properties identified with lead hazards by census block group.","The Agency may issue amendments to the RFQ at any time prior to the submission deadline.","Mineral wool shall be of a type and manufacture acceptable to the Department of Buildings.","If lead is present, safe work practices must be followed.","In order to implement a late charge, a written request must be submitted to HPD setting forth the dollar amount of the proposed charge and the date of the month it is to be billed.","Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty.","City is not available or is not provided in a timely manner.","The City and the Agency shall not be obligated to pay, nor shall they in fact pay, any costs or losses incurred by any Applicant at any time, including, but not limited to, the cost of preparing an application.","SAMPLE SIZEThe following sample sizes also apply to the finished product portion of inline samples when analyzed for Salmonella.","Arrange to shut off indicated utilities with utility companies.","The income of the occupants of the housing is not relevant.","We recognize that defendants might quite rationally plead guilty to crimes they did not commit and that prosecutors might be willing to accept such pleas.","The Agency shall establish first rentals or adjust maximum rents, whichever is applicable, for all buildings rehabilitated with a municipal loan and certify same to the Division of Housing and Community Renewal.","Your complete application and acceptable bid will be reviewed and a Loan Settlement.","Notice of Interim and Disposition Rent Increases.","Anchorage in or bracing in terra cotta is not permitted.","Minimum number of instructors.","Class A dwelling unit in existence immediately prior to the demolition preceding construction.","Upon receipt of a request for a hearing or if a determination is made that a hearing would be appropriate, the Department shall establish the time, date and place for the hearing and provide notice of the hearing to the relocatee.","However, EPA is providing additional time for renovation firms and workers to obtain the necessary training and certifications before enforcement of the firm certification and individual renovator requirements begins.","They are typically carried out at an outsourced metal Destruction or licensed incineration facility with the specific capabilities to perform these activities effectively, securely, and safely.","No indication as to when; if that would be during the study or afterwards.","Water heating units are to be properly maintained in working condition and must be free of any water leaks.","The consenting parents in the contested casesat bar were not the subjects of the experiment; the children were.","City of New York payment for the acquired dwelling, or on the date on which he moves from the acquired dwelling whichever is the later date.","Maintenance and Repair by Tenant.","NFUnless directed otherwise by your assignment or supervisor, submit samples to your normal servicing laboratory.","This would be especially so when science and privateindustryte in search of material gains.","Agency to publish the amended advertisement in the publications in which the original advertisement appeared, the Agency shall endeavor to provide substantially the same type of notice as was provided with respect to the original advertisement.","PCB Article, PCB Equipment, or PCB Container.","Certificates of Occupancy were issued by the Department of Buildings for separate portions thereof covering less than the requisite number of units.","Application Procedure and Documentation.","The results of the analysis, including data from the Quality Assurance Plan.","Metal shall be handled by device or clean canvas gloves between all cleaning and etching operations and the application of reflective sheeting.","If the collector is not assured of this, collect the samples according to the instructions below.","The Commissioner, upon good cause shown, may alter the timing or sequence of the actions described in these Rules, provided all affected parties are given reasonable notice.","As a result, parties attempting to obtain sensitive information may seek to focus their efforts on alternative access means such as retrieving residual data on media that has left an organization without sufficient sanitizatieffort having been applied.","Where units are selected from the production line, do so in representative manner.","Portland cement or gypsum mortar, mineral wool, or other materials acceptable to the Department of Buildings.","This is true regardless of whether the person who actually did the recording has personal knowledge of the information recorded.","PCB wastes may apply for a TSCA PCB Coordinated Approval.","Plumbizer for type M mounts.","Boiler inspector holding a certificate of competence from the New York State Department of Labor.","The name, address, and telephone number of a contact person tenants can call if they find lead hazards in their unit.","Home visits conducted in connection with a credit check are permitted.","Do not use glass jars with dry ice.","Acceptable enclosure shall be airtight and of permanent construction, so that the area behind them is inaccessible.","Reconditioning, if possible, will be based on lot numbers.","This subdivision applies to a Relocatee who has accepted an offer of Shelter Services by HPD.","The Contracting Agency may sample each aggregate component prior to introduction to the weigh batcher or as otherwise determined by the Engineer.","If your property does not pass either a visual inspection or dust wipe clearance, you must repair the property so it passes clearance before the tenant can move into the unit.","The agency may issue written amendments to the RFP at any time prior to the submission deadline.","Law which the Agency deems to be in the best interest of the City, including, but not limited to, direct negotiation, RFQ, RFP, competitive bidding, public bidding, auction, and selection by entities other than the Agency.","Each Essential Maintenance Plan shall outline the measures needed to ensure proper maintenance of all components addressed through the Program.","Preference in admission to any development or to such portion of any development which has been specifically designed for occupancy by elderly or disabled persons, as the case may be, shall be given to such persons.","SCRIE subsidy under this subdivision, the affected housing company shall be entitled to receive a payment from the successor in an amount equal to all SCRIE subsidies attributable to a capital assessment or voluntary capital contribution.","Report the number and location of live and dead insects, rodent pellets, or other adulteration discovered inside the containers as well as on their exterior surface.","Except for the Specifications and requirements specifically listed above, Tall Channelizing Devices are defined to be Traffic Cones.","The lettering of the signs shall be of the bold type and shall be properly spaced to provide good legibility, and the letters and the background shall be of contrasting colors.","If the clearance area includes one to four rooms, all rooms must be sampled.","Ioccupancy, whichever time period is shorter.","Repairing any physical defect in the substrate of a painted surface that is causing paint deterioration, removing loose paint and other material from the surface to be treated, and applying a new protective coating or paint.","The agent must maintain an office or place of business in the metropolitan area at no cost to the housing company where it will keep all books, records, bills and other documents pertaining to the housing company.","Mesh shall be uniformly applied with adequate tension to prevent d with new screen mold unless sections.","Bonner was an unusual case that involved the grafting of skin from a minor donor cousin to a badly burned donee cousin.","PATENT RIGHTS Whenever any article, materials, equipment, process, composition, means, or things called for by these specifications is covered by letters of patent, the successful bidder must secure, before using or employing such article, material etc.","Signs shall be fastened directly to the wall by screws or bolts in a rigid, substantial manner, or by other means as may be approved by the Department of Housing Preservation and Development.","Preemption sequences shall be as noted in the Contract.","Limitation on such expenses.","If the depreciation period were over when the cooperator vacated, the incoming cooperator would be obligated to purchase new appliances and the process would commence again.","Wooden handled sampling instruments are particularly susceptible to bacterial contamination, are difficult to sterilize, and should be avoided.","The door shall be attached to the housing by means of two noncorrosive, stainless steel hinge pins that are removable without the use of a special press or tool.","The task may be delegated to an agent but the facility owner is solely responsible for timely and sufficient payment.","Commencement of substantial work.","Hazard Category The Hazard Category is a number that indicates the degree of hazard within a Hazard Class.","Angle iron top rails will not be accepted.","For some unexplained reason, processing the dust samples typically took several months.","The case reached us in the context of summary judgmentsenteredby e evidence presented by theplaintiffs, most favorable to them, wasinsufficient as a matter of law to establish the prospect of liability.","Instead, the inspection process is primarily complaint driven.","Place the name and telephone number of the person that is to receive the sample on the outer shipping containernear the address with instructions to the carrier to contact the abovenamedindividual upon arrival of the package.","The owner shall provide all tenants in the building with a copy of the lead hazard information pamphlet.","Pull off the top of the whirlbag holding the Spongestick along the perforation.","In general, all matters involving management, maintenance, and operation shall be supervised by HUD except as otherwise set forth by statute or in this section.","Talk to your state or local health department about testing paint and dust from your home for lead.","There clearly was more than a minimal risk involved.","Gravel base shall meet the following requirements for grading and quality when placed in hauling vehicles for delivery to the roadway or during manufacture and placement into a temporary stockpile.","That section additionally authorizes the city to examine soil around such buildings and to inspect commercial establishments.","An audio tape or transcript shall be made of the proceedings and a record shall be made of persons in attendance at the hearing.","Qualified manufacturers are identified in the Qualified Products List.","The name, address, and telephone number of a contact person tenants can call if they find peeling, chipping, cracking, chalking, and paint dust in their unit or on the premises.","Act shall be rented to persons of low and moderate income as defined by this chapter at rents to be determined by the Department pursuant to this section.","DEPARTMENT OF HEALTH AND HUMAN SERVICESFOOD AND DRUG ADMINISTRATIONSAMPLE NO.","The firms hired by the homeowner to perform renovation tasks are responsible for complying with all aspects of the RRP Rule that are applicable to their work, including firm certification.","Under the Real Estate Notification and Disclosure rule, however, sellers, landlords, or agents who fail to provide the required notices and information are liable for triple the amount of damages.","Start and completion dates of lead hazard reduction activity.","Eligible Improvements and Upgrades.","The Contractor shall provide the testing and certification for toxicity characteristics in accordance with Section prior to delivery and placement of the steel slag and use of the steel slag in other materials.","Natural gas pipeline systems containing PCBs.","However, EPA does not require this and allows renovators to use other methods to ensurethat dust and debris does not leave the work area, including the HEPA vacuuming of clothing, tools, and other items before they leave the work area.","For the purposes of selecting samples, a lot of bolts shall be the quantity of bolts of the same nominal diameter and same nominal length in a consignment shipped to the project site.","Kennedy went in there and improved the home and in this case the home was improved so that it was below clearance standard.","Theh abatement they could use most cheaply?","Describe the plan to maintain satisfactory inventory levels of products and supplies.","The Department shall make a final determination as to whether a stay shall be granted upon receiving such information or upon an expiration of the interim stay.","Maintenance Data: For roofing system to include in maintenance manuals.","The purpose of the study was manifestly not to reduce the level of lead in the bloodofled researchenvironmenton dust.","Please check the country and number.","At the conclusion of each training course, the instructor shall provide the student a copy of the registration form for the state licensing examination and a copy of the examination schedule.","In our view, they are not designed, generally, to be sufficiently objective in the sense that they are as sufficiently concerned with the ethicality of the experiments they review as they are with the success of the experiments.","Load switches shall include indicator lights on the input and output circuits.","In order to receive funds from the Administering Agent Reserve Account, a Homeownership Generating Site must submit payment requests to HPD, along with proof of Administering Agent services rendered.","Prior to the auction, the Agency may, but shall not be required to, hold an open conference where Agency staff answer questions about the Project and the auction.","Exposed Face Color: Black.","The method validated may be used only to decontaminate surfaces containing PCBs at concentrations on which the validation study was performed and lower concentrations.","The source of PCB contamination is removed or contained to prevent further release to porous surfaces.","The Contracting Agency intends to perform Quality Assurance Inspection.","KI never disclosed test resultsbecause the letters KKI sent to Ms.","Disbursement of rental replacement housing payment.","Administrative Code and all regulations promulgated thereunder.","All openings between containment areas and adjacent areas, including but not limited to windows, doorways, elevator openings, corridor entrances, ventilation openings, drains, ducts, grills, grates, diffusers, and skylights, shall be sealed.","If there is an indoor allergen hazard in your apartment, the owner is required to fix it, using the safe work practices that are provided in the law.","If the block erase command is not supported, the Clear procedure could alternatively be applied.","Report the results of the field examination in the EIR and as a Field Exam in FACTS.","Each duplicate subsampleshould be collected from the same bag, box, case, or container.","Coercivity may be difficult to determine based only on information provided on the label.","Media Sanitizationsanitization operation may take as long as several hours depending on the media size.","Mill test certificates verifying the silicon content of the steel shall be submitted to both the galvanizer and the Engineer prior to beginning galvanizingoperations.","IDENTIFICATIONRestore lots to their original condition.","Ballast used to obtain the minimum weight requirement, or any other object that is placed on the vehicle, shall be securely anchored such that it will be retained on the vehicle during an impact.","Additionally, each line of insurance may have its own set of requirements that must be met.","HPD determines to be necessary or appropriate, including, but not limited to, provisions in any deed, land development agreement, regulatory agreement, note, mortgage, enforcement note, enforcement mortgage, security agreement, lien, restrictive declaration, or other legal document.","Maryland Code in respect to scientific research of thenaturet impose standards of care thatattachy funded or sponsored research projects that use human subjects.","Public health and safety orunavoidable economic concerns are the qualifications for an emergency rather than expediency.","Policies shall be endorsed to cover the interest of The City of New York, as first mortgagee.","Company name and address.","This agreement is subject to written approval by HPD.","When containing the work area during an interior renovation, the firm must close windows and doors in the work area.","PCB concentration prior to treatment.","Follow the chart on the next page for the field examination.","Place the folded wipe sample in the tube.","For samples already in frozen state: five to ten pounds of dry ice depending on sample size is normally sufficient.","HPD issued a certification or a waiver, HPD shall deliver a notice of suspension to the applicant and to the owner and will refer the matter for hearing at the Office of Administrative Trials and Hearings.","Type of cleaning products, restroom supplies and floor products.","The level of PCB contamination found at a collection point is assumed to extend to the next collection point downstream.","Such sign shall be visible at all times to the occupants of such apartment or suite.","These examinations vary from simple visual observations for gross filth, such as rodent pellets in wheat, to the detection of odors of decomposition in seafood.","The material used shall be compatible with the insulation material of the insulated conductor or cable.","Tubing color shall be blue in accordance with APWA Uniform color standards.","Updated final statement, accounting for final changes to the Contract Sum.","The carbon monoxide concentration and the excess oxygen percentage are checked at least once every hour that mineral oil dielectric fluid is burned.","All shipments of the fly ash to the Contractor orconcrete supplier shall identify the applicable Mill Test Report Number.","Certificate of Compliance including Certified Test Reports of each proposed geosynthetic shall be submitted to the State Materials Laboratory in Tumwater for evaluation.","The grade of the ground granulated blast furnace slag, the source, and type ofmanufacturing facility shall be certified on the cement mill test certificate.","Such inspection report shall contain a description of the surfaces tested and the results of such testing.","Sample Handling: If you are shipping swollen cans, double bag and ground ship the sample.","After the sheeting has been fabricated, the surface of each panel shall be protected from corrosion.","Computations of replacement housing payment for displaced tenants.","Sample costs cannot be charged directly to your government credit card.","Sampling for Lead Contamination, to ensure that the work did not result in additional soil contamination when compared to baseline samples collected prior to the start of work or that abatement work successfully lowered the lead contamination to more acceptable levels.","City of a false or misleading statement in connection with a lead clearance examination.","PCBs from the sample.","Fittings used for polyethylene tubing shall be either compression or stab type.","Unlike domestic products, where considerable information is readily available on manufacturing and distribution channels, it is frequently difficult to identify the responsible parties for products of foreign origin once they enter domestic commerce.","The research relationship proffered to the parents of the children the researchers wanted to use as measuring tools, should never have been presented in a nontherapeutic context in the first instance.","However, since conditions at the job site may be difficult to predict, EPA strongly recommends that all firms involved in the renovation be certified and use properly trained and certified personnel.","Interest and amortization payments shall be due and payable commencing on the first day of the third month after a certificate of occupancy, temporary or permanent, has been obtained, where applicable.","Place the subsamples in a dark container, such as a cardboard box to protect them from light and protect the exhibits from being crushed.","Contractor shall ensure this shift is covered.","This report lists the levels of contaminants that have been detected in the water, including lead, and whether the system meets state and EPA drinking water standards.","HPD may conduct audits of Homeownership Affordable Housing Units to ensure that all such units are being used as the primary residences of their respective Homeowners.","What you said is you were aware that this program was only to be a partial abatement?","Although the emergency provision exempts certain RRP work practices, firms should perform as many of these leadsafe work practices as possible when conducting activities that must be immediately undertaken to respond to the emergency.","Department, a tenant, or an owner of a child care facility.","This license is not required for a licensed management planner; however, the management planner must provide documentation of completion of the inspectors course or refresher when renewing a management planner license.","Centers for Disease Control and Prevention and the American Academy of Pediatrics and shall be updated as those recommendations are changed.","Also, it must conform to the rules on admissibility of evidence.","Review of agency determination.","The fabricator shall endeavor to use the least number of seams possible with the horizontal lap preferable.","Bidder is a contractor that has met the program participation requirements and all other material terms and conditions of the bid documents.","Obstruction of Exits Used as Means of Egress in Case of Fire in Various Multiple Dwellings.","If youcover and protect the seal with heavy clear plastic, the sample custodian will be able to copy the necessary information off the seal without removing the protective cover.","It is the responsibility of the bidder to make inquiry as to addenda issued.","When a length of pipe having seven or fewer segments is removed for purposes of disposal, sample each pipe segment.","Section XVII, Procedure for Filing Liens in this policy.","HPD will assist a Relocatee in completing and submitting an application for housing or a NYCHA housing application on behalf of the Relocatee.","For purposes of this paragraph, PCB Voltage Regulators shall be recorded as PCB Transformers.","Assistant Commissioner of Housing Supervision shall call a meeting with both parties present prior to making a recommendation to the Commissioner.","When an invoice does not designate the size of the fish in the shipment and inspection reveals more than one size in the lot, use sampling plan for medium fish.","If the sample is shipped by air, enter the air waybill number.","Primary source of power shall be solar power with a battery backup to provide continuous operation when failure of the primary power source occurs.","Captain Sam Seafood, Inc.","Payments are calculated on the basis of the number of rooms required by the tenant based on family composition, and into which the tenant moves.","Information to be given in application.","The University of Iowa, the successor to the State University of Iowa, confirmed the experiment in a recent apology.","No attempt has been made or will be made by the Bidder to induce any other person or firm to submit or not to submit a bid.","Place Ice Paks, etc.","Each bidder shall be required to comply with all of the eligibility criteria established in the terms and conditions of the auction.","The test switch shall provide a spring loaded momentary contact that will place a call into the controller.","Unlabeled or Partially Labeled Lot.","Following the submission of an application, the Department may request any additional information that it determines is relevant to the application.","DELIVERIES: Deliveries shall be made in strict accordance with any delivery schedule contained in the bid specification or contract and in the exact quantity ordered.","The second light strip shall be mounted under the lower shelf, such that the output terminal landings are illuminated.","PCB waste shall establish financial assurance for closure of each PCB storage facility that he owns or operates.","The interference filters furnished shall be hermetically sealed in a substantial case filled with a suitable insulating compound.","Applicant and members of his or her household shall assume the cost of obtaining certified copies for these purposes.","Regardless of whether all the represented units are sampled or recleaned, a further delay in permitting residents back into the area is possible when using random clearance sampling.","Marking of PCBs and PCB Items.","Dump the sifted beans from each sub into a bag of sufficient size to hold and permit mixing all of the subs collected from the lot.","Environmental or their agentsknew or should have known or had reason to know existed in the premises.","Administrative Code of the City.","Thus, until each publication iscompleted, current requirements, guidelines, and procedures, where they exist, remain operative.","NLLAP does not specify or recommend analytical methods.","RRP training and certification is required even if someone already has abatement certification.","Sprinklers, in entire building.","EPA will notify the person who submitted the plan of the approval.","Each training provider shall administer a closed book written examination to persons seeking accreditation who have completed an initial training course.","Measurement precision is usually expressed numerically by measures of imprecision, such as standard deviation, variance or coefficient of variation under the specified condition of measurement.","When applying for recertification in the Federal program, what types of accreditation are acceptable for refresher courses?","Workers with contaminated clothing can take that contamination home to their own children, and taking contaminated equipment to another jobsite could potentially create a lead hazard at a new site.","General As soon as possible, freeze any sample containing, or suspected to contain live insects, as long as freezing will not change or damage the product or break the container.","Department of Services, The Nature and Extent of Lead Poisoning in Children in the United States: A Report to Congress, Atlanta, Georgia.","Beyond informing the patient as to means available to treat him orher, a subject must become a voluntary and willing participant in an endeavor thatmay yield no direct benefit to him or her, or worse, that may cause harm.","Floor Area in the Eligible Multiple Dwellings in the Eligible Site.","Bureau of Labor Statistics for the specific commodity or service group being provided by the contractor under this contract.","Saddles fastened to pipe with external bands shall not be acceptable on any new system.","Award will be made to the lowest responsive and responsible bidder provided all pricing is reasonable and in the best interest of the City to accept.","One light strip shall be ceiling mounted and oriented parallel to the door face.","Adjustments shall be provided whereby any number of days may be omitted and whereby any one or more positions on the controller can be skipped.","SCREEN DOORS, ALUMINUM, WOODmesh aluminum screen wire.","The surface areas of subsamples within a composite sample must be very similar in order to avoid oversampling a room.","Every such scuttle and the stair or ladder leading thereto shall be located within the stair enclosure.","RRP Rule, what type of container is adequate for onsite storage of debris?","This can be done by using the Examination Label, a handwritten ID or by using a rubber stamp.","Provide current and continuing information on the availability, prices and rentals of comparable decent, safe and sanitary sales and rental housing, and of comparable commercial properties and locations for displaced businesses.","The Commercial Rent Restructuring Committee shall determine the fair market rent of each commercial tenant, other than governmental tenants or community gardens, as determined by HPD.","The relocatee shall file a written request setting forth the action and the manner in which he or she believes he or she will be harmed.","Environmental Inspection Services, Inc.","Temporarily cover openings to remain.","The second coat of mortar shall not be applied until the first coat has thoroughly set and in no case shall the second coat be applied on the same day that the first coat of mortar is applied.","Piping: waste and vent.","Supplements If the concentrate or supplement is relatively inexpensive, follow the sampling procedures for complete feeds.","Loan applications may be submitted by an owner or his duly authorized agent or by a contract vendee who becomes an owner prior to or simultaneously with the loan closing.","Media that are being exchanged for warranty, cost rebate, or other purposes and where the specific media will not be returned to the organization are considered to be out of organizational control.","Check with your laboratory for its recommendation regarding preserving mold samples.","This is the date of interstate shipment.","This is a good example of how local laws have been adapted to local housing conditions.","This procedure must be followed each time the of\ufb01cial seal on a sample is broken.","The determination astoerly pled, lies with the trier of fact.","This is the divisionthat actually collects the sample.","Refund and cancellation policy.","DO cities and other cities designated by the DD as FDA inspection points.","Except as hereinafter provided, this chapter, as amended, applies to all applications pending on or submitted after the effective date.","Swabs may also be useful for sampling floor cracks or the inside of tubular equipment mounts.","The Hovnanians also hired GMS to provide engineering services and Pillori as a geotechnical engineer responsible for inspecting the underpinning work and ensuring that it was completed as per the project plans.","The Estate contends that civil fraud can be predicated on either intentional misrepresentation or, when there is a duty to disclose, a concealment of fact.","ADDENDA Any changes to the scope of the specifications will be sent to all bidders in the form of an addendum.","Shannon was an excellent statistician, but that he had no experience with either wipe sampling or vacuum sampling.","Selection of Buildings, Tenant Notification.","Study were first tested for eligibility.","Centers for Disease Control and Prevention.","Home rule provides flexibility to appropriately address housing conditions, economics, and population demographics that often vary widely across a state.","Precautions must be taken to ensure that all personnel, tools, and other items are free of dust and debris before leaving the work area.","Affixing doorway entrance flap.","Trenches, dikes, buckets, and pans are examples of proper containment measures.","The discharge shall be treated to meet applicable State or Federal discharge standards or recycled to the chemical waste landfill.","At no time shall the ENGINEER allow any subcontractors to perform Work without the required types and limits of insurance coverage.","Requests for approval of incinerators to be used in only one region must be submitted to the appropriate Regional Administrator.","MATERIALS All materials shall be new and free from defects.","Marketing Monitor was filed with the Agency at least sixty days prior to the date upon which the first lease for an Affordable Housing One Hundred Thirty Percent Unit will be executed.","Project Operation by Sponsor under the SDMA Prior to Disposition.","The Agency may impose such competitive criteria for the comparative evaluation of bids in the bid solicitation as it deems necessary or desirable.","This option makes the project affordable to them.","She contends that this agreement between the parties gave rise to a duty owed by KKI to provide her with that information in a timely manner.","The obligations of the Contractor under this Paragraph shall not include normal wear and tear under normal usage.","Training courses shall be conducted by training providers licensed by the department.","Not eligible without new or existing storm window.","Respirators times in containment during asbestos abatement activity.","All Dispositions shall require prior approval by the Governing Body and shall be subject to any further terms and conditions imposed by the Governing Body as a condition for its approval.","If balance used is not FDA equipment, give style, capacity, minimum graduations, etc.","The City shall further maintain a database of all residential properties granted a certificate of occupancy after the effective date of this article.","The home must be permanently connected to water, sewer, electric, fuel, and similar facilities or utilities, and fully skirted.","State or local government agency; or a nonprofit organization.","Provide the license number if the project is a public building.","The Commissioner shall assess fees for accrediting training programs and for certifications, registrations, licenses, and license renewals issued in accordance with this chapter.","Submit final Application for Payment with or preceded by final waivers from every entity involved with performance of the Work covered by the application who is lawfully entitled to a lien.","Purging the data, the availability of a dedicated command that incorporates the ability to invert the data pattern allows an efficient and effective approach that mitigates any residual risk associated with variations in implementations of magnetic recording features across device manufacturers.","Include the sample number and submit to your fiscal unit for payment.","New construction: Preliminary Certificate of Eligibility.","Act, upon completion of the processing, labeling or repacking.","Federal district courts to enjoin activities prohibited by these regulations, compel the taking of actions required by these regulations, and issue orders to seize PCBs and PCB Items manufactured, processed or distributed in violation of these regulations.","HPD must receive an application to purchase a Homeownership Affordable Housing Unit.","Regional Administrator finds are necessary to ensure that operation of the chemical waste landfill does not present an unreasonable risk of injury to health or the environment from PCBs.","Try to use only enough buffer to keep the sponge gliding smoothly over the surface.","Destroy: Shred, Disintegrate, Pulverize, or Incinerate by burning the device in a licensed incinerator.","Studies show that the process of informed consent serves as a social filter: Better educated and wealthier individuals are more likely to refuse to participate and are underrepresented in most research.","After removal, workers wrapped the old windows in plastic plastic sheeting was carefully gathered up and bagged for disposal.","The name of the facility, and the name of the owner or operator of the facility.","No Application shall be filed with respect to any Rental Project before the Completion Date of such Rental Project.","Firestone Building Products Company.","The inspection staff may not give advance notice of their inspections.","In organizations, information exists that is not associated with any categorizedsystem.","The remaining eight local laws represented a range of legal and environmental contexts, new innovations, and proactive approaches to local primary prevention.","The expenses shall be projected by HPD based on its experience and knowledge of the operation of similar buildings.","When collecting selective samples of products to show adulteration by filth, be guided by this criteria.","This will include the identification of all suspect materials and the preparation of a cost estimate based on the proposed project scope.","Any income derived during any period of occupancy prior to commencement of debt service may be credited against the construction loan.","PROJECT: Belfast Hall Roof Replacement ISSUE DATE: RFI No.","EPA will confirm the EPA identification number of facilities already assigned one, and will assign an EPA identification number to facilities that do not have one.","This schedule was developed with the assumption that color distribution in the lot will be homogeneous.","The exterior of the signal case, lamp housing, and mounting flanges shall be finished with a high quality, baked enamel prime and finish paint.","The Agency may impose such eligibility criteria for bidders in the auction as the Agency deems necessary or desirable to ensure that only responsible bidders are selected.","Every sprinkler head shall bear the year of manufacture clearly on its surface.","Please work with your volunteers to ensure that they The work practices you will have to change are few.","Locking the container and placing it behind a locked barrier are good examples of ways to prevent access to the dust and debris.","State of New York Division of Housing and Community Renewal.","Ineligible Projects, Items of Work.","Documented proof that an analyst can perform a given method and, using it, obtain results having the accuracy and precision appropriate for that method.","RRPM activities and has obtained a license to perform such activities for compensation.","Such Grandfathered Tenants will also retain the right to purchase their Dwelling Unit.","Sanitary napkin receptable Liner must fit existing dispensers Commercial Grade; Waxed Paper bags for Sanitary Disposal Containers are required.","LEAD, or check www.","TAXES: No bid or proposal shall be awarded by Jefferson County unless the prospective Bidder provides proof that the Bidder does not owe delinquent real or personal property taxes to Jefferson County.","Piling shall be cut from sound, live trees and shall contain no unsound knots.","The Contracting Agency may conduct verification tests of pipe stiffness or other properties it deems appropriate.","Closed When collecting samples using aseptic technique and thesubs are collected using presterilized containers and equipment, collection and submission of ed, closedcontrols is required.","This dust may accumulate to unsafe levels.","Upon conclusion of such hearing, the hearing officer shall make a report and recommendation to the Commissioner whether an application should be granted or denied.","Lead in Water must be part of the scope of work.","PCB household waste storage and disposal.","Otis Warren Real Estate Co.","Unless otherwise provided, PCBs are quantified based on the formulation of PCBs present in the material analyzed.","City Housing Goals, including, but not limited to, direct negotiation, RFQ, RFP, competitive bidding, public bidding, auction, selection by entities other than the Agency, and application.","DAT MOTIE and LOLITA MOTIE, Defendants.","Must a certified lead abatement professional also become trained and certified to do renovation or repair work?","The bottom channel shall have weep holes.","Purchase Order immediately upon completion of the shipment or services.","Aluminum sheeting shall be used to fabricate all construction signs.","Reference Cultures are used for training and quality control purposes.","If you are collecting samples from a dairy, obtain this number from the firm.","Refuse chutes shall extend to the underside of the roof of the refuse room or lower.","The exam can bediscontinued earlybased on the number of abnormal containers found.","Hold samples in cold storage until ready to be shipped or delivered to the laboratory.","CDX account can only be registered to one person, and cannot be shared or transferred.","The inclusion of a veteran or surviving spouse as a member of the household shall not entitle any other applicant of record to this preference in admission.","Manufacturers and shall be listed on the NTPEP audit program website displaying that they are NTPEP compliant.","SAFETYAND HEtoingareollowallplijurisdictional reguiodingtyiroment ortation.","Concealed Finish: White or lightcolored acrylic or polyester backer finish.","Clearthe deviceand associated media These still meet the definition for Clear as long as the device interface available to the user does not facilitate retrieval of the Cleared data.","This report must be placed in the project file.","The printed circuit board shall be coated to prevent corrosion.","Completion of cleanup may be delayed only for the duration of the adverse conditions.","Procedures for applications for SCRIE subsidies for charges attributable to capital assessments and voluntary capital contributions.","Applicant or such Person, or any Person for whom the applicant or person owning a substantial interest in the property is an officer, director or general partner.","Preliminary Selection, HPD shall notify the Tenants of a Building of the Final Selection of the Building for the Program.","Procedure for processing increase.","If required by the City, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment.","Building owners that would have their own employees perform such activities foll be licensed according to this section.","The agency may withdraw any RFP in whole or in part prior to conditional designation of a community group.","If the seams are sewn in the factory, the Engineer will obtain samples of the factory seam at random from any of the rolls to be used.","In no event shall any Preliminary Certificate of Eligibility be issued prior to full payment of all filing fees deemed by the Department to be outstanding.","Purge capabilities, but these capabilities are specific to the hardware and software of the device and should be applied with caution.","Use the smallest graduate that will hold the volume to be measured.","Policies carried during the initial or construction periods of a housing development for which there is a continuing exposure thereafter may remain in force and the policies adjusted in accordance with requirements during later conditions.","The County conducts an internal annual survey regarding janitorial services.","You will need the proper tools and supplies to do the job correctly.","Bureau of Housing or the implementing agency attend the preconstruction At this preconstruction conference, the homeowner and contractor will agree to working conditions, use of facilities and other construction related matters, and they and a completion date for the construction.","Occupants shall have the right to elect to use either a schedule method or comparative method in determining the amount to be paid.","Childoccupied facilities may be located in target housing or in public or commercial buildings.","The house was safe.","As a general matter, the requirements are not prescriptive but instead state that certain activities be conducted using appropriate documented methodologies.","Obtain the preliminary average tare by totaling preliminary tares and dividing by the number of tares weighed.","Cryptographic Erase to ensure that data recovery is infeasible, and that the device does not simply remove the file pointers.","If you are unable to determine the cost of the sample and the \ufb01rm states they will bill you later, enter the estimated cost in this \ufb01eld and state that it is an estimate in the Collection Remarks \ufb01eld.","All service enclosures shall be fabricated from steel or aluminum.","New York State income tax returns for audit or verification purposes with regard to continued eligibility, surcharges or any other valid purpose.","No Affordable Housing Unit shall be offered to a corporation, partnership or other entity.","One of these samples should consist of five randomlyres randomly located at the yard boundary.","Necessary qualifications include the following.","Si usted no informa al due\u00f1o, el due\u00f1o esta requerido inspeccionar su apartamento para descubrir si un ni\u00f1o menor de seis a\u00f1os de edad est\u00e1 viviendo en el apartamento.","Calculation of Minimum Period of Residency.","Breysse Jill, et al.","Forward wipe samples to an authorized laboratory.","Designated historic district or landmark site or structure.","Application which contains incorrect, misleading or fraudulent information.","PCBs within the indoor location.","The name, address and telephone number of the applicant, the owner, the managing agent and the holders of existing mortgages and other liens against the multiple dwelling.","They shall be regularly disinfected and kept in a clean sanitary condition.","LICENSING AND REGISTRATION: CONFLICT OF INTERESTS.","Was building debris stored in the yard?","Lead was the first policy in which we recognized that our staff did not hold the needed expertise, and we had to partner with outside agencies, community groups, and academic institutions to design a smart policy.","The repairs are not intended, or expected, to completely remove exposureto lead.","Work in the interior of the unit was completed within one period in eight daytime hours, the site was contained, and the work did not create other safety, health, or environmental hazards.","The Bidders and the public are invited but not required to attend the formal opening of the bids.","The coefficient of retroreflection of each reflex reflector intended for use in cutout letters, symbols, and accessories shall be equal to or exceed the following minimum values with measurements made with reflectors spinning.","Collection Report includes can seam analysis, the CSO shall collect the can seam specifications for the cans in the sample.","HPD than the cost of similar space leased by competing businesses, thus providing such commercial tenants an unfair competitive benefit.","Department of Finance if applicable.","BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.","The contents of voluminous writings, recordings, or photographs, otherwise admissible, which cannot conveniently be examined in court may be presented in the form of a chart, calculation, or other summary.","The circuit court had granted judgment after it concluded that the plaintiffinfantwas incapable of relying on a representation due to his infancy.","Fueled Space and Water Heaters.","PCBs and liquid PCBs.","Photo IDWaste disposal records for leadbased paint waste must be recorded to show that it was disposed of properly.","State of Texas, a certificate of authority issued by the Texas Secretary of Statauthorizing the corporation to do business in this state.","Sterile Disposable Gloves If sterile disposable gloves are used to handle the product, submit one unopened pair of gloves as a control.","Development of Two Sample Preparation Methods for Determination of Lead in Composite Dust Wipe Samples.","Commissioner of Housing Preservation and Development, or his or her designee, or the chief executive officer of any successor agency or department thereto authorized to administer these Rules.","Where because of the nature of the rehabilitation, plans are not required by the Department of Buildings, this requirement for three copies of preliminary plans may be waived in the discretion of the Deputy Commissioner.","Department deems appropriate, including, but not limited to, income and occupancy restrictions and a plan for the continuing repair and maintenance of the property.","The person is the owner of the residential dwelling.","MCLPPP Maine Childhood Lead Poisoning Prevention Program.","If a tenant moved out, or tenant requests an inspection or a request by a state or federal agency, then you must have the unit inspected.","Compare the BGYF color with a fluorescent standard, if one is available.","Wet sanding or wet scraping.","Eligible Multiple Dwelling to which the residents of two or more rental dwelling units have access without paying a usage fee and that is not located in a rental dwelling unit, in a Commercial Space or in a Service Area.","The informed consent requirements in this policy are not intended to preempt any applicable federal, state, or local laws which require additional information to be disclosed in order for informed consent to be legally effective.","Records of Regularly Conducted Business Activity.","Plus all other applicable partial elevator items listed.","Mulch produced from finished wood products or construction debris will not be allowed.","Standard Plans and Special Provisions for each use specified in the Plans.","Never use water from the hot water tap for drinking, cooking, or making baby formula.","Copies of such notices shall be sent to the council member for the council district in which the Garden is located and the community board of the community district in which the Garden is located.","Such logo shall not be less than one square inch in size.","We noted in Toliver, that the property management contract was between the property owner and IRS, not between the owner and Waicker.","This categorization will impact the level of assurance an organization should require in making sanitization decisions.","This information is often hard copy internal communications such as memoranda, white papers, and presentations.","AIHALAP, LLC accreditation or the AIHALAP, LLC accreditation symbol may not be displayed on communication media or any other laboratory materials that are outside the scope of accreditation for which the laboratory is accredited by the AIHALAP, LC.","The comparable dwellings may be selected by the Relocation Agency, or by the displaced person with the approval of the Relocation Agency.","The Office shall act on the application within sixty days of receiving it from the property owner in proper form, but not before expiration of the time for the community board to make its recommendations, unless the board has acted sooner.","Match material and finish of metal roofpanels, unless otherwise indicated.","The Agency shall amend the advertisement accordingly and shall place such amended advertisement in The City Record, the publications in which the original advertisement appeared, and such other publications as the Agency shall deem appropriate.","Recooper or reseal barrels and drums, resew bags, etc.","Department nor, shall the premises or any part thereof be conveyed without the prior written consent of the Department.","If the Commissioner determines that the parcel is not a Distressed Property as defined in these Rules, then the tax lien on the parcel may be included in a tax lien sale.","No license or registration issued under these sections may be sold, assigned, or transferred.","The design shall permit the slats to be installed in a vertical position as shown in the Plans without distortion of the slats.","The activity described above does not disturb a painted surface.","Place the duplicates in separate containers and identify these to correspond with the original probes.","Act or the Extended Affordability Act, such requirements shall only be applicable to persons who are employed at a building, eligible site or extended affordability property, as applicable, for at least a ninety day period.","The fields described below are listed in alphabetical order to facilitate locating the instructions.","The plaintiffs assert that the Hovnanians are obligated under the license agreement to provide them with certain reports and that the Hovnanians have failed to supply these reports despite repeated demands.","Can we get a proffer what his opinion will be in reference to this document?","Therefore, the contract contemplates indemnification only to the extent Autun is not negligent.","The Respondent: Because they had to see, they were testing to see which levels worked the best.","Samples need to be kept under lock or in your possession, until sealed.","The data entered into specific fields of the report are intended to provide information for the compliance officer to prepare documents for legal proceedings.","Actual direct loss of property by business.","Training course providers shall permit representatives of the department to attend, evaluate, and monitor any training course without charge.","Other Bare Soil: Bare soil outside of play areas shall be tested for lead content.","The Website may contain copyrighted material the use of which may not always be specifically authorized by the copyright owner.","No gas or offensive odors shall be allowed to escape from any water closet, sewer or outlet into any sleeping room or part thereof.","If you are performing a demolition without ACBM you still need to list who will be transporting the waste from the project site.","We also collected information using publicly available data from the Centers for Disease Control and US Census Bureau.","All relevant and material evidence will be admissible and the legal rules of evidence will not apply.","The designated facility if transported solely by rail.","Comply with material and installation requirements specified in individual Specification Sections.","Circuit Court, which entailed rulings that the evidence presented by the plaintiffs, for purposes of the motions, even when taken in a light most favorable to them, was insufficient as a matter of law to establish the prospect of liability.","Environmental Sampling for Detection of Listeria monocytogenes, CFSAN Guidance.","Rules set forth in this chapter.","The pieces in the charge shall be separated to ensure contact of treating medium with all surfaces.","If so, pay only the scheduled price.","For example, an organization might decide that for PII, for example, that any method applied with an available optional component should execute that optional component.","Unless the Agency elects to limit the types of entities which may serve as Sponsor for a Project, a Sponsor may be an individual, corporation, partnership, joint venture, or any other entity permitted by Law.","Dust samples shall be collected and analyzed in accordance with this section.","What records must a subcontractor keep?","Neatly cut openings and holes plumb, square, and true to dimensions required.","Filler material applied to gaps in existing material must contain no asbestos, shall adhere well to the substrate, and shprovide an adequate base for the encapsulating agent.","Rules promulgated by the Department of Finance and the Department to secure compliance with the Act and all applicable local, state, and federal laws.","Color shall be white or silver.","The opinion is that this house was remediated.","Each person listed below completed at least one of these courses.","Drain and contain the solvent from the surface.","PCBs may consist of either personal, special knowledge of the source and composition of the used oil, or a certification from the person generating the used oil claiming that the oil contains no detectable PCBs.","If the public information meeting is outside the community district in which the housing company is located, the owner must provide transportation for tenants.","Outside or exposed surfaces of the boards or plywood shall be covered with No.","Where compactors are installed so that the refuse flows directly into the compacting equipment, the equipment may be used in place of the hopper and cut off door.","The Agency shall make no warranties, express or implied, with respect to any factual information contained in any bid solicitation.","PCBs or PCB Items were transferred to a designated disposal facility.","Growing Crops ateto entatheubs m h ea.","Finished paint shall be well ground, and the pigment shall be properly dispersed in the vehicle, conforming to the requirements of the paint.","Copies of the plan shall be on file with the owner or management agency, and in the possession of the supervisor in charge of building operations and maintenance.","You would need to collect a sample of the clean incoming flour, and subsamples at points in the system to demonstrate where insect infestations exist in the system.","However, do not collect all the evidence you see as this would recondition the lot.","Does it matter whether the molding will be discarded, replaced with new molding, or reinstalled?","Nothing in these Rules shall be deemed to prevent the Agency from exercising such greater or additional rights, remedies, privileges, powers, and authority as shall be provided by Law.","FATA, its provisions for investigation, filing of false reports, and tampering can be useful and informative to those individuals.","Relocation Services have not been terminated pursuant to these Rules.","Record, substantiate or annotate for retrieval later.","Sanitization are vendor unique.","Apparently, thechildrennts involved in the cases and were, at least in one case, minorities.","Name, address, and qualifications of persons who will review analytical results and other pertinent data, and who will perform a technical evaluation of the effectiveness of the trial burn.","If the wash water contains admixtures from different manufacturers, the Contractor shall provide evidence that the combination of admixtures are compatible and do not adversely affect the air void system of the hardened concrete as per Section.","In its evaluation, HPD will consider comments from the housing company and the Tenants Association but will make the final determination regarding the increase.","The clearance examiner and work supervisor may also want to recheck the completeness of the work.","Is my water safe, and are my test results accurate?","Science cannot bepermitted to be the sole judge of the appropriateness of such research methods on humansubjects, We hold that in these contested cases, the researchstudy protocols, those of which we are aware, were not appropriate.","Affidavit of no future harassment.","TSCA that the owner or operator has failed to perform final closure in accordance with the closure plan and other approval or regulatory requirements when required to do so.","Type Q, R, and S mounts.","Land Disposition Agreements or other documents of such public nature.","The records may be held by only one of the firms.","Standard Plans or Special Provisions.","SCRIE subsidy pursuant to this subdivision.","In this State, it may, depending on the facts, create such a duty.","PCB materials, testing samples, spent laboratory samples, residuals, untreated samples, contaminated media or instrumentation, clothing, etc.","Cables shall not be armored unless specified in the Contract.","Please note, when a collection report is generated, the field names may change on the report.","If a firm completely blocks access to a common area for the duration of a renovation, does the renovator still have to provide notifications to all tenants?","If the homeowner does not respond to the letter, or furnish the requested information, then the Bureau of Housing or the implementing agency will send a final letter informing the homeowner of intent to deny assistance under this program.","The EPA and HUD Real Estate Notification and Disclosure Rule simply ensures that you have the opportunity to test for lead before purchase.","Nuremberg Code into Maryland state tort law.","The Contractor shall immediately notify the Facility Maintenance Manager, authorized County representative or County Security of any active plumbing or roofing leaks.","That the default was excusable and that relocatee has a meritorious defense to action taken by the agency.","Inspections, risk assessments, and clearance med according to the following five HUD training manuals received from GEBCO Associates, Inc.","Accordingly, in most cases when a hazard abatement order has been issued, even pursuant to a local law, clearance by a certified assessor or inspector will be required under federal law.","Any other person residing with the tenant in the apartment as a primary residence, who can prove emotional and financial commitment, and interdependence between such person and the tenant.","The Agency may impose a deadline for submission of applications, which shall be a reasonable period of time after the advertisement first appears.","Thus, your signature is attesting to the fact that the affiant has read and understood the statement and has confirmed that the statement is the truth.","Where necessary, pack joints with filler.","If recleaning is necessary, the clearance examiner should provide the client with a copy of the visual assessment form so it is clear exactly what areas should be recleaned.","The Contractor is responsible for emptying the large common area trash containers daily.","Fliuid, a of inaporiquidhe apprpriaamplisof in.","An oil consumption log setting forth delivery date, gallonage and price per gallon; or a steam or gas consumption log, where applicable.","How do you dispose and transport the chemical?","In other cases, when painted surfaces are being disturbed or disrupted, but not completely removed, the disrupted surface area is the area being actively disturbed.","All electrical conductors, buss bars, and conductor terminals shall be copper.","If the finished product is also to be analyzed for Salmonella, collect samples in accordance with instructions in the IOM.","Drexel Metals Association of Regional Manufacturers member.","The hearing officer may accept any evidence which he or she deems to be relevant and material.","In a rental development, a copy of the approval letter shall be sent to the President of the Tenants Association.","Do not complete the education and experience sections if the Laboratory Director acts as the Quality Assurance Officer.","This term does not include immediate renovations resulting solely from a lack of adequate planning for foreseeable asbestos abatement activity.","The use of pesticides must not substitute for pest management measures described in this section.","Buried Expansion joints to connect ductile iron or PVC pipe shall be ductile iron.","Solvent welded pipe joints are not permitted.","State of Georgia law.","Insurance coverage shall be reviewed prior to the anniversary date of each policy with respect to the adequacy of coverage.","In most instances, you can enter paper checks as ACH transactions by providing the Check Number on the application.","Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition.","The physical conditions or economic characteristics of the Site make it appropriate for the treatment afforded by the Project.","Dumping and open burning of residential leadbasedpaint waste is not allowed.","The provisions of these rules shall not apply to any multiple dwelling where regular incinerator services are provided and maintained.","Establishment of Intake Rents.","Federal agencies and their employees must comply with all Federal, State, interstate, and local requirements, both substantive and procedural, respecting leadbased paint in the same manner and to the same extent as any nongovernmental entity.","Program and the HOME Investment Partnership Program.","Fasteners for Type A, B, E, H, and K mounts.","Such receptacles shall always be kept covered with tight fitting covers.","This is particularly true where substantial costs are involved due to large sample size, expensive sampleswhen samples are collected from third parties such as carriers and publicstorage warehouses, or when delivery followed by subsequent billing is the dealers normal business practice.","If feasible, windows should be shut to prevent abrasion of painted surfaces or opened from the top sash.","The minimum size of all other load carrying conductors used within the service cabinets shall be based on the National Electrical Code ampacity tables for not more than three conductors in a raceway or cable.","If this equipment is not available, or the units exceed their capacities, use commercial scales.","The houses were separated in the backyard by a wire fence.","Documentation required of applicants for licensing as asbestos training providers is as follows.","Conforwialllitemuirlabooryo be or aediion.","PCB concentrations by dilution.","This subpart also contains a procedure for contemporaneous sampling of waste as it is being generated.","Weatherbased emergency renovations are also exempt from the warning sign, containment, waste handling, training, and certification requirements to the extent necessary to respond to the emergency.","Moreover, in nontherapeuticresearche consent of a parent alone cannot make appropriate thatwhich is innately inappropriate.","Journal of Public Administration: Research and Theory.","Pins for messenger hanger fittings shall be a minimum of \u00bdinch in diameter.","Assistance may be made available to Sponsors in any form permitted by applicable Law which is determined by the Agency to be necessary or desirable, including, but not limited to, Loans and Subsidies.","As a practical matter, it is likely that interior and exterior surfaces of window and door assemblies were repainted or refinished separately and should be tested separately.","Part IV: EVALUATION CRITERIA Award of a contract for Lead Based Paint Inspections and Lead Risk Assessor services shall be made to the responsible individual or firm whose proposal is most advantageous to the City of Kenner Department of Community Development.","Particular emphasis was placed on finding subjectstwo yearsof age or younger.","Failure includes roof leaks.","Certificate of Final Inspection to indicate that all work is complete and in accordance with the Healthy Hazard Intervention Contract and any change orders.","Office of Regulatory Science, Emergency Operations, and the Office of Medical Products and Tobacco Operations.","If samples are still refused, leave the premises and contact your supervisor immediately.","Selected Applicant that the Agency will commence negotiations with such Selected Applicant regarding a Project.","The case at barwasedical researcher and research study subject.","They should be so located as to provide short runs of piping to fixtures.","Drain the PODF from the surfaces.","The entire Loan amount is forgiven after three years from the date of closing if the owner complies with affordability and ownership requirements.","Signs were posted at the doors to the bedroom and kitchen.","People performing hazard control, rehabilitation, or maintenance work and the cleanup following such work must not know where clearance dust samples will be taken.","Because a swab takes a very small sample, microorganisms of signi\ufb01cance are often missed.","Ten percent of the total surface area on an interior or exterior type of component with a small surface area.","Thus, your signature is attesting to the fact that the af\ufb01ant has read and understood the statement and has con\ufb01rmed that the statement is the truth.","This equipment must operate using existing building circuits.","Therefore, the Hovnanians are ordered, at their own expense and in accordance with the license agreement, to obtain and provide plaintiffs with copies of the aforementioned reports.","This amount is called a area or amount.","Service fees and charges.","Prohibited Types of Water Heaters.","The joints shall be fused, snap together, or threaded.","Department of Finance or DOF.","Good standing meansthat the laboratory is not currently suspended with their current accreditation body.","PCB remediation wastes that meet the criteria of the Policy.","The time at which all existing occupants vacate a unit and all new occupants move into the unit.","Use photographs and diagrams if necessary to portray the present condition of the lot.","Thus, the cases were remanded for furtherproceedings Every issue bearing on liability or damages remains open forfurther development, and any relevant evidence not otherwise precluded under our rulesof evidence is admissible.","At least one wipe sample shall be taken from a window trough or a windowsill with a paint history, if present, and one from a floor in each room.","The addresses of the dwellings in which EMP were performed.","Fire and extended coverage insurance.","The courses must be accredited either by EPA or by an EPAauthorized state or tribal leadbased paint program.","Copies are not given to the shipper or consignee but can be obtained from the carrier.","The form of residential lease including occupancy agreements utilized by housing companies is subject to the approval of HPD and shall be submitted to HPD, if requested.","EPA and HUD Real Estate Notification and Disclosure Rule apply to housing common areas such as stairwells, lobbies, and laundry rooms?","The modified acceptance criteria are defined in the QPL for each material.","ATTIC AREA economically feasible.","Urban Renewal, Model Cities, Code Enforcement or any certified area of governmentally sponsored improvements, a letter from the Project Director in charge of such area certifying that rehabilitation of such property is in conformity with plans for the area.","Housing Trust Fund Corporation.","Purge: The implementation of External Locally Attached Hard Drives varies sufficiently across models and vendors that the issuance of any specific command to the device may not reasonably and consistently assure the desired sanitization result.","It does not prove actual movement.","Ineligible Portions of Projects.","The permit of the Department of Housing Preservation and Development issued for such lodging house shall be continuously and conspicuously displayed in the office or hall of such lodging house.","Department of Finance or other appropriate agency.","ND Not Detected NIH National Institute for Health NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NLLAPNational Lead Laboratory Accreditation Program program recognizing laboratories complying with the USEPA LQSR.","Based on the mark on the top of the pipe segment made prior to removing pipe from the ground or lifting the pipe from its location during former operations, sample the inside center of the bottom of the pipe being sampled.","Installed to cover all surrounding earth likely to be in contact with the waste.","Unit is required to pay all or a portion of the utility costs with respect to such unit in addition to any payments of rent.","This affidavit should include the following information.","EPA identification number, if any, previously issued to the facility.","GENERALd wheer of theent.","The name and address of the owner or operator of the boiler and the address of the boiler.","Replace existing deteriorated portion as determined by the administrating agency to match existing.","Food and Drug Administration ordered a halt to eight humangenee.","Never burn lead debris.","Bathackflow prevention devices or similar equipment shall not be so located as to make possible their submergence in any contaminated or polluted liquid or substance.","No variations in color or overlapping of colors will be permitted.","Where the Agency determines that an owner has rejected a tenant applicant, it reserves the right to order him to submit another applicant for that housing unit.","Distillation bottoms or residues and filter media are regulated for disposal as PCB remediation waste.","If not, the more economical approach of interim controls plus ongoing monitoring of maintenance practices may be more realistic.","The training courses are offered by EPAapproved private training providers; there is no additional fee to EPA.","The visionmust assure that the Episode Number is used within the divisionand any other divisionwhich followup to the original violative sample.","Subpart B also includes authorizations from the prohibitions.","Relocatee, prior to moving from a temporary shelter to a lawful dwelling unit found by his or her own efforts, or to signing a lease for such lawful dwelling unit, the Relocatee must notify his or her Case Manager in writing.","Ignitable wastes shall not be disposed of in chemical waste landfills.","Dwelling unit and worksite were secured against unauthorized entry.","Mitchell is also dismissed for the reasons already discussed.","In states and tribal areas with EPAauthorized programs, check with the state or tribal agency administering the program to learn about the certification requirements in that state or tribal area.","Tenants which rental assistance program is most suitable for their individual needs, assist Tenants in completing rental assistance applications, and forward all necessary documentation to the appropriate authority for final review and processing.","In the case of infiltration of loosely woven bags, shake or tumble the bag over a large sheet of clean paper to collect the siftings as a sample.","The department may deny or shall reprimand any licensee or registrant, or shall modify, suspend, suspend on an emergency basis, refuse to renew, or revoke a license if the licensee, registrant, or applicant engages in the behavior listed below.","For information on becoming an accredited renovation training provider.","Plaintiffs contend that these reports are necessary to determine the full extent of their damages.","You must make these records available promptly to EPA or to any party possessing the equipment through sale, loan, lease, or for servicing.","Officials believe the test results, which included analysis of particulate matter, dust composition, building debris and soil composition, show that there is no apparent health risk to the surrounding community.","Each breaker shall be labeled with the device name by means of a screwed or riveted engraved plate.","Verification of income at time of admission and during occupancy.","Dust Wipe Sampling, then your inspector will give you instructions on how to safely address the deficiencies.","If a reasonable compromise cannot be reached, proceed as a refusal to permit sampling.","Certificate of Compliance for all bolts, nuts, washers, and load indicators.","BUREAU OF HOUSING OR THE IMPLEMENTING AGENCY The Bureau of Housing or the implementing agency is responsible for pang or the implementing agency is responsible for administering the program in a professional manner that ensures maximum effectiveness, efficiency, and customer satisfaction.","The owner shall make full and timely payment of current real estate taxes, assessments, water and meter charges and sewer rents during the term of the loan.","Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from authorities having jurisdiction.","Act, then the abatement shall equal the amount of real property tax that would have been due but for such full or partial exemption.","Such provisions may include a fixed period of time for which the approval is valid.","The City work is done in stages, interim dust lead clearance must be obtained prior to t clearance must be repeated following Uniform Relocation Act for temporary s are required to relocate.","Joists shall be secured to the roof timbers framed about the openings in a sound and secure manner.","The collection of airborne samples for analysis of fibers.","The base of the valve shall have standard female pipe threads.","State of New York.","The owner shall accept referrals from whatever governmental source the Agency may designate.","The Administering Agent will select Eligible Buyers, beginning with the first name on the potential buyer list.","Notes: Verification must be performed for each technique within Clear and Purge as described in the Verify Methodssubsection, except degaussing.","The sample point is in the center of the square area of inference.","BY REFERENCE OF FEDERAL AND OTHER STANDARDS Adoption by reference.","Rules, the filing of an application for a Certificate of Eligibility and Reasonable Cost is deemed a representation by such applicant that, with respect to all items of work claimed in such application, there has been Completion of Construction.","Not all implementations of encryption are necessarily suitable for reliance upon Cryptographic Erase as a Purge mechanism.","Type II and V systems.","Storage operations have not ceased until all PCB waste, including any PCB waste generated during closure, has been removed from the facility.","TSCA PCB reporting and recordkeeping requirements at subparts J and K of this part.","The Act requires that the recipient of the pamphlet, among other things, consents electronically to email delivery and in a manner that demonstrates that the recipient can access the information in the form it will be provided.","City from the United States Department of Housing and Urban Development which require that such a database be maintained.","Worklan, Compliance Program, or assignment.","If a renovation is to be performed in a common area in one building, are we required to provide prerenovation education to all tenants in all buildings?","All contracts require lien waivers and are subject to final inspection before payment will be issued.","Licensed persons meet this requirement since accreditation is a prerequisite to obtaining a license under these regulations.","All documents, including the certification, can be submitted to the address below.","For some unexplained reason, processing the dust samples typically took severalmonths.","Requirements for decontaminating spills in nonrestricted access areas.","Although EPA does notspecify who may make a hazard determination, EPA does specify what constitutes a hazard determination.","Amongtheexhibitsattached to motion was an excerpt from Dr.","Lap metal flashing over metal roof panels to allow moisture to run over and off the material.","Thermoplastic Pipe and be listed on the NTPEP audit website displaying they are NTPEP compliant.","If the storage device has been successfully verified and the sanitization results in a lower confidentiality level of the storage device, all markings on the device indicating the previous confidentiality level should be removed.","INV be ommtheuteres atof wedwhenng thebe panton theouterthebe the, eauterpped er then.","Install vents watertight to structure.","The usual subsample is a consumer size container of a product.","This witness has clearly covered the chain of custody, this witness and a previous witness aboutthe samples being bar coded when they were collected.","Interim changes in income.","Remember that the laboratory may charge based on the number of composite subsamples, which may eliminate any composite sample discount.","NELAC state and a copy of the most recent inspection report and corrective action plan.","Consent Form in this case constituted a contract.","If there is a lease, such notice will be attached as a rider to the lease.","An invoice for the required fee will be sent to the building owner after the notification has been received by the department.","Final Selection, the Tenants of a Building selected for the Program may apply for any other HPD disposition program that accepts applications from Tenants.","The housing, complete with integral ballast, shall be weathertight.","Sites outside of the geographic exclusion area may be either privately owned or owned by the City of New York.","The post shall mount directly into or onto the base in a tamper proof manner and shall allow for easy replacement.","The Market Price for a Fee Tier is equal to the fortieth percentile sales price per square foot for units that are in developments meeting the unit count and maximum square footage eligibility criteria for the Affordable Housing Fund option.","RRP Rule apply to federal employees performing work on federal facilities?","In such an election each dwelling unit in the development shall be accorded one vote.","Some swells, especially in acid products, may result from chemical reaction between the contents and the container.","Rope, tape lines, pylons, and similar work area designation devices which can be easily surmounted or bypassed are not acceptable barriers for this purpose.","If you are unable to locate the trucking company, contact the local of\ufb01ce of the Of\ufb01ce of Motor Carrier Safety, Federal Highway Administration, Department of Transportation.","If the vertical containment meets these criteria the floor containment measures may stop at the edge of the vertical barrier.","The Philadelphia Department of Public Health is developing a portal for online submission of certificates and dust wipe results and will post instructions on how to use this portal as soon as it is available.","Telephone interviews may be conducted.","The certificate frame shall be faced with plastic or other transparent lacing but not glass, adequate to permit the certificate of inspection visits to be read without difficulty.","The date of shipment.","AMIAn owneroccupied Living Unit in a multifamily building is eligible under the Program if the owner meets one of these income limits.","Owner or Licensee of such Letters of Patent and file the same with the City.","The successful Contractor is required to present all keys and access cards to a County representative on a nightly basis or as requested.","Viscosity and application life may be waived providing the material is mixed and placed by a pump and mixer approved by the Engineer.","Basic eligibility conditions for relocation payments.","State Homes and Community Renewal or any court having jurisdiction that one or more acts of Harassment were committed at the Pilot Program Building during the Inquiry Period, the Commissioner shall make a final determination to grant or deny the application.","All lamp sockets shall be positioned to locate the light center of the lamp within \u00bdinch of the light center location for which the luminaire is designed.","So we had a, pretty much, automated system from the beginning to the end of analysis.","Lead poisoning in children is a problem in Baltimore City and other communities across the country.","PTFE except where filled PTFE is specified in the Plans.","Sampling multiple lots should be considered depending on the type of product and process used.","The generator must give the transporter the remaining copies of the manifest.","Department staff shall contact committee members to determine availability for a meeting date and place.","We realize these are big changes in our program.","Occupied Rehabilitation Program the subject property taxes must be current.","The following conditions and agreements shall apply to issuance of licenses under this section.","If the strength of the core meets the required compressive strength of the concrete, the pile may be accepted.","In the event the income and reserves of the housing company shall be insufficient, as determined by HPD, to complete all required repairs, HPD, in conjunction with the housing company, shall establish priorities.","Multiple layers of polyethylene sheeting shall be used as needed to prevent dust from contaminating the floor.","Disposition of Funds Statement.","The program administrator shall submit a written report of the facts related to the processing of the application and good cause foexceeding the established time periods.","Pending final decision of the dispute herein, the Contractor shall proceed diligently with performance under the agreement signed by the City and the Contractor.","Preliminary building plans as approved by the Department, indicating a site plan of the low and moderate income building, total size of the building and the size and configuration of the dwelling units to be contained in the building.","If the heater thermostat is separate from the fan thermostat, the heater thermostat must meet the same requirements as the fan thermostat as defined in TEES.","Dry sanding or dry scraping.","Contract and related to the Work covered by the payment.","Note: Students must take the inspection course beforewww.","Lawrence Polakoff was the President of Chase Management, Inc.","Hovnanians do not address these claims in their moving papers.","In the sole discretion of the Department, progress payments shall be made payable directly to the owner, directly to the contractor, or jointly to the owner and contractor.","The seal must be rubbed when af\ufb01xed to generate heat and help it There are many acceptable methods of of\ufb01cially sealing samples.","Each face shall be protected with a removable visor.","Comply with hauling and disposal regulations of authorities having jurisdiction.","Notice of Inspection should be issued when samples are collected from lots in possession of a manufacturer, processor, packer or repacker, whether or not regulatory action is intended toward the articles, the dealer, the manufacturer or the shipper.","Commercial General Liability Insurance bodily injury, death, personal injury, and property damage.","Type II sheeting in rural areas and Type III or IV sheeting in urban areas.","Transporter compliance with the manifest.","The Office of Rent Control shall issue written notice to the tenants of the rent increases requested by the owner.","PCB waste broker or other preparer who prepares or arranges shipments of PCB waste for transportation.","However, the filing of such objections shall not postpone the effective date of the new rent, or of any other action that HPD may take with regard to the commercial unit.","Unreported Opinion THE COURT: Okay.","The following shows basic steps or action required for compliance with the new Lead Safe Housing Rule.","The interior work will be completed within five calendar days and the work The following information has been extracted from the regulation.","Other jurisdictions, like Washington, DC, and New York City, have adopted similar limitations.","Observations should be specific.","All cabinets shall provide a gasketed door flange.","Use alternative methods only after successful completion of these comparison testing requirements and after documentation of the results of the testing.","Wire shall be galvanized prior to fabrication.","Street, that Whitney Seymour, Jr.","For units that are newly leased during this monitoring period.","All controller cabinets shall be furnished with front and rear doors.","Enclosures for ACBM shall be specifically designated by signs, labels, color coding, or some other mechanism to warn individuals who may in the future be required to disturb the material.","Work practices and surface finishing.","EPA will approve such an application if it finds that the method will not pose an unreasonable risk of injury to health or the environment.","Fully describe any record collected as part of the DOC sample and where possible indicate the page of the document that demonstrates the deviation.","Sufficient lighting shall be provided so that the sign will be plainly legible at all times.","This phone number format is not recognized.","Unlike the present case, the Navajos were not recruited by the researchers to beplaced in the environment being tested for unhealthy substances.","Renovators may choose to use lead test kits to determine whether leadbased paint is esent before the start of the job.","However, if substantial costs are involved, consult with your supervisor before making a commitment to pay.","Transfer liquids in glass to expandable containers before freezing.","Living Units in multifamilybuildings can be located in buildings of any size.","Por favor de llenar este formulario y devolver una copia al due\u00f1o del edificio o al agente o representante cuando usted firme el contrato o empiece a ocupar la unidad.","The RRP Rule does not require certified inspectors or certified risk assessors to test each and every component that will be affected by a renovation.","How long will sanitization take?","If you provide a copy of the af\ufb01davit to the af\ufb01ant, you should keep the original af\ufb01davit since the original is an of\ufb01cial FDA document.","DOF Data used to determine Market Prices.","Provided that a bidder has passed all basic requirements, the Agency shall evaluate such bids on the basis of such competitive criteria as are established in the bid solicitation.","Use a random number generator or random number table to select one quarter of the pile.","The Commissioner, upon good cause shown, may alter the timing or sequence of the actions described in these rules, provided all affected parties are given reasonable notice.","Rhode Island Lead Disclosure for Landlords is found in the Appendix.","Hovnanians fail to raise an issue of fact.","The department, on receipt of such notification may instruct that the records be surrendered and may specify a repository for such records.","Once you passed the thirdpartyexam you will receive an approval package by mail when your application is approved.","These sections shall apply to the extent necessary to allow the department to adoptand enforce the federal NESHAP.","Upon approval, the advance sample shall be stored at the plant or site of manufacture in a location readily accessible to the Inspector where there is adequate daylight for examination.","CRC set forth therein.","The housing company or managing agent shall notify HPD, HDC and the Tenants Association of any litigation by or against the housing company which would have a material effect upon the financial condition of the housing company.","It is to be taped to the outside of the sealed envelope containing your proposal.","Sample site selection for pipeline section abandonment.","Initial Filing Date of the application.","Where collection efforts on the part of the housing company, managing agent and counsel have not been successful, the housing company may turn over uncollected accounts to a collection agency licensed by the New York City Department of Consumer Affairs.","DO NOT USE magic markers, etc.","The notice of Disposition Rent may be combined with any notice of Disposition.","Office, other governmentally supervised housing programs.","Text meant only for screen readers.","For structures, all material delivered to the project shall bear a grade stamp and have a grading certificate.","Playgrounds and gardens should not be placed in areas where the soil is contaminated with lead.","Tax Exemption, Grants and Loans.","In Washington, DC, the requirement to inspect applies if either a child under age seven or a pregnant woman will reside there.","POR ESO ES IMPORTANTE QUE USTED LE DEVEUELVA ESTE AVISO AL DUE\u00d1O O AGENTE AUTORIZADO DEL EDIFICIO PARA PROTEGER LA SALUD DE SU NI\u00d1O.","Develops and applies subtyping methods to further enhance data generated for Pulsenet, strain identification, and molecular epidemiological investigations.","PCB Container, a description of the contents of each PCB Container, such as liquid, soil, cleanup debris, etc.","Though not expressly recognizedin type of relationship which creates a duty ofcare, a duty or duties wouldordinarilyd exist, based on the facts and circumstances of each ofthesedual cases.","Use a core sampler to collect a minimum of one core sample for the entire depth of the waste at the center of the container.","The cause of the problem was corrected.","Examples include efficiencies, studio apartments, and dormitory housing.","The committee shall file an annual written report with the board.","Use of these procedures will also minimize exposure risk to other potential pathogens and it is encouraged to follow these procedures whenever any dusty feed samples are collected.","Termination of Relocation Services: Other Grounds.","This command typically executes substantially faster than attempting to rewrite through the native read and write interface.","HPD will pay the cost of Shelter Services in such amount as HPD deems adequate for Relocatees residing in temporary shelters.","The Contractor shall immediately report to Facility Maintenance Manager, authorized County representative or County Security any damages to County property.","Ensuring that disclosure information is given to home buyers and tenants helps all parties avoid misunderstandings before, during, and after sales and leasing agreements.","Specify title of course.","Study because the Study provided no benefit to him and posed more than a minimal risk of harm to him?","Ballasts for underdeck and wall luminaires shall conform to the provisions in Section.","Hotel suites that provide a sleeping area that is separate from the living area are covered by the RRP ule because they are not zerobedroom dwellings.","Federal, State, and local laws and regulations for the management of radioactive material.","There are a few simple steps affiliates can take to minimize the risk of lead poisoning.","Thisfield requires some thought on the part of the collector and communication with the supervisor.","Therefore, renovation firms should look for a vacuum cleaner that was designed to be operated with a HEPA filter, rather than a shop vacuum that can be fitted with a HEPA filter in place of the original basic filter.","Fees due and payable to an approved title company for the title insurance policy, recording of loan documents and mortgage recording taxes.","Signiinhiplaboryloion l requre boratoo rapplyer anew rediion numer.","If only selected faces of the building were treated, the samples should come from the soil under those faces.","Third, all surfaces in the work area shall be washed with a detergent solution.","Minimize dust generation Use a spray bottle to mist surfaces that are being cut, sanded, or scored.","Samples may be collected by removing any covering soil, cutting the pipe to gain access to the sampling location, and collecting the surface sample with the pipe in place, rather than completely removing the pipeline sections to collect the surface sample.","Provided that a qualification statement has passed all threshold criteria, the Agency shall consider such competitive criteria as are established in the RFQ.","Does the RRP Rule apply?","However, if inspectional evidence or other examination results indicate problems, conduct field examinations using the large chart on the next page for guidance.","These instructions describe procedures for collecting samples of raw agricultural commodities and processed commodities.","DEP Lead Management Regulations, which plan shall also include any temporary relocation assistance to be provided to an Applicant.","The evidence proved that vacuum sampling is a generally accepted method for evaluating trends in levels of lead dust over time, and we hold that the circuit court properly admitted the vacuum sampling evidence for that limited purpose.","The time and place for such conference, if any, shall be indicated in the RFP solicitation.","Department and has a current license issued by the Department to supervise and conduct abatement projects and prepare occupant protection plans and abatement reports.","When the interface supports sanitizing only a subset of the encryption keys, partial sanitization via is possible.","Upon acquisition of site.","Keep doors and windows closed to prevent dust from blowing and close off vents to central air or heating systems to avoid spreading dust to other parts of the house.","How long will my new certification last?","Community Profile An important goal for the City of Kenner is to maintain viable and quality housing conditions.","Fittings shall be blow molded, rotational molded, or factory welded.","The agency may impose such additional threshold criteria in the RFP as it deems necessary or desirable.","The results of the visual assessment for the presence of deteriorated paint and visible dust, debris, residue or paint chips.","The LED pedestrian signal module shall be operationally compatible with controllers and conflict monitors.","You cannot state that the law requires the records be furnished to FDA unless you also explain it is required only after a written request is issued.","It is recognized that house dust is a hazard?","All construction shall be performed by the developer under a license agreement with the City.","Without external signal, the unit shall inhibit extension and enable delay.","You should only sign the af\ufb01davit AFTER the af\ufb01ant has signed it.","It does not include a family residence registered as a child care facility.","Thus, once the moving party has provided the court with sufficientgrounds for summary judgment, the nonmoving party must produce sufficient evidence to thetrial.","Real Property Tax Law, but not including the provisions of the Private Housing Finance Law as of the date that the Certificate of Eligibility is issued.","Some individuals may have some bruising around the arm vein due to leaking of blood from the vein.","Microbial spoilage can be detected by observing swollen lids on jars or swollen can ends.","Note the fact that the Cut portions of bags or containers containing suspected insect entrance or exit holes from containers using small scissors.","GOVERNMENTSHIPMENT Two completed and signed copies of this Declaration must be handed to the operator WARNING Failure to comply in all respects with the applicable Dangerous Goods Regulations may be in breach of the applicable law, subject to legal penalties.","Based Paint were conducted during the period of _______to ____________.","Component Selection Procedures The Housing City of Atlanta inspects the home or unit and develops a complete list of areas to be sampled.","So the point is this house passed clearance under the standards in place at the time the study was done and, therefore, it meant it was safe for the child to move in.","When placed on top of ground containment, such containment should effectively limit the travel of dust and debris to the interior of the enclosure.","Aquick sampling verification as described in the Verify Methodssubsection should also be performed after any additional techniquesare applied following Cryptographic Erase.","LICENSURE: AIR MONITORING TECHNICIAN.","If a Contractor employee leaves the County property with County keys, the employee shall return and secure County keys as directed above.","State of Missouri or in the state where the vendor is incorporated or otherwise licensed to do business and which shall remain, at all times during the term of any contract with the County, in full force and effect.","Circuit Court for Baltimore City had previously dismissed several claims of battery against KKI on the same theory.","California statute provides a model for how state laws can be used to encourage the adoption of local laws that are appropriate to different environments and, in addition, provides an explicit recognition that in doing so coordination issues must be addressed.","When do I need an inspection?","The bids are to be returned to the designated located on the specific due date.","Refer to the TCGand device manufacturers for more information.","The use of the community room for these purposes should be at the discretion of the housing company in consultation with the Tenants Association.","Traffic covers shall be constructed of aluminum, steel, cast iron, or ductile iron.","Burlington Code of Ordnances, city inspectors, including two health officers operating through the city codes inspection process, were able to inspect housing for lead hazards and ensure compliance with EMP requirements paralleling those of the state law.","Joint ownership of shares.","An applicant shall designate at least one individual for the purpose of complying with this training requirement.","Because projects located in a SFHA cannot be funded with Program funds, it is important to know from the outset whether or not a project site is located in a SFHA.","Accordingly, we write on a clean slate in this case.","Remember normal corn, if it fluoresces, will fluoresce a bluish white.","Do not prepare Authentic Factory Samples when the cannery is packing for USDA fillcontainer certification unless: USDA inspection is not continuous.","DAMP may set rents for a particular building based on a per square foot per apartment standard instead of a per Room per apartment standard.","An applicant desiring to be an asbestos laboratory shall designate one or more individuals as their responsible persons, who shall have responsibility for the asbestos activity.","Until EPA issues a final rule, individuals and companies included in the class exemption will be allowed to continue processing and distributing PCBs in small quantities for research and development.","The proposed instruction would have question from the jury, and ed the jury to proceed directly to each issue.","PCB disposal activity for which the extension is sought.","HUD in the federal register and are updated annually.","The RRP Rule does not prohibit firms from reaching agreement on which will supply the certified renovator who is responsible for ensuring compliance with the RRP Rule and who directs and trains noncertified workers.","Alternate bids without complete specifications may be rejected.","Push the soil recovery probe into the soil to a depth of approximately two inches, then twist and snap the coring sample.","Family Member that inherits, by either intestate succession or testamentary disposition, a Homeownership Affordable Housing Unit.","Act, the Office shall issue a Preliminary or Final Certificate of Eligibility.","RAP and use of the RAP in HMA.","Site Occupancy Record, upon request, at a reasonable time prior to the hearing.","Increase the amount for longer hauls or unusually warm weather.","Philadelphia Fair Housing Commission plans to monitor the number of complaints of housing discrimination against families with children to determine if there is an increase with enactment of this law, but that will only measure increases in reported instances of discrimination.","Alternatively, remove the DRAM from the device.","Material which, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.","Building Permits are in effect for each such filing.","The intent element of battery requires not a specific desire to bring about a certain result, but rather a general intent to unlawfully invade s physical wellbeing through a harmful or offensive contact or an apprehension of such a contact.","Blood sampling will involve taking blood froma vein in the arm.","HPD or the housing company shall have the right to immediately terminate any managing agent for cause.","The Estate points out, as it did in Reedhearing, unlike accepted abatement clearance standards based on dust wipe sampling, vacuum dust collectionhas not been adopted as a legal standard to measure lead dust by any jurisdiction.","All import sampling plans are based on lot size and the sizes of the fish in the lot.","With these few exceptions, state and federal laws do not protect children from lead hazards in privately owned housing not subsidized through government programs.","Include a notice about owner responsibilities under the law with each lease and provide a pamphlet informing occupants about lead.","Theairommihallimeforinghat s not rent an unde buor he lboratory or requd parip, inuding feallsirualmeein.","If any member of the household fails to sign and submit consent forms for obtaining information, such as income verifications and other release of information forms.","Insurance certificates for products and completed operations where required and proof that fees and similar obligations were paid.","Copies are filed at both origin and destinationoffices of these carriers.","Where was the work done?","EPA for the disposal of PCB waste which is regulated for disposal under the requirements of subpart D of this part.","At no time shall material be allowed to accumulate on the floor or become dry.","EPA PCB spill cleanup policies in effect at the time of the decontamination.","Certificate of Eligibility and Reasonable Cost shall be exempt from taxation on any increase in assessed valuation resulting from the certified reasonable cost of the alteration, improvement or conversion performed pursuant to the Act.","Percent soil passing No.","Program a new message, which may include animated arrows and chevrons.","The field tests will include installation with control markers to determine relative adhesion and durability characteristics.","This episode number will be indicated in the applicable Import Alert.","Notwithstanding the foregoing, HPD reserves the right, where violations of law or of HPD rules are found, to reinstitute temporarily or permanently, a requirement of prior review and approval of all applications for admission to or transfer within a development.","National Housing Act, as amended.","Complies with the reporting and recordkeeping requirements in subparts J and K of this part.","The insurance requirements outlined in this Contract shall in no way be construed to limit or eliminate the liability of the ENGINEER that may arise from the performance of Work under this Contract.","Double tube grain probe must have individual compartments permanently separated.","If it is necessary to show the sample temperature did not go above the desired or specified temperature, you can use one of several methods, such as including a prechilled, shaken down, maximum reading thermometer or commercially available indicators.","Engineer for review, in quantities specified for Product Data.","Samples must be collected randomly from the entire lot.","TSI means insulation applied to heating, ventilation or air conditioning systems, hot or cold domestic water systems for the purpose of preventing heat transfer or water condensation.","Prior to the time of sale of rental target housing, the real estate agents, sellers, and other transferors of title shall provide the buyer or transferee with information approved by the Commissioner explaining EMP obligations.","The Agency acknowledges the desirability of involving recognized and responsible community organizations in the planning and execution of rehabilitation efforts in their areas.","The main objective of safety recommendations is to minimize exposure to feeds and feed dust at the time of sample collection and to minimize future exposure through feed dust on clothing or equipment.","OPERATIONS: NOTIFICATIONS General provision.","Egress from lowest balcony.","The origin, or reference point for measuring selected random numbers of centimeters to the sampling area, is on the lower left corner when facing the surface.","To be endorsed to include site and any buildings thereon.","Persons disposing of PCB Articles must wear or use protective clothing or equipment to protect against dermal contact with or inhalation of PCBs or materials containing PCBs.","Respondent: I think the expectation would be that they would be told if there were any problems.","For dwelling units that were inspected, the owner must provide copies of the inspection report including a statement of whether there was or was not peeling paint on all visually inspected components or similar documentation.","HPD from any individual, firm or corporation which may submit any bid, or to whom any contract is proposed to be awarded.","Violations, revocation or suspension of permit.","However, the availability of open source tools helps organizations understand how the commands work and allows testing of sanitize commands on a drive, as well as supporting the ability of home users to apply sanitization to their personal media.","Rochester code contained no specific prohibition against lead paint hazards.","Bottles packed in white, paperboard boxes with black printing.","Paint Finish Warranty: Project information sheet and warranty applications shall be completed and submitted by installer prior to delivery of the warranty.","Such inclusion in multiple selected family compositions also shall result in disqualification of all involved parties from such lottery.","AIHALAP, LLC approved proficiency testing program.","But the actions, themselves, are not defective on the ground that no legal duty can, according to the trial courts, possibly exist.","The Board of Directors has the responsibility for establishing policy covering administration of property, interests, business and transactions of the corporation and may delegate to officers such authority as it deems necessary.","All luminaires shall include shorting caps when shipped.","The mutual housing company shall follow the chronological order of its waiting list in the sale of shares.","Commissioner of the New York city department of housing preservation and development or of its successor agency.","Unit prices submitted in the bid shall not be increased or decreased regardless of changes in quantity.","Zerobedroom housing means a residential dwelling in which the living area isnot separated from the sleeping area.","Measuring Law for Evaluation Research.","Best interests of the city.","Quality Assurance Plan and have indicated the proficiency testing programs in which the lab participates.","Such hearing shall be scheduled as soon as possible after a request.","Have any of the dwellings ever received a housing code violation notice?","PCB waste who owns more than one disposal facility or mobile treatment unit shall not accept waste unless the disposer has received an EPA identification number for each facility or mobile unit.","Moreover, which process is appropriate, or whether both are, is in dispute.","The Tenant Association will respond in a timely manner to all Tenant complaints.","Treatment is a form of disposal under this part.","Under certification provisions, city may suspend a certificate of compliance, obtain search warrants, and investigate complaints.","Cryptographic Erase through the TCG Opal SSC or Enterprise SSC interface by issuing commands as necessary to causeall MEKs to be changed.","Consider each of the smaller sections to be a separate abandonment and sample each one, at a minimum, at all ends.","Objects required by these specifications shall support all values within its standardized range.","If an organization cannot verify that CE effectively sanitized storage media, organizations should employ an alternative sanitization method that can be verified, either in combination with CE or in place of CE.","Media type is Legacy Magnetic media.","Pursuant to the Notice as specified above, the rental housing company shall conduct at least one public information meeting with the tenants.","The access door frame head and jamb members shall be mitered, securely welded, and ground smooth.","Termination of or change of benefits.","For this reason, a property manager may receive, and acknowledge receipt of, the lead hazard pamphlet on behalf of the owner.","The housing company shall, in consultation with the Tenants Association, establish priorities for the use of the community space.","Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction.","They are separate components and must be tested separately.","The lettering shall be of the Gothic type.","The central heating unit shall be safe and in good working condition.","All agreements with managing agents must include a provision that it is the responsibility of the managing agent to bill and collect surcharges.","No fewer than three persons, a brother and a sister who are both adults, or a parent or guardian with at least one child.","Building owners may hire a licensed asbestos abatement contractor to conduct asbestos abatement.","Minimum Sampling Requirements for Dwelling Units.","Although it is recommended that delivery be attempted on more than one occasion, a single good faith delivery attempt is acceptable for purposes of the RRP Rule.","Would the rule apply to a job that replaced parts or components of a window, such as broken or failed glass, hardware, or balance systems, where some components might be painted, but the frame of the window would remain?","Clearance examiners should determine if the property they are evaluating has been treated as a result of a legal or regulatory proceeding.","Mineral wool shall then be blown into all spaces by the pneumatic method with air pressure sufficient to pack the insulation to a density acceptable to the Department of Buildings.","Does zoning affect the target housing determination?","Energy auditor certified as oil burner or system replacement auditor qualified by the oil heating institutes of New York in accordance with training qualifications set by the Public Service Commission for purposes of the Home Insulation and Energy Act.","Overwrite Writing data on top of the physical location of data stored on the media.","Department may, in its discretion, accept a financing statement as security.","Multiple Dwelling Law, or by an additional enclosed stair.","If a survey cannot be performed before demolition or renovation is started due to the building being structurallyunsound and unsafe to enter, all material must be presumed to contain asbestos and must be treated as ACBM.","Name and identification number of each laboratory conducting an analysis.","Certified test results for minimum average roll values.","With CE, media sanitization is performed by sanitizing the cryptographic keys used to encrypt thdata, as opposed to sanitizing the storage locations on media containing the encrypted data itself.","Unlike the present case, the Navajos were not recruited by the researchers to be placed in the environment being tested for unhealthy substances.","The term is not applicable to persons who have already been certified.","Collection Remarks field needs to describe any discrepancy between the date sealed and the date collected.","Use one of the ATA Sanitize Device feature set commands, if supported, to perform a Sanitize operation.","Each applicant and members of his or her household shall furnish an affidavit attesting to the gross household income for the preceding year and the anticipated gross household income for the current year.","General: Provide metal roof panels of full length from eave to ridge.","Grower Jones has violative residues of chlorothalonil on collards for which there is no tolerance.","Also please note that retouched, and profile images are not acceptable.","Only one date can be entered; if the sample collection was accomplished over several days, use one date.","If so, consideration should be given to not collecting the sample or if possible modifyingthe sample collection.","No person may open burn PCBs.","RCRA to manage hazardous wastes in containers.","PCB concentration in each liquid phase shall be determined separately on a wet weight basis.","Since samples of lots which are sampled selectively are official samples, complete labeling must be collected.","Concentration of carbon monoxide.","Failure to produce documentation satisfactory to the Office or failure to comply with these Rules may result in the denial of a Certificate of Eligibility, and rejection of the application.","Landmarks Preservation Commission of the City or which is within the boundaries of a historic district designated by the Landmarks Preservation Commission of the City.","No keys issued to the Contractor shall be duplicated.","Administrator shall request property owner to submit a copy of ownerproperty and liability insurance.","Each applicant shall only be entitled to one entry per lottery for a housing company development.","Agency to be appropriate upon submission of a proposal.","In the event the stated prices are determined to be higher than the prices for which Supplier has sold the items, or services, to others, this contract price shall be reduced accordingly.","The Agency may impose such additional competitive criteria in the RFP as it deems necessary or desirable.","Applies to all LED luminaires, regardless of wattage.","Notes: When material is burned, residue must be reduced to white ash.","The Commissioner of HPD shall determine, and advise the Commissioner of Finance, not less than ten days preceding the date of the sale, whether such parcel remains a Distressed Property.","Finish flush with adjacent All excess caulking compound shall be removed immediately with a solvent, light wire brushing, or sanding.","If twentyone or more rejects are detected, return beans examined to the composite and submit to the laboratory.","The sample is being transported back to the sample collector after testing.","Marketing of the Homeownership Affordable Housing Unit.","Yes, they would have been up to the point of data transfer to the data manager.","Larch or Hem Fir.","Preparing validation study samples.","Wendell Johnson Speech and Hearing Center, is a highly respected entity, considered to be a leader in the development of treatments, and treatment itself, for children infected with lead poisoning.","The Code asks more of an experiment, a researcher, or society than mere consent.","The Agency may negotiate with one or more Applicants who have submitted proposals pursuant to an RFP, and may negotiate with parties which have not responded to the RFP.","These master waiting lists shall be kept in the management office.","HPD upon application by such person.","The head of the Relocation Agency shall make every effort to pay promptly any displaced person who makes application for payments authorized by these regulations after a move, or in hardship cases, advance payments may be authorized.","Department or a person or entity designated by the Department to enter the Pilot Program Building for purposes of an investigation of an application for a Certification of No Harassment.","Please note that timeliness of services will be an important factor in selection of firm.","Local Health Departments have property files that may contain important septic system information such as copies of permits, design plans, asbuilt drawings, and soil test data.","Wrought iron replacement is to be used only as matching replacement for portion of existing.","State agencies involved with case management and lead hazard reduction.","Your Lead Inspection will give you a Lead Certificate and all of the results of the visual inspection and dust wipe samplings.","The Commissioner shall offer the issuer an opportunity to be heard, at which a hearing officer appointed by the Commissioner who is not a City employee shall preside.","My weight in dry film.","At least two years of experience in a related field.","If a property is tested by a certified renovator, inspector, or risk assessor and found to be free of leadbased paint, does any testing need to be done again if work is done on the property several years later?","Certificate of Eligibility, an affidavit, on a form approved by the Office, stating that the owner shall register all units other than Exempt Dwelling Units as they become occupied and shall submit proof of registration thereof.","Every room will have a minimum of two lls and one light fixture or receptacle switched at each room entrance.","EPA and presumablywas These conditions, if appropriateadministrative been taken, require fully informed consent in any research usinghumane subject to any level of control or fundingby any federal department or agency.","Where new partitions or enclosures are erected in a cellar they shall be constructed of incombustible materials.","The original vendor shall be responsible for the difference in price and required to make restitution to the County for the difference in price.","Initial Training Course Approval.","Court of Appeals on the identical contract.","Upon initial occupancy, all units created pursuant to this section must be registered with the New York State Division of Housing and Community Renewal.","They shall require that the foundations shall be carried not less than four feet below the surface of the ground, and that the soil on which it is build to be not overloaded.","Wood fencing materials shall have sufficient sapwood in the outer periphery to obtain the specified penetration of preservative.","Finance Law shall not be ineligible pursuant to this section if there are no real estate taxes or water and sewer charges due and owing as of the last day of a tax quarter preceding commencement of construction of such rehabilitation.","Department if the developer fails to make necessary capital repairs.","PCB remediation activities may apply for a TSCA PCB Coordinated Approval.","All joints shall be thoroughly cleaned out, all dust and loose material removed and surface completely cured and dry before application of caulking compound.","Therefore, spills which occurred before the effective date of this policy are to be decontaminated to requirements established at the discretion of EPA, usually through its regional offices.","Unreported Opinion over time, all state clearance standards to measure whether a residence is safe are based on wipe sampling.","These rules apply to residential apartments in City owned buildings under the jurisdiction of HPD.","Tape the template to the floor or use tape to outline the sample area.","Shall be same thickness as existing, adjoining material.","For example, there is little need to collect a physical sample of an insect infested box of cereal from the complainant.","PCB component of the waste, on the basis of its radioactive properties in accordance with all applicable requirements for the radioactive component of the waste.","The qualification statement must comply in all respects with all material terms of the RFQ.","If the application has been approved, HPD will notify the Tenant Association of such approval in a written notice by regular mail to the president of the Tenant Association.","Reulatorycies needo understahe impactand rresults reprted thdegree of rior neded inan estiatiunceraintymentwill deend on such fas the iremens ofthe testmethothe requirments ofthe customr and he exstence of narrw limis on whsios onormncetoa specifionare bsed.","Department of Buildings with respect to a Class A multiple dwelling for all dwelling units contained therein.","Prior to the disposal of any PCBs and PCB Items in a chemical waste landfill, the owner or operator of the landfill shall receive written approval of the Agency Regional Administrator for the Region in which the landfill is located.","PCB remediation waste, regardless of whether the site was intended for management of waste.","No trash will be left in building overnight.","Deliver PCB waste to transporters, disposers, or commercial storers of PCB waste that have not received an EPA identification number.","The record of integrity of the issuer.","Tenant or other occupant of the property shall be notified of the actual date of title vesting in the City.","Hotels, Motels and Tourist Cabins.","Conditions may be found where this modification will not exactly apply.","Grant proceeds may be used only for lead hazard controland Healthy Homes Intervention in Living Units receiving lead hazard control measures.","Regional Administrator may require the owner or operator to submit any other information that the Regional Administrator finds to be reasonably necessary to determine whether a chemical waste landfill should be approved.","The City or Landlord will pay for the first clearance test.","Compliance with Requirement to Pay Supplements.","Autun has not proven itself free of negligence.","During the validation study, use the same ratio of contaminated surface area to soak solvent volume as would be used during actual decontamination.","This is likely the most effective verification technique.","RRP Rule affect the work of nonprofit or notforprofit groups?","When research, with the potential forhealth in Maryland, we will not defer to science to be the soledeterminant The reason, in our view, isapparente research protocols at issue in the case at bar.","This contract shall be construed and enforced in accordance with the laws of the State of Washington, and venue of any suit between the parties arising out of this contract shall be in Okanogan County, Washington.","It continued to maintain this position at oral argument.","There is no set formula for this determination.","With the exception of Rochester and Washington, DC, none of the laws we studied directly requires annual reports and evaluation of the local law.","Advisory Actions are defined as actions that do not include the judicial system.","Cut off pipe or conduit in walls or partitions to be removed.","Law Department, all Dispositions shall require prior approval by the Agency, which approval may be withdrawn by the Agency, for any reason deemed by the Agency to be in the best interests of the City, at any time prior to Disposition.","PCBs and PCB Items the owner or operator of an incinerator shall receive the written approval of the Agency Regional Administrator for the region in which the incinerator is located, or the appropriate official at EPA Headquarters.","DVD for both movies and data from the DVD Forum.","Repeated lthis paragraph, shall mean a lead poisoning rate unit year, with dwelling unit years being calculated by multiplying the number of dwelling minimum housing violations shall be defined by rule by the housing resources commission.","In some cases, photographs may be a suitable substitute for collection of physical subsamples.","The name of the person who performed the EMP.","This seal is effective for use on wooden crates, drums, baskets, etc.","Samples of imported raw materials, which are collected before further processing or mixed with other ingredients.","The media encryption key is sanitized directly during Cryptographic Erase.","Grimes rules on the exact issue that ently the subject of this discussion, the subject of this instruction.","Seymours derived no benefit.","When remaining construction will not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner.","They clearly told everybody if there was some lead in their dust during the study.","Gabion Fabric Gabions may be fabricated from either hexagonal twisted wire or from welded wire.","MIH Application by HPD.","If the Board of Directors requests a meeting to review such analysis, the Assistant Commissioner of Housing Supervision shall call a meeting prior to making a recommendation to the Commissioner.","Hooked ends of steel reinforcing bars shall be standard hooks unless shown otherwise in the Plans.","Childhood Lead Poisoning: Conservative Estimates of the Social and Economic Benefits of Lead Hazard Control.","In opposition, the Hovnanians failed to raise a triable issue of fact.","This manner of verification typicallyonly applies where the device is in an operational state following sanitization so that data can be read and written through the native interface.","If a Borough Office was not using any of the referenced forms when documentation was obtained, the Office may require the forms then in effect or as listed in the prior Rules and Regulations.","There are no required procedures for collecting a sample from each single phase liquid.","Initial data from San Diego suggest that the law is making progress in identifying and addressing lead hazards in housing.","When chimneys are to be used to combustion ventilation, they shall be relined.","Works with state law.","Criteria for Identification of Buildings for Participation in the Alternative Enforcement Program.","Only one end is slack or slightly bulged and the end remains flat if pressed in.","RRP Rule apply to renovations that disturb ceramic tile where the glaze on the tile contains lead at regulated levels?","LLC aion symbol after ignhe appriae ling agremen, deailing the permisiblee.","Any cracking, other than surface cracking evident on only one face of the post, is considered a failure.","The following major capital improvements require the approval of designated agencies on the forms indicated below, and such additional documentation as the Office shall require.","Put the cuttings in a large enough containerto avoid excessive folding of the cutting.","Occupied Rehabilitation Program Policy Manual computed by the greater of either the current market income from the asset or the imputed value of the asset using the current passbook rate as determined by HUD.","Signature Interior Demolition, Inc.","Recycled concrete, in any form, shall not be placed below the ordinary high water mark of any surface water of the State.","The Contractor shall keep adjacent areas dusted and at a standard cleanliness level during construction.","The report must specify all items and equipment that are in need of repair or replacement or which have exceeded their useful lives or are projected to need repair or replacement within five years.","Decontamination waste and residues shall be disposed of at their existing PCB concentration unless otherwise specified.","The health effects of lead poisoning are devastating and irreversible.","If the conversion, alteration or improvement results in an increase in the gross cubic content of the building, the portion of the building which represents the additional cubic content shall not be exempt from any increase in assessed valuation.","Identification Marking The date of manufacture, the length, and identification number corresponding to the detail layout shall be marked in black paint on the back or end of each piece of curb.","The floor within the room for the collection of refuse shall be constructed of concrete and shall be sloped to a floor drain within the room connected to the house drain.","The serial number or internal identification number shall be permanently marked on the equipment.","Certification of No Harassment.","Roe in the county and State aforesaid, who, being duly sworn, deposes and says: I am the Vice President in charge of production of the Doe Bottling Co.","When the improvements are completed, such proviso is to be deleted from the policy.","Seymours occupying the first floor, basement, and cellar, and a family of tenants occupying the second and third floors in a separate apartment.","These clear yellow plastic sheets are available at most stationery stores.","The interior shall be free from sags or runs, but slight residual corrugations due to cooling shrinkage of the lining will not be cause for rejection.","EPA also recommends that children eat nutritious foods as specified in that National Dietary Guidelines because children with good diets absorb less lead.","It shall not contain resin, tannin, or other compounds in quantities that would be detrimental to plant life.","HPD proposes to Revoke, or does Revoke, a Tax Benefit.","The housing company shall maintain an internal transfer list by apartment size, listed in chronological order by date of receipt of transfer request.","Do not separate a multilayer cutting.","It is important to document this point to fix responsibility in the event the agency wishes to pursue action against that individual.","The storage capacity of magnetic media has increased at a relatively constant rate and vendors have modified the technology as necessary to achieve higher capacities.","The applicant must indicate on the application that it is a request for a transfer of accreditation.","Common areas that children under age sixonly pass through, such as hallways, stairways, and garages are not included.","Should any accidents or injuries arise, either to a person or property, the Contractor is to notify the appropriate facilities manager immediately and cooperate fully in any required investigation.","Collecting these kinds of data may provide a basis for later adjustments of implementation strategies.","Nuremberg Code immediately adopted by United States courts as setting the minimum standard of care for human experimentation?","Time and labor costs saved in recleaning might justify the added cost of dust sampling.","The advertisement shall include, at a minimum, a short description of the program, the availability of syndication funds, any required or suggested project, the place where application forms can be obtained and the deadline for submission of applications.","NESHAP for all covered activities.","Determination of Initial Rent; Rent Increases.","Completion Assessment Cap Requirement.","Trainers seeking accreditation in states, states tribes and territories not administered by EPA should contact the respective state or tribe for more information about their training and certification requirements.","The allergen compliance program, when issued, will provide additional sampling guidance.","Well, let me say this: If there was an emergency, if something had to be done we would have done it.","Armstead about the possibility of lead exposure is likewise unsupported by the facts.","DO NOT store trash on site.","The concentration of PCBs spilled is determined by the PCB concentration in the material spilled as opposed to the concentration of PCBs in the material onto which the PCBs were spilled.","If you do not refuse stove knob covers in writing, the owner will attempt to make them available to you.","Remove and replace saturated materials such as interior walls and cabinets.","Commissioner and has a current license issued by the Department to perform abatement work supervision.","Certificate of Training of the individual who took surface dust samples.","Garnett, Why Informed Consent?","Remove all old putty and compound.","HPD in the event of cancellation, amendment or alteration of a policy.","The term includes a subcontractor.","If the lot consists of different containers or bags of different manufacturers, collect controls to Collect nesting material with minimal handling.","Breaks, such as those for summer or winter, are mere temporary disruptions in regular visits by children.","Electronic Code of Federal Regulations in XML.","The regulator must be fully adjustable.","County keys are not allowed to leave County property.","Approval of commercial storers of PCB waste.","At a minimum, EPA suggests that reuse stores label suspect items to indicate that they may contain lead, educate staff about lead hazards, and provide outreach materials to customers about leadsafe work practices.","Following the renovation, the work area must also be cleaned until no dust, debris or residue remains.","Our analysis of these case studies relied primarily on the text of local and relevant state laws.","Such application shall be submitted both electronically and by mail, in such form as HPD shall approve.","Certified employee of a public utility.","Courtas the Personal Representative of the Estate.","DAMP Program and the maintenance and operating expenses incurred by other buildings presently or previously in that or other DAMP Programs.","The firm must retain a copy of the determination for three years after completion of the renovation.","Subsamples of uncontaminated product from beneath the unstained bagging, or other container.","The proper initial configuration of each type of device helps ensure that the sanitization operation is as effective as possible.","Joints in masonry shall be broken.","SDR, size, material, machine, and date on which the pipe was manufactured.","York City Charter, including the procedure for filing an application for tax exemption and tax abatement and the issuance of Certificates of Eligibility and Reasonable Cost by the Office of Tax Incentive Programs of the Department of Housing Preservation and Development.","Accordingly, we vacate therulings and remand these cases to that court for furtherproceedings consistent with this opinion.","Develops, optimizes, and validates methods for the determination of color additives in foods and cosmetics.","We unbolt the door from its hardware and remove it without penetrating, scraping, or removing paint.","Offer the PCB waste to transporters, disposers, or commercial storers of PCB waste who have not received an EPA identification number.","Sheets and pillow cases shall be kept in a condition clean and satisfactory to the Department of Housing Preservation and Development.","The typical phosphate levels found in a liter of drinking water are about one hundred times lower than the phosphate levels found in the average American diet.","Containment is not required for portions of the renovation outside this area that do not disturb painted components.","Permit the tool to cool in the air or inside a sterile container before using.","Contaminated articles, may not be disposed of in a scrap metal recovery oven or smelter unless approved or otherwise allowed under subpart D of this part.","The control shall also have secondary zener diode and transient filter.","Photos, names and types of equipment to be used.","Similarly identify any outer packaging, labels or circulars.","However, local laptop control capability shall be limited to that traffic controller.","Evaluation of Efficacy of Residential Lead Based Paint Repair and Maintenance Interventions.","Decontaminate the following prepared sample surfaces using the selected testing parameters and experimental conditions.","The building is to be placed in a program of rehabilitation or reconstruction which requires the vacating of the entire building.","The Court: Your contract was to protect her against a risk.","Analyzes all heparin and insulin samples.","Implementation by housing company.","Tax abatement may not be received for repairs to any item for which benefits of tax abatement are already being received.","Existing damaged areas shall be removed and new flooring of the same type and material applied.","Obtain an Af\ufb01davit, from the driver setting forth the facts of the shipment.","All parts necessary for assembly shall be constructed of aluminum, galvanized steel, or stainless steel in accordance with the Plans.","Please provide the location information for this facility.","MUTCD supplemented by the further requirements of the Standard Plans.","OEI coordinator, so the information can be updated in the FACTS firm table.","Administrators will also cooperate with the DEP to complete ead nspections and related remediation efforts.","Note: Include these notations on all Dry Ice shipments.","What is the difference between a certificate of mailing and certified mail?","National Sanitation Foundation test method.","Notice of Substantial Completion.","Safety precautions listed should be followed for ALL sample collections for BSE analysis, both import and domestic.","Federal, State, and local laws and regulations.","Boyce Sarah, Hood Kim.","If a ramp run has a rise greater thfeatures: of ramp segments.","In that case, you can enter the FEI twice and identify it as both the manufacturer and the dealer.","The valve shall be constructed so as to allow all internal parts to be removable from the top of the valve without disturbing the valve installation.","BRM Sampler equated to a minor modification of the HVS, and that the modification was validated in the scientific community.","Flexibility to allow less stringent or alternative requirements.","The grade stamp and grading certificate shall not constitute final acceptance of the material.","If yes, the review is completed.","British thermal units per hour.","New York, and further provided that such actual total project cost does not exceed the specific costs determined by the Department pursuant to its promulgated Annual Schedule, plus any allowable abnormal, unique or special foundation costs which may be incurred.","One interior window sill or window trough, alternating between rooms.","Certificate of Eviction was issued for at least one dwelling unit in the displaced building.","The Respondent: It sounds like Your Honor is looking at this informed consentas a contract where each side is getting something out of this.","English and Spanish inquiring whether a child of applicable age resides or will reside therein.","City inspector after reduction measures have been implemented.","XXSweep and wet mop floors XVacuum carpeted areas including floor mats Spot clean, as needed.","Comptroller Schedule if such apprentice has been individually registered in an Apprenticeship Program prior to his or her employment as an apprentice on the applicable work.","It is a violation of these rules to have acontainer leak or break due to overfilling.","Bureau of Housing or the implementing Adhering to warranty agreements and performing warranted work within the warranty Notifying the Bureau of Housing or the implementing agency in writing, including Housing or the implementing agency regarditime required to complete them.","Payment of any fees under this section shall be made by a certified or bank check or money order payable to the Department of Finance of the City of New York.","PCBs into the environment.","Refer to the manufacturer for details about the media type in a storage device.","They are the campaigns for the study, the periods of time when sampling was done.","It is a violation of criminal law to alter documents for the purpose of obtaining an asbestos license, to submit a fraudulent application for such a license, or to alter original documents in order to qualify for asbestos activities.","Where the surface area of a paint chip sample cannot be accurately measured or if an accurately measured paint chip sample cannot be removed, a laboratory analysis may be reported in percent by weight.","Agency shall deem appropriate.","The department shall reject any such application that does not contain sufficient references to be fully verifiable.","While many communities conduct ongoing awareness campaigns on lead paint hazards, they have limited primary prevention potential unless tenants have the ability to get their homes inspected.","Plant materials shall be nursery grown stock.","English and Spanish and shall be either posted in a common area of the Building and affixed to or placed under each apartment door of the Building, or mailed to every apartment in the Building, as determined by HPD.","Once the lead hazard remediation plan is approved, lead hazard remediation can begin.","Reporting PCB concentrations in samples.","PAM shall be delivered in a dry granular or powder form.","Foundations of wood, masonry, concrete, etc.","Form, both KKI and appellants expressly maderepresentations, view, created a bilateral contract between the parties.","Contract, the Contractor shall submit a schedule in either bar chart or CPM format, sufficiently detailed so that actual progress may be easily compared with scheduled progress.","The department may include such other conditions as are deemed necessary to insure correction of the violation within the time set by the postponement.","Research not otherwise approvable which presents an opportunity to understand, prevent, or alleviate a serious problem affecting the health or welfare of children.","Federal regulation exists, which created such a duty.","All materials shall bepurpose for which they were manufactured.","Asateast one author has argued, this aspect of the review may be jeopardized ifmemberstween the desire topromote interests of the institution and the need to protect the subject.","Cryptographic Erase through the TCG Opal SSC or Enterprise SSC interface by issuing commands as necessary to cause all MEKs to be changed.","Finish work shall be free from machine or tool marks, abrasions, raised grained, etc.","Each bag and all bag packaging shall have marked thereon the name and address of the principal place of business of the manufacturer or distributor of the same and a code identifying the date and location of bag manufacture.","Do not make conclusions or extrapolations about PCB concentrations outside of the area which has been cleaned up and verified based on the results of this verification sampling.","Quarterly walk through meetings are required for the courthouse building and will be scheduled in advance.","Thus, once the moving party has provided the court with sufficient grounds for summary judgment, the nonmoving party must produce sufficient evidence to the trial court that a genuine dispute to a material fact exists.","Plaster boards and gypsum mortar or stamped metal.","Sanitization performed via a remote wipe should betreated as a Clear operation, and it is not possible to verify the sanitization results.","As a general rule, Parcel Post, United Parcel Service, or current GSA contract carrier should be used for small packages and other express or comparable carriers for packages too large for PP, UPS, or current GSA contract carrier.","Minimum number of samples.","Department of Environmental Protection of the City.","Retesting: The exact same surface area is not to be tested twice since, by wiping the area, the lead has already been removed by the previous wipe sample.","Relocatee, maintained by a Case Manager, containing all documents and information concerning the Relocatee.","LLChalllaboratory of inended relingrequirmenhis ument her refe.","At the request of any state or local government, annual notice of the quantities and general description of PCBs disposed of during the year.","The required information consists of section identifies the hazards of the chemical presented on the SDS and the appropriate warning information associated with those hazards.","This will permit cursory review and, if necessary, photocopying of the container label and reduce the need to break the seal each time the label is examined.","New York City Housing Development Corporation.","Any waiver to be effective requires the approval of the Commissioner or the Municipal Loan Committee.","Applicants for licenses or renewal of licenses must provide to the department the certificate of insurance required.","If possible, direct your conversation so that the dealer suggests the embargo.","An optional paint inspection conducted on________ confirmed this prior finding.","As with any other sanitization technique applied to media, the level of assurance depends both upon vendor implementation and on the level of assurance that data was stored only in the areas that are able to be reliably sanitized.","These Specifications include: storing and curing the timber and lumber, the wood preservatives, the preservative treatment process, documenting the results of the treatment, inspection, testing, and the identification of properly treated timber.","Ines sought toholdrds that KKIallegedly Monroe Street property during the research study.","Do not mark container surfaces to outline thestained areas when taking either ultra violet or normal photographs.","The department may revoke a lead safe or lead free exemption upon failure by an owner to provide records related to encapsulation or containment monitoring as requested by the Department.","Any furniture present should be moved or covered with plastic.","The renovation firm is responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the RRP Rule for aperiod of threeyears following completion of the renovation.","Reporting the results of the procedure used to simulate leachate generation.","ADULT permitted to sleep in this room.","It also aids the dealer to differentiate between containers that have been opened by FDA as opposed to those opened by pilferage or torn opened by rough handling.","Often multiple days are required to collect an appropriate number of environmental swabs.","Such programs, services and commercial activities must be for the benefit primarily of Persons or Families of Low Income residing in the Housing Accommodations.","If refused, after providing a written request, politely explain the law requires the records to be furnished.","Provide a factsheet oncleaning to the client.","This is the case even though the organization has nonprofit status.","Payment Of Shipping Charges.","See also the definition of facility owner.","Finders fee payment are to be paid to owners, agents or brokers who have listed with the Relocation Agency standard apartment into which relocatee have moved.","The minimum CFM rating of the fan shall exceed three times the cabinet volume.","Separate the waste material which passes through the screen from the waste material which does not pass through the screen.","How best should I proceed?","The concrete supplier or Contractor shall provide mill test identification on all concrete deliveries.","The criteria in selective sampling may be prior knowledge or suspicion that fish listed as from a given lake are likely to have excess cysts; that the shipper has been known to manipulate shipments; etc.","HPD shall send a copy to the Tenants by regular mail.","All residential structures shasmoke detectors or battery operated smoke detectors, properly installed in accordance with applicable building codes.","Certificate of Eligibility shall not include a declaratory ruling or any other preliminary or informal communication regarding an actual or prospective Application.","PCBs, but not for research or analysis for the development of a PCB product.","Where the failure to exercise due care creates a risk of economic loss only, courts have generally required an intimate nexus between the parties as a condition to the imposition of tort liability.","Thus, there can be a conflict between the need to test hypotheses and the requirement to respect and protect individuals who participate in research.","Gowanus Parkway; the Gowanus Canal; and the Gowanus Bay.","Such fair market rent shall be the new rent for the commercial unit.","Where the Recipients contractor is unable to certify to the above statement, the prospective contractor shall attach and explanation to this form.","For any other reason permitted by law.","No change in the schedule or in the accommodations in the development shall be made without prior written approval of HPD.","Phase II Site Assessment may be required.","The mirror shall be so located as not to interfere with or endanger passengers in the elevator.","Pipe ends shall be cut evenly.","Thus, your signature is attesting to the fact the af\ufb01ant has read and understood the statement and has con\ufb01rmed that the statement is the truth.","Lighting shall not interfere with the proper operation of any other ceiling or shelf mounted equipment.","Construction Conference Checklist The National Center for Healthy Housing developed this model document; the Center makes no express or implied warranty about the document and assumes no legal liability for its use.","The standard color shall be as specified in the Contract.","Couplers shall be of one piece construction with steel reinforced side handles attached.","Hold the graduate vertically with the surface of the liquid level with the eye.","At least seven contaminated surfaces.","The Contractor shall furnish to the Contracting Agency all guarantees and warranties furnished as a normal trade practice for all control equipment provided.","Use the Build button to query the database and find an FEI for firms associated with your sample.","PCB Items shall be dated on the item when they are removed from service for disposal.","Note: Photographs taken in a \ufb01rm are not samples.","Federally accredited training provider.","An applicant organization shall designate at least one individual as their responsible person who will comply with this training requirement.","Deng, What is the future of disk drives, death or rebirth?","Agency to select the Sponsor for such Project, including, but not limited to, any person or entity which has submitted or might potentially submit a qualification statement, proposal, bid, application, or other submission.","County, if it decides that the facts justify such action, may receive and act upon such claim asserted at any time prior to final payment.","When is relocation required?","During availability check, the lot sampled is found to have been distributed; however, a new shipment, identically labeled, is on hand.","None of my people have takenthe leadsafe certified renovator training yet.","Policies shall be endorsed to cover the interest of the City of New York, as first mortgagee.","Can publicly available information such as tax records, etc.","This prevents dilution of the contaminated product with uncontaminated product.","The removal of dust to address the failure of the clearance examination would be considered part of cleanup from the renovation.","If the agency decides to revoke or conditionally revoke the termination, the agency shall notify the community group of its decision in writing.","ADDRESS: _____________________________________ Name of Authorized Representative RFP NO.","Reedmotion andgave the limiting instruction on the admissibility of the vacuum dust sampling Dr.","Package the sample so that it does not leak, spill, or vaporize from its packaging.","EPAauthorized state programs may address hazard determinations differently.","The disclosure provisions are similar to those of the state and federal law.","Commissioner of the Agency or his or her designee.","Aquick sampling verification as described in the Verify Methodssubsection should also be performed after any additional techniques are applied following Cryptographic Erase.","Vertical containment or equivalent extra precautions in containing the work area may also be necessary in other situations in order to prevent contamination of other buildings, other areas of the property, oradjacent buildings or properties.","New York city charter.","Special precautions for both packaging and shipping radioactive substances must be observed.","Department of Housing Preservation and Development.","There are circumstances where you may identify the same firm as the dealer and another establishment type, such as when collecting a plant inline sample.","Take care in entering search criteria to avoid creating unnecessary FEI numbers.","Example: If EBL testing rates are low, it may not be prudent to rely on past EBL data for geographic targeting.","Failure of the Contractor to ensure that this section is complied with shall be a breach of contract and shall result in the removal of any and all contract employees that are not in compliance with this section from County premises.","The lens holder and interior of the case shall be optical black.","Use a spiking solution made of PCBs mixed with a solvent to contaminate clean surfaces.","Administrative Code or other provision of law.","Certain alterations and improvements require the approval of designated agencies and such additional documentation as the Office shall require.","The duty and responsibility for ascertaining the quality of the consent rests upon each individual who initiates, directs or engages in the experiment.","Name, address, signature and certification number of each person involved in the clearance examinations.","Until the container is full.","If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.","When, in the opinion of the Engineer, undue shock is required to remove the curb from the molds, the stripping operation shall be deferred until such time as the curb may be removed without breakage.","This requirement does not apply to the Emergency Grant Program.","Having photographs for future reference is very importantshould the need arise todemonstrate rogram compliance and quality of work.","Contractor shall also submit evidence to the Engineer that the admixture will not adversely effect the air void system of the hardened concrete.","Children get lead poisoning from swallowing flakes of paint or paint dust on their hands and toys.","Persons or Families of Low Income.","Administrative Code or Zoning Resolution which authorizes HPD to make determinations concerning certifications, exemptions, or waivers.","Such units must be rehabilitated or newly created units resulting from substantial rehabilitation or conversion.","Notify the Department of Community Development of any potential regulatory or specification violations that become evident through such monitoring activities.","The PTFE may be dimpled.","Building as projected by HPD less the effective annual net commercial income, if any.","RRP Rule require a certified state lead inspector or risk assessor, who does not do renovationwork, to become a certified renovation firm in order to take dust wipe samples?","The top of the inner bag must be twisted closed, folded over and sealed with duct tape.","To the extent that such an affidavit will be viewed as creating a cloud on title, this provision may provide considerable leverage to compel abatement of hazards.","Fabrication of light and signal standards shall conform to the applicable requirements of Section.","Subpart D of the regulation concerns children involved as subjects in research.","These samples all gave results, which indicated that the lead present therein was far above the accepted Maryland clearance levels.","Of\ufb01cial Samples generally, but not always, consist of a physical portion of the lot sampled.","Eligible voters for purposes of a quorum and for a vote on preparation and submission of such plan and such Notice of Intent shall be persons named on the stock certificate.","Rehabilitation Rent for each Tenant in the Building with DHCR.","Sponsor Review Unit, as the case may be, after review of such information and any other available information, has made no finding of derogatory information which indicates that the City should not do business with such party.","Generally, in that case you will have more than one PAC code.","Class C violations relating to the existence of mold or water leaks, followed by those buildings with the highest total number of both Class C and Class B violations relating to the existence of mold or water leaks.","Zoning Resolution in effect on the operative date.","Deskside trash removal is also the responsibility of the Contractor on a daily basis.","Accordingly, a firm may discharge the task by reaching agreement on who will provide the required prerenovation education, including an agreement to assign the task to a property management company.","KKI filed a Third Party Complaint against JJB, Inc.","Rules, HPD will deliver to the Relocatee a new notice of intention to terminate Relocation Services and opportunity for a hearing.","This makes the recovery and identification of Salmonellae critical as an environmental contaminant.","Using the list of values, select one of the following with for This is always the \ufb01rm from which the sample was collected.","Signs shall be maintained in such manner as to be easily read at all times.","HPD in writing of said illegal occupancy.","Fold the wipe in half, dirty side to dirty side.","The certification shall include percent by weight of each recycled material.","For ease of testing, talcum powder may be spread on the adhesive to prevent sticking to the mandrel.","City of New York, equals the reasonable cost of a comparable replacement dwelling which is decent, safe and sanitary dwelling adequate to accommodate such displaced person, reasonably accessible to public services and places of employment and available on the private market.","Operations and maintenance manual.","This preference in admission shall only be provided to veterans or surviving spouses whose names appear on the waiting list as the applicants of record and who have identified themselves as the heads of household on their applications.","Do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by Owner and authorities having jurisdiction.","Property, he did not act, direct or participate in any decisions with regard to the rental or maintenance of the Property, nordid he have any ownership interest in, or title to, the Property.","Prior to the time of purchase of rental target housing, the real estate agents, sellers, and other transferors of title shall provide the buyer or transferee with information approved by the Commissioner explaining RRPM obligations.","The Agency may reject any bidder at an auction if the eligibility requirements are not met.","South Michigan Avenue, Chicago, IL.","In addition, you should make sure that your firm is EPA certified.","In designing a research study an investigator must focus on finding or creating situations in which one can test important scientific hypotheses.","Number of copies of a manifest.","When such may occur the owner is required to consult the Department of Buildings and receive instructions before starting of work.","Housing Maintenance Code of the City of New York or to provide for the replacement and rehabilitation of the heating, plumbing, electrical and related systems or other improvements as shall be reasonably necessary to prolong the useful life of such dwelling.","Following that site inspection and upon satisfaction that all terms of the Written Agreement and of this section have been met, the Department shall issue the Negotiable Certificates representing the completion of the affordable units.","Brown Mary Jean, et al.","If the Department determines that there is reasonable cause to believe that Harassment has occurred after the date that it issued a Certification of No Harassment or a waiver, it may suspend such Certification or waiver.","The Contractor shall schedule cleaning each weeknight Monday through Friday, excluding County Holidays.","It also includes research conducted, supported, or otherwise subject to regulation by the federal government outside the United States.","Revocation of Tax Exemption.","In such a case, the activities granted under the existing exemption may continue until the new petition is addressed by rulemaking, but must conform to the terms of the existing exemption approved by EPA.","Sample collection data may be entered either from an FDA of\ufb01ce or from a remote location in the \ufb01eld using a laptop computer and modem.","Proceed with selective demolitionsystematically, from higher to lower level.","The sample should represent the conditions observed at the time of collection and consist of suf\ufb01cient material to con\ufb01rm and identify mold growth on the equipment.","Has charge, care, or control of any dwelling or child care facility as agent of the guardian of the estate of the owner.","Occupied Rehabilitation Program will be ordered on the waiting list based on date and time of the receipt of their ished preference.","All Common Areas in an Eligible Multiple Dwelling in a Rental Project shall be open and accessible to the residents of all of the rental dwelling units in such Eligible Multiple Dwelling, including the residents of any Affordable Housing Units.","Collect a representative number of rodent pellets for laboratory confirmation.","If only one unit is displaced as the result of eligible construction, the Certificate of Eviction must pertain to that displaced unit.","Wherever possible, record quantitative observations.","Each day a violation continues will be considered a separate violation.","The sample should be submitted the same day it is collected with the subs properly identified.","Project or Program, the place a copy of the RFQ can be obtained and the fee, if any, therefor, and the deadline for submission of qualification statements and the fee, if any, therefor.","Finalize the specifications and bid the work to qualified contractors.","Improperly cleaned equipment may contaminate the product with bacteria.","Except for brackets and braces as hereafter described, what is applicable to one type is equally applicable to the other whether or not it is so stated specifically.","Occupied Rehabilitation Program eligibility criteria restrict assistance to low income seniors and disabled homeowners.","How does this rule affect a homebuyer program design?","Additionally, leveling pads are allowed on grates and solid metal covers with a height not to exceed \u215binch.","The new windows were installed and, in accordance with the contract, a clearance examination was requested.","Department will not merely rely on such certification.","Proceeds of capital assessments.","This is the case even though the organization has nonprofit or notforprofit status.","Accordingly, we vacate the rulings of the Circuit Court for Baltimore City and remand these cases to that court for further proceedings consistent with this opinion.","Collect environmental samples for testing and evaluation.","State and local government agencies, and nonprofits; and rent for target housing or public or commercial building space.","The real property in which the person resides or does business must have been acquired by the City of New York; and the person must have moved as a result of its acquisition.","The annual report is a brief summary of the information included in the annual document log.","The conversion of any building, or portion thereof.","At least oneofon was described byher counsel as being a minority.","Insulatiinstallation poses a safer cwith drip legs that extend to within one foot of the floor.","Conductor color coding shall be yellow, blue, and orange.","Prevention Program to learn safe work practices.","Maximum of one per apartment unless the apartment has two or more bedrooms.","The dealer may be a party who does not own the goods, but has possession of them, such as a public storage warehouse or transportation agency.","Every dwelling unit, shall have a kitchen room or kitchenette equipped with the following: under pressure, and maintained in source of power, maintained in workiservice for which it is intended.","All outerduct shall be marked with data traceable to plant location.","Adequate wiring, new wiring or new service.","Metal lath and cement of gypsum mortar.","If radon testing is not possible, as in cases of gut rehabs and new construction, a passive radon mitigation system shall be incorporated into the design specifications of the construction project.","These factors include case law, ongoing litigation, other local laws, and interactions with state and federal laws.","Suitable Shape and conforms to one or more of the following gradings as shown in the Plans.","The Contractor will not be required to clean within a construction area.","Such written application must be filed no later than four days before the scheduled date of termination of Relocation Services.","Oil or Other essential oils Plastic or paraffincoated liners in caps of containers used to hold samples of this type of product are not satisfactory in that the plastic or paraffin is soluble in the oils and interferes with the analysis.","Exemption during construction or reconstruction.","If the application is rejected for failure to show that the occupant is an eligible person, HPD shall give a brief description of the reason for such rejection.","Al firmar su contrato de ocupaci\u00f3n usted recibir\u00e1 un panfleto hecho por el Departamento de Salud y Salud Mental de la Ciudad de Nueva York, explicando el peligro de plomo en pintura.","Geogrids shall consist of a regular network of integrally connected polymer tensile elements with an aperture geometry sufficient to permit mechanical interlock with the surrounding backfill.","Nicholas Avenue; Gates Avenue; Wyckoff Avenue; Eldert Street; Irving Avenue; Chauncey Street; Central Avenue; property line of the Cemetery of the Evergreens; Conway Street; and Broadway.","The sand equivalent sample will be prepared in accordance with the FOP for AASHTO T For acceptance, there must be a clear line of demarcation.","Nuremberg Code has been cited as authoritative, it has usually been in dissent, and no United States court has ever awarded damages to an injured experimental subject, or punished an experimenter, on the basis of a violation of the Nuremberg Code.","The number of samples to be taken dependsdwelling.","RRP Rule, can the certified renovator comply with the rules by keeping records regarding his certification and employee training electronically, provided he can display them on a hand held device or laptop on the job site?","The Commissioner may grant a license to a person who holds a valid license from another state.","This is an unreported opinion, and it may not be cited in any paper, brief, motion, or other document filed in this Court or any other Maryland Court as either precedent within the rule of stare decisis or as persuasive authority.","The hinges shall be so designed as to be securely attached to the gate post and to enable the gate to be swing back against the fence.","PCB Transformer or a PCB Large High or Low Voltage Capacitor.","Whether to use your correct name or an alias.","If HPD approves the request, HPD will submit the request to HDC for a drawdown from the appropriate Reserve Accounts.","In another leadbased paint case, this Court affirmed a grant of judgment for KKI on intentional and negligent misrepresentation claims, but for reasons different than the trial court.","Recording and filing fees and mortgage taxes.","Thereafter, the applicant shall notify each tenant in writing by notice approved by HPD of the pending application and the date and place set for the hearing.","If the applicant is not an access authorizer, the application shall also be executed by an access authorizer.","Books, records and inspections.","EPA certification and costs to take a training course from an EPAaccredited training provider, as well as for supplies needed in order to carry out the required leadsafe work practices designed to reduce exposure to lead dust from renovations.","This system consists of a gravity flow drainfield installed above the waste disposal unit liner and above a secondary installed liner.","Multiple passes or more complex values may alternatively be used.","In no way would I ever think of defendingthis In no way.","ITS Field Wiring Chart.","City to a Sponsor for Project Activities.","PCBs or PCB Items were removed from service for disposal.","She furthertestified in a deposition that she paid rent to City Homes and that, if she needed maintenance on the property, she called City Homes, not KKI, for repairs.","By the close of financing for the Generating Site, the owner of the Affordable Housing shall enter into an agreement with an Administering Agent, for such Administering Agent to perform the duties as specified in the Program.","They point out that plaintiffs acknowledged work on the apartment upstairs to make it habitable, but did not take any action to improve the habitability of the other floors.","Labor, equipment and supply costs.","At least one hour after completion of the specialist for a final inspecclearance test is performed by the specialist and sent to the laboratoryservices for analysis.","All painting shall be done by skilled craftsmen and shall be complete, givistreaks, shadows, or other blemishes and free from runs, sags, skipmarks.","Microbiologically examines samples for potential food pathogens by rapid molecular biological testing using DNA probes, PCR, and DNA fingerprint analysis.","Any other similar facts which demonstrate to HPD that a Third Party is not qualified for selection.","At times even though you may not be able to obtain physical portions of the involved item, a Documentary Sample can be collected by photographing the container, contents, labels, codes, etc.","Occupied Rehabilitation Program Policy Appendices plumb are not to be replaced or removed.","EPA to publish guidance to assist schools, local education agencies, and day care centers in discovering the levels of lead contamination in drinking water coolers, and to take actions to reduce contamination.","Such other items as the head of the Department of Housing Preservation and Development determined should be excluded.","The protocols of the research, those of which we have been made aware, were, in any event, unacceptable in a legal context.","Homeownership Affordable Housing Unit shall be sold to an Eligible Buyer and the proceeds deposited in the estate of the deceased Homeowner.","All lighting fixtures above a rack shall energize automatically when either door to that respective rack is opened.","The heel of the brace must be secured to the top member by a rivet of the same size.","The tolerance for inside and outside diameters shall be inch.","Countrywide Home Loans Servicing.","If the Department determines that there is reasonable cause to believe that harassment has occurred after the date that it issued a Certification or a waiver, the Department shall deliver a notice of suspension to the Applicant.","The rule also requires renovators to use workpractices in order to reduce exposure to lead dust.","No polyethylene sheeting, drop cloths, or other materials that are potentially hazardous to young children or infants shall be accessible outside the work area.","Jolly Miller Canned Mushrooms which we invoiced and sold to Patriot Markets, Inc.","LICENSING, TRAINING AND REGISTRATION: INSURANCE REQUIREMENTS.","The Contractor shall give the Inspector safe and free access to the Work.","Under the program, the city administers the syndication funds paid into the escrow account by developers pursuant to syndication agreements and disburses such syndication funds to groups for projects pursuant to these rules.","The strings of the gooseneck ladder must be secured to and braced at the roof.","Install panels perpendicular to support framing.","The organization must comply with all the requirements of the rule that apply to firms performing renovations.","RRP Rule apply to office buildings, stores, and other commercial buildings?","All gaskets shall be installed on the pipe by the manufacturer.","The shred size of the refuse should be small enough that there is reasonable assurance in proportion to the data confidentiality that the data cannot be reconstructed.","INDIVIDUAL, PARTNERSHIPS, CORPORATIONS: Incorporated in the State of ____________________________.","The Assistant Commissioner, in his or her discretion, may issue a determination on the request or direct that a hearing be held on the application.","Examine the exterior of the containers looking for rodent hairs, urine stains, excreta pellets, gnaw marks, holes, nesting material and live rodents.","Rent or carrying charge increases.","For each sample collected prepare a FACTS Sample Collection Record.","Major: Years of analytical laboratory experience: Laboratory Organization and Personnel Attach an organizational chart and a list of personnel, clearly delineating qualifications, duties, and responsibilities.","EBL rates cannot be used to empirically judge which cities have more lead hazards because of variations in geographic concentrations of EBL, blood lead testing rates, and other factors.","The compost shall have a moisture content that has no visible free water or dust produced when handling the material.","The amount allowed shall not be less than that for the preceding construction cost.","In lieu of locally adopted building codes, all work or construction shall follow and meet applicable MUBECrequirements.","Nothing herein shall prevent the City from rejecting all bids if deemed to be in the interest of the City or fair competition.","PCB must obtain analyses or other information to support that claim.","When a cleanup activity conducted under this section includes the use of a fence or a cap, the owner of the site must maintain the fence or cap, in perpetuity.","KKI that the vacuum used in this Studythe BRM Samplerhas been tested, validated, discussed in peerreviewed articles.","This article begins to fill this gap in knowledge by examining the structure and design of eight recently adopted local lead laws.","The appellants also asserted that the consent agreements required KKI to again repair their homes if lead dust appeared after the original abatement measures were taken.","Weight of box and cover tested.","Rutland Avenue hadtested positive for leadbased paint before it was used in the Study.","In every lodging house there shall be provided for each lodger a separate bed with bedspread, bedding and bedclothes satisfactory to the Department of Housing Preservation and Development.","Various obstacles make it difficult to set up the tenfoot exterior ground containment in a way that would enable our renovators to perform the work and still effectively contain dust.","Valves shall have removable bonnet and stem assemblies with adjustable packing glands and shall house long acme threaded stems to ensure full opening and closing.","In such event, the Agency may, prior to taking any Agency Activity with respect to such Project, prepare a written statement signed by the Commissioner setting forth the reasons why a more competitive process was not appropriate or desirable.","Definition of subsequent compositing areas.","Remove and discard temporary seals before beginning work on adjoining roofing.","Agency to be appropriate upon submission of a qualification statement.","Multiple Dwelling Law or the Housing Maintenance Code, or will provide for the replacement and rehabilitation of the heating, plumbing, electrical and related systems or other improvements if reasonably necessary to prolong the useful life of the dwelling.","We have found no indication in the record that the research protocols were approved by The Secretary.","Broker or realtor fee to locate a replacement business with the advance approval of the head of the Department of Housing Preservation and Development or his designee.","Discard the soil pushed With a clean plunger, push the remainsample into a clean, sealable plastic container.","Fill in the application completely including all attachments.","In BEKA Industries, Inc.","The definition includes a vendee who possesses the title, but does not include a mortgagee or an owner of a reversionary interest under a ground rent lease.","PCB surface concentrations of at least three of the surfaces using a standard wipe test to establish a surface concentration to be included in the standard operating procedure.","Committee members are not prohibited from representing themselves or other entities in the legislative process.","They may also state that the organization which employs them is assisting with the training.","Likewise, a Risk Assessor must take both the Inspector course and the Risk Assessor course.","New York City Housing Connect lottery system or any successor program administered by the Agency to market vacant affordable dwelling units.","Duty Junction Box steel frame, lid support and lid fabricated from steel plate and shapes shall be painted with a shop applied, inorganic zinc primer in accordance with Section.","If the Seller will correct the condition, the Seller shall furnish the Purchaser with certification from a risk assessor or inspector demonstrating that the condition has been remedied before the date of the settlement.","The restrictive definition of a family under the Fair Housing Act, however, does not cover unrelated children other than foster children.","Type K coupling bands are not allowed for storm sewer applications.","Hours when access to be permitted.","Before thindividual signs the statement he should be asked to affirm the affidavit is true and accurate.","Abatement is the intentional and permanent elimination of leadbased paint and leadbased paint hazards.","Outlet pipes and vents on the exterior of a building shall be adequately supported and braced.","Is that the breach of contract?","Cecil filed a timely appeato this Court.","Furthermore, all general contractors and subcontractors must possess trade or other professional licenses as may be required by the State perform such functionslicensing.","One of the aims wastold not abandon theirrentalconomically feasible.","Regional Administrator or appropriate official at EPA Headquarters.","An interior or exterior surface that is subject to abrasion or friction, including, but not limited to, certain window, floor, and stair surfaces.","Plastic bags, plastic sheeting, burlap, or similar makeshift covers are not allowed.","The RRP Rule does apply to renovation activities that modify portions of existing structures.","The circuit breakers shall be capable of being independently switched.","Real property not containing Housing Accommodations is not Eligible Property.","Portland or blended hydraulic cement and water with or without aggregates and with or without admixtures.","The Department for Children and Families shall identify all child care facilities in which the owners have completed essential maintenance practices or lead hazard control measures and provide the findings to the Department annually.","These wires shall in turn be connected to the terminal block mounted in the housing, in the proper manner.","Tenants as defined by HPD and in accordance with HPD guidelines.","Regularly wetmop floors and wetwipe window components.","Levin Ronnie, et al.","If each store is a separate legal entity, then each store must be a certified firm.","Every habitable room, provided such rooms are t one open air space.","Metal castings for drainage structures shall not be dipped, painted, welded, plugged, or repaired.","When a Grandfathered Tenant chooses to vacate a Homeownership Affordable Housing Unit, such unit must be sold to an Eligible Buyer.","However, the goods may be accompanied by labeling which is not affixed to the product.","Department of Housing Preservation and Development and any successor agency.","If the PAC on your assignment is not listed, discuss with your supervisor or FACTS Lead User.","RRP Rule, when testing a property for the presence of lead prior to beginning a renovation using an EPArecognized lead test kit, must I test every component affected by the renovation?","The Program is designed to bring statewide focus to the hazards of leadbased paint poisoning, the importance of proper methods of identification of leadbased paint hazardsand leadbased paint hazard control.","No method is specified as a procedure used to simulate leachate generation.","Soft swells yield to manual pressure, but no impression can be made manually on hard swells.","Multiple Dwelling included on a List.","Refer to the TCG and vendors shipping TCG Opal or Enterprise storage devices for more information.","PCBs at regulated levels, the owner or operator is a commercial storer but is not required to seek EPA approval as a commercial storer of PCB waste.","Collect all forms of insects you see, however do not collect all the evidence from the lot or you might recondition the product.","Purchase Contracts for each unit in such Homeownership Project.","Except for optically programmed signal heads, all vehicular signal heads at any one intersection shall be of the same make and type.","Note: a situation such as this may follow fumigation of the lot and vacuuming of the exteriors of the bags.","Such an authorizing provision is helpful to drafters of local ordinances in that it protects local ordinances from challenges based on the concept of preemption, namely, that the state has foreclosed local action by state action that addresses the subject comprehensively.","EPA estimated the labor and materials costs associated with each leadsafe work practice for the various job types included in the analysis.","An adequate supply of water and clean individual towels shall be provided.","Indicate the number of photographs attached.","TSCA PCB Coordinated Approval may submit an application for a TSCA Disposal Approval.","The carbon monoxide concentration and the excess oxygen percentage in the stack of the boiler when it is operated in a manner similar to the manner in which it will be operated when mineral oil dielectric fluid is burned.","KKI agreed to this limitation.","Conversely, renovation activities that are performed by renovators or firms who are compensated for their services are subject to all requirements under the Rule.","The client should have the relevant areas recleaned before clearance dust samples are collected to avoid conducting dust sampling twice.","The first tier is of fireproof construction with no opening to the upper stories.","If present, all rainwate maintenance and repair.","Why is it important to test rental properties for lead?","General requirements for informed consent.","Except with prior written approval from the department, cleaning procedures shall use wet methods and HEPA vacuuming.","When replacing an unpainted roof, sometimes sections of paintcovered lumber under the roof need to be removed as well.","As the MEK moves between wrapped, unwrapped, and rewrapped states, the previous instance is sanitized using three inverted overwrite passes.","Any such notice shall be deemed to have been given upon the third day after such notice has been deposited in the United States mail.","Access from the public hall at the top story to the roof shall be provided by means of a bulkhead or a scuttle acceptable to the department.","Clearly, KKI contemplated that at least some of the children would develop elevated blood lead levels while participating in the study.","The tenant is advised to report peeling and chipping paint to the landlord for repair and keep children away from lead paint and dust.","Sampling technicians are not trained to make this determination.","Higgins of the high lead concentration results obtained from dust samples collected by the Cyclone vacuum dust collector.","The notification for the abatement in a public building shall only be signed by the legal owner, his designated legal representative, the DSHS licensed abatement HS licensed consultant.","This item includes inner walkways, courtyards, cellar slabs and the public sidewalk.","AIHALAP, LLC accreditation symbol signifies that a laboratory meets certain standards.","Balled and burlapped plants are grown in the ground and harvested with soil around a core of undisturbed roots.","PCB bulk product waste.","Single room occupancy housing.","If such changed information includes any facts that would render the original Applicant ineligible to submit the application, the Department may require that the amended application be executed by an individual who is at that time eligible to submit the application.","For the reasons discussed at length in the main body of the opinion, a legal dutynormallysearcher and subject and in all probability exists in the cases at bar.","Ensure that the marker protrudes from the top of the pile sufficiently to allow the strings to move easily around the pile when they are pulled tight.","Final Certificate of Eligibility.","Fittings used for copper tubing shall be either compressions or flare type.","If workers wear shoe covers, they may remove them as they leave the work area.","EPA may include in an approval any other requirements that EPA finds are necessary to ensure that operation of the incinerator does not present an unreasonable risk of injury to health or the environment from PCBs.","All information regarding an emergency must be provided.","Results obtained by counting of asbestos samples supersede and replace the initial PLM analysis results.","Such written agreement may be entered into after the commencement of construction of the multiple dwelling or dwellings located in the geographic exclusion area seeking benefits of this Act.","Proof of Insurance must be provided.","Residential Building has been converted to an Eligible Multiple Dwelling.","In the case of Philadelphia, however, the inspection requirement is triggered only if a child six years or under will reside in the unit.","Removal of windows in public hall partitions.","The undersigned represents that he is authorized byall corporate or other action necessary to execute and deliver this release.","These rules are not intended to confer rights or benefits upon the general public or upon any individual, entity, or actual or potential community group.","Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.","In case the office of presiding officer becomes vacant, the assistant presiding officer will complete the unexpired portion of the term of the office of presiding officer.","If yes, how often?","Individuals working in any states, territories or tribes not listed in the previous paragraph should contact the respective state or tribe for more information about their training and certification requirements.","This cleaning should remove any residual dirt, dust, grime, or other absorbent materials left on the surface during the first wash.","The chemical requirements shall be tested on monthly intervals.","After getting the results the lead inspector or sampling technician should compare them to the federal EPA standards to determine if the property has a hazardous level of lead dust.","Lead based paint risk assessment per HUD guidelines.","Seymour Property continued to occupy their apartment throughout the construction.","What are the total rehabilitation hard costs per unit?","Hoppers, cut off door and compactors.","It does not, and cannot, specifically address all known types of media; however, the described sanitization decision process can be applied universally.","Persons seeking a TSCA PCB Coordinated Approval shall submit a request for approval by certified mail, to the EPA Regional Administrator for the Region in which the activity will take place.","City of New York.","In either case, the clearance examiner must prepare the report on the results of the clearance examination.","Senior Attorney, Empire Justice Center.","The system shall be equipped with a means of informing the operator of signal indications, such as a light on the back of each signal head that illuminates when the signal displays a red indication, during manual operation.","If such changed information includes any facts that would render the original applicant ineligible to submit the application, HPD may require that the amended application be executed by an individual who is at that time eligible to submit the application.","Despite years of progress, each year significant numbers of children in Rhode Island suffer the irreparable harm of lead poisoning because of exposure to deteriorated lead paint and lead dust in their homes.","The Code asks more of anexperiment, a researcher, or society than mere consent.","The cost of lead reduction activities is a project soft cost and will be separated from project hard cost, which includes the cost of all other rehabilitation activities for the unit.","LICENSURE: ASBESTOS CONSULTANT AGENCY.","Is removal of dust to address the failure of this clearance examination considered abatement?","Homeownership Affordable Housing Unit on or before the date upon which he or she acquires the new Homeownership Affordable Housing Unit.","We excluded the Grand Rapids, Michigan, housing code, since it was being revised.","Coordinate enclosure with ventilating and material drying or curing requirements to avoid dangerous conditions and effects.","Standards for clearance examination and report.","Department of Finance Application for Tax Exemption and Tax Abatement.","Be careful not to use the default date if the sample was not collected on the date the CR is created.","The angle iron support in such cases shall be set so that the tie rods will pull toward the heaviest part of the webs.","Department and analysis by an accredited laboratory to determine that lead exposures do not exceed limits set by the Department.","Current and valid Certificate of Insurance or binder showing required insurance coverage must be provided with each bid.","Never use strongarm tactics or deception, but rather be professional and demonstrate diplomacy, tact, and persuasion.","Include amounts of approved Change Orders and Construction Change Directives issued before last day of construction period coveredby application.","No claim of any bidder will be allowed on the basis that bid documents are incomplete.","Example: We identified several cases in which implementation was limited by insufficient city resources to inspect and enforce the law.","This paint, if properly managed and maintained, poses little risk.","Bureau of Housing will notify the agent of the violation and the Bureau of Housing will remove the item from the work write up.","Method of Distribution Determine how the labeling is made available to the public.","If it is necessary to collect physical subsamples for organoleptic examination and they are collected from bulk, the subs must be packed in glass jars to prevent the product from picking up foreign odors.","EPA recommends that you hire a certified inspector or risk assessor.","The basic exception is if less than are disturbed.","Steel reinforcing bar manufacturers use either English or a Metric size designation while stamping rebar.","Damaged wood floors will be repaired.","Notification of legal proceedings.","If the \ufb01rm is a dealer in narcotics or control drugs, enter their DEA Number here.","If all certified results are not submitted within the specified time, a dust sample violation shall be cited.","Controllers and cabinets shall be programmed for flashing red displays for all approaches.","Residential areas include housing and the property on which housing is located, as well as playgrounds, roadways, sidewalks, parks, and other similar areas within a residential community.","Damp mop and spray buff entire office floor monthly.","For facilities which are not otherwise subject to this title as public buildings, the department will apply and enforce these sections in a manner consistent with the NESHAP.","Engineer, the weight of zinc in ounce per square foot required by the various galvanizing Specifications may be determined by an approved magnetic thickness gage suitably checked and demonstrated for accuracy, in lieu of the other methods specified.","Renovations in common areas of multiunit target housing, such as condominiums, must be performed in accordance with the requirements of the RRP Rule.","Under the Program, titles to Buildings will be conveyed to Sponsors who will thereafter be responsible for the Rehabilitation of such Buildings.","Sigma Aldridge Corporation, St.","The risk decision should include the potential consequence of disclosure of information retrievable from the media, the cost of information retrieval and its efficacy, and the cost of sanitization and its efficacy.","The Agency may require Sponsors to operate Sites in accordance with regulatory agreements entered into with the Agency.","Reels shall be labeled with the same information required for the cable markings, with the exception that the total length of cable shall be marked instead of incremental length marks.","Transferring the sample to the analytical laboratory.","Participating general contractors must obtain all permits that are required to perform the authorized scope of work.","The material is applied by heating the pavement and top heating the material.","The dates of completion.","If individuals, not a family, are joint occupants of a single family unit acquired for a project, each eligible claimant shall be paid a prorated share of the total payment applicable to single individual.","Is the paint condition assessed during these inspections?","In the event of policy cancellation or expiration, the policy shall promptly be replaced or renewed without any lapse in coverage.","The applicant shall procure from the Fire Department of the City of New York a certificate to the effect that the premises for which a permit is desired complies with all laws, rules and regulations enforceable by the Fire Department.","Make edges of paint adjoining other overlapping.","Replacing a pane of glass or fixing a broken window balancer can disturb paint.","No borders shall be spliced other than the splice of the tangent border to the corner radius.","The Contractor must keep confidential all documents, materials and data prepared or developed by the Contractor or supplied by the City.","Air express or airfreight shall be used only for samples requiring extremely rapid handling or where more economical means of shipment are not available or feasible.","As to the subgrantee in the third category, the need for certification depends on whether the subgrantee ffers, through the grant proposal, to renovate the property of a specific homeowner or other thirdparty.","Real Property Tax Law by the number of dwelling units in the building after completion of construction of the conversion, alteration or improvement, shall not be eligible for a tax exemption.","The County may elect to perform annual follow up security checks or drug screens on all employees at no cost to the Contractor.","This type of survey is required when hazardous materials are suspected to be present and the scope of work should be utilized to inform the extent of the required testing.","OR ACRONYM DEFINITION requirements.","Dust clearance testing must occur every day, and also at the conclusion of the work.","In such situations, voluntary certification or compliance is more likely to be effective than when liability is limited.","Use the following procedure to locate representative sample collection sites in pipeline sections at points other than the suction and pressure side of compressor stations, or the ends of the pipeline section to be abandoned.","Department of Buildings of a Temporary or Permanent Certificate of Occupancy for the portion of the building for which an application for a Certificate of Eligibility is filed.","The three to five cores constituting the composite sample are placed in the same plastic container.","The Bureau of Housing or the implementing agency prepares the contract documents for execution by the homeowner and the general contractor.","SECURITY ERASE UNIT command, if supported.","Department will select the group to whom the building will be sold.","Cecil read at a fourthgrade level and spelled at a sixthgrade level.","If existing and feasible to repair, shall be eligible only for items of exterior rehabilitation as determined by administrating agency.","Jujubes, Zizphus jujube, are usually labeled as Chinese Red Dates, Dried Red Dates, or Honey Dates and are not misbranded when labeled as such due to long standing use of these names.","Marketing Monitor to submit quarterly rent rolls for all Affordable Housing Units in the Eligible Multiple Dwelling to the Agency.","Conditional bids and bids containing escalator clauses will not be accepted.","The landlord must keep records of assessments and repairs.","Print a copy of the Collection Record in FACTS.","Wiring shall be free from hazard and all circuits shall be properly protected at the pane.","Administrators willbe reimbursed at cost for the Merchants Report and the cost of inspection and designin the event that an pplicant does not proceed with the rogram or if the pplication is deemed noteligible.","PCBs are not regulated under RCRA, thus do not have a RCRA waste code.","Pick up and drop out times shall be consistently within milliseconds.","Based on my inquiry of the person or persons directly responsible for gathering information, the information is, to the best of my knowledge and belief, true, accurate, and complete.","Avoid the use of polyethylene containers as rodent hairs may adhere to containers made from this material.","Article XI of the Private Housing Finance Law or any amendment to the certificate of incorporation of a housing development fund corporation.","Documentary evidence of federal jurisdiction over the lot, information about individuals responsible for the violation, where the violation was committed, and similar data.","Identification of the recycled materials proposed for use.","All blood lead data reports to the Department shall include the name, date of birth, date of blood test, and address of the individual whose blood is analyzed and, if known, the owner of the residence of the individual.","Such plans are to show existing and proposed room or apartment layouts of all the floors; also a plot plan showing the land and building with dimensions and an apartment distribution schedule.","Thereforeplaces of temporary rest for employees in these buildings, such as sleeping rooms, are not subject to the RRP Rule.","The plan should detail his experience in management of residential property, plans for tenant involvement in the upkeep and maintenance of the building and for community group involvement, if any.","Conduit ends shall be cut square to the inside diameter and supplied with thread protectors.","It is apparent that the protocols of research are even more important than the method of obtaining parental consent and the extent to which the parents were, or were not, informed.","If the child has an elevated blood lead level, the Commissioner shall provide information on lead hazards to the parents or guardians of the child.","The application must include all required forms, and such forms must be fully and properly completed and executed, at the time of submission.","HPD or HDC for such loan or grant and ending one year after the date of construction completion or the final advance or disbursement of funds pursuant to such loan or grant.","Complete all blanks as applicable.","Collars for Type C, D, and F mounts.","We have little doubt that the general motives of all concerned in these contested cases were, for the most part, proper, albeit in our view not well thought out.","Proof that the multiple dwelling has been registered with the Department in accordance with the provisions of article two of subchapter four of the Housing Maintenance Code.","However, this activity would be subject to the rule unless it meets the definition of minor repair and maintenance.","The Agency may negotiate and dispose of any Site on terms other than those set forth in the RFQ.","In addition, these materials are available from the sources listed below.","Prevailing Wage and the interest found to be due.","Powers and Duties with respect to lead hazard mitigation.","In that regard, when contested cases arise, the assessmentof the legal effect of research on human subjects must always be subject to judicial evaluation.","Sites containing these wastes are presumed not to present an unreasonable risk of injury to health or the environment from exposure to PCBs at the site.","Apparently, KKI used two different dust collecting methods, which resulted in drastically varied results.","Where there are less than four rooms, then all rooms shall be sampled.","Commercial storage and disposal facility requirements.","The compliance by the issuer with standards which may be established by the Director pursuant to rule or regulation.","My firm performs renovations covered by the RRP rule, but solely in the capacity of a subcontractor.","Final Certificate of Eligibility includes an increase in the amount of the total project cost, an additional filing fee shall be paid based upon such increase in the total project cost as is approved by the Department.","Donations, such as donations of materials or of the time of volunteers, are not compensation.","HPD rules must be met regarding such things as waiting lists and submission of rent rolls.","Each mixing facility or plant utilizing portland cement shall be equipped with a suitable means or device for obtaining a representative sample of the cement.","County issued ID badge for each employee.","After flipping the coin, the half assigned to the face of the coin that is showing is the half selected.","Upon conclusion of such hearing, the hearing officer shall make a recommendation to the Commissioner whether or not the certification should be rescinded.","Disposal of pipeline liquids.","Your water supplier may have useful information, including whether or not the service connector used in your home or area is made of lead.","If possible, take stained cuttings from areas which have not been exposed for extended periods of time to light, in particular, ultraviolet light sources or to intense heat.","For composite samples, each sample shall consist of up to four subsamples.","Covenant on low income tenancy.","The type of reduction activity will vary according to the level of assistance provided.","Pipe and fittings shall be free from defects in materials, workmanship, and handling.","We noted in West Virginia Central Railroad Co.","NEPCOAT Qualified Products List BQualified products used shall be part of a NEPCOAT system supplied by the same manufacturer.","The Agency may issue amendments to the RFP at any time prior to the submission deadline.","Any approval must be stated in writing and may include such conditions and provisions as EPA deems appropriate.","Sprinkler operation and water supply.","Private stairs within duplex apartments extending into cellar or basement are not required to be enclosed.","Sponsor to have satisfied all terms and conditions determined by the Agency to be necessary or desirable, including, but not limited to, the terms and conditions set forth in any selection process, Authorization Letter, Negotiation Letter, or Loan commitment letter.","Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.","Furring strips are not required, but if used, they shall be metal covered on both sides and on face surface.","Transfer from Third Party to Tenant Ownership.","ADDENDA: Addenda to bid specifications are incorporated by reference as if fully setout herein.","The presiding officer shall preside at all committee meetings at which he or she is in attendance, call meetings in accordance with this section, appoint subcommittees of the committee as necessary, and cause proper reports to be made to the board.","EPA does not have authority to regulate environmental conditions in foreign countries.","Squeeze as much air out of the bag as possible.","The coring and testing of the core shall be done under the surveillance of the Engineer.","HPD may require the Taxpayer to record any such Cure Agreement against the Property receiving such Tax Benefit.","Chemical analysis of standard wipe test samples.","Applicant and any other individual or entity, including known tenants of the Pilot Program Building, as determined by the Department, in the manner prescribed by the Office of Administrative Trials and Hearings.","Texas Department of Health, Toxic Substances Control Division, Austin, Texas, department regional office, or local health program under contract to the asbestos branch, and may be reviewed during normal business hours.","No transfer request will be accepted based on pregnancy.","Documentation of imposition of a capital assessment or voluntary capital contribution shall be provided by the affected housing company to HPD, in addition to any further information required by HPD to make a determination of eligibility under this subdivision.","The duty to a vulnerable research subject is independent of consent, although the obtaining of consent is one of the duties a researcher must perform.","If the posts are to be pointed for driving, they shall be pointed before treatment.","YES NO The date of the original paint inspection was _________.","However, high rates of childhood lead poisoning continue to plague many communities.","The producing foundry shall detail all test results from physical testing to determine compliance to the Specifications.","The Agency shall have the power and authority to provide, in connection with any Project, such Subsidies as are authorized to be provided by applicable Law.","As a general matter, the requirements are not prescriptive, but instead state that certain activities be conducted using appropriate documented methodologies.","Of the original parties Cecil sued, only KKI remains as a party in the current action.","The inside handrail on bottom of the ramp segment and shall be oor or ground surface.","Moving and related expenses.","Office shall require can be properly matched against the items on the Itemized Cost Breakdown Schedule and so that the auditors may examine original documentation for the cost of all supplies and the cost of all subcontracts.","The stipulated amount must be considerably below the lowest estimated cost of the move.","Freudenberg Nicholas, Golub Maxine.","Failure to submit such contracts may result in exclusion of their cost in calculating surplus.","Harris to live in when he moved into that property when he was born into that property?","All signed manifests generated by the facility during the calendar year.","Explain the purpose of your visit.","After you accept the loan and any conditions, your loan will be referred to an attorney for a title examination and preparation of the mortgage and note.","UTICL TENGredior phartial ting is ined or indrial hgiee laboes hat deelop med analamplor he pe of ealuaing poial upanal eure ticin.","New York City Department of Housing Preservation and Development or any successor agency.","Office equipment may offer Purge capabilities, but these capabilities are specific to the hardware and firmware of the device and should be applied with caution.","Department for Children and Families; and with the tenant of the facility, if any.","The contractor must comply with all the issuance and inspections of any work permitted.","They shall be repainted whenever the metal shows through the paint and whenever necessary to prevent them from becoming unsightly.","Every dwelling unit shall have access directly to the outside.","Refuse chutes shall extend from the refuse collection room to a height of at least six feet above the roof.","In no event is evidence of a sexual relationship between such persons to be required or considered.","All doors shall be properly fitted to their assemblies and there shall be no unnecessary spaces between doors and door bucks or saddles.","Second Carbon This is an extra copy for use as needed.","Salmonellae are known to survive and grow in the natural environment, including water sources.","In other words, if target housing has been demolished and rebuilt to the extent that it is effectively new construction, it is no longertarget housing.","Application for the benefits of the Act must be accompanied by the original Negotiable Certificate and a copy of the Certificate of Completion.","Contractor with each type of luminaire ballast.","Requires lead safe or lead free certification prior to rental.","If Category I or II materials are to be sanded, ground, abraded, crumbled, pulverized, reduced to powder, or have the potential to become friable because of the abatement procedures, then list them with RACM.","HPD must issue its approval in writing of such independent election company and of the intended special meeting procedures before such special meeting can take place.","Answer Replacing a pane of glass or fixing a broken window balancer is not a window replacement.","If the device is functional, one way to reduce the associated risk is to print a blank page, then an allblack page, then another blank page.","Relocation Services based upon failure to notify HPD of acceptance.","Class A multiple dwelling, but only if such conversion is carried out with substantial governmental assistance.","When called as a function of a terminal strip input, the controller shall provide both sequenced entry into flash and sequenced return to normal operation consistent with the requirements of the latest edition of the Manual on Uniform Traffic Control Devices.","Theby It was thus a joint federal and state project.","Therefore, the suite should not be occupied until is complete exposuie contents within must be discarded indicated when iypes and relative concentrations fungi in samp!","Tax exemption is not available for portions of Real Property not used for Housing Accommodations for Persons and Families of Low Income, as determined by the Office.","Real Property Tax Law.","Compactor: conversions to central and upgrading of incinerators.","Aggregates from quarries, ledge rock, and talus slopes are not acceptable for these applications.","FORGIVABLE LOAN PROGRAM between the homeowner and contractor, the homeowner shall execute a Deed to Secure Debt with the City of Atlanta for the amount of the agreed improvements.","At that point, can noncertified firms perform electrical, plumbing, HVAC, or drywall work?","Personal funds may be used to pay for samples when an ATM cash withdrawal is unavailable, or when otherwise authorized by divisionpolicy.","Failing to recognize that subjects who volunteer for the sake of the advancement of science are differently situated from patients who stand to benefit from treatment results in an analysis that misconceives the purpose of disclosure.","Where dust sample results are greater than or equal to the levels above, additional dust wipe samples shall be taken in the subject areas until all said areas are found to be below the listed thresholds.","Unreported Opinion On cross examination, Dr.","Paint that a young child could mouth or chew.","Negotiations with any Selected Applicant shall be subject to satisfaction of all conditions established in these Rules or imposed by the Agency, Governing Body, or applicable Law.","Projections beyond the building line.","Look for dry dust and residue in these boxes.","Degaussing must not be solely relied upon as a sanitization technique on flash memorybased storage devices or on hybrid devices that contain nonvolatile flash memorystorage media.","Encapsulation may be useful for the reduction of air emissions from secondary sourcessuch as contaminated building materials under and around PCBcontaining caulk or paint that has been removed.","Signs that are defaced, damaged or removed, shall be promptly repaired or replaced.","BUILT UP ROOF REPAIRexisting conditions.","Fully document every Of\ufb01cial Sample at the time of collection unless instructed otherwise by the program, the assignment or your supervisor.","General Appropriations Act or budget execution process.","Complaint samples from lots for which Federal jurisdiction is clear should be submitted as Of\ufb01cial Samples.","Library of Specifications are acceptable ways to address the identified hazards.","The corners of the gate frame shall be fastened together and reinforced with a malleable iron or pressed steel fitting designed for the purpose, or they may be welded.","Request for a specific rent increase.","Buried couplings for connecting steel pipe to steel pipe shall be steel.","The test samples will be sent to a certified laboratory for testing.","For other work, use appropriately qualified workers.","Concrete blocks shall be laid in masonry cement mortar with a mix of not more than three parts of sand for each part of masonry cement by volume.","Decontamination standards and procedures.","A\ufb02atoxins per se do not produce BGYF under long wave UV light.","The lid is securely fastened.","The DAMP Lessee shall lease an apartment to a Tenant for the lease term.","LICENSING AND REGISTRATION: EXEMPTIONS; EMERGENCY Exemption.","Carports or garages Items above standard grade or in Room additions may be approved if theyinstall a bathroom facility in a dwelling that otherwise lacks a bathroom or necessary to provide accessibility to the house.","The definition of certified firm also includes other business entities that perform leadbased paint activities.","Minimum Life: NA Trees that are too close to the structure or threaten the structure shall be trimmed or removed.","Gardening Group, acting through its Garden Contact Person, pursuant to a License.","However, an agent is not responsible for information withheld by the seller or lessor.","Construction and location of gooseneck ladders.","The qualification statement must include all required forms, and such forms must be fully and properly completed and executed, at the time of submission.","Rutland Avenue thataccording to the information available to KKIhad elevated levels of lead dust.","RRP Rule do not otherwise apply.","These shipments will arrive in Customs bonded trucks under seal applied by Customs at the port of entry.","KKI submitted an affidavit from Dr.","Any interest accruing from the syndication funds deposited into the escrow account shall become, and shall remain, the property of the city.","Improvements to the dwelling to remove architectural barriers that restrict mobility and accessibility may be authorized for owner occupied households that include elderly or physically disabled persons.","Owners of rental units must obtain inspection for required annual registration including lead clearance.","The treated and untreated sections of timber composite pile shall meet the respective requirements specified above for full length of treated and untreated timber piling.","United States Federal Government.","Bags With Filling Spouts.","For example, a massproduced commercial software program contained on a DVD in an unopened package is unlikely to contain confidential data.","If the block erase command is not supported, the Clear procedure is an acceptable alternative.","HPD may at any time remove a property from the process toward eventual ownership by Tenants based upon its evaluation.","Such additional information shall be verified and filed in quadruplicate within the time stated by HPD.","Certified test data supplied by the manufacturer shall be subject to verification by appropriate tests conducted by the State Materials Laboratory.","The assurance provided by degaussing depends on selecting an effective degausser, applying it appropriately and periodically spot checking the results to ensure it is working as expected.","The seam assembly description shall be submitted by the Contractor to the Engineer and will be included with the seam sample obtained for testing.","HPD, by a direct designation of an entity judged by HPD to be a suitable Permanent Owner.","Review and finalize selective demolition scheduleand verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.","See the License for the specific language governing permissions and limitations under the License.","Payment and performance bond.","Conducts microbiological and chemical investigation of seafood, including bacterial and viral pathogen, natural marine toxins, aquaculture drugs, products of decomposition, and other contaminants when special skills or equipment required for analysis are not availablein the field.","Based Paint Regul to conform to the following codes if financial resources are available for a specific project: Accessibility: ANSI standards for handicapped accessibility.","Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.","Since you cannot see, taste, or smell lead dissolved in water, testing is the only sure way of telling whether there are harmful quantities of lead in your drinking water.","We do not feel that it serves proper public policy concerns to permit children to be placed in situations of potential harm, during nontherapeutic procedures, even if parents, or other surrogates, consent.","Wet mop floors to eliminate trackable dirt and wipe down walls and doors of demolition enclosure.","HPD may state Subsidy terms in a commitment letter signed by the Commissioner.","The department shall be notified of any abatement project, disturbance, or renovation involving the abatement of asbestos within a facility, as required by and in accordance with NESHAP.","Size of sign and lettering.","KKI presented evidence that additional samples were collected by the dust wipe technique and that these samples indicated a presence of lead below the Maryland clearance levels.","Prepare composite samples using equal volumes of each constituent or component sample.","Enclosure may be used as a method of abatement if it is designed to be permanent.","Collect debris on equipment and from floor defects, joints and gaps.","The improvement of an existing structure through alterations, incidental additions or enhancements.","If painted with oil, all walls and ceilings shall be thoroughly washed with soap and water at least twice yearly, and at such other times as the Department of Housing Preservation and Development may direct.","PCB Spills Cleanup Policy at subpart G of this part.","The location of the facility.","KKI was under a duty toprotect appellants from injury.","With these considerations in mind, we turn to the instant cases.","For replacement compactor, submit affidavit attesting to the replacement.","Upon occupancy of buildings.","Since much paint does not contain additional requirements will apply.","Effect of compliance with this policy and enforcement.","Annually, a schedule of examination dates and locations will be published by the department, listing the schedule for the monthly testing.","It is a paper document.","Welded top cap shall be ground and filled for exterior applications.","Certificate of Compliance, a mill certificate, and test report may be shipped directly by the manufacturer to the Engineer.","Thely result in viable negligence actions.","This signed Lead Disclosure form shows you have done your part and given tenants and buyers the information they need to protect themselves.","At such hearing, the Department, in its discretion, may receive relevant testimony from such known tenants, community groups, and any other interested parties.","Check with your State lead program to make sure that there is no regulation prohibiting this.","Media Sanitizationmostly a business decision, system owners must understand early on that this decision affects the types of resources needed for sanitization throughout the rest of the system life cycle.","Existing refuse rooms and incinerator rooms that have been approved by the department for such use may be retained as approved.","Work listed in the Times per Year column shall be scheduled with the Facility Maintenance Manager or other authorized County representative.","Preliminary Certificate of Eligibility; documentation.","HEPA Is the work area sealed off during painting?","The signal shall be mountable with ordinary tools and capable of being serviced with no tools.","EXCEPTIONS TO FUMIGATIONWhen submitting samples or exhibits to show live infestation, do not fumigate.","Rule, in exterior containment if a large tree or shrub is within the work area can the plastic be placed around the base and would the plant, however large, also need to be covered?","Proper Feathering will produce a surface that, after painting, has no edges that can be lifted with a nerate dust from abrasion during normal use.","Decontamination, reuse, and disposal of solvents, cleaners, and equipment.","PCB disposal activity does not present an unreasonable risk of injury to health or the environment.","If specified, include evidence of insurance or bonded warehousing.","Some SDS authors might choose to include the Hazard Category used to determine the Hazard Statement.","Study to produce and keep such data and reports.","The SDS may also state where the changes have been made to the previous version.","RRP Rule apply to removing a roof that is not painted?","ASTM standards, EPA does not interpret this as limiting the acceptable standards to those of ASTM.","Technical violation and other variances.","PCB activity for which approval is requested will not present an unreasonable risk of injury to health or the environment.","The business contributes materially to the income of the displaced owner.","SCRIE subsidy which are attributable to a capital assessment or voluntary capital contribution.","Such statement shall indicate whether or not surplus cash, as defined in the Regulatory Agreement, is available.","These new regulations take full HUD applauds the important work you do.","Additional samples may be collected based on observations, such as animal incursion, areas where water may drain, portions of the field susceptible to road dust or runoff, etc.","Request for information concerning exam.","Landlords must conduct a visual inspection and correction of presumed lead hazards at unit turnover.","Install work with laps, joints, and seams that will be permanently watertight and weather resistant.","BIDDER INTEREST IN MORE THAN ONE BID Multiple bids received in response to a single solicitation from an individual, firm, partnership, corporation, affiliate, or association under the same or different names will be rejected.","Any such waiver shall be binding and irrevocable.","The individual that is designated by the licensed asbestos abatement contractor, asbestos operations and maintenance contractor, asbestos laboratory, asbestos consultant agency, or asbestos management planner agency, as responsible for their operations and compliance with these rules.","Reels shall also be labeled with the type of cable.","Project or Program, the place a copy of the RFP can be obtained and the fee, if any, therefor, and the deadline for submission of proposals and the fee, if any, therefor.","Any reaccreditation may be selected for TAP review.","The person being employed to perform the role of manager must be approved in writing by HPD.","Violations of the Labor Law.","Childcupied facilities may include, but are not limited to, day care centers, preschools and kindergarten classrooms.","THE COURT: He can explain in terms of the dust levels.","No inspection if fully abated or certified lead free.","Collection of environmental and product samples for microbiological testing requiresa thorough understanding of critical factors associated with the production of the specific product being inspected.","The fact that an applicant is on welfare shall not be grounds for rejection.","During the construction period coverage may be for less than the amount of the loan.","Alphabetical Disclaimer: The resources provided in this appendix are a collection of sample forms, sampledocuments, worksheets, checklists, and guidance documents.","Attach a copy to the FACTS Collection Record.","Any other interest bearing escrow account established and administered pursuant to these rules and applicable laws.","Prior approval of instructors and guest speakers is required.","What is the material?","The well shall be pumped to remove the volume of liquid initially contained in the well before obtaining a sample for analysis.","Trim around doors and at corners.","Tenant occupying an apartment.","Such examination may include, but is not limited to, the performance and quality of the work, any and all matters pertaining to the loan and compliance with applicable statutes, rules and regulations.","If so, the asbestos abatement will need to be performed by a firm certified under the RRP rule.","Leasing of commercial space, commissions.","Reinforcing shall consist of a minimum of five No.","You may consider hiring a risk assessor to evaluate lead hazards in your home and recommend a lead hazard control plan.","Do not assume the address on the label is the location where followup to a violative sample will be initiated.","Interest will accrue to such Fund, which will be held by the Department.","If the committee is not continued or consolidated, the committee shall be abolished on that date.","Specifications for Containers Used for Containing Compacted Refuse.","These values may vary between different environments.","Values in excess of the minimum requirement are considered to meet the specification.","Proxies, Direct Mail Ballots and Absentee Ballots.","Any syndication funds so obtained or recovered shall be deposited into the escrow account and made subject to the requirements of these rules.","Department which the relocatee believes is in violation of any law or regulations, the relocatee may make application for relief to the Assistant Commissioner of the Division of Relocation Operations.","ID Cards issued by the department are the property of the individual until they expire or are revoked by the department.","PCB Transformer and the release of PCBs.","Only one box may be checked.","Such affidavit also must provide that the waste heat from the cogeneration unit is used for heating domestic hot water or space heating or cooling of the residential units.","PCBs and PCB Items that are subject to the disposal requirements of subpart D of this part.","One of the key decisions that will affect the ability to conduct sanitization is choosing what media aregoing to be used within the system.","The Agency shall make no warranties, express or implied, with respect to any factual information contained in any advertisement.","There was a chain of custody for them, and they were prepped by a sample prep technician for analysis.","If a law relies on private inspectors, sufficient time and resources must be allocated to develop technical capacity to conduct required inspections.","Charts are used to monitor the validity of test results and trends of successive test results.","Occupants were temporarily relocated before and during hazard reduction activities if necessary.","Hearing procedures: Conduct of hearing.","Narrative descriptions may be placed on the mounting er next to the print or, if explanatory graphics are required, use a plastic overlay.","Wipe sampling, however, is the required method of dust collection because it is simple, inexpensive, and has been used successfully for a number of years.","Import samples are physical sample collections of products, which originate from another country, collected while the goods are in import status.","When a group is specified, all items in the group must be bid.","See Determine the clearance area.","The agency may review and judge applications and select community groups by any method and upon any criteria permitted by law or these rules.","The sample is being stored in a laboratory before testing.","The surface area of the old furnace exceeds six square feet.","Periodic reports are required where interim controls were used.","Theby ntities, pursuant tofederalgulations, are conditions attached to funding.","Such report shall be submitted with a certification by the owner that the person preparing the report is qualified under the terms of this chapter.","DF copy of your course completion certificate.","The state of California has created a complex framework of statutes and regulations that divides authority and delegates the responsibility to protect children from lead poisoning among a variety of agencies and levels of government.","It is important to document this point to \ufb01x responsibility in the event the agency wishes to pursue action against that individual.","Reclaimed aggregate may be used if it complies with the specifications for concrete.","Do not push large quantities rapidly across screen because insects, eggs, stones, excreta pellets, etc.","HPD will refer a Relocatee to one Standard Apartment.","Bid submissions are open for public review at the time of the Bid Opening.","Note that emerging mediatypes, such as HAMR media or hybrid drives may not be easily identifiable by the label.","For information on becoming an accredited abatement training provider.","Also indicate which documents were collected to document specific violations encountered during inspections.","Do not ue glss jrs with ice.","For small surfaces having irregular contours, where the entire surface was sampled, measure the surface area.","For example, a party may attempt simple keyboard attacks without theuse of specialized tools, skills, or knowledge of the media characteristics.","The Agency shall provide copies of such amendments to all recipients of the bid solicitation.","Slate roofs shall be repaired when at all possible.","This disability must substantially impebe improved by more suitable housing conditions.","RRPM activities, and shall be at least as protective of human health and the environment as the federal programs.","What should the Inspector give me upon passing the inspection?","Kitchens shall be vinyl composition tile over plywood underlayment.","Standard order and production materialsand products shall be delivered to the site before including in Application for Payment of such items.","In that event, the media cannot be reused by other organizations that might otherwise have been able to benefit from receiving the repurposed storage device.","All orders of treated timber and lumber shall be accompanied by a Certificate of Treatment showing conformance to this specification and AWPA standards record.","Those persons renewing a license or registration are subject to the following fees and conditions.","Living Unit on which Program work will be undertaken staywith family or friendsfewer relocation assistance services may be needed and the cost of such services may accordingly beless, although such resident will still be reimbursefor meals, utilities andor fuel cost.","EPA expects most PCB spills subject to the TSCA PCB regulations to conform to the typical spill situations considered in developing this policy.","The construction of an airtight, impermeable, permanent barrier surrounding asbestos to prevent the release of asbestos fibers into the air.","In other words, the continuing presence of the children that were thesubjects of the study was required in order for the study to be complete.","Remove the seal on a package containing the wipes, and open the lid.","Contingent approval of an asbestos training course shall be granted to an applicant after all required information and documentation submitted has been found to meet the requirements set forth in these sections for approval of the course by the department.","The purpose of the study in the case at bar was, in the words of Dr.","Organizations retain the ability increase the level of sanitization applied if that is reasonable and indicated by an assessment of the existing risk.","Rehabilitated properties shall be IX.","EDA, including, but not limited to, funds which never were the subject of an EDA and funds which were the subject of an EDA which has been terminated.","What is most objected to are the provisions for substituted.","Wendell As his education and career advanced, he formulatedhypothesestering is emphasized and conditioned in children by environmental causesratherby genetic or inherited traits.","In addition, Facilities Management requires specific supplies as listed below.","Enter the complete reason for collection giving the suspected violation, compliance program guidance manual, and analysis desired.","List of any services, projects or activities which would be subcontracted.","If the application is disapproved, HPD shall issue a written notification of disapproval to such head of household indicating the reasons for the disapproval.","Similarly, in a typical condominium building, owners of individual units jointly own the common areas of the building.","Temporary Shoring: Provide and maintain exterior shoring, bracing, or structural support to preserve stability and prevent movement, settlement, or collapse of construction to remain, and to prevent unexpected or uncontrolled movement or collapseof construction being demolished.","The assistant presiding officer shall perform the duties of the presiding officer in case of the absence or disability of the presiding officer.","This sample type may also be used for other designated sampling situations as directed.","Effect of emergency or adverse weather.","Report the code weighed and if short weight, the quantity in the code.","Nothing in this chapter shall be construed to limit the authority of the Secretary or the Commissioner of Health, of Labor, or of Environmental Conservation under the provisions of any other law.","Email, telephone, or another means to a user, and the user may then query the system and obtain the desired data.","The head of household is not receiving any other rent subsidies other than public assistance.","Give preference to the examination of the lot that was processed incorrectly.","The actual size of the bar, whether stamped with an English or a Metric size designation is acceptable.","PCBs to the concrete or portion thereof being decontaminated.","Carrying out this streamlined inspection system, the City of Rochester carried out more than fifty thousand lead inspections during its first four years of implementation; city records indicate that nearly every eligible unit was inspected at least once during this period.","Initials ______ PERFORMANCE BOND: The successful bidder will be required to provide a performance bond payable to Jefferson County, Missouri to guarantee satisfactory performance.","Actually, the random assignment was slightly more involved.","It can be argued that the researchers intended thatthe children be the canaries in the mines but never clearly told the parents.","Any other information is optional.","Office of Tax Incentive Programs of HPD, or any successor thereto authorized to administer this chapter.","Since World War II the specialness or nature of suchrelationships has been frequently of concern in and outside of the research community.","KKI reasons that, because Cecil failed to persuade the jury by a preponderance of the evidence on the lesser evidentiary standard of negligent misrepresentation, he could not possibly have won his intentional misrepresentation claim.","Code or in any other location not prohibited by law.","Ballast may be substituted for gravel borrow for embankment construction.","Be sure to obtain product labeling.","Any change in the status of the head of household or members of household which renders such persons ineligible shall result in the cancellation of benefits.","Hexagonal twisted wire shall be formed from galvanized or aluminized wire in a uniform hexagonal pattern with nonraveling double twist.","Recycling of rinse water for water jetting operations is not allowed.","Such accreditation must be furnished to the Division of Housing Supervision of HPD if requested by HPD.","Additionally, the ENGINEER should be aware of and comply with any requirements of its own insurance policies.","You MAY NOT Use the Logo in any manner that would imply EPA endorsement of a company, its products or services.","If there is any concern regarding the contents of the package the sample custodian may verify in FACTs the identity of the collector and the product collected prior to opening the package.","Lead Hazard Prevention Ordinance.","Prefabricated drainage core shall consist of a three dimensional polymeric material with a structure that permits flow along the core laterally, and which provides support to the geotextiles attached to it.","We are now doing a study to learn how well different practices work for reducing exposure to lead in paint and dust.","Unreported Opinion testing, not the vacuum sampling results.","When the water supply for the irrigation system is from a nonpotable source, irrigation components shall have lavender indicators supplied by the equipment manufacturer.","The Lead Safe Housing Rule requires that the relocabelongings, and utility hookups at the temporary unit.","New York State Department of Education that, among other things, calculates the Aggregate Floor Area of the Eligible Multiple Dwellings in the Eligible Site and the Aggregate Floor Area of Ineligible Space in the Eligible Multiple Dwellings in the Eligible Site.","This product shall not be harmful to plants, animals, and aquatic life.","Conditional Designation of Community Groups.","The license may not be transferred to another company which has bought the licensed laboratory.","Department of processing the application for a Certification of No Harassment.","Some dealers may wish to charge their regular selling price.","Plugging is usually the deliberate mixing of violative grain below the surface or in isolated pockets of grain.","Each field should be issued a separate sample number for ease of identification and review of data.","All of the neutral bars shall be secured in accordance with the TEES.","Portion, and carefully observe the entire corn surface one kernel at a time.","Whenever a synthetic liner is used at a landfill site, special precautions shall be taken to insure that its integrity is maintained and that it is chemically compatible with PCBs.","The managing agent will advise HPD in writing of actions taken to comply with recommendations in the inspection report.","EDA by any party pursuant to these rules shall not obligate the agency to proceed with the project or with the execution of such EDA.","In the present case, the circuit court granted summary judgment, afextensive discovery, on the battery claim on the groundthat KKI did notpossess the requisite intent.","In the cost allocation document, he alloca to lead hazard reduction.","Manhours required for refinishing shall be in addition to the minimum hours committed for cleaning as described in General Requirements above.","Periodic inspections shall be conducted for this purpose.","Make sure your child does not have access to peeling paint or chewable surfaces painted with leadbased paint.","For example, it shall be misted to reduce dust generation during removal.","The chart below will show the areas where dust was collected in your home.","Revocation or suspension of approval.","Fill bottle carefully without splashing and be sure no water from your hands or other objects enters the bottle.","If the dealer still objects, accede to his wishes, but record the facts in your diary.","High efficiency boiler facilities.","The Contractor shall collect cuttings in accordance with applicable sensitive area ordinances.","Mandatory abatement project design.","Therefore, when taking initial courses in lieu of refresher courses, Project Designers would need to retake both the Supervisor and Project Designer initial courses and Risk Assessors would need to retake both the Inspector and Risk Assessor initial courses.","If multiple subsamples are to be collected, it may be advantageous to place identifying information such as sub number, sample number, and collection date on peeloff labels, tape, etc.","TSCA approval meets the regulatory requirements under TSCA as written, or require additional conditions the EPA Regional Administrator has determined are necessary to prevent unreasonable risk of injury to health or the environment.","Payment of loan proceeds.","As we indicated, supra, this information was not furnished to Ms.","Appellant filed an Amended Complaint to add JJB as an additional defendant alleging negligence and violations of the Maryland Consumer Protection Act.","The organization sanitizes or destroys information system digital media before its disposal or release for reuse outside the organization, to prevent unauthorized individuals from gaining access to and using the information contained on the media.","The Contracting Agency may collect verification samples at any time.","All chutes shall be supported on fireproof construction having at least a three hour fire resistive rating.","ELLAP laboratory aent o anoher orgionwhnot LLAP.","Pursuant to this inspectionand before Ms.","EPA certification requirements throughout the building permit process, thus using their local law to increase the effectiveness of a federal rule.","IRB hadaception of the difference between therapeutic and nontherapeutic research andtheng to aid researchers in gettingaroundulations designed to protect children used as subjects in nontherapeuticresearch.","Wall backfill material satisfying these grading and property requirements shall be classified as nonaggressive.","Initial Determination to Deny Assistance or the implementing agency may receive information regarding grounds receiving such information, the Buto the homeowner scheduling an appointment toprogram assistance or to provide requested necessary information.","Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.","Initials ______ COOPERATIVE BID FORM Bid Name: ____________________________ INSTRUCTIONS: Bidders MUST fill out this form as part of the bidding process and attach to your bid response to Jefferson County, Missouri.","HPD every twelve months.","Individuals can become a leadsafe certified renovator by successfully completing a oneday training course in leadsafe work practices.","You MAY Use the Logo to identify your firm as an RRPcertified firm.","The following provides general procedures for sample submission.","The Site Occupancy Record will be part of the evidence at any hearing whether or not the Case Manager is or can be present.","Prevailing Wage for Apprentices.","The following specifications are intended to serve as gecontrol design and construction.","PCB waste, does not make the new owner of the facility a commercial storer of PCB waste.","Check with the Post Office or other carriers regarding shipment of liquids.","Government Bill Of Lading.","The department shall be notified of all demolitions regardless of size.","The access tubes shall be watertight and free from corrosion, with clean internal and external faces to ensure a good bond between the concrete and the access tubes.","Agency shall not be obligated to pay, nor shall they in fact pay, any costs or losses incurred by any Applicant or Selected Applicant at any time, including, but not limited to, the cost of responding to a selection process.","The place of storage of the containers shall be one from which the containers may be safely moved to the location where they are emptied or collected.","CONTRACTOR shall submit an approved Affidavit of Wages Paid annually.","Abatement program applies to all states, tribes and territories where EPA has not specifically provided authorization for that state, tribe or territory to operate the program themselves.","Mazmanian DA, Sabatier PA.","Gate valves inches in size shall be arranged for operation in the horizontal position by enclosed bevel gearing.","Do not use industrial or permanent type markers on sample containers which allow penetration by ink.","Caution: Dry ice is potentially dangerous and requires caution in handling and shipping.","No buckling or collapse of the box.","Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces.","The financial ability of the new owner to achieve correction of violations.","Spoilage may be significant because high numbers of microorganisms may affect the adequacy of the thermal process.","The agency may terminate any application process in whole or in part at any time.","You can enter only one value.","Training providers may now use CDX to submit posttraining notifications to EPA that contain the abovedescribed numbering protocol.","The contemplated legal action determines the extent of documentation.","Administrator may choose to stagger the submission of these forms to client to minimize confusion in completing or obtaining necessary documents.","Verification of certificate information.","In addition, our analysis was based primarily on document analysis with limited interaction with local stakeholders.","Documentation in support of a claim.","While Mitchell moves for summary judgment dismissing all cross claims against it, it fails to adequately address the cross claims in its papers.","No work shall commence until this agreement is approved by HPD.","Submit samples to the laboratory with microbiological testing capabilities which serves your divisionunless directed otherwise.","Blending of more than one type of recycled material into the naturally occurring materials requires approval of the Engineer prior to use.","Initials ______ The Facility Maintenance Manager will supervise construction, alteration, and repair projects within the buildings from time to time.","We shall describe them, i Accordingly, we write on a clean slate in this case.","City for the partial financing of the rehabilitation, shall be subordinated to the lien of the mortgage given to secure the City loan.","How is this law different from existing regulations?","First Time Homebuyer Preference.","However, EPA heard from the industry that renovators had been taking steps to control dust from renovations prior to the promulgation of the rule.","The outside renovation firm hired must be a leadsafe certified firm, perform the renovation using a trained and certified renovator, and is otherwise responsible for meeting all work practice and recordkeeping requirements.","HPD shall attend such meeting.","The Agency may, in the alternative, impose no deadline, in which case the Agency shall receive, review, and approve or reject applications on a rolling basis as and when such applications are received.","These case studies address the legal structure of each law and the context in which each is implemented.","In those instances, where the taxes to be paid are less than the amount to be abated, HPD shall issue a voucher to the housing company for the balance.","Tax abatement exclusion zone.","Implementation of Intake Rent.","Degaussing may be used when nonvolatile flash memorymedia is present if the flash memorycomponents are sanitized using mediaependent techniques.","New brackets shall be provided where necessary.","Administrative Code, as amended.","Neill, Autun, JG, and Mitchell counterclaimed for, inter alia, indemnification and contribution against the Hovnanians.","If it is difficult to read, filling in the tracing with a marker, may highlight the tracing.","This interaction is referred to as corrosion.","Relocation of occupants is required and the following activities will occur for occupant protection: Occupants will not be permitted to enter the worksite during hazard reduction activities.","Fire Resistance: UL Class A Fire Rating.","Under no circumstances will less than three samples for each suspect homogeneous area be collected for purposes of rebutting the presence of ACBM.","Must these subgrantees be RRPcertified firms?","The new Temporary or Permanent Certificate of Occupancy must be issued by the Department of Buildings by the taxable status date in order for the Eligible Multiple Dwelling to receive tax benefits the following tax year.","Environmental or their agents knew or should have known or had reason to know existed in the premises.","Reinforcing steel shall be placed and maintained in its proper position as shown in detail drawings.","However, in new or unusual situations it is your responsibility to use imagination and ingenuity in getting the job done and, if necessary, to consult with your supervisor.","The relocatee shall be shown this summary and given the opportunity to object.","The duty to a vulnerable research subjectis independent of consent, although the obtaining of consent is one of the duties a researchermust All of this is especially so when the subjects of research are children.","Law with respect to which HPD makes determinations of eligibility.","If you work in a state where EPA administers the renovation program yourfirm needs to be certified by EPA.","Court of Appeals analyzed the exact same contract in and held that it was a contract.","These samples should be submitted as Of\ufb01cial Samples, rather than INV.","Code of Ordinances, pt.","Floors and walls of waterclosets, etc.","Where two or more Projects share the same funding source, Sponsor, grantee, or borrower, or otherwise provide for similar treatment of multiple Sites pursuant to these Rules, the Agency may deem such Projects to constitute a Program.","The relocatee has a duty to advise the Department whenever permanent accommodations are found and to keep the Department advised regarding the date of expected occupancy.","Call Our Program two weeks after returning the loan acceptance form and every two weeks until settlement.","Property from continued compliance with the requirements of the Law pursuant to which such Tax Benefit was granted, including, but not limited to, any provision of such Law regarding rent control or rent stabilization.","As a reminder, notice of renovation activities in common areas may be provided to affected tenants by posting signs.","You should only enter one \ufb01rm with the \ufb01rm type you designate as the responsible \ufb01rm type.","The RRP Rule does not specify the format in which records must be kept.","What do I need to do?","The interior lining shall be applied by centrifugal or other approved methods.","Line posts shall be studded, slotted, or properly adapted for attaching either wire or mesh in a manner that will not damage the galvanizing of posts, wire or mesh during the fastening.","Respondent: What they expected was that different levels of repair would have different levels of effectiveness over time.","Wood stakes shall have a notch to secure the rope ties.","Please give these areas special attention when you are cleaning the house, and please use the kit we brought you!","Each Site and Sponsor selected for any Project pursuant to these Rules shall meet the eligibility criteria of the Laws which authorize the Agency to undertake the Agency Activities necessary or incident to the performance of such Project.","RRP Rule only to the extent necessary to respond to the emergency.","Directors appointed under this section shall serve only for a period coexistent with the duration of the violation, or until HPD is assured against commitment of violations of a similar nature, and shall serve in such capacity without compensation.","Aluminum components shall not be used.","Qualification and Selection of a Third Party.","Bidder is not debarred or suspended from participation in Federal Assistance programs.","The system shall be capable of operating either as fixed time or traffic actuated controller.","Therefore, whenever a building meets the definition of a childoccupied facility, it remains so for at least a period of one year.","Provideinformation on safe paint repair.","Evolutionary changes in magnetic media will also have potential impacts on sanitization.","Both you and your tenant should retain a copy of this form.","Lots Used as Gardens or as Open Space; Gardens not Deemed Mapped Parkland.","Finished floors must slope to drain away from main structure.","Follow Drexel Metals, Inc.","ACBM includes transite siding.","Turnover of Dwelling Units.","QCP shall be submitted through the QPL Engineer and approved by the WSDOT State Materials Laboratory.","It shall meet the following requirements for grading and quality when placed in hauling vehicles for delivery to the roadway or during manufacture and placement into a temporary stockpile.","Tenants Association pursuant to this subdivision within a reasonable time after receipt of the bill for services, and not later than thirty days after the hearing on the rent increase application.","This ensures that anyone reading the SDS knows exactly what to expect immediately, without having to refer to a long list of codes.","Store in a dry location.","KENNEDY KRIEGER INSTITUTE, INC.","The Court: You can terminate the contract unilaterally.","Acceptable coupling bands are the two piece helically corrugated band with nonreformed ends and integrally formed flanges and those bands meeting the requirements of Section.","If any of the other insurance does not permitcontribution by equal shares, we will contributeby limits.","Paint has been identified.","Standard wipe sample method and size.","This conflict and the resulting tension that can arise within the research enterprise suggest a need for guidance and oversight.","Onon of KKI to inspect or testthis premises or to test the individual.","The certified renovator must testeach component affected by the renovation.","This documentation must be at the jobsite where the accredited person is working.","The laws required different methods of correction and different documentation to support the correction.","Shortly was compared to World War II experiments, it wasterminated.","Little Village and across the city.","All plant material shall be purchased from a nursery licensed to sell plants in their state or province.","Records retention and access.","However, the number of apartments, if any, which may be set aside for such employees shall be subject to the approval of HPD.","Proper training courses include the following.","Eligibility for refresher training courses is dependent on the effective date of the initial training.","Methods for Measuring Acute Toxicity of Effluents.","Any disputes regarding a breach, insurance amounts, liability, coverage, lapse or otherwise shall be litigated in the Circuit Court of Jefferson County, Missouri and the same shall be incorporated into any Contract agreed to by the parties.","Based on the nature of the former Crawford Station site, testing for lead and arsenic was made a priority, and no asbestos was detected in the samples collected from the area where the dust cloud settled.","Topsoil Type BTopsoil Type B shall be native topsoil taken from within the project limits either from the area where roadway excavation is to be performed or from strippings from borrow, pit, or quarry sites, or from other designated sources.","Such individual appliances shall be provided in proportion to the number of beds in the lodging house as follows: One such appliance for every ten beds or fraction thereof.","RCRA facility or previously approved TSCA facility.","NEILL ARCHITECTS, GILSANZ MURRY STEFICEK LLP, PILLORI ASSOCIATES, PA, SIGNATURE INTERIOR DEMOLITION, INC.","Sale of the Buildings will be pursuant to applicable Laws and each Disposition will require approval of the Mayor and the City Council, acting in their respective capacities pursuant to such Laws.","Waicker had no knowledge or information about the condition of the Property while it was being managed by the IRS, nor was he personally involved in any way with, or informed or consulted about, the rental or maintenance of the Property.","In the event of contract award, this information is required in order to issue purchase orders and payments to your firm.","However, EPA continues to encourage states and tribes that may be onsidering establishing their own renovation programs to keep reciprocity in mind as they move forward.","The affiant will only sign the version in their native language, as that would be the one the affiant can attest to.","The Commissioner shall prepare and distribute clear and simple materials describing the dangers of lead poisoning, the need for parents to have their child screened, how to have a child tested, and recommended nutrition and housekeeping practices.","Commissioner shall review the report and recommendation of the Hearing Officer, shall determine whether or not the Tax Benefit should be Revoked and shall thereafter deliver a Determination Notice to the Taxpayer by the method provided herein for delivery of notices.","Import status ends when Customs has cleared an entry for the shipment.","If the Vendor fails to honor stated prices as submitted in the Bid Form or Contract, the County reserves the right to obtain the same items from the next lower vendor who submitted a bid price for the item.","The owner shall notify all tenants concerning location of receptacles and hours of collection.","Do not use glass containers for packaging or storing dry ice.","Department in writing of his or her objection to such charge.","Any increase granted will be in writing and will extend only for a maximum of the time remaining in a specific exemption year.","Kennedy Krieger to the plaintiff.","The provisions of article eight of subchapter five of the Housing Maintenance Code shall govern the effect and enforcement of such debt and lien.","Provide the DSHS Inspector License Number, if required.","Deed restrictions for caps, fences and low occupancy areas.","These LEDs and switches shall function as follows: TEST When the switch is in the test position, a call shall be placed to the controller and energize the associated LED.","HPD and a Third Party selected for conveyance of property pursuant to the Third Party Transfer Process that restricts or conditions the use of such property.","Carefully reclose all containers and shipping cases.","In making this determination, EPA will consider such factors as absence of any approved treatment technology and insufficient time to complete the treatment or destruction process.","Broken Official Seals Reseal the sample whenever you break the official seal.","Have More Compliance Questions?","Therefore, the renovator is not required provide the studio apartment occupants with notice of the common area renovation.","Labeling All labels and other written, printed, or graphic matter upon any article or any of its containers or wrappers or accompanying such article.","ST trable r ealen.","Social Security Administration for this year.","The Department may require the deposit of loan advances in a separate escrow account, in a bank designated by the Department, subject to withdrawal only upon the joint signatures of the borrower and a representative of the Department.","The County reserves the right to request additional written or oral information from Respondents in order to obtain clarification.","Many municipalities are considering developing local laws to target the continued problems of childhood lead poisoning in their communities.","Agency has reliable information a particular package sought to be examined is destined for, or received from another state, and contains an FDA regulated article.","Modification of personal property to adapt it to the replacement site, except when required by law.","Implementation and Public Policy.","Hamlet on Olde Oyster Bay Homeowners Assn.","Department and has a current license issued by the Department to prepare lead abatement project designs, occupant protection plans, and abatement reports.","It also includes research conducted, supported, or otherwise subjecttoby the United States.","Collect samples only of specific assignment.","Take samples at the end upstream of the former gas flow of each segment removed.","It is considered a minor maintenance and repair activity.","Locally appropriate lead laws must take into account the resources, responsibilities, and relationships between local agencies.","Send invitro diagnostic device samples to WEAC.","Tape the protective paper or heavy clear plastic securely around the edges so it cannot come loose and expose the of\ufb01cial seal.","However, it fails to establish as a matter of law that none of the claimed damages arose from or were alleged to have arisen from the work it performed under its contract with the Hovnanians.","LICENSURE: ASBESTOS ABATEMENT SUPERVISOR.","Protecting the Official Seal.","Repairs, demolition, or any other work performed by an owner who has entered into a regulatory agreement for such building with the Department.","Extremely high levels have been known to result in seizures, coma, and even death.","EPA regional office may establish an alternative cleanup method or level and place the responsible party on a reasonably timely schedule for completion of cleanup.","Texas asbestos health protection law which shall be conducted by a training sponsor licensed by the department.","For example, pictorial descriptions of a field exam for a filth sample; or a description of relative documents and what they demonstrate regarding the subject lot of a documentary sample; etc.","ASTM Standards are voluntary consensus standards developed after careful review by technical committees which generally include EPA and HUD staff.","Bidders are responsible for examination of drawings, specifications, schedules and instructions.","It is thought the BGYF is produced by the reaction of kojic acid formed by the fungi and a peroxidase enzyme from living corn.","Submit screenings as separate subs if actionable.","No water shall be added to any batch after the completion of the initial mixing period.","PCBs and PCB Items shall be placed in a landfill in a manner that will prevent damage to containers or articles.","All waterstops shall be molded or extruded in such a manner that any cross section will dense, homogeneous, and free from porosity and other imperfections.","Such agreement may be contained in the mortgage securing the Loan or may be a separate agreement recorded of record against the Real Property.","City assisted urban renewal site.","Higgins sought to hold KKI liable for negligence on several different grounds.","However, even though courts in the United States may use the Nuremberg Code to set criminal and civil standards of conduct, none have used it in a criminal case and only a handful have even cited it in the civil context.","They contend that they did not participate in the wrongdoing that caused the damage inasmuch as they engaged design professionals and a general contractor to perform the actual work.","This information will be important for the compliance officer to know when preparing a seizure or other regulatory action.","The Agency reserves the right to make periodic inspection on each apartment in the rehabilitated building.","Normally do not use certified or first class for routine samples.","Department determines that compliance with the room count requirement would impose an undue and unreasonable economic hardship.","Conduct of special meetings.","For both Clear and Purge, refer to the manufacturer for additional information on the proper sanitization procedure.","ASBESTOS MANAGEMENT IN FACILITIES AND PUBLIC BUILDINGS General.","Application Procedure, Documentation, Filing Fees.","For a very small job, such as repainti For a large job, there could be significint.","At no time will title to the multiple dwelling be conveyed to the developer.","Some raised in this case, in the briefs and at oral argument, were importantonese, and the Court therefore attempted to address those issuesind exhaustive manner.","EPA considered, depending on factors such as the size, configuration, or other conditions of the work area; how the contractor uses his or her discretion to comply with the rule; and the prevailing local wage rates.","The Administrator must also verify Gross Household Income using established employment, depositand other forms of income verification.","Allow the dried waste to cool to room temperature.","However, that is not the law in this Department.","Piping, heat, mains, risers, branches in all dwelling units.","The Bureau of Housing or the implementing agency reserves the right to amend the bid documents or extend the bid deadline.","Department of Housing Preservation and Development may determine.","Take a standard wipe sample of the decontaminated surface.","Study measured the effectiveness of different tiers of lead remediation and abatement in residential housing by measuring the blood lead levels of children participating in the Study.","The committee is authorized to transact official business only when in a legally constituted meeting with quorum present.","Documentation submitted for an application will be considered for that application only, regardless of any other applications submitted at the same time.","The Agency may establish Program and Project requirements and conditions for the commencement and continuation of negotiations.","This signed Lead Disclosure Form shows you have done your part and given tenants and buyers the information they need to protect themselves.","The following shall be required to be submitted to the Department with any request for a written agreement.","Department of Finance that contains the date of a statement of account.","The fee may be further adjusted on a compound basis by a percentage to be established annually by HPD, said percentage may be subject to negotiation by the housing company, but may not exceed the maximum percentage authorized by HPD.","Cause occurred, without regard to the date upon which such Cause was discovered by HPD.","EMP obligations including the address of the unit, date of completion, names of persons performing the tasks.","Children can also beexposedes.","Local Director of Health for investigation and abatement actions.","Region must be submitted to the appropriate EPA Regional Administrator.","In that case, the organization might decide to include the optional component even if the data is not in a higher confidentiality category.","Sample The Agency has defined minimum direct reference seizure criteria to assist in assessing filth of individual lots.","If the User Data Erase command is not supported, the Clear procedure is an acceptable alternative.","Where an invoice does notlist lakes of origin of boxes of fish in a shipment, fish of the same size and kind will be considered to comprise a single lot.","Complaint samples from lots for which Federal jurisdiction is clear should be submitted as Official Samples.","The PCB bulk product waste is segregated from organic liquids disposed of in the landfill unit.","LICENSURE: STATE LICENSING EXAMINATION.","ALLC webe and additional notifications and information may appear on the AIHALAP, LLC website.","Before collecting the next composite sample, discard the plastic liner.","PCB waste shipment from the designated facility to the alternate facility.","The RRP Rule is not intended to supersede or preempt any more stringent State or local laws.","HEPA exhaust and full containment.","Work Site Cleanup The purpose of work site cleanup is to remove dust and debris from the work area.","Only the Hovnanians and Signature oppose the motion.","Even small amounts of lead can cause harm to the brain and other parts of the nervous system.","Provide a copy of the statement to all tenants with written materials regarding lead hazards approved by the Department.","KKI, as a medical researcher, owed a duty of care to them, as subjects in the research study, based on the nature of the agreements between them and also based on the nature of the relationship between the parties.","HPD has entered a lease for the management of buildings under any DAMP program.","Lama mutual housing company development be bequeathed to another.","More than one subsample may be collected from large institutional or bulk containers when the number of sub samples required exceeds the number of containers in the lot.","In these situations, the Regional Administrator has the authority to require cleanup to levels lower than those included in this policy upon finding that further cleanup must occur to prevent unreasonable risk.","Concrete Floor wet mop.","Misrepresentation also assigns error to the circuit courtof summary judgment on the intentional misrepresentation claim.","Kennedyy were going to inform the parents of the result of thedust No indication as to when; if that would be during the study orafterwards.","If it is impossible to locate an alternative facility that can receive the waste, the facility may return the rejected waste to the generator.","The Court: I know that, how about scientific studies, what do they show?","Additional coats may be required for ready mixed and used as supplied by manufacturer without thinning.","One end of a can bulges.","Motions for Summary Judgment vacated and cases remanded for proceedings consistent with these Opinions; Costs to be paid by KKI.","Entrance, Foyer, Lobby, etc.","Study or its context.","The Agency may utilize such administrative procedures, consistent with such laws and regulations, as it deems appropriate to effectuate the purposes of the federal benefits and the City Housing Goals.","This field is critical; be certain to verify the date.","HUD Lead Safe Housing Rule.","Occupant Responsibilities for CO Alarms for Class A Multiple Dwellings and Private Dwellings.","Reasonable efforts include filing with courts or agencies responsible for enforcing payments.","If bruising occurs, it usually lasts only a day or two and has no permanent effects.","An estimate of the expected year of closure of the PCB waste storage areas, if a trust fund is opted for as the financial mechanism.","The sample is collected from a person named on the label of the article or his agent, and such person is also owner of the article.","Fees shall not be imposed on any state or local government or nonprofit training program and may be waived for the purpose of training State employees.","We holdthatn of theexistenceies arising out of contract, or out of a special relationship, or out ofregulations and codes, or out of all of them, in each of the cases.","Panels shall be manufactured with smooth surfaces on both top and bottom of the panel.","Affordable Housing Unit is not more than the maximum percentage of the Area Median Income, specified for such Affordable Housing Unit pursuant to the Act.","The joints shall not create an increase in the outside diameter of the pipe.","These examinations vary from simple visual observations for gross \ufb01lth, such as rodent pellets in wheat, to the detection of odors of decomposition in seafood.","PCB concentrations below the specified cleanup level.","It is important to verify the qualifications of individuals and firms before hiring them.","Notification to county of violations.","In response to Dr.","Department of Buildings are required, at the option of the Office, alternative documentation to prove absence of Building Code violations.","Individual LEDs or pixels shall not be visible.","The Commissioner shall assess fees for accrediting training programs, licenses, license renewals, and permits issued in accordance with this chapter.","Use glass, cork, foil covered, or plastic, nonparaffin closures.","HPD will provide a written notice to Tenants of properties that are the subject of an in rem judgment of foreclosure and eligible for the Third Party Transfer Program.","For the secondary verification, a full verificationshould be performed.","One from a window trough, if present.","The switch shall automatically return to the run position when it is released.","The housing company shall submit to HPD for review, plans and specifications for installation of direct metering equipment.","The porous ceramic cups or suction lysimeters are installed along the sides and under the bottom of the waste disposal unit liner.","Practices that minimize the spread of leaded dust, paint chips, soil and debris were used during worksite preparation.","For example, a certified firm establishes containment and removes wall and ceiling board to the rough framing members.","Failure to Submit Required Reports, Failure to Submit Accurate Reports or Failure to Pay Minimum Average Hourly Wages in Accordance with the Minimum Average Hourly Wage Act.","Baltimore City Healthy Start, Inc.","The other hand can be left ungloved for manipulation of nonsterile surfaces materials if preferred.","As I have indicated, this case presents a narrow question of whether a duty in tort exists between the plaintiffs and the defendants.","The circuit court allowed thenegligence claimnot based on the Baltimore City Codeto remain for the juryto decide Unreported Opinion questions and did not reach the issue of causation on any claim.","Others, subject to Agency approval.","Where necessary, plant material shall be temporarily heeled in.","The laboratory test data shall summarize the tensile strength of each, and the average tensile strength for both control and weathered samples.","Fusion equipment used in the joining procedure shall be capable of meeting all conditions recommended by the pipe manufacturer, including, but not limited to, fusion temperature, alignment, and fusion pressure.","Factual Issues to determine whether there is Cause to revoke a Tax Benefit, at which administrative hearing the Taxpayer may be represented by counsel and may present witnesses and other evidence.","The Agency may negotiate with Applicants and may negotiate with parties which have not submitted applications.","IRS or New York State income tax returns, as requested and shall assume the cost of such copies.","The department shall consider prior teaching of the course applied for as a part of the approval process.","The waste is placed in a pile designed and operated to control dispersal of the waste by wind, where necessary, by means other than wetting.","Code of Ordinances; Pt.","Assistance than would be provided under any other appropriate Project or Program, and the Project permits the treatment of the Site with such level of private investment or Assistance.","VCT and Ceramic Tile elevator floors daily.","Partnerships: If the ENGINEER is a partnership then the evidence of all primary and excess liability insurance required to be maintained during the term hereunder shall be furnished in the name of the partnership.","Recordation against the MIH Zoning Lot of a restrictive declaration setting forth the amount of the Affordable Housing Fund contribution and the amount of residential floor area to be constructed at the MIH Development.","Click on this button to continue.","Always attempt to collect the original wrappings showing cancellation of origin office and address sticker.","Standard Practice for Sample Digestion of soils for the Determination of Lead by Atomic Spectrometry.","If a sample can be delivered to the laboratory promptly and confirmatory analysis handled expeditiously, freezing of the FDA subsamples is not necessary.","The research study was to collect data from all five groups over a period of two years.","It is a more accurate and usable document due to their contributions.","General contractors should keep in mind that if a firm hires a subcontractor that fails to follow the work practice standards or otherwise violates the RRP rule, the firm that hired the subcontractor is also responsible for the violation.","Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast.","Commissioner and shall be substantial, rigid and durable, in construction.","State of Texas, a certificate of authority issued by the Texas Secretary of Statauthorizing the corporation to do business in the state.","Put specimen or product into container and seal tightly.","Top rails must be well braced at the gateway.","Narrative and all applicable information pertaining to the risk assessment.","Fused sprinkler heads shall be replaced promptly.","The building is to be sealed or demolished.","All luminaires shall have housings fabricated from aluminum.","The clock shall provide four functions and shall be enclosed within a dust tight mounting case.","Lead Hazard Prevention and Control Ordinance.","PCB dielectric fluid from the electromagnet, switch, or voltage regulator.","The Facility Maintenance Manager will supervise construction, alteration, and repair projects within the buildings from time to time.","No member of an IRB can have a conflicting interest.","The maximum pipe diameter for corrugated polyethylene storm sewer pipe shall be the diameter for which a manufacturer has submitted.","Recycled concrete aggregate shall be in a saturated condition prior to mixing.","EPA recommends that you follow these simple procedures: Contain the work area so that dust does not escape from the area.","Line out any unused blanks and strike out all words and letters in parentheses, which are not applicable.","Cecil asked the circuit court for a jury instruction stating that held that this Consent Form was a contract.","If the buyer exercises this right, the buyer is responsible for scheduling and paying for the risk found, the buyer has the right to cancel the contraccontract.","All materials, uding rubbish, must be removed from the premises.","Compare the differences between the two sample SDSs as you move through each section.","Fittings for Type N mounts shall be installed unpainted.","Transfer of any Lot.","Commissioner shall review the report and recommendation of the hearing officer and make a final determination to grant or deny the application.","If a gas meter is to be installed its location shall be given.","Exemption after construction or reconstruction.","Penicillium were identiiied in the sample.","Such Written Agreement must be submitted to the Department with the application for benefits of the Act for the multiple dwelling located in the geographic exclusion area.","Commissioner or his designee, which designee shall not be one who has participated in the original decision.","Residential Building to an Eligible Multiple Dwelling.","IMPLEMENTATION PLAN The bidder must provide an implementation plan with the bid.","Put on disposable shoe covers before entering the dwelling to be sampled.","The above priorities shall not be applicable to staff or student housing or to housing for the elderly or disabled except as such priorities apply within each special category.","For this purpose, an inner court shall be considered fully enclosed even though some of the enclosure walls are located on an adjoining lot.","If laboratory analysis is used to determine lead content, results shall be reported in milligrams of lead per square centimeter.","Soil samples were collected from around the site of the former smokestack, and composition testing was conducted by CDPH that were also analyzed and validated by an outside party.","Mark shall be placed over the encapsulated area or the barrier to the encapsulated area.","If you have any questions abcontact _____________ at _________________.","The locking mechanism shall then be cycled once to verify operation at this temperature and humidity.","The training provider shall also assist the applicant if needed to complete the application to include listing any special requirements of the student, such as an accommodation for a disability covered by the Americans With Disabilities Act.","Thenotification must be filed on the form specified by the department.","This of consent raises some timeless and thornyquestions.","Operations: General Requirements for Publicshall exhaust filtered air to the outside of the building wherever technically feasible.","An amount approved by the Agency for contingencies, to provide for approved change orders and other approved increases in development cost.","Enhances federal disclosure law by attaching affidavits to deeds.","Agency deems necessary or desirable to transfer title to the Site, enforce the obligations of the Sponsor, effectuate the purposes of the Project, and otherwise protect the best interests of the City.","Do not mix wipes from different sample areas.","DOC sample is collected merely to establish interstate commerce, in those situations, the value of the goods that traveled, or will travel, in interstate commerce is what is needed.","This is not a study that should ever be considered defensible in any era.","DHCR which may only be rebutted by the presentation of certified copies of other DHCR documentation.","An explanation of the procedures to be followed to ensure that burning the waste will not adversely affect the operation of the boiler such that combustion efficiency will decrease.","The most practical way is to establish a paper trail of records going back as far as possible in the distribution chain to the actual entry.","Locking the dumpster and placing it behind a locked barrier are good examples of ways to prevent access to the dust and debris.","Note: Photographs taken to document conditions observed, or subsamples collected, are included as exhibits to establishment inspection reports.","Bronx County Clerk must make a showing of excusable default and a meritorious defense within one year entry of the order.","Commencement of Construction for any project that is carried out with Substantial Governmental Assistance.","An individual must be licensed as an asbestos consultant to design asbestos abatement projects.","Did the trial court commit reversible error in admitting evidence of the prevalence of childhood lead poisoning in Baltimore City which was irrelevant and unfairly prejudicial?","Storage or sale of removed items or materials onsite will not be permitted.","The portion of ballast retained on No.","REPLACE WOOD FLOORING AND CEILINGtive treated to prevent deterioration.","Tackifiers shall hydrate in water and readily blend with other slurry materials.","Criteria for the Building Qualification Index.","The sample is handled in exactly the same manner as any other DOCsample, once original labeling has been removed and the remainder of the sample destroyed.","After the unit passes the inspection the inspector will issue for the unit a CERTIFICATE OF CONFORMANCE that is good for two years.","Documentation: Submit proper documentation for the amounts being requisitioned from subcontractors and material suppliers with each Application for Payment.","The Commissioner shall make the final determination in writing, based upon evidence produced at the hearing.","In addition, at the end of the job, a certified renovator must perform a visual inspection to determine whether dust, debris or residue is still present on surfaces in and below the work area, including windowsills and the ground.","The Relocatee must actively seek out a lawful dwelling unit and accurately report his or her progress to his or her Case Manager weekly or at such intervals as HPD requires.","Commercial Bill Of Lading.","Misconduct or dishonesty during the examination, or an individual taking the examination other than the individual scheduled, will constitute grounds for the issuance of a failing grade and revocation or denial of a license.","The PCB waste management process is being operated in a manner which may result in an unreasonable risk of injury to health or the environment.","This is a competitive negotiation procurement process and is not a low bid process.","AMIandmust have a child under the age of six years to receive Program assistance.","The deadline for submissions shall be a reasonable period of time after the advertisement first appears and shall be stated in the bid solicitation.","The parts shall be identified by name or number in a manner readily interpreted.","Detector switches with separate operate, test, and off positions shall be provided for each field detector input circuit.","Mix composite samples thoroughly.","For example, a common area inside one building of a multibuilding apartment complex is likely to be used exclusively by tenants of only that building.","The repairs were not intended or expected to completely remove exposure to lead.","This leaves only the ciphertext remaining on the media, effectively sanitizing the databy preventing readaccess.","Lead Renovation, Repair and Painting Rule.","The DAMP Lessee shall credit the amount collected against the rent owed by the Tenant.","NUMBER OF SUBSAMPLES REQUIRED NO.","The criteria in the Compliance Policy Guide can be used to determine if a particular lot meets the minimum criteria for direct reference seizure.","If soil lead clearance levels are greater than or equal to the applicable limits, the baseline samples should be analyzed to determine if soil lead levels were already high before the work began.","Larch, or Hem Fir.","Dispose of filter media and desiccant in the air dyers based on their existing PCB concentration.","While the window troughs could conceivably be sampled individually to determine which ones require recleaning, it is likely to be more cost effective to simply reclean all of them.","All fabrication shall be complete before galvanizing.","In some cases, thefor the work site only.","The local law is innovative, in several respects.","Advance notice of inspections or investigations by the department is not required.","The registry shall be maintained as a public record.","Housing Company Funds and Bonds.","Place each of the wheat subs in clean, paper bags.","EPA protocol for to and from the work area.","Until environmental cleanup is completed, parents should clean and isolate all sources of lead.","Floor and wall preparation.","It can be a hazard, especially if it deteriorates or, if it is disturbed during maintenance or normal wear and tear.","RRequirements of the EPA National Lead Laboratory redin Progor redif lead anals in pain, oil ad des byn EPAd labory accreditation organization.","Relocation Services, or on any adjourned date, will result in termination of Relocation Services, unless the Relocatee makes a written application to the hearing officer.","AAB may vote to accredit with suspension.","Moreover, in the present cases, the consent forms did not directly inform the parents that it was possible, even contemplated, that some level of lead, a harmful substance depending upon accumulation, might contaminate the blood of the children.","The Agency may determine to place any Site into any Project where the Agency determines, for any reason, that such Project is an appropriate treatment for such Site.","Wall type convenience outlets used in bathrooms and kitchens shall be based on applicable code.","The purpose of the study was manifestly not to reduce the level of lead in the blood of the children that were the subjects of the study, but to create a controlled research environment focusing on abatement of lead dust.","Aflatoxins per se do not produce BGYF under long wave UV light.","Commissioner of the Department of Housing Preservation and Development.","If the DOC sample is collected to document a lot that has already been shipped, estimate the value, or obtain a \ufb01gure from your documentation, which represents what was shipped.","Trim or edging shall be metal, or edges shall be of same covering material as cabinet top.","Existing tops must be repaired or replaced before covering is applied.","This subdivision shall not apply to staff housing where employment at the institution is a primary requirement for residency.","Kennedy Krieger owed any duty to the plaintiff in this case that would arise to civil liability.","The Major System Repair Program will limit assistance to an eligible homeowner to XIX.","The checklist should be signed by employee and dropped off in Facilities Office after each shift.","LED drivers shall be removable for user replacement.","Amicus Curiae: Brief of Amici Curiae the Public Justice Center, the National Health Law Program, and the East Harbor Village Center for Appellants.","We were very confident because of the bar code system, the computer reading system, that the results were matched.","City, within the constraints of statutory purchasing requirements, departmental needs, availability, and sound economic considerations.","Occupied Rehabilitation Program Policy Appendices Sampling procedures for floors are as follows.","The cabinet wiring diagram shall indicate and identify all wire terminations, all plug connectors, and the locations of all equipment in the cabinet.","After seating, the frame and grate or frame and cover shall be maintained as a unit.","Therefore, without determining whether there was error, we conclude that the Estate cannot demonstrate prejudice.","Use in carbonless copy paper.","When wiping, wipe in one direction only, do not wipe back and forth.","Is condensate, \ufb02aking paint, etc.","Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.","Agency in the loan documents, and forfeiture by the contractor of consideration for future work under this program.","ACCREDITATION: ASBESTOS ABATEMENT IN COMMERCIAL BUILDINGS.","Your supervisor may also want to notify your compliance branch so evaluation of When Selective Sampling consists of an actual sample of a product, however small, as distinguished from bag cuttings, rodent pellets, insects, etc.","Subsamples of small portions of the product from directly beneath the stained areas.","BILL OF LADINGThe shipper who delivers the goods to the carrier for shipment, prepares The Bill of Lading.","The Respondent: But the results never came back to the level where it was defined as a hazard.","The Agency shall determine whether any Project is in a Program and whether any set of Projects constitutes a Program.","The storage device may support configuration capabilities that artificially restrict the ability to access portions of the media, such as SCSI mode select.","The occupant shall have one year from the date of installation to make such reimbursement.","The relay shall be wired as shown in the Plans.","United States Environmental Protection Agency.","The tenants may forward their comments or objections regarding the proposed loan to the Department for consideration of all relevant issues.","CDPH will continue to actively monitor the site and take samples, while also dispatching an environmental consultant who will thoroughly inspect the site for any additional environmental issues.","The cleaning hours worked shall be paid according to the bid sheet.","The building owner retains primary responsibility for compliance with these rules.","Mirror the message currently being displayed or programmed.","The pertinent specifications approved by the Department shall be made a part of each such contract and each such contract shall be subject to the written approval of the Department.","Agent will review the refinancing product after a Homeowner has submitted, to the Administering Agent, a request for approval of the refinancing product form, along with information concerning the term of the refinancing product, the applicable interest rate and the lender.","At such time as the Agency issues a bid solicitation for a Project, the Agency shall inform prospective bidders and solicit bids in such manner as the Agency shall deem appropriate.","HPD may require, shall be drawn in form and substance satisfactory to it and shall have as surety thereunder such company or companies authorized to do business within the State of New York as are approved by HPD.","The lamp shall energize upon vehicle, pedestrian or test switch actuation.","When using the certificate of mailing option, no record is kept at the mailing office and a receipt is not obtained when mail is delivered to the addressee.","Excess honeycombing in the back of the curb may be cause for rejection of the curb.","An of\ufb01cially sealed sample must sometimes be reopened to prepare it for submission to the laboratory, or for some other legitimate reason.","Not all types of available media are specified in this table.","Standards define the design process and the specific recommendations for multifamily housing financed through CHFA.","Even when plastic is used to cover the floor, you must also clean the floor at the end of the job.","Moreover, while the Hovnanians aver that they did not intend to cause the gases and steam to vent onto the Seymour Property, it is not necessary that they acted for the purpose of causing the invasion.","Therefore, refer to the device manufacturer for coercivity details.","Your inspector will also provide information about financial and licensed contractor help.","Rental Project or Homeownership Project by the Department of Finance indicates such benefits.","Each year hundreds of children in Rhode Island get lead poisoning from living in older rental properties that have lead paint.","FDA office shipping the sample and the receiving laboratory or other office.","Not all laboratories will analyze composite samples, so check with your laboratory before collecting them.","Property taxes unless the homeowner has entered into a written agreement with the taxing authority outlining a payment plan for delinquent taxes and is abiding to the written agreement.","When required, the toe plate extensions shall be punched with holes to match those in the lip of the skirt and fastened with \u215cinch or larger galvanized nuts and Molts.","The amount of the Affordable Housing Fund contribution per square foot for each Fee Tier is determined by calculating the difference between the Market Price and the Affordable Price for each Fee Tier.","List of All Violations Classified as Rent Impairing.","Identify cans with a single INV Sample number.","HPD upon Selection of a Building.","Most of the relatively few cases in the area of the ethics of protocols of variousresearch that a parent can give informedconsent their children in nontherapeutic research.","If exterior cleanup is necessary, the clearance examiner should provide the client with a visual assessment form explaining exactly what areas and what material must be cleaned up.","However, these tests usually require a chemical extraction process and are therefore not amenable to FDA \ufb01eld examination procedures.","Subject to these limitations, this analysis suggests that local lead laws are diverse but that most of the laws rely on a finite set of tools and approaches.","Such additional information in such form as the Agency may require.","WHEAT CARLOAD SAMPLINGSAMPLING NORMALCARSCAUTION: WHEN USING A GRAIN PROBE, BE CAREFUL NOT TO CLOSE THE TRIER COMPARTMENT DOORS ON YOUR FINGERS.","Lead and Housing Rehab Compliance Specialist by phone to receive preliminary approval to proceed with the additional work.","All tax lots apportioned from such tax lots shall be deemed part of one contiguous development.","Subject to the limitations set forth in these Rules and applicable Laws, a Loan may be made in such amounts as may be required for all Project Activities.","The resulting number is the interval between the segments you will sample.","Apply by method best suited to the job conditions.","The ability to generalize these lessons is limited by the usual caveats about extrapolating from case studies.","Real Property Tax Law of the State of New York.","Single stream recycling does not include Styrofoam, food trash, trash liners, plastic bags, paper towels, napkins, tissues or broken glass.","AMI units and GEA SGA units.","Examines surveillance drug samples collected and shipped under current program directives.","All Certificates of Disposal that have been received by the facility during the calendar year.","Removal from the Program.","The cost of such transcript shall be borne by the housing company.","Landmarks Preservation Commission of the City of New York or any successor commission, agency or department thereto.","The required healthy children to be included in thestudy?","As a result of the atrocities performed in the name of science during the Holocaust, and other happenings in the World War II era, what is now known as The Nuremberg Code evolved.","If the Agency approves a Stipulation of Settlement, it shall have the full force and effect of an Order of the Agency.","HPD may review the performance of a managing agent at any time and may solicit comments from owners, tenants, and others relating to the performance of the managing agent.","Small or irregularly shaped surfaces.","Enclose a copy of the MSDS with the shipped sample.","Canaries were particularly susceptible to such gasses.","Investigation and decision on appeals shall not result in any discriminatory actions.","Wiping off shoes before entering the house.","Tenants may refuse stove knob covers by marking the appropriate box on this form.","HEPA filter is not necessarily properly sealed or designed so that all of the intake air goes through the HEPA filter.","Bannon testified that once the Unreported Opinion information from the computer was transferred to Brian Rooney, the data manager, Dr.","Is it illegal to refuse to rent to families with children?","As we haveindicated, institutions and institutionalvolunteers in a wide variety of communities.","Limit upon the initial sale of such unit.","If HPD determines that the proposed group has been duly constituted, it will advise the housing company in writing of its decision to recognize the group.","For inspections focusing on the presence of Salmonellae, such as firms producing peanut products and other dry product environments, food contact surfaces are normally not sampled unless specifically requested in the assignment or CP.","We conclude that Dr.","If utility services are required to be removed, relocated, or abandoned, before proceeding with selective demolition provide temporary utilities that bypass area of selective demolition and that maintain continuity of service to other parts of building.","There is authority in our American jurisdiction that nontherapeutic operations can be legally permitted on a minor as long as the parents or other guardians consent to the procedure.","Yet, it is important to recognize that, even before consent becomes an issue, the scientific merits and the acceptability of risks need to be appraised.","HPD in writing in advance as to the cause of such absence, the date upon which he or she can return, and include any supporting documentation, which is subject to approval by HPD.","Blocking the recessed portion will not be permitted.","The managing agent shall verify the documentation submitted, and if the interim change in income is so determined, shall reduce, eliminate or defer collection of surcharges for a reasonable period of time or shall arrange for an extended payment plan.","EPA will monitor the use of all Logos.","Office of Housing Management and Sales, transfers of Jurisdiction over a Site from one City agency to another, or licenses.","The Court: To see which abatement they could use most cheaply?","The nominal pipe diameter and the pipe wall thickness shall be as shown in the Plans or Standard Plans.","HPD may waive the penalty for projects receiving substantial governmental assistance.","Notwithstanding the foregoing, the obligation to pay prevailing wages cannot be reduced or discharged through the provision of bona fide fringe benefits that cost more than the prevailing supplement rate in the Comptroller Schedule.","Do not pay for Post Seizure Samples or any samples collected of a lot reconditioned under a Consent Decree.","To be considered minor repair and maintenance, the renovation must not disrupt more than sixsquare feet of painted surfaces per room.","This is not the value to be used for seizure bond purposes; however, it may be used by the district to evaluate whether seizure is an appropriate action.","Failure to comply with regulations.","Network PCB Transformers with higher secondary voltages which are removed from service in accordance with this requirement must either be reclassified to PCB Contaminated or non PCB status, placed into storage for disposal, or disposed.","CE techniques are typically capable of sanitizing media very quickly and could supportpartial sanitization, a technique where a subset of storage media is sanitization.","The notice will be in Spanish and English and such other language as the Department deems necessary.","New construction: Final Certificate of Eligibility.","When multiple units are collected, all or at least a portion should be labeled as subsamples.","Before the tenant moves in or before an annual contract is renewed, all defective surfaces must be corrected by trained workers or workers supervised by a certified supervisor or contractor.","Your sample collection should be suf\ufb01cient to document the extent of the violative conditions and not be limited to this minimum.","Research shows that children with elevated blood lead levels are seven times more likely to drop out of school and twice as likely to lose a few years in language acquisition.","Use in hydraulic systems.","Dust mop, damp mop daily.","Trials of War Criminals Before Nuremberg Military Tribunals Under Control Council Law No.","This study isintendeds of the repairs and is not intended to replace theregular medical care your family obtains.","The CONTRACTOR shall submit an approved Statement of Intent to Pay Prevailing Wages from the Department of Labor and Industries before beginning to provide services under this CONTRACT.","Check each stud panel with a weight and line to find out whether there is any obstruction.","The Maximum CRC contained in this column is available to multiple dwellings, Buildings or structures that are owned as a Cooperative or Condominium and that have an average assessed value of less than thirty thousand dollars per dwelling unit.","Be sure to name the shipper and consignee if known.","Where and at such time as the Agency deems it to be necessary or desirable, a Sponsor may be selected for a Project via an application process.","The Contractor shall supply construction cores with two master keys.","There shall be no contractual relationship between the City and any subcontractor.","Risk assessments are conducted to determine whether lead hazards are present in a home, while clearance tests are performed after lead hazard work is completed to ensure cleanup was done properly.","The initial compositing area has the same center as this square and sides one half a grid interval more distant from the center than the square.","Use a random number table or random number generator to select a pair of coordinates that will locate the sample within the area to be sampled.","Do not enter any data in this form if the sample is being delivered to a FACTS lab.","Contracts for building services, repairs, replacements, redecorating or improvements and supplies shall be let on the basis of lowest cost compatible with quality of performance, material and workmanship.","Closures: Provide closures at ridges, fabricated of same metal as metal roof panels.","For example, a firm hired to install an HVAC system after demolition of painted surfaces has taken place may find that to complete the job painted surfaces need to be disturbed.","Individuals not eligible for employment in the United States will not be licensed.","Subchapter A: Tripartite General Order No.","The licensee shall not supervise asbestos abatement projects, which are larger than small scale, short duration or which have the sole purpose of removing ACBM, or act as a contractor.","Code, from the United States Internal Revenue Service, or any successor agency.","The owner shall fully complete such form and state whether he wishes to reject or accept the tenant applicant.","Texas and shall be approved in writing by the Chief of the Asbestos Programs Branch, Toxic Substances Control Division, prior to the start of abatement.","Filing with the Department of Finance.","This signed copy must be retained as a record for at least three years from the date the waste was accepted by the initial transporter.","Relocatee may request that such Standard Apartment be located in a particular borough, if available, provided, however, that a Relocatee may not refuse a Standard Apartment on the basis that it is not located in the preferred borough.","HRC presents to the aggrieved party written lieve that imminent harm to health or safety shall occur if such a stay is imposed.","Department and setting out any conditions relevant to the use of such container, including a list of compactor systems with which the container is compatible.","Anyiontiwitneo reiew ns byhe oher he appeal.","Conduit and fittings for PVC outerduct shall be manufactured with an ultraviolet inhibitor.","Pesticide sample sizes no longer differentiate between Surveillance and Compliance Samples.","Act is sought or in the case of exempt property, the record owner or lessee thereof.","If a significant number of defective beans or significant contamination is found during the examination of these six bags, continue the examination using the following schedule, which applies for both Import Field Examination and samples for laboratory analysis: LOT SIZE NO.","COUNSELAnd is this a document that you prepared based on the information that you reviewed in this case?","Inbe used and in return for limiting their tenantstopplying for and receiving grantsorls of abatement required by KKI for eachclass of home.","We disagreed with that determination.","Stamped metal shall not be applied until after existing plastered ceiling has been inspected and approved by an inspector of the Department of Buildings.","REQUIREMENTS FOR PUBLIC BUILDINGS.","Are there any ethical issues?","When PCB waste is removed from the storage facility during closure, the owner or operator becomes a generator of PCB waste subject to the generator requirements of subpart J of this part.","The Agency shall provide copies of such amendments to all recipients of the bid solicitation as set forth on the list of recipients.","HPD may grant waivers of occupancy standards for medical reasons.","Where the filing of a complaint leads to an inspection, the inspection shall include the unit which is the focus of the complaint and all common areas.","Construction Workers employed by the contractor or subcontractor and set forth the dates for all hours worked, the hourly wage and benefit rates, and the weekly gross and net pay amounts for each such Construction Worker.","All plastic or equivalent sheeting used during the performance of the work shall be of sufficient thickness and durability to prevent tearing during the performance of the work.","Finish grade shall adequately drain.","Then review the OSHA Quick Card below, or the separate NFPA guidance before responding.","Describe a specified plan to cure poor performance issues as reported in any of the following written communications: emails, unsatisfactory inspection reports, or deficiency letters.","Leachate collection systems shall be monitored monthly for quantity and physicochemical characteristics of leachate produced.","XRF tests fall within the inconclusive zone for the particular XRF machine or where the configuration of the surface or component to be tested is such that an XRF machine cannot accurately measure the lead content of such surface or component.","Mark Farfel to Barry Mankowitz, President of City Homes.","Dry Ice Caution: Dry ice is potentially dangerous and requires caution in handling and shipping.","Fees will be based upon the annual notification and any amendments.","PCB disposal facility approved under this part.","Please refer to the manufacturer to identify whether any reserved areas exist on the media and whether any tools are available to remove or sanitize them, if present.","If that time, another reevaluation should be that time, no further reevaluations are needed.","Asname of science during the Holocaust, andotheruremberg Code evolved.","Living room ___________ Do you use window air conditioners?","Specifically, the floor surface must be covered with taped down plastic sheeting or other impermeable material sixfeet the perimeter of the work surface, or a distance sufficient to contain the dust, whichever is greater.","Rhode Island General Laws, as amended.","The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.","Supply information concerning Federal, State and City housing program disaster loan programs and other Federal, State or City programs offering assistance to displaced persons.","Consider the use of a moistened artist brush to collect subsamples.","Such work shall be performed in the time period commencing with the vacancy of the unit and shall be completed prior to reoccupancy of such unit.","Philadelphia has a number of lead dust sampling technicians and companies who can conduct the tests needed for lead safe certifications.","Commissioner, or court order regarding lead hazards.","Department of Housing Preservation and Development of the City, or its designee.","The Agency may withdraw any bid solicitation in whole or in part at any time.","RULING THE CIRCUIT COURT FORBALTIMOREGRANTING IS VACATED AND CASEREMANDED WITH THIS OPINION; COSTS TO BE PAIDBY KKI.","Collect a DOC Sample for misbranding or labeling deficiencies.","The documentation shall also include the name and address of the test laboratory, the date of testing, the lot identification of the bolts and nuts, and coating thickness for galvanized bolts and nuts.","The fourth groupconsistedbut had since allegedly received acomplete abatement of lead dust.","These fees shall apply to all applications where the first Certificate of Eligibility, for such application, whether Preliminary or Final, is issued after the effective date of these rules.","The appropriate DSHS Regional or Local Program inspector should be contacted in the event of an emergency.","HPD and a copy to the housing company, and must arrange for the posting of a notice in each building of the development advising the other tenants of their intention to seek recognition.","As such, it has failed to satisfy its prima facie burden on this branch of its cross motion.","Note: If circumstances change, relocation may be required.","In closing, KKI argued that Dr.","Along with the omethoate on kohlrabi, Grower Jones has violative residues of omethoate on beets.","It is possible that this random selection procedure will result in selecting the same pile number more than once, even if seven or more piles are present.","Determination of spill boundaries in the absence of visible traces.","Identify contents of containers.","Target Data The information subject to a given process, typically including most or all information on a piece of storage media.","Guardrail Posts and Blocks, Signposts, Mileposts, Sawed Fence Posts, and Mailbox Posts, the material delivered to the project shall either bear a grade stamp on each piece or have a grading certificate as defined above.","Number and Location of Clearance Dust Samples for All Abatement Work.","Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.","RFP shall be made available to all potential Applicants prior to the submission deadline.","Departamento de Salud y Salud Mental de la Ciudad de Nueva York sobre el peligro de plomo en pintura.","Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.","Same material as Spec.","On all forgivable grant projects, all outlets located in a bathroom or kitchen that is placed with a GFCI outlet.","Specific other amounts which would ordinarily and customarily be incurred in connection with the construction of an eligible project.","Enter the Government Bill of Lading Number, if used.","Persons seeking to be licensed or accredited as asbestos inspectors shall successfully complete the approved training course as described in this subsection.","Using this framework, we conducted a comparative analysis of eight recently adopted local lead laws.","For example, Waybill No.","Allow cold water to run before drinking.","Liability Coverage: The insurer shall agree to ainst the City of Atlanta, its officials, employees, and volunteers for losses arising from the activities under this contract.","Lighting shall be sufficient to make the signs legible at all times.","Department may pay such additional sums as are necessary to obtain suitable shelter for the relocatee.","State, Territorial, Tribal, or local standard.","They should be kept clean.","Casetext are not a law firm and do not provide legal advice.","The fifth group consisted of modern houses, which had neverhadt.","When the displaced person does not move personal property and claims direct loss, he shall be required to make bonafide effort to sell it.","Conducts analyses ofcolor additive samples submitted to FDA for certification, assigns certification lot numbers to compliant lots, and denies certification to noncompliant lots.","The breach of obligations imposed on researchers by the Nuremberg Code, might well support actions sounding in negligence in cases such as those at issue here.","For applications received prior to the effective date of these Rules, the application fee shall be paid at the time of issuance of a Certificate of Eligibility.","They shall be examined for compliance with these rules and all other laws and regulations applicable to such installations.","Install weather tight and properly spaced to provide adequate cross ventilation under structure.","La interrupci\u00f3n en servicio se espera comenzar en ______________ y terminar en ______________.","NO COPIES of bid tabulations are sent to vendors.","Take digital color photos beforethe work begins, at each inspection, and for contested items.","The LST Dashboard is an interactive tool showing respective sample capacities by PAF and servicing lab.","Department of Buildings of the City of New York or any successor agency or department thereto.","In addition, divisionsare not being asked to unnecessarily extend inspections to include these results.","It is the intent of these rules to cover only general conditions and they are not designed to cover specific or special cases.","This paragraph applies only to containers of chemical substances or mixtures.","City and assigned to HPD for management.","Maintenance of monitoring records by persons who import, manufacture, process, distribute in commerce, or use chemicals containing inadvertently generated PCBs.","Upon a finding that emergency action is required to protect the public health, safety, or welfare, the Commissioner shall issue an appropriate summary order pending completion of administrative proceedings.","Any person may begin to use solvent validated in accordance with this subpart at the time results are submitted to EPA.","For the family participant side, we were looking for families thatobviously were willing to cooperate with the study by signing informed consentstatements.","If visible soil or residue is present, sample the surface by vigorously rubbing the swab over the designated area until the soil or residue is removed.","HPD if there has been a material breach of contract.","Study had ethical flaws and did not adequately protect its subjects.","States and the Federal Government.","Real Property Actions and Proceedings Law who is authorized by court order to aply to HPD for a certification and to DOB for building permits.","Are workers involved in a hazard communication program?","The address of the child care facility.","Must notifications for common area renovations always be provided to every unit in a multifamily housing complex?","Until the bare soil iscovered, parents should move play areas away from bare soil and away from the sides of the house.","Such resident employees shall not be shareholders, if such company is a mutual housing company.","Termination of Relocation Services: Refusal of Referral.","Suspension or revocation of any certification, privileges or database access issued pursuant to these regulations may be implemented in any circumstances of plemented in all other matters.","Preparation and signing of the clearance report.","Evidence of completion of Project closeout requirements.","Users of this guide should categorize the information to be disposed of, assess the nature of the medium on which it is recorded, assess the risk to confidentiality, and determine the future plans for the media.","Galbestos; sound deadening or other types of insulation; and felt or fabric products such as gaskets.","However, the CRC for such qualifying work shall be equal to the actual cost of the work.","KKI contemplated that some children in the tudy would be exposed to lead.","The certificates must be provided to the Department of Public Health.","And then on the right axis here on the Y, the vertical axis here, this is micrograms of per deciliter.","The above parties may be required to submit to oral examination under oath.","LICENSURE: ASBESTOS CONSULTANT AGENCY Scope: Asbestos consultant agency licenses.","Additional ITS and Communication equipment as described in the Contract Plans and the ITS section of the Contract Special Provisions.","DHCR rules and regulations; whether rent stabilization will be applicable; prospective changes in ownership and any other relevant information regarding future plans for the rental housing company affecting the tenants.","If the shipper is not the operator of the establishment, he must \ufb01rst obtain from the owner a written agreement signed by the operator.","All personnel must exit the containment area through the shower before entering the clean room.","Any finding and waiver under this paragraph will be stated in writing and included as part of the approval.","Nails in exposed work shall be set and filled.","One door opening, readily visible from the street, may, at the discretion of the owner, be sealed with a door.","KKI did not collect rent, was not responsible for making necessary repairs for the property, and did not solicit prospective tenants for the property.","Work practices shall include the following requirements.","WSDOT adopted edition of the Manual on Uniform Traffic Control Devices for Streets and Highways.","FISH AND SELLFISH PUCTSNOTE: THIS SAMPLE SIZE FURNISES SUFFICIENTFISH FOR HEAVY METAL ANALYSIS.","In opposition, the Hovnanians contend that GMS negligently performed its work under the contract.","It may well be thatintermine that no damages have been incurred in the instantcases In that regard, we note that there aresubstantialins and in the Grimes cases.","Prior to the termination of Relocation Services, HPD will give the Relocatee notice of the intended termination and an opportunity to be heard, according to the procedures stated in these Rules.","For contracts subject to HPD approval, such certificates must be submitted to HPD for its written approval before any such contract is executed by the housing company.","Marks shall be replaced when worn or illegible.","Thus, there can be a conflict between the need to test hypothesesand the requirement to respect and protect individuals who participate inresearch.","Notwithstanding any provision of these rules to the contrary, HPD may grant a waiver or exemption at any point following the submission of an application therefor.","The initial system requirements should include hardware and software specifications as well as interconnections and data flow documents that will assist the system owner in identifying the types of media used in the system.","Minimum Average Hourly Wage Act.","Butterfly valves shall be suitable for direct burial.","HPD responsible for the operation of an individual DAMP Program or his or her designee.","Seepage port size and shape may vary per manufacturer.","Bioresearch Monitoring sample collections.","The access tubes shall be fitted with watertight threaded PVC caps on the bottom, and shall be fitted with watertight PVC caps, secured in position by means as approved by the Engineer, on the top.","Gardening Group of any programs, activities and events in, and existing features of, the Garden.","This information will be reviewed for each material by color and roadway surface to determine compliance with this Specification.","Netting if present shall be made of natural plant fibers unaltered by synthetic materials.","Program for the development of affordable housing.","Industrial buildings are not generally or typically accessible to other than workers.","Supervision by the Department.","What are the total rehabilitation hard costs to this project?","All bolts, nuts, and direct tension indicators shall be marked and identified as required in the pertinent Specifications.","Window replacement typically disturbs paint on both the interior and exterior of a building.","The total quantity of beans taken from each bag must be the same, since both wharf and laboratory examinations are to be performed on a composite sample of all beans collected.","XXShampoo and hot water extract all carpeted floors XJanitor Closets, Storage, etc.","HPD Division of Housing Supervision.","Until a new standardized label is issued, investigators need to use the street address of the receiving laboratory or office.","Describe process for assuring quality performance of requirements contract.","PCB waste generation owned or operated by the person who generates PCB waste.","Department which shall certify that plans have been submitted to and approved by the Department of Buildings.","Mounting shall be as noted in the Contract.","On a random basis, homes will receive one of two levels of repair.","Upon issuance of the Certificate of Eligibility, the calculation and implementation of the tax exemption are under the jurisdiction of the Department of Finance.","Any bill, statement or notice must be in writing.","Attribution would, however, be appreciated by NIST.","Each Project must comply with all statutory and regulatory requirements with respect to the use of such funds, which requirements shall supersede Project requirements in the event of any conflict or inconsistency.","No punching, drilling, cutting, or welding will be permitted after galvanizing unless authorized by the Engineer.","Bureau of Housing Director.","One from an interior window sill, if present.","If you are unable to find an accredited refresher course in your discipline, you may take an accredited initial course in your discipline.","Affidavit of Jennifer Schork, NYSCEF Doc.","CHFA would require testing of all suspect materials within the property to provide the most accurate cost estimate.","Each application, together with income and occupancy information and other data as hereinafter specified, shall be investigated by the housing company at the time an apartment is offered to determine the eligibility of the applicant.","The RRP Program rule only applies to persons who perform renovations for compensation.","Such inspections shall be for the purpose of inspecting the condition and maintenance of the building, including its utilities, fixtures and equipment.","Any persons owning, operating or managing such multiple dwelling, during or after rehabilitation, shall comply with the laws under which a loan is made and the Rules and Regulations now or hereafter adopted by the Agency, including Equal Opportunity Regulations.","The agency may at any time allow applicants to make modifications or additions to their applications.","Owner for the cost of the Materials should the Materials be lost or damaged or stolen, regardless of exclusions in insurance policies required under this document.","Pipe segments are usually linear.","The record is therefore not extensive.","EPA protocol for The minimum clearance area includes the rooms in which work was done, the area outside each containment area, and each and from the work area.","Such notification shall include the date and place established by HPD for the public hearing on the application.","Plants that are grafted shall have roots of the same genus as the specified plant.","Stamped metal shall be No.","Common renovation activities like sanding, cutting, and demolition can also create hazardous lead dust.","HPD to the Taxpayer delivered after the Hearing or, if there is no Hearing, after the Comment Period stating the determination of the Assistant Commissioner regarding whether a Tax Benefit will be Revoked or will remain in effect.","This canbe kept to a minimum by pressing on the vein for a minute or so after the needle stick.","The law also requires owners who have been sent compliance orders by the city to obtain their own lead hazard clearances, thus reducing the cost to the municipality of implementation and leveraging an already existing pool of available private risk assessors.","What do I do?","Agency deems to be relevant.","Round off the number of centimeters in the length and the width measurements to the nearest centimeter.","Remove and dispose of both surfaces at the completion of the job.","Plywood shall be of A grade.","Evidence that claims have been settled.","RRP Rule if no one is compensated?","Finally, during ingress or egress from the vertical enclosure, a firm must take precaution to ensure that dust and debris on personnel, tools, and other items do not escape the work area.","These commands typically execute substantially faster than attempting to rewrite through the native read and write interface.","The Engineer may order or approve changes to asphalt binder content.","Provide the Housing Rehabilitation program with a written risk assessment report including the results of the testing and recommendations for lead paint hazard reduction.","If possible at the time of collection, provide the FACTS sample number to the firm and request that this number be placed on the billing invoice.","Occupancy by persons or families of low income.","As the technology approaches the superparamagnetic limit, or the limit at which magnetic state can be changed with existing media and recording approaches, additional new approaches and technologies will be necessary in order for storage vendors to produce higher capacity devices.","Normally, all fittings shall be the same material as the pipe being connected, except that fittings using other materials or constructed with more than one material may be used subject to the approval of the Engineer.","Whenever amendments the referenced codes and standards, each reference to said code and standard shall be considered to reference the amendments as well.","Relocatee accepts an apartment.","Unreported Opinion So basically coming way down, slightrebound after they move back in, and then a longterm sustained reduction.","Renovations covered by the rule must be performed or directed by a Certified Renovator.","Department of Environmental Conservation.","Do not use wet ice to ship the sample to the lab.","The Contractor shall be responsible for refiles of hand soap dispensers for the entire contract term.","Year Benefit Property that is operated as a hotel shall be eligible for Extended Affordability Benefits.","English and Spanish, and shall either be posted in a common area of the Building and affixed to or placed under each apartment door of the Building, or mailed to every apartment in the Building, as determined by HPD.","All covers shall be interchangeable within the dimensions shown in the Standard Plans.","An invoice does not establish interstate commerce and thus federal jurisdiction.","While the choice might be made to neither Clear nor Purge embedded flash memory, it is important to recognize and accept the potential risk and continue to reevaluate the risk as the environment changes.","It may be necessary to rk more containers than sampled to assure proper identification of the lot.","All components shall have smooth, sharp cut edges.","The size, coating, metal, and protective treatment, if any, shall be as shown in the Plans or in the Specifications.","This sampling scheme also allows some sites to be characterized on the basis of composite samples.","Note: The detention without physical examination procedures provide for recommending detention based on a single violative pesticide finding.","Department shall prepare a written statement setting forth the reasons for the granting or the denial of such application.","Organizations should ensure that equipment operators are competent to perform sanitization functions.","The process to cancel proposed repairs is outlined in Procedures Manual.","Filth found on the exterior of containers, on pallets containing regulated product, or on the floor adjacent to lots of regulated product you are selectively sampling can be considered subsamples of that official sample.","UEFI interface as well as the remote management interface.","Department of Health, specifying the make and model shall be approved.","Any employee, applicant for employment, or prospective employee with information concerning any breach of these requirements may communicate such information to the City Manager who shall commence a prompt investigation of the alleged violation.","Fracture or cracks passing through the entire thickness of the concrete.","Whether to accept certification from another jurisdiction is up to the individual state or tribal area.","Leadbased paint free determinations by a certified inspector or risk assessor are valid for both the Real Estate Notification and Disclosure Ruleand the RRP Rule and they do not expire.","The Drawings aslisted in the Project Manual.","This will allow your CR to be linked to the complaint and viewed by the Consumer Complaint Coordinator and other visionand Center personnel.","Fittings shall be manufactured from the same resins and cell classification as the pipe unless specified otherwise in the Plans or Specifications.","When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.","Determine the hourly rate and keep track of time, labor, or machineryactually used.","In contrast, it is the question of whether such duty was breached in the two cases presented that is a factual determination to be made by the finder of fact after a trial on the merits on remand.","Such writing shall state the reasons for such waiver.","The loosening of the curb from the molds shall be carefully performed to avoid excessive shock and straining of the curb.","CSis riedhrouire prampe prparatiugh as as ifit e a ield ample.","Each access door shall have two pull plates.","MEDICATED ANIMAL FEEDS SAMPLING.","Department finds appropriate, including repayment of Emergency Repair Program expenditures.","Address where these transformers are located.","The device or devices for the intercommunication system installed hereunder shall be of a type and kind approved by the Department of Buildings or previously approved by the Board of Standards and Appeals.","The common benefit across all these approaches is assurance that the data is infeasible to recover using state of the art laboratory techniques.","At the Hearing, the Taxpayer will have an opportunity to present witnesses and other evidence regarding any Factual Issue specified in the Hearing Notice.","Each mixing facility or plant utilizing fly ash shall be equipped with a suitable means or device forobtaining a representative sample of the fly ash.","However, if there is an indication management expects payment, attempt to reach a clear understanding of the charges before proceeding.","The thickness of the lining shall be maintained to the ends of the pipe.","Certificate of Eligibility, so long as such Eligible Multiple Dwelling is used or held out for use for dwelling purposes, except as otherwise provided herein.","If these barriers are set up at a distance less than six feet from the perimeter of the work surface, must I still extend the containment on the floor beyond the vertical barrier to meet the sixfootrequirement?","Are property owners and maintenance staff trained and certified renovators?","This requirement shall be completed prior to commencing any licensed asbestos activity within the state.","Proper sample collection is the keystone of effective enforcement action.","Specifically, the court granted summary judgment on the intentional misrepresentation claim and not the negligent misrepresentation claim.","The actual action performed by an enhanced erase varies by vendor and model, and could include a variety of actions that have varying levels of effectiveness.","This is an option in lieu of other requirements.","HPD shall complete and sign a rent order, and shall mail such order to the Tenant with a copy to the Sponsor.","Lettering shall be legible and permanent under normal conditions of handling and storage.","Fluorescent light ballasts containing PCBs in the potting material.","The permissible standard for lead in shall be the acceptable level of dust for mitigation.","Spills that result in the direct contamination of sewers or sewage treatment systems.","The Agency shall promulgate by rule the amount of any fee provided for in these Rules.","Salaries, fees or other compensation to officers or directors.","Certificates of Insurance shall be completed on the ACCORD form only and shall be forwarded to the Community Services Department.","All determinations will be made on a case by case basis.","In the case of a Documentary Sample, sufficiently describe the article to identify what is sampled.","Select pseudorandom locations on the media each time the analysis tool is applied.","Agency may conduct periodic inspections of the work.","This is specific to the can manufacturer and can size collected in the sample.","Lead Paint Risk Assessor and, as applicable, Lead Paint Inspector Technician.","EPA through its regional offices, nor is this policy intended to interfere with ongoing litigation of enforcement actions which bring into issue PCB spills cleanup.","Any Determination Notice stating that a Tax Benefit will be Revoked shall specify the Revocation Date.","The invoice and grading certificate accompanying the order must be accurate and complete with the information listed above.","Justted to question as a result ofgeneticrimentation on a Pennsylvania citizen.","Install plumb and leveeconomical, existing doors shall requirements and properly fit opening.","Clean all surfaces that the failing samples represent.","Purge capabilities, but these capabilities are specific to the hardware and firmware of the device and should be applied with caution.","However, if information were available showing that both residues resulted from the same application of the pesticide or the residues were closely related in some other way, the beets might be considered as part of the kohlrabi episode.","Sheet Metal Flashing and Trim.","The Declaration, or, for that matter, the Nuremberg Code, have never been formally adopted by the relevant governmental entities, although the Nuremberg Code was intended to apply universally.","If you need additional space, continue the description in remarks.","First, all polyethylene sheeting shall be sprayed with water mist and swept prior to removal.","Under hand wash or eyewash stations if appearance of leaks, cracks, etc.","Protection of mortgage lien.","RRP rule apply to contractors working on homes damaged by a hurricane or other natural disaster?","Place the pellets in a vial or other rigid container to prevent crushing.","Did you see that?","Notes: Preparatory steps for Destruction, such as removing the tape from the reel or cassette prior to Destruction, are unnecessary.","Concrete: Demolish in sections.","However, EPA expects that decontamination will be achieved promptly in all cases and will consider promptness of completion in determining whether the responsible party made good faith efforts to clean up in accordance with this policy.","The violative status of these samples should be established by laboratory analysis.","Truck lines prepare Freight Bills at the origin of\ufb01ce and both origin and destination of\ufb01ces should have copies.","If violative, the Of\ufb01cial Sample provides a basis for administrative or legal action.","Couplers shall be furnished with all quick coupler valves unless otherwise specified.","CABConformity Assessment Body; A body that performs conformity assessment services and that can be the object of accreditation.","This is so even though Dr.","MATERIAL AVAILABILITY: Bidders must accept responsibility for verification of material availability, product schedules and other pertinent data prior to submission of bid and delivery time.","Where masonry is installeconcrete grade beam with the prclean condition.","EPArecognized lead test kit or paint chip sampling determines that the components that will be affected by a renovation are free of leadbased paint, can a firm that does not have RRP certification do the actual renovation work?","Act, a Temporary Certificate of Occupancy issued by the Department of Buildings for all of the dwelling units in an Eligible Multiple Dwelling for which benefits pursuant to the Act are sought.","HPD and he or she has executed an occupancy agreement or lease.","During the course of the experiment the human subject should be at liberty to bring the experiment to an end if he has reached the physical or mental state where continuation of the experiment seemed to him to be impossible.","Relocation of occupants was required and the following activities occurred for occupant protection: Occupants were not permitted to enter the worksite during hazard reduction activities.","Income verification during occupancy.","The Agency may impose such eligibility criteria for bidders in the bid solicitation as the Agency deems necessary or desirable to ensure that only responsible bidders are selected.","Prohibition of retaliatory action.","Federal, State, Tribal or local government agency; or a nonprofit organization.","Law, HPD may replace any or all members of a Board of Directors by appointing persons who HPD in its sole discretion deems advisable, including officers or employees of HPD, as new directors to serve in the places of those removed.","ACBM removal but before the containment is removed to determine if the project has been properly conducted in accordance with the specifications and with applicable state and federal regulations and confirm that all ACBM has been properly removed, encapsulated, or maintained.","Departamento ha impuesto una violaci\u00f3n que requiere la correcci\u00f3n de un riesgo de al\u00e9rgenos en interiores en su apartamento.","All legal documents relating the transfer of title or otherwise relating to the Project shall require prior approval by the Law Department.","For AIHALAP, LLC purposes, a DOC can consist of PT, round robin, internal proficiency testing, or internal quality control results.","This unease and toallow us to profess simultaneous commitment to values that often conflict.","Term Mulch shall not be used in conjunction with permanent seeding.","Hazardous Communications as it pertains to the training, safety, and equipment needed for all employees engaged in custodial service.","Iny judgment, this Court must considerthe plaintiffs.","Article Containers, and the total number of PCB Containers in storage at the facility at the beginning of the calendar year, received or generated at the facility, transferred to another facility, or disposed of at the facility during the calendar year.","COMPLIANCE: POLICY OF THE TEXAS DEPARTMENT OF HEALTH.","Multiple Dwelling Law shall be so painted that the entire wall or ceiling is of a uniform color.","City shall operate as a waiver of any portion of the contract, or any right to damage therein provided.","In such a case, the user should follow the State instructions for completing the waste code fields.","The Contractor shall provide the Engineer with certified test results from the abrasive blast media manufacturer showing that the abrasive blast material meets the Military Specification.","If the application has been rejected, HPD will notify the president of the Tenant Association of such rejection and the reason therefor by regular mail.","The other responsibilities in the remainder of this section are for illustrative purposes and the intent is to ensure that organizations think through the different responsibilities for sanitizing media and assign those responsibilities appropriately.","This method of sampling also assures that you are not contaminating what remains in the container from which you sample.","Regional Administrator in the Region where the activity would take place, for decontamination activity occurring in a single EPA Region; or to the Director, Office of Resource Conservation and Recovery, for decontamination activity occurring in more than one EPA Region.","In a public building, licensing is also required.","In no event shall evidence of a sexual relationship between such persons be required or considered.","Valves shall be factory set to the flows as shown in the Plans.","Lease and occupancy agreements.","The Deed to Secure Debt shall be due and payable according to its terms upon any sale of the property secured by such Deed for the program.","This reporting of the CT DPH Lead Inspection and Testing Summary Firm will trigger the CT Department of Public Lead Poisoning Prevention and Control Regulations.","NOT use the product code of the covered product for environmental samples.","Availability of housing company records.","Neill asking him what this bizarre new construction was.","Affidavits from the consumer, retailer, and wholesaler should be obtained.","Most important, they do not dispute the lead level measurements cited in the lab reports.","Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidenceof such leaks, defects, or deterioration.","Order Rodentia, including but not limited to mice, Norway rats, and any other unwanted plant, animal or fungal life that is a pest because it is destructive, annoying or a nuisance.","They should not participate in activities that disturb old paint or in cleaning up paint debris after work is completed.","RRP Rule must test each and every component that will be affected in order to determine that the RRP Rule does not apply to a particular renovation.","All damaged, loose or rotted parts placed and the finished work shall match adjacent work in design and dimension.","Before wet sweeping occurs, the affected surfaces shall be sprayed with a fine mist of water to keep surface dust from becoming airborne.","PT samples may be obtained from an approved PT Provider or prepared internally as described in AIHALAP, LLC policies.","Buried couplings to connect ductile iron, gray cast iron, or PVC pipe shall be ductile iron.","Live stakes are cut from one to two year old wood.","The study protocol, the data collection protocol was to get close intimeasurements and the venous blood lead.","Specifications, the Plans, and the Special Provisions.","Article of the Annotated Code of Maryland which provides that persons who have engaged in certain prohibited activity may be disqualified, either by operation in law or after a hearing, from entering into contracts with the Mayor and Council of Rockville.","Accurately align roofingmembrane and maintain uniform side and end laps of minimum dimensions required by manufacturer.","Act, provided, however, that if an applicant applies for a Certificate of Eligibility for such benefits, he or she shall submit proof of completion of partial conversion with the application for such certificate.","Two flexible posts will be used for weatherometer testing.","The compliance by the issuer with any special or general standards of responsibility.","Letter of Completion for DIR.","Each batch of concrete shall be completely emptied from the mixer before placing more materials in it.","GENERAL REQUIREMENTSmounted doorstop, strike plate, lockset, and appropriate hinges.","To try and abate more properties in Baltimore City.","Collection of Environmental and Product Samples for Food Susceptible to Contamination with Pathogenic Microorganisms.","For any unencrypted areas, describe how sanitization is performed.","Should include line items for maintaining a lead safe work site.","When the sample is ready to be resealed the new seal must show the date it is applied.","EPA recommends that they not be removed from the work site during the job and that they be disposed of as part of final cleanup.","If you provide a copy of the affidavit to the affiant, you should keep the original affidavit since the original is an official FDA document.","Administrative Code and any successors thereto, shall be made in accordance with the Laws concerning such benefits.","MEK or another key.","Official seals may be used up to five years beyond the expiration date indicated by the manufacturer of the seal.","EDA, these rules, or applicable laws.","Designated housing for the elderly and the handicapped unless children reside or are expected to reside there; and Rental housing that has been inspected by a certified inspector and is found to be free of lebased paint.","The number of practical subsections depends on thedevice and addressing scheme.","The Commissioner shall prepare an appropriate media campaign to educate the public on lead poisoning prevention.","Electro fusion may be used for field closures, as necessary.","The pedestal shall have a completely removable locking faceplate to allow easy access to wiring.","EPA prior to engaging in PCB waste handling activities.","The Contractor shall furnish pipe of adequate thickness to withstand the forces exerted by the boring operation as well as those forces exerted by the earth during installation and shall Me a minimum of \u215cinch thick.","Me as noted in the Plans.","Any tax lien on a parcel so determined to be a Distressed Property shall not be included in such sale.","All fabrication shall be complete and ready for assembly before galvanizing.","Pillori asserts that any claims or cross claims against it sounding in negligence must be dismissed, because it was neither the person who made the decision to excavate nor the contractor who carried out the excavation work.","The managing agent must maintain supporting documentation for all agreements which shall be available for review by HPD.","This is cheating; it is a subterfuge designed to hide our unease and to allow us to profess simultaneous commitment to values that often conflict.","In short, most cases of lead hazard control will require that clearance dust sampling be conducted in every unit treated.","Cost of preparing the application for moving and related expenses.","Our study design called for collection of blood lead, venous blood lead from participating children.","Do children or pregnant women live in your home?","Respondent: appellant in this case did not get any benefit fromthe What the appellant had the benefit of in thisstudy.","Shannon could not, however, explain how wipe sampling itself was validated.","AMI unit or a GEA SGA unit is required to pay all or a portion of the utility costs with respect to such unit in addition to any payments of rent.","Fees and Declaratory Rulings.","Made of natural plant fiber unaltered by synthetic material.","Notes: For most cases where Purging is desired, USB removable media should be Destroyed.","New York City Charter and Administrative Code.","If the DAMP Lessee fails to submit a request for an interim rent increase, the DAMP Program Director may propose an increase in the rents in accordance with the provisions of these rules.","If you are unsure of the circumstancesunder whichto perform environmental sampling, consult with your supervisor.","Comprehensive form of policy is recommended for this coverage.","Describe any special circumstances.","Plastic vapor barriers will be placed over bare soil in crawl spaces.","Super Storm Sandy Disaster Recovery Programs.","When samples of narcotic or controlled drugs are collected, the complete DEA Registration Number must be entered on the RECEIPT FOR SAMPLES, given to the person from whom the samples were collected.","TSCA Toxic Substances Control Act Technical Manager The individual designated as the primary technical management for AIHA LAP, LLC accreditation purposes.","Agency, the owner may be required to enter into a regulatory agreement with regard to the management and operation of the building and the rents, profits, dividends or distribution of its property and as otherwise prescribed by the Agency.","The acceptance or processing of a loan application by the Department may not be construed to be a commitment for a loan.","RRPM activities, including the mandatory topics of instruction, the knowledge and performance standards that must be demonstrated by graduates in order to be certified or licensed, and required accreditation qualifications for training programs and instructors.","Notice of Project Commencement.","Every owner of a multiple dwelling is responsible for maintaining, in a clean and sanitary cpublic areas of the Dwelling Unit and Premises.","Relocatee must pay such rent, without interruption, to establish and maintain any such right to reoccupy the Former Apartment when repairs have been completed.","Live poles shall have no more than three branches which must be located at the top end of the pole and those branches shall be pruned back to the first bud from the main stem.","In no lodging house shall any person be allowed to sleep in a room in which there is a watercloset.","In lieu of the above method, completely remove all combustible materials from plaster face of partitions on hall side and repair existing plaster.","At least one of the consenting parents in one of these cases was on public assistance, and was described by her counsel as being a minority.","Other Sampling Official Samples Filth, Micro, etc.","Rutland Avenue was source of exposure to Cecil.","Johns Manville International, Inc.","Thesecharacteristicscan be used to drive the types of questions that media users should ask vendors, but ideally this information would be made readily available by vendors so that it can be easily retrieved by users to facilitate informedrisk basedsanitizationdecisions.","Early commencement of work by owner.","CD or DVD, but has a higher density and gives the option for data to be multilayered.","Porch repairs will be structurally sound, with smooth and even decking surfaces.","Maximum of one per apartment.","Please contact your servicing lab to determine an appropriate sampling container and sample size.","In opposition, the Hovnanians do not contest that they must supply plaintiffs with these reports.","TAP review and recommendation.","JG argues that the claim for contractual indemnification should be dismissed insofar as asserted against it.","Administrative Code of the City of New York, as amended.","The proposal must include all required forms, and such forms must be fully and properly completed and executed, at the time of submission.","Report all sample concentrations as ppm by weight on a dry weight basis.","The Contractor shall provide a list of feedstock sources bypercentage in the final compost product.","The remainder of the number will be assigned by FACTS.","General allegationss are not sufficient to forestall summary judgment.","Use a fresh glove for each sub and submit an unopened pair of gloves as a control.","Type K bands are used, pipe arch ends are not required to be recorrugated.","DELIVERY Time is of the essence.","The respondent shall have adequate technically qualified personnel employed within his organization to perform all phases of contract requirements.","Further, the RRP Rule only applies to renovations the modification of an existing structure that results in the disturbance of painted surfaces.","Application Deadline and will forward such list to the Administering Agent.","In every such room, etc.","Samples are often collected during the course of an establishment inspection or inspection of a vehicle.","Architect shall supply all required services, plans, specifications and filing with the Department of Buildings.","Architectural Barrier Removaems such as wheelchairs, rsonal assistance items.","It is the responsibility of each laboratory to identifyall reference standards and support equipment whose calibration has a significant impact on analytical uncertainty.","Theren jurisdiction that nontherapeuticoperationsted on a minor as long as the parents or otherguardians consent to the procedure.","The work practices for exterior projects are based on a performance standard the work area must be contained so that dust or debris does not leave the work area while the renovation is being performed.","Emergencies shall be documented to the extent that the need for the emergency is evident.","TRAINING Contractors will submit a list to the City of Atlanta of all individuals and subcontractors that will ting that each has completed a SUBCONTRACTORS Subcontractors shall be bound by the same terms and conditions as the general contractor, as applicable.","Some analysts contend that RB review tends to focus exclusively on consent requirements, rather than fully evaluating the merits of the research.","When in the OFF position, respective detector circuits will be disconnected.","These descriptions were sent to key informants in each case study city to check for accuracy and completeness.","Such notification may be, but shall not be required to be, in writing and may be in any form which the agency deems to be appropriate, including, but not limited to, a conditional designation letter.","Ambient; Frozen; Check this box if you collected the duplicate portion of food, drug or cosmetic to be held by FDA for release to the owner or person named on the label for their own analysis.","The HECP shall be manufactured in such a manner that, when agitated in slurry tanks with water, the fibers will become uniformly suspended, without clumping, to form a homogeneous slurry.","The need for immediate action relieves firms from the prerenovation education requirements.","The RRP Rule does not address the responsibilities of other entities.","City or with a DAMP Lessee.","The paint shall be supplied as two components that are mixed together just prior to use.","Sometimes this information may be considered sensitive.","Where the agency deems it to be necessary or desirable, a community group may be selected to receive syndication funds without any competitive process.","Temporary Reseal the sample whenever you break the of\ufb01cial seal.","Sample lots to be examined by using either the Single or Sequential Sampling Plan depending on whether examination is made at the DO Lab or at the dock.","ASSISTANCE CATEGORIES A project may be determined infeasible if the cost to complete all needed repairs exceed the respective program limits outlined below.","Section I and II may be executed together on one sheet.","Be capable of simultaneously activating all pixels for the purpose of pixel diagnostics.","RRP rule apply to simple painting activities that occur when rental properties turn over?","AIHAPAT Program, LLC proficiency testing program for industrial hygiene laboratories.","The plastic reflectors face shall be colorless and be entirely smooth to present a water repellent and dirt resistant surface.","TERMINATION FOR CONVENIENCE This Contract may be terminated, in whole or in part, upon written notice to the Contractor when the City determines that such termination is in its best interest.","PCB concentration applies to the entire cleanup site.","Must be trained in accordance with OSHA Hazard Communication Standard.","Inspection, testing, and correction records must be maintained for three years and made available to the city on request.","Corrugations on the bands shall be the same size and shape as those on the pipe to be connected.","Further research into evaluation models and practices as implementation of these laws progresses might be valuable.","See the Recertification Fact Sheetfor further information.","The agency may negotiate and execute an EDA on terms other than those set forth in the RFP.","The markers shall be precast in the form of a single based spheroidal segment terminating in a rounded or squared shoulder.","Conducts analyses of foodsand cosmetics for color additive contentwhen specialskills and expertise are not available in the field.","Charter, during the period of such suspension or debarment.","Apply the ATA sanitize command, if supported.","Tenant may request, in writing, a proportionate rent reduction for such loss, provided, however, that such reduction shall only be for the period until the area involved has been restored to the Tenant.","HPD to select a Building for the Program.","Yes No Are you the Tenant?","Concrete with water from mixer washout operations shall not be used in bridge roadway deck slabs, flat slab bridge superstructures, modified concrete overlays, or prestressed concrete.","Local, minority, female owned, and small businesses are encouraged to submit proposals.","The sheeting surface shall be readily processed and compatible with transparent and opaque process colors and show no loss of the color coat with normal handling, cutting, and application.","Performing all work in an acceptable and professional manner.","The grading certificate and grade markings shall not constitute final acceptance of the material.","The center of the initial compositing area and each of the subsequent compositing areas is the origin of the grid axes.","CHFA funded projects shall ensure that properly credentialed Environmental Firms and individuals are used for lead consulting and lead abatement activities.","LED light strips shall be provided for cabinet lighting, powered from the Equipment breaker on the Power Distribution Assembly.","SUBSTRATE DECKxisting ensure the substrate is in good condition prior to installation of new metal.","He also committed to working with the thousands of dedicated public servants at EPA who have devoted their careers to helping realizethis shared vision, while faithfully administering environmental laws.","Such housing accommodations shall be operated in compliance with such requirements of such Law until the Expiration Date or for such longer period as may be specified by Law.","Requirements for decontaminating spills in outdoor electrical substations.","Posts and blocks shall be of the size, length, and type as shown in the Plans and shall meet the requirements of the below Specifications.","HDC will submit the executed agreement to HUD for approval.","What is the purpose of the law?","Landlord has performed Minor Repair and Maintenance at the property.","The burden falls on the user to accurately determine the media type and apply the associated sanitization procedure.","Dust has been contained to the work area.","Many inks will penetrate to the product and act as a contaminant, interfering with the analysis.","Site preparation costs may include, but are not limited to, costs expended to demolish structures.","The Contractor is obligated to renew the contract at the same terms and conditions for each optional year if County exercises its option to renew the contract.","Useful life of the rehabilitation or improvement.","Must each store be a separate certified firm?","It is not intended that these rules and regulations in themselves require plans to be filed.","Price increases for renewals are not authorized unless approved in writing by the County.","The research experiments that follow were also prior instances of research subjects being intentionally exposed to infectious or poisonous substances in the name of scientific research.","Such application shall also include a copy of the certificate of training of the person who performed such testing.","The closure cost estimate may not incorporate any salvage value that may be realized with the sale of wastes, facility structures or equipment, land, or other assets associated with the facility at the time of closure.","Thet: First of all, he found that there was no contract.","With respect to the occupants, the researchers recruited families that had at least one small child.","It is clear from the wording of the applicable federal regulations that this requirement of informed consent continues during the duration of the research study and applies to new or changing risks.","Compliance with the applicable section.","The main breaker on the SPA shall be provided with a cover to prevent accidental tripping.","KKI argues that the Maryland clearance levels for lead concentration in dust are based solely on the dust wipe collection technique and not the Cyclone vacuum testing.","The City and the Agency shall not be obligated to pay, nor shall they in fact pay, any costs or losses incurred by any Applicant at any time, including, but not limited to, the cost of responding to the RFP.","Collect a standard wipe test sample in the sixth half.","The Agency may charge a fee, in an amount to be determined by the Agency, for a copy of the RFP.","Invoices covering transit shipments usually are not available.","Included in the diagram shall be an intersection sketch identifying all heads, detectors, and push buttons and a phase diagram.","Property managers are acting in the capacity of agents for the building owners.","Shampoo and hot water extract carpet in entire building once annually.","If deteriorated paint and visible dust, debris, paint chips or residue are present, they must be eliminated prior to the continuation of the clearance examination.","Agency to perform such selection.","Muchon consent for the participation of his or her minor child in a medical study.","Policystiation of Uncetanty Meaent in ironmental tiin prehis policy document.","If the department suspends a license on an emergency basis, the suspension is effective immediately.","The LST Dashboard can be used to identify all servicing labs with current available capacity for a selected PAF.","All windows that are intended to open must be able to be opened during the visual inspection.","Department of Buildings against the premises.","Maximum annual and aggregate abatement.","County and its assigns.","Approval of a fee schedule different than outlined below is only authorized by the Bureau her designee, or the implementing agency.","DHCR shall contain escalation clauses for real estate taxes or any other provisions for increasing the rent set forth in the lease, other than permitting an increase in rent pursuant to an order of DHCR or the Rent Guidelines Board.","Occupied Rehabilitation Program Policy Appendices Appendix B LEAD HAZARD REDUCTION ACTIVITIEI.","Federal Street property to the research study.","Salmonellosis outbreaks have been associated with a variety of foods, including raw seafood, fresh produce, egg products, cake mixes, unpasteurized milk, peanut butter, chocolate and salad dressings.","HEPA vacuuming is best.","When human subjects are used in scientific research, the rights of the human subjects are afforded the protection of the courts when such subjects seek redress for any wrongs committed.","Hand painted numbers are not permitted.","Any plumbing device or fixture, domestically produced or imported, that contains any amount of lead and is in contact with the water is a potential source of contamination.","All treads must be set level and must not overhang so as to interfere with foot room on the tread below.","No such contract or agreement shall exist, and no such rights shall be created, until the City and the Sponsor enter into a Binding Agreement.","The information distribution requirements do not apply to emergency renovations.","The posts shall have sufficient strength and durability to support the fence through the life of the project.","The permitted lawful occupancy for sleeping purposes of each room in this apartment is as follows: Room No.","Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when approved Change Orders or Construction Change Directives result in a change in the Contract Sum.","Measure individual congener PCBs based on a comparison with individual PCB congener standards.","Effective date of exemption.","Melting A physically Destructive method of sanitizing media; to be changed from a solid to a liquid state generally by the application of heat.","Department for review, examination or audit.","So long as every sample collected at a grid point is analyzed as either an individual sample or as part of a composite sample, there are no other restrictions on how many samples are analyzed.","Compensated Development on a development site on which such Assisted Affordable Units are located where such development site includes two or more zoning lots that were reviewed and approved as a single unit pursuant to the Zoning Resolution.","The peepholes must be so located as to enable a person in such housing unit to view from the inside of the entrance door any person immediately outside.","EPA encourages authorized state and tribal programs to accept certifications issued under the Federal program and under other state and tribal programs, but this is not required.","Title Companies on LSHR Sample Letter to Lenders, Realtors and Title Companies To better protect young children from the dangers of lead based paint in their homes, the Department of Housing and Urban Development issues the Lead Safe Housing Rule.","An Authorized Certifier shall protect such user ID and password to ensure against unauthorized use.","Gravel base material retained on a No.","Category IThis includes all foods that would normally be in Category II except that they are intended for consumption by the aged, the infirm, and infants.","Epoxy Coating Facilities, this information will be available to the Fabrication Inspector upon request.","Administrator for Programs and Policies, the Comptroller, and the General Counsel; and in the case of loans processed by the Office of Special Improvements consisting also of the Office of Rent and Housing Maintenance and the Deputy Commissioner of such Office.","The valves shall be factory set as shown in the Plans.","Provide the name of the building or an identifying description.","If the cans are moderately swollen or worse you should ship the sample with ice packs.","Department and has a current license issued by the Department to conduct inspections.","If applicable, the date the PCB Article is scheduled for repair or servicing.","Each seal will show the history of the date it was applied and broken.","Send device and GWQAP device samples for physical and engineering analysis to WEAC.","Charges begin when the Contractor arrives at each job site and end when the Contractor leaves the job site.","If there is still uncertainty, EPA recommends that renovators err on the side of caution and be prepared to contain any dust and debris.","The Commissioner of the Department of Housing Preservation and Development shall coordinate all relocation activities with project work, and other planned or proposed governmental actions in the community or nearby areas which may affect the carrying out of relocation assistance programs.","The consenting parents in the contested cases at bar were not the subjects of the experiment; the children were.","Include total cost and proportionate share of general overhead and profit for each item.","Such Tenants Association shall provide a copy of the retainer agreement or agreements to the housing company and to HPD prior to submission of the professional report or reports pursuant to paragraph four of this subdivision.","WHY WE HAVE A HOME IMPROVEMENT PROGRAMWe created a Home Improvement Program by Our Program.","Protection Mat: Woven or nonwoven polypropylene, polyolefin, or polyester fabric mat, water permeable and resistant to ultraviolet degradation, type and weight as recommended by roofingsystem manufacturer for application.","AWARD: Award will be made to the lowest responsive and responsible bidder complying with all provisions of the Invitation for Bid, provided the bid price is reasonable and in the best interest of the City to accept.","In instances with smaller firms that have short production periods, swabbing should be conducted during the mid to tail end of their production schedule.","Where dumbwaiter service is provided all garbage, rubbish, refuse and other waste matter in the building shall be collected at least once daily and deposited in separate metal receptacles.","Nothing in these rules shall be deemed to prevent the agency from exercising such greater or additional rights, remedies, privileges, powers, and authority as shall be provided by law.","The copies of the Sweet Sugar Co.","Samples of PCB remediation waste used in the comparison study must meet the following three requirements.","Large masses of ingredients may cool or warm slowly enough to permit Improperly cleaned equipment may contaminate the product with bacteria.","The materials and methods used for lubricating the forms shall be such that they will not result in discoloration of the curb at any time.","It shall be the responsibility of the Contractor to purchase, supply, and replenish all necessary chemicals and supplies.","Shipments between divisionmay be shipped COD when the conditions cited above are met.","In the case of a mutual housing company development, applicants approved by the mutual housing company shall upon notification of such approval be required to pay the balance of the purchase price of the shares allocated to the apartment.","Such facts, recorded in writing and signed by the person who can testify in court to those facts, can be used either to establish federal jurisdiction or fix the responsibility for a violation.","In every instance before negligence can be predicated of a given act, back of the act must be sought and found a duty to the individual complaining, the observance of which duty would have averted or avoided the injury.","Mirrors shall be mounted and secured so that they cannot be readily removed by the public.","Approval from the appropriate official at EPA Headquarters may be effective in all ten EPA regions.","New York State Division of Housing and Community Renewal within fifteen months from the date of issuance of a Final Certificate of Eligibility if a cooperative or condominium plan has not been declared effective by that time.","Follow DOT and IATA guidelines when shipping or mailing samples with preservatives as stated under fumigants.","Fittings shall be factory welded, injection molded or PVC.","The owner of record of any building.","All stairs and steps shall have a rise height of not more then eight inches and a tread width of not less than nine inches.","Adequate provisions are made for soliciting the assent of children and the permission of their parents or guardians, as set forth in Sec.","Some of these supplies may retain impressions of data printed by the machine and therefore could pose a risk of data exposure, and should be handled accordingly.","Department of Housing Preservation and Development determine that any person occupying property immediately adjacent to the real property acquired is caused substantial economic injury because of the acquisition, he may offer such person relocation advisory services under such program.","Piling shall be cut above the butt swell and shall have a uniform taper from butt to tip.","Other express shipping companies, such as Federal Express, and United Parcel Always attempt to collect the original wrappings showing cancellation of origin of\ufb01ce and address sticker.","Conduct environmental surface sampling as directed by the work plan, compliance program or assignment, or based on inspectional observations.","All persons residing in other states, applying for any category of license, must comply with all licensing requirements which would be imposed on a Texas resident.","KKI also called Dr.","Acceptance will be based on testing of samples from each lot.","Without the encryption key used to encrypt the target data, the data is unrecoverable.","Note: Always collect a minimum of two retail units of each product.","Otherwise, they shall be properly disposed of as asbestos waste.","The quantity of low concentration PCB liquid burned in the boiler each month.","Detailed written description of the lead hazard reduction activity including the methods used.","TSI shall mean insulation applied to heating, ventilation or air conditioning systems, hot or cold domestic water systems for the purpose of preventing heat transfer or water condensation.","The operation of the storage facility will not pose an unreasonable risk of injury to health or the environment.","All work performed will be subject to inspections and approval by HNS prior to final disbursement of The Contractor shall: Furnish all materials, equipment, etc.","All horizontal surfaces, including, but not limited to floors, stairs, window sills and covered with a smooth, cleanable covering or coating, such as meta smooth flooring such as wood tile, linoleum and vinyl.","The interim controls are less expensive initially, but they may be more expensive in the long run since they need to be reevaluated and maintained more frequently.","Future rent increases may not exceed the increases established by the Rent Guidelines Board.","These fees will be determined at an inquest.","Food laboratories performing testing in this area may perform testing to detect pathogens in the material.","The relationship between health and housing agencies is particularly important.","Unless otherwise instructed, do not weigh leaking containers.","Advising the homeowner regarding city property standards, code requirements, and housing rehabilitation standards which may affect the prioritizing of work items.","If none of these furnish the sample size, consult with your supervisor or the laboratory.","Temporary facilities and other majorcost items that are not direct cost of actual workplace shallbe shown as separate line items in the Schedule of Values.","Control of exits and entrances shall be maintained.","EPA recognizes, however, that personal delivery will not always be a viable option, especially when a renovation needs to be commenced on short notice and an adult occupant of the apartment is not available.","Free transportation will be provided to and from the clinic.","Anchor bolts, anchor rods, nuts, and washers shall be inspected prior to shipping to the project site.","These signs must be posted in areas where they can be seen by the parents or guardians of the children.","Term Strength for Geosynthetic Reinforcement.","EPA has no such requirement.","All fabrication shall be completed prior to galvanizing.","If the DOC sample is collected to document a lot that has already been shipped, estimate the value, or obtain a figure from your documentation, which represents what was shipped.","Develops, optimizes, and validates methods for recovery, detection, identification, and quantitation of pathogens and toxins from foods and cosmetics, and the processing environment.","The total limit of insurance must be equal to or greater than the minimum acceptable limits indicated below.","The individual SCMs composing the blended SCM shall be individually listed on the WSDOT Qualified Products List.","The potential effectiveness of this provision is amplified by the fact that Illinois state law requires most children in Chicago to have their blood tested for lead.","To control shrinkage, an inert filler may be used in the resin provided the specified viscosity requirements are met.","Clearance testing showed clearance was achieved.","These eight grid points must be adjacent to one another in the subsequent compositing area, but need not be collinear.","When material is being produced and stockpiled for use on a specific contract or for a future contract, the uncompacted void content, fracture, and sand equivalent requirements shall apply at the time of stockpiling.","Additional Requirements The Contractor shall provide service in accordance with County ordinances and other applicable laws and regulations.","Does it matter if children live in other apartments in the building?","The locking mechanism shall provide a tapered bolt.","Place goggles and respirator in clean carrying bag.","Determination of Ineligibility for Benefits.","Community Renewal, as shall be determined by said Commissioner to be appropriate; provided, however, that if a tenant fails to accept any such offer of restoration of possession, such unit shall return to rent stabilization at the previously regulated rent.","If tape is used, measure thewidth and length of the sample area.","Consequently, the city issues a compliance notice requiring the owner to obtain a lead clearance by a certified risk assessor.","Listing the Homeownership Affordable Housing Unit.","Hearing Procedures; Conduct of Hearing.","All other applications shall be subject to the fees defined by the rules in effect immediately prior to promulgation of these rules.","Recipient, __________________________, certifies, by submission of this document, that neither it nor its representatives is presently disbarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency.","Documentation of tester qualifications and equipment verification records shall be maintained and available for review by the Contracting Agency upon request.","It received funding for developing and conducting the research.","Because these homeswere Kennedy went in there and improved the home and in this casethe home was improved so that it was below clearance standard.","The fracture requirement shall be at least one fractured face and will apply to the combined aggregate retained on the No.","Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when Owner took possession of and assumed responsibility for corresponding elements of the Work.","Multiple passes or more complex values mayalternatively be used.","Final Selection, HPD shall notify such Tenants that the Project has commenced.","One type of line post shall be used throughout the project.","EPA and HUD guidance.","Spills that contaminate animal grazing lands.","The project would be able to assess whether a particular level of partial abatement caused a to be elevated beyond a level deemed hazardous to the health ofchildren.","Sediments in marine and freshwater ecosystems.","BRM Sampler used in the present case, and the ASTM standard.","Multiple Dwelling Law shall be deemed a Class A multiple dwelling.","This was the only time ERI or paid for any lead remediation work during the tenancy at issue.","Gross Annual Income, includes but is not limited to childpensions, income from annuities, interest income on savings, etc.","Where suspension requires an AAB vote.","The Inspector may accept a mill test report certifying that the steel used in fabricating the rail element meets the requirements of the Specifications.","If corrosion control treatment is not effective in reducing lead levels, your water system may replace lead service lines that connect some households in your community to water mains.","If a general contractor is not engaged, the owner shall enter into a written construction contract with each subcontractor.","These problems make us squirm a little, just as they did Mill.","Expansion fittings for rigid galvanized steel conduit shall have an external tinned copper bonding jumper or an internal tinned copper bonding jumper.","NEW YORK: The area bounded by Jamaica Avenue; Elderts Lane; Atlantic Avenue; Fountain Avenue; New Lots Avenue; and Sheffield Avenue.","The device shall enable the sample to be readily taken in proximity to the ground granulated blast furnace slag weigh hopper and from a container or conveyor holding only ground granulated blast furnace slag.","For other large nearly flat surfaces, sample all of the one meter square areas.","The sign display shall be covered by a stable, impact resistant polycarbonate face.","The hearing officer shall have the power to administer oaths and shall have no prior personal knowledge of the particular facts concerning the denial of benefits or the claim to be reviewed.","The Tenant shall not mortgage or place or cause to be placed, any liens or encumbrances upon or affecting the fee title or any interest in the apartment or building.","Those performing the work must not know exactly where the clearance samples will be collected.","Adequate coverage shall be maintained for any materials which are stored away for the development site.","Failure of more than four of these samples shall be cause for rejection of the lot.","Collect the first sample at the randomly selected time in minutes after start up of the waste output, or if the waste is currently being generated, after the random time is selected.","Any deviation from the above requires prior written approval of HPD.","Rent Supplement and Capital Grant Assistance.","It was a practiceinbsurface miners to rely on canaries to determinewhethervels of toxic gasses were accumulating in the mines.","HHS refers to the Department of Health and Human Services.","These cases should be remanded for further proceedings.","Disposal as daily landfill cover or roadbed.","Me uniformly graded up to a maximum size of \u215cinch and shall contain sufficient fine fractions to permit securing the type of surface finish specified herein.","Tenants Association pursuant to this subdivision to review a particular rent increase application submitted by a housing company pursuant to this section.","The housing company or its duly authorized representative shall meet on a regular basis with representatives of a Tenants Association to discuss matters relating to the development.","Topsoil Type ACompliance with the applicable section.","HPD shall at its discretion conduct audits and reviews of housing company financial operations.","Any surcharge or any other fees and charges owing to the housing company shall be deducted from the equity due the cooperator.","Existing Appliances in Ineligible Locations.","General Considerations for all Affidavits.","DOB during such period which complies with such conditions, if any.","Your training and experience will enable you to become pro\ufb01cient in most sampling operations.","The end user cannot turn off the encryption capabilitieswhichensures that all data in the designated areas areencrypted.","Each gate shall be provided with two upright braces of the same material as the frame, spaced at \u2153points in the gate.","Study, and, as Dr.","The second criterion above is intended to exclude rental property.","Kenner during the current term and past term, and that he has not made any contributions to or in support of elected officials of the City of Kenner through or in the name of another person, either directly or indirectly.","The certificate must include the signature of the instructor and the signature of the course director, principal officer, owner, or CEO.","In other words, the work area is defined by the containment measures established by the certified renovator.","Media control may be transferred when media are returned from a leasing agreement or are being donated or resold to be reused outside the organization.","Thus, itreasonablyor the children to leave theexperiment prior to its conclusion.","Racketeer Influenced and Corrupt Organization act, or the Mail Fraud Act, for acts in connection with the submission of bids or proposals for a public or private contract.","Office of Tax Incentive Programs of the New York City Department of Housing Preservation and Development or any successor thereto.","It shall be the duty of the keeper, agent, or owner of every lodging house to immediately report to the Department of Health the occurence of any illness in such house.","Both internal and external waiting lists must be posted in a format prescribed by HPD in the management office, or, if there is no management office, in the lobby of each building of the housing company development.","If a local clearance standard exists and is more stringent than the State standard, use the local standard.","The following terms used in this section shall have the meaning stated below.","After the salt spray test and exposure to ultraviolet light as specified above, the PVC coating shall not show cracks, blister, split, nor show a noticeable change of color.","Kudos to each of the individuals and organizations who provided comments on this revision.","Reallowlaoratormayor immediaand etuwial ofion.","Flammable and combustible liquids.","In particular, these more recent laws were designed to fill gaps after the major federal lead programs had been implemented.","Round the resulting quotient off to the nearest whole number.","However, the RRP Rule provides that when removing painted components, or portions of painted components, the entire surface area removed is the amount of painted surface disturbed.","The door assembly shall be fabricated and assembled as a complete unit including all hardware specified prior to shipment.","Unencumbered funds shall be disbursed from the escrow account in accordance with these rules and all applicable laws.","IRC as currently adopted by the City of Atlanta to include local amendments.","When using the selfadhering seals, the surface on which the seal is to be placed must be clean and dry.","Enter split sample data on separate lines.","If you disturb paint by scraping or sanding while preparing the surface, the RRP Rule applies.","United States Postal Service within the state.","If the random number generator or random number table produces either the first pipe segment, the last pipe segment, or any previously selected segment, select another random number until there are seven different numbers, each corresponding to a different pipe segment.","The certified renovator is responsible for ensuring compliance with the work practice standards at all renovations to which he or she is assigned.","There will be a separate account for each project.","The developer shall enter into an agreement with the Department to fund two reserve funds.","This process is often the most difficult piece of the media sanitization process because it includes not only the act of sanitization but also the verification: capturing decisions and actions, identifying resources, and having critical interfaces with key officials.","The asbestos consultant shall specify the protocol for monitoring the project.","Board of Directors of the housing company.","PCB Article, PCB Article Container, PCB Container, PCB Equipment, or anything that deliberately or unintentionally contains or has as a part of it any PCB or PCBs.","At such hearing, the Department, in its discretion, may receive relevant testimony from tenants, community groups, and any other interested parties.","Each cabinet shall be equipped with a, shelf mounted roll out drawer mounted directly below the controller to house one or more cabinet wiring diagrams.","Multiple Dwelling that was either included on the List that allegedly did not meet the criteria for inclusion at the time of its inclusion or omitted from the List that allegedly did meet the criteria for inclusion.","Examinees will be required to call for an appointment to ensure availability of the examination and persons to administer it.","Certified paint inspectors and risk assessorsmay also perform post renovation clearance.","PCBs or PCB Items.","Certain commercial entities, equipment, or materials may be identified in this document in order to describe an experimental procedure or concept adequately.","Tops shall be sawed before treatment.","It is not necessary to determine or \ufb01x responsibility in order to seize the goods.","For each sample collected prepare a FACTS Sample Collection Remember the collection report is the basis for most administrative and regulatory actions.","Real Property Tax Law, any provision of the Administrative Code enacted pursuant thereto, and any rule of the City of New York promulgated pursuant thereto.","Payment of rent and deposit of security.","Signed statements from persons who may be called upon as witnesses, if there is a subsequent court action.","Balled and burlapped rootballs shall be securely wrapped with jute burlap or other packing material not injurious to the plant life.","All window wells must be covered.","If the homeowner or family member commits fraud in connection with this program.","The housing company may adopt a policy permitting or prohibiting guarantors that must be applied uniformly to all applicants.","Standard steel steam or water pipes are acceptable in such locations.","The licensure and certification credentials must be verified again to ensure that the licenses, certifications and refreshers are still current.","Do not use ink as it often contains urea.","TSCA PCB Disposal Approval.","The regulatory citation of each exemption is cited as additional guidance.","Certification of structural soundness when required by lender, Federal Housing Administration or Veterans Administration.","Documents visual assessment results stabilization Clearance Report and Clearance Review Worksheet Documents that unit passed clearance Disclosure Form received disclosure and Lead Hazard Reduction Notice Documents that buyer received required lead notification.","This argument lacks merit.","Aggregate Floor Area to the Aggregate Area.","City, managed by HPD and which, prior to entering City ownership, was either developed or rehabilitated through a City loan program.","PCB concentration and its radioactive properties.","In such a situation, a renovator should consider how factors like the condition of the underlying paint or the chosen method of removal may increaseor decrease the likelihood for a disturbance of paint.","The sample costs may be billed to the visionor cash may be used to pay for the sample.","Fiscal examination of operations.","The advance sample shall be protected from damage and discoloration and shall be used as a standard of comparison for color, surface texture, and bottom finish for all curb manufactured.","Concentration of carbon dioxide.","Where the window frame is loose or defective, the boards shall be securely fastened to the brick wall.","This assumes that encryption is on and that all data has been encrypted.","Division of Property Management of the Office of Property Management of the Department of Housing Preservation and Development.","In every lodging house there shall be provided washrooms with running water, set wash basins or other individual washing appliances satisfactory in character to the Department of Housing Preservation and Development.","Maintenance of Space and Water Heaters.","Kennedy Krieger Institute, a research entity, on the ground that, as a matter of law, it owed no duty to warn appellants, Ericka Grimes and Myron Higgins, et al.","This is not the value to be used for seizure bond purposes; however, it may be used by the divisionto evaluate whether seizure is an appropriate action.","Wire screens and storm windows.","In none of the documents relied on by the Estate is there evidence that KKI possessed generalintent to produce a harmful or offensive contact that would sustain a battery claim.","The agency may also mail copies of such amended advertisement to potential applicants who have done prior business with the agency or who have requested to be on a mailing list for such purpose.","The optical system shall accommodate projection of diverse selected indicia to separate portions of the roadway such that only one indication will be simultaneously apparent to any viewer after optically limiting procedures have been accomplished.","Prior to contaminating a surface for the validation study, mark the surface sampling area to assure that it is completely covered with the spiking solution.","Si un ni\u00f1o menor de seis a\u00f1os de edad no vive en la unidad ahora, pero viene a vivir en cualquier tiempo durante el a\u00f1o, usted debe de informarle al due\u00f1o por escrito inmediatamente.","Results should be written down as the assessment proceeds, and the report should be precise about amounts and locations.","Generally known as the Jewish Chronic Disease Hospital study where chronically ill and debilitated patients were injected with cancer cells without their consent.","Department of Housing and Urban Development.","It may also include recommendations distinguishing between responses for large and small spills where the spill volume has a significant impact on the hazard.","Residential Building but for such full or partial exemption.","The owner or operator of the facility shall keep at the facility during its operating life the most recent closure cost estimate, including any adjustments resulting from inflation or from modifications to the closure plan.","Compositing is not mandatory.","Operation shall be unaffected by temperature change, water, ice, pavement deterioration, or electromagnetic noise.","What can I do to determine if lead is in my drinking water?","Acceptance of the materials shall be subject to passing the designated tests per ASTM Standards.","Polycarbonate attached with stainless steel hardware.","Set up screen and adjust height to permit opening the bags directly onto the high side of the screen.","The above item is for use only on exterior openings of interior heated areas.","Clearance examiners should reach an understanding on this with their clients as early as possible.","This is the case even though the organization has nonprofit ornotforprofit status.","Mortgage or financing statement.","The metal shall be free from grease, dirt, dust, moisture, or other deleterious contaminants.","FUMIGATION SAFETY PRECAUTIONSFollow safety precautions when fumigating samples.","Thus, this qualifying language expressly contemplates indemnification only if the party seeking indemnification is not negligent.","The ethical face of the research subject can beobscured by such factors.","Typically, interior clearance is achieved by means of dust wipe sampling by a certified inspector or risk assessor using single surface dust wipes.","The medical profession, and its ancillary research organs, felt that the Nuremberg Code was too restrictive because of its origins from the Nazi horrors of that era.","Commissioner may impose; and the opportunity to request a hearing prior to final department action to suspend or revoke accreditation or suspend or withdraw approval.","No consideration will be granted for any alleged misunderstanding of the intent of the contract documents.","The design of the valve shall be such that it will open only upon inserting a coupler key and will close as the coupler is removed from the valve.","If removing windows from the exterior creates dust and debris on the interior as well as the exterior of the building, then the firm must follow the requirements in the RRP Rule for both interior and exterior containment.","Office requires for specific alterations and improvements.","Temporary access in accordance with these provisions may be allowed for no longer than five days.","We recommend that you adjust your emailsettings to receive emails from the EPA sender lead.","The identity of the disposal facility, by name, address, and EPA identification number.","Para solicitar o rechazar los protectores, marque la casilla correspondiente mas adelante en este formulario y envieselo al propietario a la direccion proporcionada.","Initial training courses shall not be combined with refresher courses.","The rent for governmental tenants shall be the cost of operation of the unit.","Structural changes and major capital improvements.","All couplings installed underground to connect ductile iron or PVC pipe shall be manufactured of ductile iron.","Review these documents carefully before applying for a postponement.","Friction or Impact Surface?","When digital photos are taken as part of DOC samples, the rolls of exposed film should besent to established commercial film dealers or color processors for developing.","More information on these statistics is available from HUD.","If you work in a state where EPA administers the renovation program your firm needs to be certified by EPA.","Distributions of surplus cash.","Light distribution shall be as shown on the Contract.","TEST All detector indicator LEDs shall illuminate and no calls shall be placed to the controller.","Should the property contain items that would constitute a defined play area per the Federal guidelines, then a sample from this area shall be required.","Shall be provided to meet City of Atlanta Plumbing Code.","The commercial rent for every leased commercial unit under the jurisdiction of DPM and DRO shall be reviewed not more than once every year.","However, once you know how the sheets are organized, you can find information quickly, thanks to the standardized format.","Sponsor during the period between Project Commencement and Disposition if HPD and Sponsor enter into a temporary lease of the Building.","Contract Terms and Insurance Requirements.","The Loan documents may provide that the indebtedness evidenced or secured thereby shall evaporate in any manner permitted by applicable Law.","This includes, even in cases where the numerical decontamination levels set forth in this policy have been met, civil or criminal action for penalties where EPA believes the spill to have been the result of gross negligence or knowing violation.","Weren that had sickle cell anemia, to the bestof our knowledge, had sickle cell anemia.","RFP, selection by a process mandated by an entity other than the agency, and selection by an entity other than the agency.","Certificate of Compliance, a mill certificate, and a test report.","The purpose of the committee is to provide advice to the board in the area of asbestos licensing and compliance.","Nonetheless, many of the laws were amended within five years of their initial passage, suggesting that ongoing adaptation of the law to new conditions is common.","Operating Reserve Account may be made to HPD to cover the documented increases in the following costs if they are part of Common Expenses: fuel, electricity, water, sewer, Building staff salaries and taxes.","To contain dust in the work area, we cover the entire interior surface of the window with impermeable plastic sheeting and affix thesheeting to the surrounding interior wall.","That email is too long.","Additionally, the name of the county and state, or country where grown must be entered in the appropriate fields in the Collection Record.","The differences should be minimal.","PCB remediation waste is not complete.","All training and equipment testing is complete.","All transfers of ownership interests in rental developments including changes in general partners are subject to prior written approval of HPD and HDC.","Value of the property after completion of rehabilitation.","Give new occupants a form inquiring if a child under age six will reside in the unit.","Your initials must be in your own handwriting.","If the landlord hires a contractor to do the work, the landlord does not need to be certified, but the contractor doing the work does.","The cost versus benefit tradeoff of a sanitization process should be understood prior to a final decision.","Leaddust tests are wipe samples sent to a laboratory for analysis.","The laboratory will confirm both tare and net volume.","Two copies of these certifications shall be furnished to the Engineer.","The date on which the demolition or renovation process begins.","Some versions of Android support encryption, and may support Cryptographic Erase.","HPD will notify such Relocatee of the name, office address and telephone number of the Case Manager assigned to the Relocatee.","Home Rule Charter of Jefferson County, Missouri requiring all workers performing work under any contract with Jefferson County be paid a wage that is at least the prevailing hourly rate of wages for work of a similar character in Jefferson County.","Sampling and testing will be made by the Engineer in accordance with commonly recognized national standards and methods used in the laboratory of the Department of Transportation.","The work area and all immediately surrounding areas which could foreseeably be disturbed by the actions necessary to perform the project must be inspected and sampled as applicable prior to renovations or demolition.","Court of Appeals was unable to discern definitively what the rationale was.","The Agency may decline to enter into negotiations with any and all bidders.","Acme Freight Lines, Inc.","Health professionals believe these levels do not currently pose a material health risk to the surrounding community.","Healthy Homes and Lead Hazard Control.","The facility must retain a copy for its records and then give the remaining copies of the manifest to the transporter to accompany the shipment.","METAL ROOF PANEL INSTALLATION, GENERALProvide components required for a complete metal roof panel assembly including trim, copings, fascia, corner units, ridge closures, flashings, sealants, gaskets, fillers, closure strips, and similar items.","Doyle, Michael et al.","Notwithstanding anything to the contrary in this section or these rules, an Applicant may waive its right to a hearing before the Office of Administrative Trials and Hearings.","No Women or Children lodged.","At least one uncontaminated surface.","Subcommittees shall meet when called by the subcommittee chairperson or when so directed by the committee.","Council may be subjected or put by reason of injury to persons or property as a result of the work, whether caused by negligence or carelessness on the part of the Contractor, or subcontractors or agents thereof.","The affirmative suppression of the truth must have been with intent to deceive.","Commercial Rent Committee established pursuant to these rules.","Keep your Certificate of Conformance current.","The study documents were concealed ordestroyed and have not survived.","When the firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris.","In the event of emergency renovations made necessary by an unexpected or unplanned asbestos incident, notification will be made as soon as practicable, but not later than the following work day after the occurrence of the incident.","Both cases allege that thechildrenbeing poisoned, by lead dust due tonegligence on the part of KKI.","Multiple Dwelling Law or to units which have a Certificate of Occupancy as part of a Class A multiple dwelling.","Laborats awevr, eted tohave antading ofthe conribs tovariabilityt resuls.","The draft hood shall be installed at the flue collar or as near to the appliance as possible and in the position for which it was designed, with reference to horizontal and vertical planes.","Notes: In either case, the DRAM must remain without power for a period of at least five minutes.","City, upon transfer of shares.","These chemicals can be obtained from your servicing laboratory.","It also provides external links to other sanitization tool resources.","City of Chicago government site.","The statement of income shall include, but is not limited to, the monthly rent of each residential apartment and the rent controlled or rent stabilized status of each unit.","Tenant or other occupants.","Award of the Contract.","The sample material submitted for approval shall be fused to a suitable substrate prior to performing the following tests.","The individual named as the lessee in a lease, rental agreement or occupancy agreement for a dwelling unit.","The ENGINEER shall deliver to KENNER certificates of insurance, with copies to each additional insured identified in the Contract, evidencing all insurance which the ENGINEER has purchased and shall maintain in accordance with this Contract.","Rack mounted equipment shall be as shown in the Standard Plans.","We are now doing a study to learn about how well different practices work for reducing exposure to lead in paint and dust.","If the payment request is satisfactory to HPD, HPD will request a drawdown from the Administering Agent Reserve Account for payment to the Administering Agent.","We concludethat the evidence did not establish that KKI possessed the requisite intent to supporta battery claim.","For example, desktop computer may contain a hard drive, motherboard, RAM, and ROM, and mobile devices contain onboard volatile memory as well as nonvolatile removable memory.","If this is an amendment, which amendment number is this?","Shampoo and hot water extract carpet in other areas upon request.","Setting up the sample site selection system from a pile.","Thereafter, only minimal and unsuccessfuleffortss of the stuttering that the scientists had induced.","Fire policies shall contain a provision that the settlement of all fire losses shall be subject to the approval of HPD.","The person may obtain a new license by complying with the requirements and procedures, including the examination requirements, for obtaining an original license.","The later provision may incentivize private attorneys to accept these cases and thus enhance the likelihood they will be initiated.","Records Accompanying Literature and Exhibits.","The reversing coupling shall be galvanized and have three setscrews or a lock nut ring to lock the coupling in place.","During the regular school year, the work area would fall under the definition of a childoccupied facility.","AMI units or GEA SGA units.","The commissioner may at any time waive in writing one or more of the provisions of these rules with respect to any community group or project.","Project Operation After Disposition.","Do not handle with unprotected hands; transport in your car without adequate ventilation; or place inside tightly closed metal, plastic, or similar type containers that do not breathe.","Reclaimed aggregate is aggregate that has been recovered from plastic concrete by washing away the cementitious materials.","The results of any containment and daily inspection required for uncorrected active leaks.","The extent of the visual inspections will depend on the physical constraints of each transformer installation and should not require an electrical shutdown of the transformer being inspected.","Hazardous materials will be removed by Owner before startof the Work.","Any suggested monitoring requirements.","Examples of acceptable treatment include covering with a plastic stair tread covers.","That conflict dictates astronger reason for full and continuous disclosure.","This article analyzes eight recent local lead laws aimed at reducing lead hazards in housing.","The fee shall not be refundable and shall be used to help defray the expenses of the City in administering the Program.","All testing, reports and estimates will be required prior to CHFA Board approval.","Outer jacket shall be free from holes, splits, blisters, or other imperfections and must be smooth and concentric as is consistent with the best commercial practice.","The occurrence of a spill on a weekend or overtime costs are not acceptable reasons to delay response.","Test Methods for Evaluating Solid Waste, or a method validated under subpart Q of this part, for chemical extraction of PCBs from individual and composite samples of PCB bulk product waste.","United States Department of Housing and Urban Development for Affordable Housing Units in an Eligible Multiple Dwelling with a HAP Contract.","Collect specimens of any shipping case labels and any labeling which accompanied the original shipment.","The original copy shall be delivered to the Engineer, the duplicate to the consignee and the triplicate shall accompany the shipment to be furnished to the Inspector at the job site.","Tax Law of the State of New York, including the procedure for filing an application for tax exemption and the issuance of Preliminary and Final Certificates of Eligibility by the Office of Development of the Department of Housing Preservation and Development.","Source and date of acquisition for each shall be documented.","Fittings for ABS composite pipe shall be specifically designed for connection to ABS composite pipe with solvent cement.","No loan shall be made unless the Department shall have determined that the owner has evidenced an ability to manage the building in accordance with good real estate industry practice.","Air Freight Waybill numbers are designed so that the originating line and point of origin are encoded in the Waybill number itself.","Containment of the combustion reaction in an enclosed device to provide sufficient residence time and mixing for complete combustion.","PCBs or PCB Items were received by the submitter of the report, if applicable.","Equally, we want to make sure that we are able to continue to offer this valuable service to our community.","HPD is the supervising agency under the provisions of the Private Housing Finance Law.","No disbursements from the capital repair and replacement reserve account can be made without prior written authorization by HPD.","Guidance on optional purposes of clearance examinations is provided in this chapter.","Tenants will be monitored by HPD.","There were problems with the extent of the informed consent there obtained.","Avoid manual entry, save time, store electronically.","Laboratory accreditation records are maintained for five yearsto cover the duration of the current cycle plus the previous full accreditation cycle.","RRPM activities performed or if previously inaccessible components are exposed after the date of the original written inspection report.","Office not less than thirty days prior to the start of rehabilitation.","HPD will from time to time establish an interim rent roll for a Building in the Program reflecting expenses of maintaining and operating the Building.","Lead dust settles on floors and other surfaces where it can easily come into contact with children.","The Agency may issue RFQs for Projects at any time it deems appropriate and desirable.","Quality control plan to be used by management.","The seam sewn for sampling shall be sewn using the same equipment and procedures as will be used to sew the production seams.","The name must phone number must be provided.","Jacobs David E, et al.","Work, or by anyone for whose acts any of them may be liable and shall name The City of Kenner, its elected and appointed officials, agents, directors, servants, employees, and volunteers as an additional insured there under.","Division Although the primary purpose of the of\ufb01cial seal is for sealing samples, there are times when the of\ufb01cial seal may be used to of\ufb01cially seal items other than samples.","At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flamecutting operations.","Institutional Review Board proper.","Accordingly, the clearance examiner and others visiting the worksite are advised to wear disposable booties to minimize any cross contamination from one work area to another, or dust migration from outside the worksite into the worksite.","Towers in Multiple Dwellings to Determine Lighting Requirements.","Final eligibility will be determined after the initialtesting of your home.","Documents are not available if they cannot be viewed.","KKI to inspect or test this premises or to test the individual.","All testing of bolts, nuts, washers, and load indicating devices shall be performed on specimens as they are to be installed.","Determining Contribution Per Square Foot.","EPA or State, Tribal or local standards, were found.","However, soil sampling near the foundations of dwellings is often complicated by the presence of paint chips embedded in or under the soil surface from previous repainting efforts.","Separate the fumigant from the sample with a piece of paper, paper napkin, or unscented facial tissue.","Covered Categories of Work.","In other words, the continuing presence of the children that were the subjects of the study was required in order for the study to be complete.","The prohibited work methods listed below were not used.","Zoning Resolution of the City of New York.","EPArecognized laboratory performing the paint chip analysis, a description of thecomponents tested including their location, and results of the tests.","The Tenants Association may make a list of complaints available to HPD in advance of the inspection date; the inspector shall notify the representative in advance of the date and time of the inspection.","Asthestances and with the relation to each other oftheo the alleged negligence varies, and the actcomplained of never amounts to negligence in law or in fact; if there has beenno breach of duty.","Three passes with a pattern that is inverted between passes.","The Order shall be deemed to have been received by the third business day after such Order has been deposited in the United States mail.","Postal Service to the Administrator.","Department of Finance which describes the work for which tax benefits will be claimed, estimates the cost of the work for which tax benefits will be claimed and estimates the cost of the work which will be eligible for tax benefits.","Neither end will remain flat without pressure.","The wire fabric shall be attached to the studs and frame with standard tie practices.","Use aseptic technique, where applicable, when collecting samples of finished products from bulk containers.","Monitoring implementation of the law is important for two reasons.","Hexagonal twisted wire shall be formed from galvanized or aluminized wire in a uniform hexagonal pattern with nonraveling double twisted.","Paperboard boxes packed in brown cardboard boxes with black printing.","Therefore, landlords would only be eligible for the exemption when they meet all of the above criteria.","The two lead action levels differ because of the different problems they seek to detect and the different monitoring protocols used in the two situations.","Narrate the facts in the words of the affiant, using the firstpersonsingular.","In other words Ms.","Rehabilitation Rents, HPD shall give due consideration to Tenant comments regarding the quality of the Rehabilitation.","The actual cable length shall not be shorter than the cable length marking.","Clearance assures that children will be safe from lead hazards in the area being cleared as long as the work remains intact and there are not exterior sources contaminating the area.","The Agency or its designee may charge a fee, in an amount to be determined by the Agency, for application forms.","Digital printed permanent traffic signs shall have an integrated engineered match component clear protective overlay recommended by the sheeting manufacturer applied to the entire face of the sign.","Vent and outlet pipes shall not pass through a floor.","Grower Jones also has violative residues of omethoate on kohlrabi about two months later.","Adjustments to the JMF will only be considered if the change produces material of equal or better quality and may require the development of a new mix design if the adjustment exceeds the amounts listed below.","Venting of Gas Appliances.","EDA, or any other action taken pursuant to these rules, nor shall such technical violations give rise to any rights, claims, or causes of action in favor of members of the general public or potential community groups.","Demolition area must be raked clean.","All firms performing renovations, including general contractors, must ensure that all individuals performing renovation activities on behalf of the firm are either certified renovators or have been trained by a certified renovator.","The agreement obligates the Hovnanians to comply with specified inspection, notice, monitoring and reporting requirements, and to take measures to protect the Seymour Property and its occupants.","The fee shall be assessed only for the amount of asbestos to be removed.","BID AWARD Award will be made to lowest responsive and responsible bidder complying with all provisions of the Invitation for Bid, provided the price is reasonable and in the best interest of the City to accept.","Department of such closing of sale by electronic submission, if possible, or by regular mail, in a form prescribed by the Department.","Thed through all stages of theexperiment of those who conduct or engage in the experiment.","Such notice shall state the date, time, and location of hearing and shall inform the applicant that he or she may be represented by counsel and may present witnesses and other evidence.","Does my firm need to have a certified renovator at the job site?","Collect samples in the container in which the dealer is packaging the product.","When applied to a clean vertical surface, the paint shall dry without running, streaking, or sagging.","Measurement of capacity will be determined by the application of the following formula, applying the prescribed measurements of the unfilled bag.","If the protection circuits fail, they shall fail to an open circuit condition.","PCB concentration assumptions for use.","CDX user ID and password.","Stamped metal shall not be applied until after existing plaster has been inspected and approved by an inspector of the Department of Buildings.","If the liquid is single phase, collect and analyze one sample.","Certificate of Liability Insurance, NYSCEF Doc.","Warning lights are not required unless specifically shown on the traffic control Plan but provisions for securely attaching a warning light are required.","Environmental Sampling Doyle, Michael et al.","Site Assessor schedules site assessment with laboratory.","All measurements and dimensions shall be verified at carpentry shall be self fitted, nailed, and drawn up tight.","Merchants Reportsareequired to verify ownership.","An application shall be executed by an Applicant.","Prior to execution, all loan documents for the refinancing of a Homeownership Affordable Housing Unit must be reviewed by the Administering Agent for compliance with the above requirements.","The experiment should be such as to yield fruitful results for the good of society, unprocurable by other methods or means of study, and not random and unnecessary in nature.","The exemption would not apply to homeowners performing leadbased paint activities in a house they owned and rented out to others.","The Bureau of Housing or the implementing agency shall advise the homeowner of the appointed time in writing.","The samples were also tested for inorganic materials and metals, and while small concentrations of lead and barium were found in the dust, health experts determined that the levels found do not present an apparent health risk to residents.","Anecdotal reports indicated that such efforts do exist.","Purge: Degauss the magnetic tape in an organizationally approved degausser rated at a minimum for the media.","Portions of samples of a size designated in a chemical extraction and analysis method for PCBs and extracted for purposes of determining the presence of PCBs or concentration of PCBs are unregulated for PCB disposal under this part.","Department annually, in such form as shall be approved by the Department, a statement of the income and expenses of such multiple dwelling.","When the concentration of the PCB sample has been determined, and its use is terminated, the sample must be properly disposed.","Salmonellamay form a biofilm or colonize sediments and be recovered well past the outbreak period.","Spills that result in the direct contamination of any private or public drinking water sources or distribution systems.","Material specifications may be exceeded in quality, strength and durability at the discretion of the contractor and written approval of the homeowner and the Rehab Office.","Based on that review, the Agency may accredit programs offering alternative training and instructional methods.","General Liability Insurance for employees not so protected.","These Rules govern the procedures for the periodic review and resetting of rents in leased commercial units under the jurisdiction of the Division of Property Management and the Division of Relocation Operations.","The anchor nuts shall conform to the specified strength requirement degree misalignment between the nut and the bearing plate.","Obtain copies of any document proving the articlewas introduced into or in interstate commerce or held for sale after shipment in interstate commerce.","The traffic safety drums shall be designed to accommodate at least one portable light unit.","Heating, ventilation, and air conditioning systems.","Document any available transportation record that establishes the lot to be in interstate commerce.","Protection of information is paramount.","Seymour Property that the excavation caused.","Do not allow demolished materials to accumulate site.","Temporary or Permanent Certificate of Occupancy, if issued.","Provide fasteners as recommended by mortarfaced insulation manufacturer.","Jacobswas qualified as an expert in the areas of industrial hygiene as they specifically relate to lead risk assessment, sources of lead exposure and perhaps more generally on the prevention of lead poisoning.","OPERATIONS: GENERAL REQUIREMENTS FOR PUBLIC BUILDINGS Responsibility.","After a discussionregarding, Ms.","Note: FIS sample numbers will no longer be required when the FIS is turned off.","Occupied Rehabilitation Program provides a mechanism for eligible homeowners to bring their eligible house into compliance with decent housing for lower income individuals.","Vacate Order was issued.","Jeff Tanguay, Burlington Lead Program, Community and Economic Development Office, pers.","Request for waiver of a bond or letter of credit shall be submitted in writing to HPD by the housing company.","United States Occupational Safety and Health Administration as adopted and referenced in these rules.","This may contaminate the product by migration through the containers.","Higgins sought to hold KKIliable for negligence on several different grounds.","Two certified copies of mill test reports of the cable used shall be furnished to the Engineer.","State revenue stamps, or sale or transfer taxes.","Completely close and seal all opjoints including, but not limitendows, wood trim and moldings, and where vinyl flooring meets base or shoe molding.","This plan should contain options and contingencies to be used if unanticipated higher concentrations or wider distributions of PCB remediation waste are found or other obstacles force changes in the cleanup approach.","You and the affiant should sign all pages of a multipage affidavit.","The issuance of a Purchase Order Number shall be construed as acceptance of a Contract with all terms, conditions, and prices firm during the length of the agreement terms.","Evaluate the results of the report.","Identify options if proposed measures are later determined to be inadequate.","Program, a singlefamily home is a detached, standalonestructure with its own lot, used as a single Living Unitand containing at least bedroom.","The County shall notify the Vendor of the intent to exercise the renewal option.","The City of Kenner reserves the right to reject any or all untimely or incomplete proposals.","Estateargues that the circuit courtabd its discretion by refusing to read itsequested jury instructions concerning the fact that the Consent Form was a binding contract.","An inspection by a certified lead assessor or inspector is not required.","Neill breached its contract to perform architectural services at the Project.","Use the following procedures to sample bulk PCB remediation waste that is in more than one container.","The foods are listed in the Categories by Product Code sequence.","SAMPLE HANDLINGAll samples must be handled, packaged, and shipped to prevent compromising the identity or integrity of the sample.","Special designs must be submitted for any variation, and approved before work is begun.","EPA incur that must be recovered by the fees under the Fee Rule for Abatement and RRP Programs?","If you are documenting a shipper violation at a dealer, it is your responsibility to show the storage conditions did not contribute to the violation.","My firm plans on doing renovation work on a storage building which is detached from, but a part of, an tment complex.","AND SERVICE THEREOF: Any notice from the County shall be in writing and considered delivered and the service thereof completed when said notice is posted, by certified or regular mail, to the Supplier, at the address stated on the bid form.","The adjustment to the closure cost estimate is then made by multiplying the most recent closure cost estimate by the latest inflation factor.","The Court does not so find that a duty was created as a matter of law by the statute.","Subsamples of insects, larvae, webbing, etc.","Submission of Dismissal Requests.","Only one request for an application per person shall be permitted.","Working safely with lead requires few new tools and techniques.","All disciplines shall receive refreshcompletion of such training shall be a condition of renewal, and evidence of satisfactory completion shall be included in the annual renewal application.","Deformities of the stem or major branches.","Applications shall be consecutively numbered and dated upon receipt by the housing company or shall be numbered pursuant to order of selection by lottery, as applicable.","Federal certification under the RRP Rule may perform, offer, or claim to perform renovations in any of these states.","The one case must meet the minimum sample size specified below.","The agency shall require applications to be submitted on the required forms and to be completed and executed in the manner set forth therein.","In an action brought under this section, evidence of actions taken or not taken to satisfy the requirements of this chapter, including performing EMP, may be admissible evidence of reasonable care or negligence.","Lead Abatement Strike Team Program of the Philadelphia Department of Public Health.","Public Housing and Finders Fee Apts.","Data is stored on media, which is connected to a system.","Protect items from damage during transport and storage.","Compare the laboratory results tothe EPA guidance provided below.","Notice of opportunity to comment.","The relief opening of the draft hood shall not be obstructed.","In addition to complying with all state or local law and regulations, EPA recommends the following practices to help minimize lead exposure to employees, volunteers, and customers.","For multilayer bags, be sure you cut through all layers of the bag and identify the layers with pencil.","Facilities of repairs needed.","No incoming air shall bypass the filter element.","ADOPTION BY REFERENCE OF FEDERAL AND OTHER STANDARDS.","Estimate of the time required from receipt of request to execution of completed assessment work per residence.","The double wash rinse procedure in subpart S of this part is conducted on the surface to remove surface PCBs.","CONTRACTORS DURING THE TERMS OF THE CONTRACT SHALL IMMEDIATELY BE DEEMED A MATERIAL BREACH UNDER THE TERMS OF ANY CONTRACT.","Do not send the records to another divisionunless you know it is the divisionof the actual responsible firm.","The Agency may repeat a Project or create a Program where the Agency, for any reason, deems it necessary or desirable to do so.","Each group of fish of a distinct size, listed in the invoice as from a distinct lake, will be considered as a separate lot.","Environmental media containing PCBs, such as soil and gravel; dredged materials, such as sediments, settled sediment fines, and aqueous decantate from sediment.","Certification by the Owner.","Any couplings that utilize set screws tightened against the outside pipe wall are not acceptable.","This applies to the cryptographic keys, and potentially to wrapping keys affected by the CE operation.","Under some of these provisions, it may not be necessary to determine the PCB concentration or leaching characteristics of the PCB bulk product waste.","The law does, however, apply to cooperative or condominium units occupied by a tenant or subtenant.","KKI allegedly discovered in the Monroe Street property during the research study.","HHSe meetsthe requirements of Sec.","In the example given, the bedrooms provide sleeping areas that are separate from the living area, so the housing does not meet the definition of zerobedroom housing and the RRP rule applies.","Take time and temperature measurements of cooking, freezing and cooling procedures.","If the Applicant has regularly earned overtime, bonuses, shift differentials or commissions, they must be included in income even when the employer does not guarantee their continuation.","Occupied Units in a Building.","Control activities within the worksite until they can be safely removed.","The Agency shall have the power and authority to provide, in connection with any Project, such Loans as are authorized to be provided by applicable Law.","Does this certification allow my firm to work in EPAadministered jurisdictions?","Every physical Official Sample will be fully documented at the time of collection and Collection Reports prepared unless instructed otherwise by the program or assignment.","This could be accomplished by mailing or hand delivering these instructions, or by including them on the signs posted as part of prerenovation education.","DAMP Program, the appropriate DAMP Program Director may establish a minimum per Room rent level for all dwelling units in such building.","It also provides guidance for information disposition, sanitization, and control decisions to be made throughout the system life cycle.","Get forms and instructions.","The color for plastic slats will be approved by the Engineer from samples submitted by the Contractor or supplier.","Conversions within the County of New York.","The existing work order system is an informal, verbal one.","Doors and gates provided with key locks are prohibited.","All access openings shall be sealed with weather resistant rubber gaskets.","Have you examined these data points, if we can call it that?","United States mayhave regulations different than these examples.","The Regional Administrator will notify the Director, Office of Resource Conservation and Recovery of any decision and the basis for the decision to allow less stringent cleanup.","Registration must be submitted by mail or phone and must be received by the department no later than five days prior to the desired test date.","PChase was a general partner.","Also enter any pertinent remarks.","If new ng wall, permits shall be required.","Review the Applicant Information Sheet and Owner Affidavit form, if applicable, with the pplicant.","In fact, we pay lip service precisely because we often silentlysuspectustify.","The City and the Agency shall not be obligated to pay, nor shall they in fact pay, any costs or losses incurred by any bidder at any time, including, but not limited to, the cost of attending the auction.","If we disturb the paint on just one of the door panels, is that activity subject to the RRP Rule?","Utilitarianism was the ethic of the day.","Louis code, given our focus on more recent initiatives.","The report shall be filed on forms to be prescribed by the department.","Agency believes that the responsible party has not made a good faith effort to comply with all provisions of this policy, such as prompt notification of EPA of a spill, recordkeeping, etc.","The EPA Protect Your Family from Lead booklet.","Allietihallat leatwrouearied byhe apriae an module.","Fabricate to slopes indicated.","Standard Apartment that is Prepared for Occupancy and referred to him or her by HPD.","This form must be used whether you are notifying in accordance with NESHAP, TAHPR, or both.","The extreme cold generated by the dry ice may cause plastic to become brittle and rupture.","The applied sign face shall not have bubbles, wrinkles, or foreign material beneath the reflective sheeting.","The Commissioner shall encourage professional property managers, rehab and weatherization contractors, minimum housing inspectors, social workers, and visiting nurses to attend education and awareness workshops.","The conflicts are inherent.","Occupied Rehabilitation Program, the Bureau of Housing or the implementing agency will proceed with the preparation of contract documents.","License Agreement, NYSCEF Doc.","Narrate the facts in the words of the af\ufb01ant, using the \ufb01rst person singular.","PCB Transformers at the time of manufacture, at the time of distribution in commerce if not already marked, and at the time of removal from use if not already marked.","EPA shall determine if a trial burn is required and notify the person who submitted the report whether a trial burn of PCBs and PCB Items must be conducted.","The Contractor is not responsible for sorting the recycled items.","The name, address, and signature of the clearance examiner.","Measurement standard designated for the calibration of other measurement standards for quantities of a given kind in a given organization or at a given location.","This includes payment of certification fees.","Seymour, they were unable to question him about the intended meaning of the indemnification provision.","Chemical extraction and analysis of individual samples and composite samples.","Department that the improvement is expected to function in good condition, with routine maintenance and repair.","For each bulk load of PCBs, the identity of the PCB waste, the earliest date of removal from service for disposal, and the weight in kilograms of the PCB waste.","If the unsampled pipe segment is between two pipe segments which have been sampled, assume that the unsampled segment has the same PCB surface concentration as the nearest sampled pipe segment.","Manhours required for this work will be in addition to the minimum hours committed for general cleaning.","Courts tread cautiously when third parties are relied on to make decisions for an incapable patient.","Therefore, if there is any unexplained deteriorated paint, the clearance examiner should provide the client with a copy of the visual assessment form so it is clear exactly what paint should be repaired.","Affidavit is found in the back of the book.","Landlord then has done a thorough Visual Assessment of the property looking for deteriorated paint.","Conversion, Alterations or Improvements made thereunder.","You must comply with this requirement unless it is impossible to do so, for example, during portions of a renovation project that involve removing flooring, sanding a hardwood floor, or removing or installing carpeting.","Ask the client where work tookof the clearance area.","On a random basis, homes will receive one of two levelsof We are interested in finding out how well the two levels of repairwork.","The on hard costs for the unit will determine the level of lead hazard reduction we will complete.","This requirement shall not apply to the award of bids for projects which are funded in whole or in part by Federal funds.","The provision of a dwelling unit free of charge to a Building Service Employee shall be considered a bona fide fringe benefit with a cost of no more than the value of prevailing rentals in the locality for comparable dwelling units.","If the office of assistant presiding officer becomes vacant, it may be filled by vote of the committee.","Your supervisor may also want to notify your compliance branch so evaluation of evidence for a possible mass seizure can commence.","Endorsements reflecting the Mayor and Council of Rockville as an additional insured are required to be submitted with the insurance certificate.","IRBfor the subjects and compliance withfederal regulations, wrote to Dr.","Chemical waste landfill operations.","EPA and HUD require that cleaning be repeated and additional visual assessments dust testing performed until the area meets clearance standards.","One of the most important objectives of such review is the review of the potential safety and the health hazard impact of a research project on the human subjects of the experiment, especially on vulnerable subjects such as children.","Department may require a written management plan, acceptable to the Department, to ensure proper procedures for management of the property, including rent collection, supervision of building employees, payment of bills for maintenance and operation and handling tenant complaints.","Sampling Method: For large area environmental sampling, handheld sponges or sponges on a stick should be used.","Regional Administrator or the Director, Office of Resource Conservation and Recovery, in the cases where an official at EPA Headquarters issued the approval.","How do I resolve an HPD violation after the due date has passed?","Arabic numerals and letters in combination may be used for identification.","Will the rule apply, for example, to church groups who, as part of their missionary work, are making improvements for lowincome residents?","Contractor shall not be entitled to any increased compensation over and above the unit price bid for such item, or any claim for damages on account of loss of anticipated profits should any quantities be decreased.","The apartment shall consist entirely of rooms used in Class A occupancy, or in one or two family dwellings.","Cecil argued that KKI could not use vacuum sampling data to show safe or low lead levels because its use in that manner was new and novel and not generally accepted in the scientific community.","Thus, on its face, the Vermont state law would appear to be an aggressive and potentially effective law.","Such intake rent levels and the rationale therefore will be kept on file by HPD and will be available for public inspection.","Regulated areas within which asbestos abatement is to be conducted shall be separated from adjacent areas by impermeable barriers such as plastic sheeting attached securely in place.","The Agency shall require applications to be submitted on the required forms and to be completed and executed in the manner set forth therein.","The results of the testing shall be reported in sufficient detail to enable the State Materials Laboratory to evaluate compliance with these Specifications.","Other potential concern areas exist as part of the system, such as for monitors, which may have sensitive data burned into the screen.","Collect portions of urine stains or gnawed holes from containers using small scissors or a sharp knife.","HUD recognizes that the transition to comply with the revised Lead Safe Housing Rule is challenging.","AWM, stranded and coded wires shall interconnect all sections to permit field connection within any section.","In conducting closure activities, unexpected events require a modification of the approved closure plan.","Persons and Families of Low Income.","The owner of the dwelling must, subject to the approval of the Agency, take the action necessary to assure compliance with these provisions.","If there was no suspect material discovered, such as a garage, built of concrete and steel only, indicate no suspect material found by the license number.","Building Service Employee, the proposed civil penalty and the complete hearing record, the Agency shall issue an Order, which shall include instructions for payment of any such respective amounts of Prevailing Wage underpayment, interest and civil penalty to the Comptroller.","Approximate depth of soil excavation and the amount of soil removed.","Second, environmental factors may change once the system has been designed and implemented, either as a function of or independent of the local law.","This includes research conducted by federal civilian employees ormilitary may adopt suchprocedural modifications as may be appropriate from an administrativestandpoint.","Whenever changes occur in rentals or carrying charges or any component thereof used in the computation of surcharges, surcharges shall be recalculated by the housing company or its managing agent.","The firm will be required to assign an RRPcertified renovator to the project, and workers will need to have been trained by a certified renovator.","The dead front cover shall have cutouts with for the entire breaker array, with blank covers where no circuit breakers are installed.","The circuit court did not think it was appropriate to expand the scope of the trial from the financial institutions actuallyat issue in the case to all savings and loans institutions in existence over the same time frame.","The Seymours never resumed living in the Seymour Property.","Additionally, this practice presents the potential problems of children initiating actions in their own names upon reaching majority, if indeed, they have been damaged as a result of being used as guinea pigs in nontherapeutic scientific research.","The annual records and written annual document log shall be available at the facility for inspection by authorized representatives of the EPA.","KKI to enter the property to collect future dust samples from the Federal Street property and to obtain blood samples from her son.","Zoning Resolution, the Appreciated Price is calculated by multiplying the Resale price of a Homeownership Affordable Housing Unit on the previous Sale Date by the Appreciation Index At Resale.","Take steps to minimize exposure of product, sampling equipment, and the interior of sampling containers to the environment.","If retrieval of the sample collection data is needed, the original record and all changes to the original record can be retrieved.","The law was the culmination of a grassroots community effort formed in response to community concerns about high rates of children with lead poisoning.","All repairs shall be completed during normal business hours for the State Materials Lab.","Flip Tax imposed upon the seller of a Homeownership Affordable Housing Unit at Resale.","PCB disposal requirements that apply to the individual phase with the highest PCB concentration except where otherwise noted.","Tax Benefit commences pursuant to applicable Law.","State or the federal government, or any of their agencies or instrumentalities.","Interpret the laboratory results by comparing them to the applicable standards.","It is important to note attby andon subjects.","Because of the unusual circumstances of this case andtheat the naturalparents would be able to substitute their consent for that of their minor childrenaftertigation of their motivation andreasoning.","Older buildings, especially those built based paint than newer buildings.","Corners and edges of molded pads may Me rounded at the option of the Contractor.","SEDs feature alwaysencryption that substantially reduces the likelihood that unencrypted data is inadvertently retained on the device.","AIHALAP, LLCapproved proficiency testing program as maintained on the AIHALAP, LLC web site.","At that point, Johnson was a scientist with a theory searching for subjects to prove it.","For good cause shown, EPA may approve a reasonable extension to the period for removal of the PCB waste.","Users are expected to make sanitization and disposal decisions based on the security categorization of the information contained on the media.","Austin, Texas at a location and time specified in the published schedule.","This determination must be made by a certified inspector, risk assessor or certified renovator using an EPArecognized lead test kit or paint chip sampling and lab analysis.","Failure to complete annual refresher training within two years of the most recent training shall require that the original course be repeated.","Pressure washing is subject to the same containment requirements as other permissible work practices.","No personal property, books, financial or other records of a housing company shall be destroyed or disposed of without the written consent of HPD.","Department of Environmental Protection.","Be sure to leave feedback using the Feedback button on the bottom right of each page!","When the pedestrian change interval is reduced due to a programming change, the display may continue to show the previous pedestrian change interval for one signal cycle.","Bolts shall be sampled prior to incorporating into a structure.","The chemical manufacturer is responsible for creating an accurate SDS for each chemical they produce.","Product need not be shown to have become contaminated.","Federal, State, or local laws and regulations.","The drain shall be provided with a protective screen to retain solid material.","Acceptance of PVC coating material shall be by certified test reports of an independent laboratory.","This includes all other oneperson businesses that would not be considered to be sole proprietorships.","The certificate shall clearly identify production lots for all materials represented.","The Contractor shall submit a detailed installation procedure to the Engineer for approval.","The questionnaire simply contains general questions regarding the habits of Ms.","On farm collections should be limited to instances where it is specifically mentioned in an assignment or is preferred by the industry or other sampling venues are not available.","Continue sampling and repeat cleaning until the clearance area achieves compliance with applicable clearance standards.","When lots are very good or very poor quality, in terms of cyst infestation, double sample plans require a smaller sample size on the average than single sampling plans, to reach a decision.","If no State or local standards exist, use the EPA standards.","Divide the pile into quarters.","Adequate flashing to waterproofing.","Selected Applicant to perform or be responsible for the performance of Project Activities in connection with a Project.","These children were not to be mentally retarded or severely handicapped in any way that would limit their physical movement.","ACBM and suspect ACBM in a public building; and documenting inspection results.","The most manageable narrative describes the events and circumstances chronologically.","Repairs resulting in isolated small surface disruptions, including drilling and sawing into wood and plaster.","Verify that surface plane flatness and fastening complies with requirements.","Fill out the permission to verify deposits, mortgages and request your credit report.","Completion of Construction date to the satisfaction of the Office.","The top member of the bracket must be drawn out to form the necessary bolt end without welded connection.","Such a containment shall conform spatially and geometrically to the localized work areas, in order to perform its intended containment function.","All existing both interior and exterior including switch legs shall be concealed within the wall.","Repair to match existing as closely white pine.","Plans plus a minimum bar extension at the free end of the bar shown in the table below.","Use the proper equipment.","Samples for Pathological Examination.","Disposition to Permanent Owner.","Collecting and delivering samples to the laboratory using aseptic technique, will permit testimony that the bacteriological \ufb01ndings accurately re\ufb02ect the condition of the lot at the time of sampling and, ideally, at the time of the original shipment.","Any substitutions of above must be presented to and approved in writing by Facility Maintenance Manager BEFORE substitution is made.","The invoice for the notification fee will be sent to the owner of the building and the billing address for the invoice will be obtained from the information that is provided in this section.","New Building Tax Lot.","The owner decided not to have water sampling conducted at this property.","If the Relocatee enters into an agreement with the owner of the Former Apartment terminating or diminishing his or her legal rights to occupancy of the Former Apartment, such action will result in termination of Relocation Services.","For any outdoor area, annually remove all visible paint chips from the ground on the property.","Eligible Multiple Dwelling, except Exempt Dwelling Units, shall be fully subject to control under such local laws and act for the entire period for which the Eligible Multiple Dwelling is receiving benefits pursuant to the Act.","All leases shall be for a minimum term of one year.","The vertical edges shall be neat interlocked hemmed edge seam.","Fidelity bonds for rental, sales and managing agent.","Destination and shall include all charges that may be imposed in fulfilling the terms of this contract.","As of this writing, the regulations implementing the amended lead law have not been finalized; this section describes the currently proposed regulations.","Coarse aggregate shall be washed to meet the specifications.","Per CHFA funding requirements, the Phase I ESA must be considered currentat the time of application for funding.","Every Premise must be graded, drained, free of standing water, and maintained in a s material on the interior surfaces of any Dwelling Unit, rooming house, rooming unit, or facility occupied by children is prohibited.","Notwithstanding any other provisions of this chapter, HPD may authorize special emergency measures in any instance in which it is determined by HPD that a development is in serious financial difficulty.","New York city department of housing preservation and development or its successor agency.","These other defects include visibly leaking cans, severe dents around seams, gross seam defects, severely rusted containers, etc.","Courses presented in a language other than English must use instructor manuals, exams, and other course materials in that language that have been reviewed by EPA as part of the accreditation process for the course.","Furthermore, all hazards identified the ead nspection report must be addressed in compliance with the DEP Lead Management Regulations.","Along with the certificate, the landlord must provide the tenant with other specific information as required by federal law.","Post a notice in a form approved by HPD in a common area of the dwelling, readily visible, informing the occupants of such dwelling of the procedures to be followed when a gas leak is suspected.","Agency to constitute a Program.","Media Sanitizationwell as their business missions and specific use cases.","Damp mop floors in restrooms and high traffic areas as needed.","It covers a broad range of firms including renovators, carpenters, painters, electricians, plumbers, handymen, and more.","Hearing Procedures for Termination of Relocation Services.","Marketing Monitor to submit quarterly rent rolls for all Affordable Housing Units in the Extended Affordability Property to the Agency.","Replacement housing payment to purchaser.","Every sleeping room shall have at least onapproved for emergency egress or rescue.","Conformance is contingent upon routine maintenance of the property.","The Contractor shall furnish a new certificate prior to any change or cancellation date.","The certificate of insurance must be complete, including all applicable coverages and endorsements, and must name the Texas Department of Health, Toxic Substances Control Division, as a certificate holder.","KKI submitted, and Dr.","It was beyond the scope of this study to identify all community, government, and academic evaluation efforts unless they were explicitly referenced in the text of the law.","Third, a local law can typically be amended more readily than state law, and certainly more easily than federal law, when legal, economic, or environmental conditions change.","Maryland law is the ultimate function of various policy considerations as adopted by either the Legislature, or, if it has not spoken, as it has not in respect to this situation, by Maryland courts.","Rule, how should I dispose of contaminated water used in twobucket mopping?","Other Insurance Provisions med as an additional insured on the General Liability and Automobile Liability policies.","The contractor is not on probation as described in Section VII.","Revocation or reduction of tax exemption and tax abatement for failure to substantiate claimed costs.","Section IX, below, provides guidance on interpreting dust sampling results and when recleaning and resampling are needed.","Reporting the PCB concentrations in samples.","Corrugations on the bands shall be the same size and shape as those on the pipes to be connected.","Baltimore City negligent misrepresentation, breach of contract, and lack of informed consent.","Bureau of Housing or the implementing agency.","Control of admissions and transfers.","Permanent deformation of the lid or any impairment to the function of the lid.","After inspection, cover existing plaster with herringbone or similar approved type metal lath with rigid rib reinforcement to provide good bond between new and existing plaster.","They did not attempt to compare vacuum dust lead results directly to the wipe guidance lead dust levels, as incorrectly alleged by plaintiffs.","An Examination of Paired XRF Water.","Agency from applying for a loan under this program for up to three years following the date of any failure.","Use a random number table or a random number generator to select each representative sample collection site from a complete list of the sequential identification numbers.","If a chute is used to remove waste from the work area, it must be covered.","Extended Benefits unless it was issued a Final Certificate of Eligibility and such Final Certificate of Eligibility was delivered to the Department of Finance together with an application to the Department of Finance for partial tax exemption.","Can it harm us?","The block erase command.","Over time, she conditioned several of the orphans who had not theretofore stuttered, to become stutterers.","Articles II, IV, V or XI of the Private Housing Finance Law.","Disposal: Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.","SDSfor every chemical to which employees might come into contact.","Plumbing repair slips shall be accepted only where gas appliances will be connected to flues in existing brick chimneys, and where no other venting or other work is required to be done.","County Auditor APPROVED AS TO FORM ________________________________________ County Counselor COOPERATIVE BID FORM Bid Name: ____________________________ INSTRUCTIONS: Bidders MUST fill out this form as part of the bidding process and attach to your bid response to Jefferson County, Missouri.","Jesse Gelsinger consented to participatein of Human Gene Therapy.","He realizado los trabajos necesarios siguiendo las pr\u00e1cticas de trabajo seguro establecidas por la ley.","The Agency shall send copies of such amendments to all recipients of the auction brochure.","The local director of health shall issue an Order letter to the property owner to abate all lead hazards.","Transport PCB waste without having received an EPA identification number from EPA.","Carbonless copy paper containing PCBs may be used in a manner other than a totally enclosed manner indefinitely.","Accordingly, the subgrantee must be a certified firm and comply with all other applicable RRP requirements.","The HCl neutralizing capability of cement kilns is considered to be an alternate method.","Maryland, under the law of this State, can legally consent to placing a child in a nontherapeutic research study that carries with it any risk of harm to the health of the child.","In addition, in each room in any such apartment or suite, there shall be displayed a sign showing the maximum lawful occupancy, for sleeping purposes, of such room.","The proposed selling agent.","Owner Responsibilities for CO Alarms for Class B Multiple Dwellings.","Each sample shall consist of three subsamples.","Remove the used sterile glove and discard.","HPD and shall be of no force or effect until the contract has been approved in writing by HPD.","Housing Maintenance Code, supplied with all appropriate fixtures and appliances, reasonably cleaned, and available for occupancy.","Forms of media exist that are not addressed by this guide, and media are yet to be developed and deployed that are not covered by this guide.","The major advantage of this sampling scheme is that it is designed to characterize the degree of contamination within the entire sampling area with a high degree of confidence while using fewer samples than any other grid or random sampling scheme.","Such legal duties, and legal protections, might additionally be warranted because of the likely conflict of interest between the goal of the research experimenter and the health of the human subject, especially, but not exclusively, when such research is commercialized.","ASTM Standards relating to lead often reference EPA and HUD documents, just as EPA and HUD documents often reference appropriate ASTM Standards.","Vent connectors and vent and outlet pipes shall be installed so as to provide a minimum clearance of three inches on all sides from combustible material.","All LEDs shall have tinted diffused lenses.","Also, if two components of the same fferent paint history, both must be tested.","The security lid shall be installed on any appropriately sized box that is currently approved on the Qualified Products List.","In every lodging house each room shall be adequately ventilated as required by law and to the satisfaction of the Department of Housing Preservation and Development.","The Commissioner shall certify individuals engaged in RRPM activities for no compensation and who have successfully completed an accredited training program and met all other requirements as the Commissioner may impose by rule.","Contractor and all subcontractors, subsubcontractors, subsubsubcontractors, etc.","Ground areas around buildings shall be sloped away from walls to eliminate low areas where standing water may collect.","This will allow for ridges on the outer edges and back of post intended for structural support.","Some of the shortcomings evident in the case studies might have been avoided by a better understanding of the environmental context when designing these laws.","Deputy Commissioner of the Agency; the retention on completed work may thus be reduced to five percent upon completion of fifty percent of the work.","All documents shall be received and filed.","Test decks conducted by other public entities may be considered provided they produce data similar to a northern NTPEP test deck.","At any intersection where there is a combination of operational and covered signal heads, signal head covers shall be yellow or orange in color.","The clearance procedures and standards described in this chapter conform to EPA and HUD regulations.","Withrance, we can note that its reputation alone might normally suggest thatthereon t the protocols of theexperiment were questionable, except for the letter from the IRB requesting that theresearchers mischaracterize the study.","Hazardous materials will be removed by Owner under a separate contract.","EDA for each such project.","Pilot Program Building, or is authorized to sign on behalf of and bind the persons or entities who have legal possession of all common areas of the Pilot Program Building.","DEALER OBJECTION TO SAMPLINGIf the dealer objects to your proposed sampling technique, attempt to reach a reasonable compromise on a method that will provide a satisfactory, though perhaps not ideal, sample.","NOTEWhen the product sampled is packaged in a container, shipping case or similar container, quote the pertinent labeling from the container.","Rinse your cleaning utensils in clean water.","If the Plans or Special Provisions specify painting of the galvanized steel surfaces, then the controlled silicon content requirement does not apply for those steel members.","Concerning this issue, the granting of the summary judgment motions was clearly inappropriate.","Reasonable cost for meals and lodging.","While remedial actions to abate pollution may be taken at any time in the course of characterizing a site, a final remedial action plan can only be developed after a complete Phase III investigation.","PVC pipe shall have the same outside dimensions as ductile iron pipe.","Selection of community groups.","PCB research and development waste.","Floor receptacles shall be removed and a metal cover plate installed.","PCB concentrations must maintain records of any such monitoring for a period of three years after a process ceases operation or importing ceases, or for seven years, whichever is shorter.","In such cases, parental consent, no matter how informed, is insufficient.","The Contractor shall give advance notice to the Engineer of the coating schedule in the coating plant so that Contracting Agency inspection may be provided.","Misdemeanors; cumulative penalties; private right of action with treble damages; and attorney fees.","Tighten setscrews on lock nut ring.","The city and the agency shall not be obligated to pay, nor shall they in fact pay, any costs or losses incurred by any applicant at any time, including, but not limited to, the cost of responding to the RFP.","These Rules are not intended to confer rights or benefits upon the general public or upon any individual or entity.","See Chapter VII, Section VI.","Eligible Multiple Dwelling owed to the City.","When directed by your supervisor, youmay use an official seal to seal questionable or suspicious bioresearch records encountered during an inspection or investigation to prevent tampering or to preserve their integrity.","Public information notice for rental companies.","There It wasthus, it was to the children in the case at bar, nontherapeutic; a way to study theaffectson experiment.","After that grace period, initial training must be completed again to become accredited again.","Please provide the contact information of the Sole Proprietorship, Partnership, Limited Partnership, Corporation, Limited Liability Company or Governmental Entity.","Before using motor express lines and passenger bus lines determine that their schedules and delivery practices are satisfactory and reliable.","HETL will bill the dministrator directlyforthe cost of analyzing and processing the dust wipes.","If my staff and I do our own painting and remodeling work, do we need to be a certified firm?","Remove aggregate spud off loose roofing material, cut blisters and renail.","The purpose of the research was to determine how effective varying degrees of lead paint abatement procedures were.","Any other criteria that HPD deems relevant to the request, including, but not limited to, any information provided to it by the Third Party.","Thisary judgmentishether the trial court was legally correct.","The owner shall submit an affidavit to the Department certifying that such written notification has been given to the tenants.","Maintain portable firesuppression devices during flamecutting operations.","The kit shall provide three cutoff sections on both lines and load side to accommodate various wire sizes.","Department of Finance of the City.","The process is not exothermic.","The performance standard requires firms to isolate the work area, prevent dust and debris from exiting, and ensure plastic sheeting is not torn or displaced.","The number refers to the spec number of the scope of work in the NCLSH database.","If it is necessary to use this type container, adequately vent to prevent pressure build up.","Neill moves for summary judgment dismissing all cross claims against it, it fails to address the cross claims in its papers.","The installation of such appliances including Type B and other gas vents, but not chimneys, shall be inspected by inspectors of plumbing.","Windowsills and wells can also contain high levels of leaded dust.","Such notice shall be signed by the owner or by a representative of the firm performing the work.","New York State Division of Housing and Community Renewal, and otherwise be in conformity with the requirements of the mortgage.","Use in scientific instruments.","Junction boxes installed on exterior of structures shall have an external hinge.","HPD shall deliver an Initial Notice to the Taxpayer by the method provided herein for delivery of notices.","Interim interest on the loan proceeds.","Qualification Data: For Installer and manufacturer.","It did not prefer the properties to the landlord.","Grounding shall be continuous in flexible bends.","Select a large enough number of subsections so that the media is wellcovered.","All plumbing shall be remain and be satisfactorily repaired.","Use of vegetable or marine oils, paraffin materials, stearates, or organic pigments in any part of coating formulation will not be permitted.","The Agency may negotiate and dispose of any Site on terms other than those set forth in the RFP.","The bearing areapercentage will be measured for each side of the lid as it bears on the frame.","Metal, aluminum stoops may be provided onladministrating agency.","Leadbased Paint Hazards, including specialized cleaning, repairs, maintenance, painting, temporary containment, ongoing monitoring of Leadbased Paint Hazards or potential hazards, and the establishment and operation of management and resident education programs.","Upon recognition of a Tenants Association, an election of officers must be held and the names of the officers of said association shall be furnished to HPD.","Judgment of Foreclosure; Notice.","All dealers, including hostile ones, should be approached in a friendly manner and treated with fairness, honesty, courtesy and consideration.","Submit each portion of bagging or container, pellets, material from beneath sampled area, control, etc.","Este trabajo debe hacerse antes de mudarse al apartamento, y el due\u00f1o debe limpiar correctamente el apartamento una vez que se haya completado el trabajo.","We agree with KKI on this point andconclude that evenif there were errorand we hold that there was noneit was harmless.","HPD authorized residential tenant of record.","Violations of the Environmental Conservation Law or other federal or state environmental statutes or regulations.","Selections of tenants or cooperators must be made from this list in chronological order or order of selection by lottery, as applicable.","Has a window or adequate light and ventilation in each room pursuant to the Housing Maintenance Code.","Submittals for Work being requisitioned that are complete and approved.","That legislation, in addition to establishing the interagency cooperation requirements, provided the specific authority for San Diego to adopt its local law.","Payments in lieu of moving and related expenses.","Fasteners used shall be Stainless Steel.","Refer to the manufacturer for additional information on the proper sanitization procedure, and for details about implementation differences between device versions and OS versions.","The bid complies with Invitation for Bid form and Bid Specifications.","This rootball is wrapped in burlap and tied or placed in a wire basket or other supportive structure.","Proactive, but only a visual inspection by landlord; city inspections if complaint, EBL, or other probable cause.","This conflict and the resulting tension that can arise within theresearch enterprise suggest a need for guidance and oversight.","The result was an equal distribution of houses into each of the three groups.","DVD for both movies and data endorsed by the DVD Forum.","However, banning lead in new residential paint did not eliminate risks from existing leaded paint in older homes.","If the storage device encounters a defect in a location where a key is stored, the device attempts to rewrite the location and the Cryptographic Erase operations continues, reporting success to the user if the operation is otherwise successful.","Notice of Intake Rent.","The opening and closing of all waiting lists shall be subject to prior written approval of HPD.","The quantity of the sample.","Bus lines must not be used for shipments to Washington, DC offices unless delivery at the destination address is specified.","Disposition, the provision of any Assistance, or the execution of any agreement regarding Disposition or Assistance by the Agency in connection with a Project.","Another applicable decontamination procedure in this section.","For purposes of this paragraph, PCB Voltage Regulators shall be recorded and reported as PCB Transformers.","Empty all wastebaskets and dispose of contents as directed.","DSHS; demarcate area; secure critical barriers.","Inspection Healthy Homes Intervention Work.","See the table below for more specific guidance on meeting the prerenovation education requirements as they relate to various renovation scenarios in coops and condos.","Completing any items identified at the final inspection prior to execution of the Certificate of Completion.","Municipal Code, occupants shall be protected from exposure to lead in dust and debris generated by such emergency actions to the extent practicable.","Each connector shall be a screw type with No.","RRP rule apply to that work?","The requirement applies to all residential properties, but it will be phased in by zip code over two years.","GFCI receptacle on the front of the PDA.","Apply bonding adhesive to substrate and underside of sheet flashing at required rate and allow to partially dry.","PCB waste covered by the manifest was received, that the PCB waste was received except as noted in the discrepancy space of the manifest, or that the PCB waste was rejected as noted in the manifest discrepancy space.","February fifteenth of the year in which the notice is sent.","The LCCA is aimed at the identification and reduction of lead in drinking water at schools and day care centers.","Secretary of the Corporation.","The clear packing tape should not cover any text on the official seal.","Issuance of a Certificate of Eligibility.","Case law: What are the relevant court rulings and settlements related to lead hazards, duty to maintain properties, inspections, and landlord liability?","HPD will notify the Garden Contact Person and the Alternate Garden Contact Person of the proposed Transfer.","Audit of Work Performed at Turnover of any Dwelling Unit.","Clearance testing showed clearance was not achieved.","Color matching of adjacent sheets of reflective sheeting comprising a sign shall be accomplished without a noticeable difference in color.","Regulations under The Lead Safe Housing Rule helps to ensure that your home is safe for occupancy.","Maryland in experimental nontherapeutic research involving Maryland children.","Remarks Section of the CR, the basis for determining that the sample is representative of the lot or field.","Special requirements for moderate rehabilitation.","Deleterious material includes wood, organic waste, coal, charcoal, or any other extraneous or objectionable material.","Such cure agreement shall be recorded by the Owner in the office of the city register or the Richmond county clerk, and indexed against each tax lot with Low Income Housing within the zoning lot.","Schedule is based upon unit containers weighing between twenty and onehundred pounds.","When notifies the family that they can r home.","The remaining three shall be subjected to hours of UV exposure in the QUV weatherometer.","For example, if the location where the key was stored cannot be sanitized, does the Cryptographic Erase operation report success or failure to the user?","Thus, because the Cyclone technique typically gives higher results, and because the dust wipe samples registered under the clearance levels, KKI argues that there was no potential hazard and thus no duty to inform appellants.","Alternate bids for supplies or services other than specified shall not be considered unless authorized by invitation.","EPA authorized state or tribal program?","Completion of new construction.","Agency whose income at the time of initial occupancy of such Affordable Housing Unit is not more than the maximum percentage of the Area Median Income specified for such Affordable Housing Unit pursuant to the Act.","The deflection at the test load and released state shall be recorded for each interval.","Each gate shall be furnished complete with necessary hinges, latch, and drop bar locking device designed for the type of gate posts and gate used on the project.","Disposal in solid waste landfills.","In part, this lack of information may be due to how recently many of the laws we studied were implemented; however, few cities appear to have a system in place for collecting, analyzing, and reporting such data in the future.","Roof bulkheads, skylights, ventilating equipment and similar structures shall be completely removed.","Military facilities may also be subject to treaties or other bilateral or multilateral agreements.","Its composition and properties shall conform to those set forth below.","Taking composite samples from the initial and subsequent compositing areas.","The National Voluntary Laboratory Accreditation Program.","New storage technologies, and even variations of magnetic storage, that are dramatically different from legacy magnetic media will clearly require sanitization research and require a reinvestigation of sanitization procedures to ensure efficacy.","The Commissioner, upon good cause shown, may alter the timing or sequence of the actions described in this chapter, provided all affected parties are given reasonable notice.","Flushing is not required.","FEI identifying the harvester of the product sampled.","Should workmanship of finish beshall be done and additional coats shall be applied as necessary to produce a finish in accordance with these specifications.","It is recommended that the housing company rather than the contractor obtain this coverage.","Insulate work to prevent electrolytic action.","Throwing garbage or other waste matter out of windows or depositing same in any place other than in receptacles provided for in these rules is forbidden.","The ount of the withdrawal should be limited to the cost of the sample.","KKI intended to expose children to harmful levels of lead are simply too attenuated.","Typically, filth exhibits submitted as part of an INV sample are not tied to any specific lot of product but are meant to illustrate the conditions at a firm.","Renovation firms will also receive a customized logo and guidelines for its use in the approval email.","Crushed screenings shall be substantially free from adherent coatings.","PCBs; studies of environmental transport processes; studies of biochemical transport processes; studies of effects of PCBs on the environment; and studies of the health effects of PCBs, including direct toxicity and toxicity of metabolic products of PCBs.","Means a visual inspecdetermine that the lead hazard controls have been met.","Upon a satisfactory demonstration the controller assembly will then be accepted by WSDOT for testing.","The result of their activity is paint chips scattered throughout the landscaping.","Hazardous conditions either to structure or life shall require demolition.","Mssigned duties in those work areas.","Work claimed as substantially complete.","If unable, through tactful discussion, to convince the dealer to lower the sample cost, do not haggle over the price to be paid.","It is not necessary to determineor fix responsibility in order to seize the goods.","Food or feed is excluded from this definition if it is used or stored in private homes.","Surface which has loose, delaminating, flaking, peeling, abraded by friction, shows evidence of teeth marks, or is damaged by water.","Dedicated sanitize commands support addressing these areas more effectively.","The lens shall be mounted in a doorframe assembly, which shall be hinged to the luminaire and secured in the closed position to the luminaire by means of an automatic latch.","Engineer upon Contract completion.","Leesdemonstratethat vacuum sampling results are generally accepted in the scientific community.","If the internal volume of PCBs is not known, a best estimate may be used.","SECURE ERASE UNIT command, if support, in Enhanced Erase mode.","Filler material applied to gaps in existing materials shall contain no asbestos, and shall adhere well to the substrate.","The preliminary application form requests basic information about occupants.","PCB remediation waste: soil, sediments, dredged materials, muds, PCB sewage sludge, and industrial sludge.","The amount of water in the concrete shall be kept at a minimum consistent with the manufacture of dense curb, free from air bubbles and surface defects in excess of the tolerance limits specified.","The termination date may be delayed if such written application is made by the Relocatee prior to the scheduled date of termination of Relocation Services.","State of Maryland, another state, or the United States for acts or omissions in connection with the submission of bids or proposals for a public or private contract.","Lead in paint, house dust and outsidesoiln.","Owners will be advised on how to select eligible contractors.","In most jurisdictions, these will be the EPA clearance standards described in this chapter.","EPA model curriculum for renovators and remodelors; or An equivalent course approved by HUD.","Reimbursement to housing companies.","Do not dilute the contaminated product beneath the stain with the noncontaminated product.","When Cryptographic Erase is leveraged, there are multiple options for verification, and each uses a quick review of a subset of the media.","Digital The coding scheme generally used in computer technology to represent data.","Duties and responsibilities of managing agent.","EPA does not accept responsibility for any errors or omissions or results of any actions based upon this information.","Computation of homeowners replacement housing payment.","Do not leave partially filled shipping cases, short weight or short volume containers in the lot after sampling.","RRP Rule apply to renovations in mobile homes?","If not feasible on exterior, locate within interior floor area, accessible for maintenance of plumbing below floor.","Vive un ni\u00f1o menor de seis a\u00f1os de edad en la unidad.","Prior to incorporating recycled materials into the work or storage on the job site, the Contractor shall provide a certification on the source of the all recycled materials.","Enter the scheduled dates for the start and completion of the building demolition.","Completely remove all existing materials to face of studs or other structural members on hall side of partitions and recover with metal lath and two coats of cement of gypsum mortar.","All external electrical connections to the luminaire shall be made through the terminal block.","County specifying such failure.","This person is not required to be licensed but must have the applicable Model Accreditation Plan training.","The Contractor will be responsible for removal of chemicals or finish splashed on baseboards, doors, trim, and walls.","How often is the household cleaned?","Department of Buildings is obtained.","In addition, length, size and placement of steel beams may be required.","Sufficient sprinklers shall be installed in the refuse room and former combustion chamber to provide sprinkler coverage for the entire area of each unit.","Keep one copy of this form for your records.","Any person storing or disposing of PCBs is also responsible for determining and complying with all other applicable Federal, State, and local laws and regulations.","Sellers and landlords disclose the proper information to lessors, buyers, and tenants; Sellers give purchasers the opportunity to conduct an inspection; and Lease and sales contracts contain the appropriate notification and disclosure language and proper signatures.","Approval packages are emailed from lead.","You cannot state that the lrequires the records be furnished to FDA unless you also explain it is required only after a written request is issued.","Department of Housing Preservation and Development of the City or any successor agency.","HPD inspects the items of work claimed in an application for benefits pursuant to these Rules, the applicant must pay the Inspection Fee for each additional inspection required to confirm that such Conversions, Alterations or Improvements have been completed.","Ambiguity is determined by looking within the four corners of the document, not to outside sources.","The Holiday list shall be shared with the Contractor upon contract award.","IDThe company that will conduct the lead hazard remediation work shall be an EPA RRP Certified Firm.","All such distributions must be in accordance with the rules of HPD and with the requirements of the Private Housing Finance Law.","Test methods for additional allergens are under development and the field will be notified when they are available for regulatory purposes.","If the landlord does not fix the lead hazards, the tenant can bring his or her concerns to the Housing Resources Commission with a Notice of Deteriorated Conditions complaint form, to investigate.","Hire a certified professional to check for leadbased paint.","Attach copies of latest bank statements.","Covered Categories of Work that is submitted to the Department of Buildings during such period which complies with such conditions, if any.","It is important to understand the local environment in order to design a local lead law that is appropriate to these conditions and complements existing state and federal laws.","This critical initial step is outside the scope of this document, but without this identification, the organization will, in all likelihood, lose control of some media containing sensitive information.","The chain of custody issue would be whether the samples taken from the house were, in fact, the samples that were tested and produced a certain result.","Ceramic tile glaze is neither a surface coating nor a painted surface.","The sections shall be interchangeable and shall be dust and weathertight when assembled with the door and appropriate furnished hardware.","Additionally, plaintiffs alleged that they were not fully informed of the risks of the research.","Provide temporary weathertight enclosure for building exterior.","Bathroom doors shall be Schlage brand, and shall mathe existing locks.","The maximum deflection measured diagonally, parallel and perpendicular to the panel by lines drawn through the center of the panel, shall not exceed \u00bdinch.","New York City to National Grid, in which case the current emergency phone number used by National Grid for New York City shall be used instead.","The unit shall be designed to not continuously pulse the output relay if the photo control bypass switch is energized.","Sterile Containers Where sterile containers are used to collect aseptic samples, submit oneunopened container, which was sterilized in the same manner as containers used for sampling.","Wipe the sample area using a moist baby wipe or towelette.","Cuttings are live plant material without a previously developed root system.","Refusals to permit sample collection commonly emerge unless you can identify a section of the law which specifically authorizes it.","Complete installation of enclosure systems, such as new drywall, paneling, or siding, can be best evaluated by direct visual observation.","According to the complaint, the Hovnanians failed to monitor the Seymour Property throughout the construction process, and consistently engaged in construction activities that exceeded the maximum permissible vibration threshold.","An owner shall maintain or transfer to a subsequent owner records of inspections of dwelling units performed pursuant to this section.","Affidavit of Release of Liens.","The landlord must promptly inspect and correct any defective conditions including removal and repair of deteriorated paint.","The valves shall also release an accumulation of air when the system is under pressure.","XRF testing of all interior and exterior surfaces, and collecting dust wipes following HUD mandated procedures.","KKI acknowledged that there are no lead clearance standards for vacuum sampling and nothing that provided any particular level of lead measured through vacuum sampling was safe, but KKI agreed that it would not make that argument.","Antennae shall be removed.","The fifth group consisted of modern houses, which had never had a presence of lead dust.","We did not review the St.","Department of Housing Preservation and Development; nor shall he accommodate any lodgers in any room in which a card, duly issued therefor, is not displayed as above described.","Body materials shall be installed exactly at all high points.","That policy should address backups or escrowed copies within the scope of the devices on which they are actually stored.","The specifications written for the abatement project shall also include the required air clearance procedures.","Some chemical manufacturers may write the SDS themselves, while others may hire a specialist to write the SDS for the chemical they are manufacturing.","EPA chemical waste landfill approval.","Coverage depends on facts and circumstances of each individual claim or loss, the applicable laws, and the policy provisions in the GNY insurance policy.","Terms of subordinate mortgage and disbursement agreement.","We answer that question in the affirmative.","Proportion of the total surface area to sample.","If you shipped the sample, enter the name of the carrier to whom the sampled was delivered.","Expenses in searching for replacement business site.","PCB Article Containers, and PCB waste in PCB Containers in storage at the facility at the beginning of the calendar year, received or generated at the facility, transferred to another facility, or disposed of at the facility during the calendar year.","Do not enter the work area during that period.","The owners of the properties that IRS managed, as well as city officials and inspectors, had the authority to give orders directly to Mosley concerning those properties.","Ultimately, the head of theorganization is responsible for ensuring that adequate resources are applied to the program and for ensuring program success.","If so, how should the information be distributed?","Completing all required Priority I items prior to starting any Priorityitems as identified in Section VI.","These should be obtained from the servicing laboratory or in an emergency, at local cooperating health agencies.","All letters shall be free of any imperfections and shall present a high quality appearance.","To this extent these rules and regulations cover only general conditions and are not designed to cover specific or special cases.","The subject of a preservation loan made by HPD or HDC within the last two years.","Application of State law and other Federallaw.","EPA for each PCB storage facility owned or operated by generators of PCB waste.","Castings for grates and solid metal covers for catch basins and inlets shall be cast steel or ductile iron and as shown in the Standard Plans.","Ask the affiant if the statement is true and correct.","Contaminate a minimum of eight surfaces for a complete validation study.","Family, whose Former Apartment is the subject of a Vacate Order and who is eligible for Relocation Services under any provision of these Rules.","Note any special preparation methods such as fumigation, frozen, kept under refrigeration, etc.","EPA considers that work site to be temporarily excluded from the common area of the building for prerenovation education purposes because it is not accessible to the residents and users of the building.","TAX EXEMPTION The City is exempt from the payment of any federal excise or any Maryland sales tax.","OF DEMOLISHED MATERIALSGeneral: Promptly dispose of demolished materials.","Activities that disrupt the matrix of ACM, render ACM friable, or generate visible debris from ACM.","The level of effort applied when attempting to retrieve data may range widely.","Farfel was referring to children in general when making this remark.","The Site possesses unique features which make the treatment afforded by the Project necessary or desirable.","Physical barriers shall be used to limit access to the work area.","Department of Housing Preservation and Development in writing, shall be paid to the architect at the rate of two and a half times the reasonable salaries of technicians engaged in such changes.","Gradually work the product across the sieve to the low side and into the receiving container.","As an alternative, a liquid encapsulant can be applied on such components when the surface is deemed suitable for such coatings.","Attorney General of the State of New York for filing.","Accompanying said request must be photocopies of utility bills for the period of two years prior to the date of request in order to compare current costs with prior costs.","This cannot be helped due to Federal Requirements.","Second, municipalities can be more responsive to the particular needs and conditions of the community.","Removing, modifying or repairing painted surfaces or painted components.","The owner shall maintain a record of such treatments which shall be available at all times for the inspection by the department.","The portion of ground mounted guide post installed below ground may be the same material as the portion above ground or other durable material suitable for firmly anchoring the post in the ground.","Document the possible link between the source of an environmental sample and contamination of the food product using both written descriptions and photographs.","Code, the Regulatory Agreement shall be deemed terminated.","The neutral conductor shall be the same size as the insulated conductor.","Instructions to Dealer The manufacturer or shipper often provide sales promotion instructions to the dealer.","Metal Soffit Panel: Provide metal soffit panels full width of soffits.","All documents, correspondence, and data that have been provided to the owner or operator of the facility by any State or local government agency and that pertain to the storage or disposal of PCBs and PCB Items at the facility.","Any portion of the loan representing interest on advances during construction shall be adjusted upon completion of the rehabilitation as follows.","The approval will state all requirements applicable to the approved landfill.","All bids must be regular in every respect and no interlineation, exclusions, or special conditions shall be made or included.","If you do not respond to this notice, the owner is required to attempt to inspect your apartment to determine if a child under six years of age resides there.","Credit card, debit card, or information needed to complete an ACH payment of the applicablefee.","The training providers shall maintain records that document the names of all persons who have been awarded certificates, their certificate numbers, the disciplines for which accreditation was conferred, training and expiration dates, and the training location.","Nothing in this chapter shall be construed to limit the authority of the Secretary, the Commissioner of Health, the Commissioner of Labor, or the Commissioner of Environmental Conservation under the provisions of any other law.","Prior to the time a purchase and sale agreement for target housing is executed, the seller shall provide the buyer with materials approved by the Commissioner, including a lead hazard brochure and materials on other lead hazards in housing.","Revocation of Tax Benefits for Cause.","The housing company shall prepare the requisite petition, application, or motion for an increase in the maximum rental or carrying charges per room and submit same to HPD for approval as to form and authorization for hearing procedures.","Any of these materials must support and convey the understanding of the subject to the student.","Table II, galvanized at finished size.","Inspect and discuss condition of construction to be selectively demolished.","Except that spaces such as entryways, hallways, stairways, etc.","EPA will deem any properly filed request for the renewal of the exemption by any member of the class as a renewal request for the entire class.","Do not make unreasonable demands.","If only one section is used, leave the other section blank, and submit the entire page.","HUD clearance examination is to determine whether the clearance area is safe for occupancy or for entry by unprotected workers.","The laboratory shall establish a calibration programme, which shall be reviewed and adjusted as necessary in order to maintain confidence in the status of calibration.","The children of middle class or rich parents apparently were not involved.","Department of Housing and Urban Development regulatory agreement for an insured subsidized project, or where, through foreclosure, title to a building eligible for partial tax exemption pursuant to the Act is held subsequently by the Department of Housing and Urban Development.","Such inspections shall be for the purpose of inspecting the condition and maintenance of the building, the condition of utilities, fixture and equipment.","If defective paint is not found, no corrective work or clearance testing is required.","The down payment shall be the amount necessary to make a down payment on a suitable replacement dwelling.","As with any sanitization tool, independent validation should be performed to ensure the desired functionality is provided.","International Electrotechnical Commission nonprofit organizations that develop and publish international standards.","The work completed shall carry no warranty.","HHS will conduct or fund research that the IRB does not believe meets the requirements of Sec.","This is a separate episode.","Work must be performed in accordance with state standards.","Conduit bodies shall have tapered threads and include a bolt on cover with stainless steel screws and a neoprene gasket seal.","These emergency renovations are not exempt from cleaning requirements, cleaning verification requirements, or recordkeeping requirements.","This provision strengthens the state regulation that requires the city to inspect an apartment upon request of the tenant when a child under age six or a pregnant woman resides there.","Unless otherwise specified, spiral rib storm sewer pipe shall be furnished with pipe ends cut perpendicular to the longitudinal axis of the pipe.","Elaborate in Remarks if necessary.","For compliance samples, you must maintain sub integrity.","Signature Printed Name __________________________________ ____________________________________ Title Date Subscribed and sworn to before me this _________________ of ________________.","GMS acknowledges that it did not install crack monitors.","OR ACRONYM DEFINITION Uncertainty of Measurement within which the true value of a test result is estimated to lie, genrallywithin a gien lilihood.","Such written feasibility study will be distributed to each shareholder no later than sixty days after its preparation is completed.","Urine stained areas may be photographed under ultraviolet light conditions.","The receptacle shall be fully annealed.","State Finance and Procurement Article of the Annotated Code of Maryland.","Both bags must be tight enough to provide both a leak proof seal and minimal airspace during shipment of the moistened sponge.","These vendors must have current licensure applicable to their specialty.","Using a random number generator or random number table, select one of the four equal parts from each of the eight equal areas.","EPA risk assessment or similarly comprehensive inspection for lead hazards and their sources.","The date of completion of the EMP.","No applicant can be refused a place on an external waiting list for reason of financial ineligibility.","County of New York.","In addition, the shop drawings shall show placement of reinforcing steel, knock outs, and any other appurtenances.","The Agency may cancel any auction at any time.","The Contractor shall place the controller in minimum recall with interval timing set at convenient value for testing purposes.","BID SUBMISSIONS Bids submitted on separate forms are NOT acceptable unless specified in the Bid Document.","Each fire extinguisher shall be maintained in a fully charged and operable condition.","Affidavit are not true and correct, the Mayor and Council of Rockville may terminate any contract awarded, and take any other appropriate action.","There is also no restriction on the level of starting PCB surface concentration.","In many cases, remediation will involve wet sanding and repainting of paint that is peeling or chipping.","City that such respondent is properly qualified to carry out the obligations of the contract and deliver the service herein.","Further, all of its design and related engineering services on the project accorded with good and accepted engineering practices.","In that regard, we note that there are substantial factual differences in the Higgins and in the Grimes cases.","For the purposes of this section, Small Cable Vaults are considered a type of Standard Duty Vault.","General PCB disposal requirements.","State or Federal regulations or requirements for control of radioactive materials.","This information needs to be entered as soon as the CR is created, in order for the laboratoryto adequately prioritize sample analysis and provide a timely notification to the firm.","If required by the Engineer, admixtures shall be sampled and tested before they are used.","The Contractor shall confirm the list of the below required janitorial equipment and number of trained equipment operators that will be used to provide required services upon award of contract.","HPD shall review the application of an occupant who seeks to become a successor tenant and shall advise the applicant of the acceptance or rejection of such application.","The fact that if such information was furnished, it mightbee research, does not affect the need to supply theinformation, or alter the ethics of failing to provide such information.","All work must be up to minimum building standards of the project jurisdiction and abide by all applicable building codes.","Sample Form OUR PROGRAM STREET ADDRESS CITY, STATE, ZIP ____ choose to remain in my home while rehae while rehabeing performed.","Purge: Most USB removable media does not support sanitize commands, or if supported, the interfaces are not supported in a standardized way across these devices.","Select the laboratory to which you are sending the sample.","Briefly describe the analytical laboratory experience.","The worker course may be taught in another language, provided the instructor is fluent in the language, and books, training materials, and examinations are in thesame language.","DSHS or Local Program inspector.","Strings of such ladders shall be secured at top and bottom and ladder must be so arranged as to permit sufficient toe hold.","Cost of sampling, testing, and processing will be borne by the sourceowner.","If so, sample the pile once and restart the sampling collection process to collect additional samples.","Load switches of sufficient quantity to fully populate the output files shall conform to TEES and shall have indicator lights on input and output circuits.","Open flame burning or torching.","JG CONSTRUCTION OF QUEENS, INC.","Any excess material resulting from the preparation of these samples, which is not used as an analytical sample, is regulated as the PCB concentration in the component having the highest PCB concentration of the component materials in the sample.","Late bids will not be accepted and returned to the vendor unopened.","US; it is packed as a single item with few or no other ingredients added, and it is notmanipulated in any major manner, which changes the product or its composition.","Commercial areas are typically accessible to both members of the general public and employees and include public assembly properties, institutional properties, stores, office buildings, and transportation centers.","The facility must retain a copy of this manifest for its records, and then give the remaining copies of the manifest to the transporter to accompany the shipment.","If the certified renovator provides onthejob training to workers, does there need to be documentation of that training at the work site too?","The Contractor shall not be compensated for claims of exe paint and other finishes nor shall his guarantee in any way be affecting his work.","The removable media must be removed and sanitized using mediaspecific techniques.","Alternate fasteners for basket assembly shall remain closed when subjected to a pound tensile force when confining the maximum number of wires to be confined.","The age of housing units is frequently used as an indicator of the overall condition of housing.","ACCESSORIESGeneral: Furnish roof insulation accessories recommended by insulation manufacturer for intended use and compatible with membrane roofing.","Trough is the surface where both window sashes can touch the sill when lowered.","Physical Destruction A Sanitization method for media.","NOTE: Administrators may not charge an application fee.","CO shall be continuous.","If you work outside of one of those states, your firm needs to be certified by EPA.","The Commissioner shall ensure that all health care providers who provide primary medical care to children six years of age or younger are informed of the guidelines.","Agency in its Rehabilitation Loan Reserve Fund.","The formidable range of potential penalties may also influence landlord compliance decisions and behaviors.","If working in target housing occupied by persons who are blind, how should a firm comply with the prerenovation information distribution requirements?","The city and the agency shall not be obligated to pay, nor shall they in fact pay, any costs or losses incurred by any applicant at any time, including, but not limited to, the cost of preparing an application.","Agency deems such method of selection to be necessary or desirable, and the Agency shall not be required to utilize any selection process solely because such selection process has been mandated by any other entity.","In addition, they may be subject to civil and criminal penalties.","Capitalization Rate of all Qualified Transactions in a given borough during the four most recent Fiscal Quarters, as calculated by HPD, at the time each Speculation Watch List update is completed.","The electrical connection between case and lamphousing shall be accomplished with an interlock assembly which disconnects lamp holder when opened.","If the package is addressed to an FDA unit, show the FDA routing symbol following the name of the FDA unit.","If they decline, read it to them.","Housing Development Corporation or its successor.","Replacement housing for homeowner.","Contaminated natural gas pipe and appurtenances.","State Division of Housing and Community Renewal, the housing company has been duly organized, and the development has been approved by the Board of Estimate or its successor.","The most common source of lead hazards are generated in a residential environment.","Building has not previously participated in the Program, unless such participation was terminated more than five years prior to the current application.","Advisory Actions and Administrative Actions are types of actions that do not involve the judicial system.","RRP Rule apply to states and local governments?","The glazing that holds the pane in place in older windows is painted, and this glazing has to be removed for the pane to be replaced.","Motion actuated security lighting will be installed at the rear and sides of properties where it will increase safety.","If the general contractor is a certified firm, does my firm also have to be certified, or can we just provide the certified renovator?","Specific areas that may need to be confirmed include paint removal, paint film stabilization, component removal and replacement, enclosures, soil treatments, encapsulants and interim controls.","Once the manual adjustment is set, the valve shall operate automatically in the adjusted position.","In this case it is best practice that clearance be performed by an independent third party whose payment is not dependent on completion of the job within any particular time period.","In calculating rental adjustments pursuant to Rent Guidelines Board orders the amount of the waived rent shall not be included in the base rent.","The controls should be collected at the start, during, and at the end of the sampling period.","IRS or New York State income tax returns for the immediately preceding year.","Afterctor will then submit an invoice for final payment ofretainage accompanied by a Lien Waiver Affidavit and gn this final certification, paymentmay be withheld from the contractor.","Do not touch or disturb the area inside the template or tape.","The process uses no external heat.","Absent dedicated leadership and active community support, even the strongest lead laws are vulnerable to erosion because of lack of sufficient implementation resources.","However, the colors shall not blister, bubble, peel, or be easily removed.","Armstead concerning the vacuum sampler results, described supra.","Dipping, painting, welding, plugging, or repairing defects will not be permitted.","Use in heat transfer systems.","It was a practice in earlier years, and perhaps even now, for subsurface miners to rely on canaries to determine whether dangerous levels of toxic gasses were accumulating in the mines.","All welds shall develop the full strength of the parent metal.","The marked and numbered device shall be of sufficient strength to be forced down through the maximum depth of the pile and sufficient length to measure the depth of the waste in the pile at any point.","Training providers should submit a copy of this statement to EPA in lieu of a photograph.","Pursuant to the procedure set forth herein, a new owner may seek to limit his or her liability while attempting to achieve correction of violations.","Thed no reason to expect that the results wouldbe forthcoming sooner.","The agency shall require proposals to be submitted in the format and number prescribed in the RFP and to contain all information and forms required therein.","These records must be available on site for review by the department.","In deciding the area of the exterior visual assessment, the clearance examiner should take into account the nature, extent, location, and duration of the work and the design of the containment used to limit the spread of dust and paint chips.","Court: Kennedy had a reason not to tell these parents that their kids wereexposedmething dangerous, because if they did the parents might leave andthen the study to be studied down the road.","Record the number of the metal seal used on the CR.","Precleanup sampling data used to establish the spill boundaries if required because of insufficient visible traces, and a brief description of the sampling methodology used to establish the spill boundaries.","Housing for the elderly is not subject tothe RRP Rule unless a child who is less than six years of age resides or is expected to reside in the housing.","Subparts C and D set forth the specific requirements for disposal and marking of PCBs and PCB Items.","EPA identification number previously assigned to them under RCRA by EPA or a State.","Minimum Average Hourly Wage Act, as relevant.","The research study wasspecificallydo the categories ofhouses to study the potential effectiveness, if any, of lesser levels of repair andmaintenance.","The provision of the Subsidy shall be made subject to satisfaction of all the terms and conditions contained in such commitment letter.","Study was designed and structured as a minimal risk study.","The Building has not been accepted into another HPD disposition program.","Do not leave blanks.","Certified Abatement Contractor shall conduct a final inspection of the punch list items in accordance with the standards set forth above, as applicable.","This sample type is used primarily for the collection of perishable products and special sampling assignments.","Reinsert circulars removed from packages.","Properties must be located in the target area and contain confrmed leadbased paint hazards.","Signature of the signer of the certification statement, typed or printed name and official title of signer, and date signed.","The DIB has the phone number of the local of\ufb01ces of the OMCS as part of a MOU between DOT and FDA.","Contractor will furnish to the Mayor and Council of the City of Rockville, under oath, answers to any interrogatories to a possible conflict of interest has herein embodied.","Signature, JG, and Mitchell.","Entries will be made for every day that monitoring activities take place and should contain sufficient notes to enable the Department of Community Development to understand conversations, instructions and other activities that took place at the work site.","Statement of Policy and Intent.","Third Party, or his or her designee, shall inform the Tenants that the property has entered into an interim evaluation period, and shall provide information to the Tenants about the process toward eventual ownership by the Tenants.","The right side of the cabinet, as viewed from the front, shall be considered the Signal Control side.","Agreement to be executed by the County upon approval by the County Council and County Executive.","House numbers shall be of such size and shall be so located as to be clearly visible from the public sidewalk during daylight hours.","Department and has a current license issued by the Department to conduct risk assessments.","Western red cedar will not require preservative treatment.","The encryption itself acts to sanitize the data, subject to constraints identified in this guidelines document.","The Texas Commissioner of Health.","Occupied Units must attend the meeting.","When the material is delivered to the project, the Engineer will check the order for the appropriate grade stamp.","Rockville, MD FOR APPELLEES.","Cut masonry at junctures with construction to remain, using powerdriven saw, then remove masonry between saw cuts.","Other wastes placed in the landfill that are not chemically compatible with PCBs and PCB Items including organic solvents shall be segregated from the PCBs throughout the waste handling and disposal process.","All housing companies are required to enter into written agreements for management services which must be approved in writing by HPD.","AIHALAP, LLC in the appropriate field of testing.","In the event a mutual housing company has substantially depleted its waiting list, the mutual housing company shall seek potential applicants.","Submission olist of completed tests, checklists, commissioning, reports, and similar requirements for the work that are submitted and in compliance with the Contract Documents.","Each licensee shall assist and cooperate with all properly identified representatives of the department in the conduct of asbestos inspections or investigations at all reasonable or necessary times, with or without priornotice.","Common charges or carrying charges.","When quoting from a label, or labeling, use exact spelling, capitalization, punctuation, arrangement, etc.","The Agency may charge a fee, in an amount to be determined by the Agency, for a copy of the RFQ.","In order to support informed decision making by users, vendors may choose to provide information about how a specific device implements any dedicated sanitize commands supported by the device.","The CONTRACTOR shall be responsible for necessary equipment and shall be responsible for providing all supplies needed such as, but not limited to, cleaners, waxes, trash can liners, etc.","Otherwise yield an inferior product.","What does this mean for cost allocation purposes?","In our view, otherwise healthy children should not be the subjects of nontherapeutic experimentation or research that has the potential to be harmful to the child.","Additional time for the completion of the scope of work is subject to the approval all parties.","Sample a minimum of seven segments.","Capture and contain all solvents and cleaners for reuse, decontamination, or disposal.","All terminals, shall be numbered and permanently identified with PVC or polyolefin wire marking sleeve consistent with the cabinet wiring diagram provided by the signal controller manufacturer and the Contract.","ACQ Treated Lumber: Do not install steel or aluminum roof systems over ACQ Treated Lumber without consulting panel manufacturer regardingproper installation procedures and requirements.","These rules may be amended pursuant only to the procedures and requirements contained in CAPA.","The mill certificate and test report shall include the yield and ultimate strengths, elongation at rupture, modulus of elasticity, and the stress strain curve for the actual prestress reinforcing intended for use.","HPD assigned to coordinate and direct the provision of Relocation Services to a particular Relocatee.","All rental housing companies shall recognize a duly constituted Tenants Association that will be representative of the tenant body as a whole.","KKI also argues that any error the circuit court could have committed in granting summary judgment was harmless because there can be no prejudice under the current procedural posture.","As described above, the firm would be excused from this requirement.","In addition, the county health department also has jurisdiction.","Piping: water mains and risers.","Please provide the ownership information for the Sole Proprietorship, Partnership, Limited Partnership, Corporation, Limited Liability Company or Governmental Entity.","Wood girders, columns, posts, etc.","Color The base color of the drum shall be fade resistant safety orange.","An Applicant or Selected Applicant has failed to comply with any term or condition established by the City or the Agency, including, but not limited to, any Program or Project requirement, deposit requirement, deadline, or schedule.","We shall resolve all of these primary issues.","Distribution of Affordable Housing Units.","We also encourageconsumers to choosefirms that are certified.","This section applies to facilities used to incinerate PCBs required to be incinerated by this part.","Documents in the possession of an agent are also deemed to be in the possession of the person or entity represented by the agent.","English, with the translator as the affiant.","Motel or Tourist Cabin.","HPD, the Sponsor and a Tenant eligible for rental assistance to temporarily accept less than the full rent from the Tenant prior to the provision of rental assistance.","Repair if economically feasible.","HPD to furnish certified copies of their IRS and New York State income tax returns.","Environmental Pollutants and Disease in American Children: Estimates of Morbidity, Mortality, and Costs for Lead Poisoning, Asthma, Cancer, and Developmental Disabilities.","The fact that if such information was furnished, it might be difficult to obtain human subjects for the research, does not affect the need to supply the information, or alter the ethics of failing to provide such information.","To determine the level of rehabilitation assistance remember to take the lower of Rehabilitation hard costs per unit OR Federal assistance per unit.","Affiliates should: Ensure that durable plastic sheeting and tape are available to isolate the worksite and cover the floor and ground.","There can be no prejudice when the finder of fact did not reach the issue to whichthe alleged error goes.","Should I furnish any false information in this application, I hereby agree that such act shall constitute cause for denial, suspension or revocation of certification in the State of Rhode Island.","Administrative Code, provided, however, that in investigating whether Harassment occurred pursuant to this Chapter, the Department shall apply the definition of Harassment in such section of the Administrative Code that existed during all relevant times of the Inquiry Period.","Certification of inability to obtain financing.","Notice Inquiring About the Residency of a Child of Applicable Age.","AIHA LAP, LLC Informs Laboratoryof AADecision and Option for Appeal Laboratory Appeals Request Received?","Mnd to obtain any necessary clarification on contract terms before submitting bid.","Use in and servicing of electromagnets, switches and voltage regulators.","The inspector, management planner, and air monitoring refresher courses shall each be four hours in length.","All loose materials and broken or cracked glass shall be replaced with minimum of SSB glass.","Owner Responsibilities for Notices of Suspected Gas Leak Procedures.","Manifest Tracking Number of the new manifest that will accompany the shipment, and a description of the partial rejection in the discrepancy block of the original manifest.","Philadelphia also excludes various types of student housing.","All examinations shall be performed by persons or entities independent of those performing hazard reduction or maintenance activities.","Fill solidly between partition uprights from underside of flooring to ceiling with brick, gypsum, or other acceptable material packed solidly to fill all spaces and voids.","Because their bodies are still growing, children tend to absorb more lead than adults.","The signature must be an original, a copied signature will not be accepted.","Unlike permanent walls, however, vertical containment barriers are subject to all containment cleaning requirements including misting, inward folding, sealing, and proper disposal following the renovation.","The specifications approved by the Department shall be made part of the written construction contract between the owner and the general contractor, and such construction contract shall be subject to the written approval of the Department.","This policy should include coverage for the maintenance or use of the premises as well as for all elevators which are located in the development.","AIHALAP, LLC accreditation is used in a misleading manner.","Thef halloneompionsupporting ocumentation he aigie.","Safe Housing Rule Applicability Form, by the Bureau of Housing.","State or local law are considered real property, but including such items of real property as the site occupant may lawfully remove.","All sockets shall be so wired that a white wire will be connected to the shell of the socket and a wire, the color of the lens, to the bottom, or end terminal of the socket.","It shall have such characteristics of size and shape that it will compact readily, and the maximum particle size shall not exceed \u2154 of the depth of the layer being placed.","If the clearance area includes more than four rooms in a dwelling unit, the clearance examiner may select just four rooms to sample, and those rooms will represent all rooms within the clearance area.","Next, plaintiffs contend that the Hovnanians are obligated under the license agreement to pay for their legal fees and expenses incurred in connection with this litigation.","Initial Filing Date with the Office or the application may be deemed withdrawn.","The floor of the work area shall be covered with polyethylene plastic or equivalent sheeting.","Repair areas where lead paint is deteriorating by repainting using a good latex paint or lead sealer.","Upon expiration of the time allowed for the tenants to answer as set forth in such notice, the Office of Rent Control shall forward any responses to the administering office or department.","Therefore, plaintiffs assert, they are entitled to a judgment against the Hovnanians finding them liable under the license agreement for the cost of these repairs, with the specific amount of damages to be determined at trial.","Purpose of tax syndication sharing program.","Inspection warrants; rent withholding; fines; incarceration; emergency injunctions authorized.","At an intersection where there are no existing operational signal displays, the covers may be black in color.","Lead dust sampling should then be performed to verify that the cleaning was effective.","When transported in open vehicles, plants shall be protected by tarpaulins or other suitable cover material.","Each signal section shall include a covered terminal block for clip or screw attachment of lead wires.","The training provider must also notify EPA before and after conducting the course.","Sites from a bid solicitation.","Eligible Buyer, the Homeownership Affordable Housing Unit must be sold to another Eligible Buyer and the net proceeds from such sale shall be given to such Successor.","Based for more information.","The total expenses of the multiple dwelling shall be determined by the Department in order to calculate the initial adjusted monthly rent.","It shall be essentially free from various types of wood waste or other extraneous or objectionable materials.","The number of locations and size of each sample should take into consideration the risks in transferring the Target Data to the storage media of the machine hosting the sanitization application.","Proof of adulteration with fecal organisms, elevated levels of nonpathogenic microorganisms, or presence of pathogenic microorganisms must be established.","Samples must be delivered as promptly as possible to the laboratory if regulatory action is to be taken against actionable lots.","EPA and presumably was therefore subject to these federal conditions.","The experiment should be so designed and based on the results of animal experimentation and a knowledge of the natural history of the disease or other problem under study that the anticipated results will justify the performance of the experiment.","Researcherstted to completely immunize themselves by relianceon is incomplete in a material respect.","The facility possesses the capacity to handle the quantity of PCB waste which the owner or operator of the facility has estimated will be the maximum quantity of PCB waste that will be handled at any one time at the facility.","Cover and protect furniture, furnishings, and equipment that have not been removed.","Routine ingress and egress is allowed.","Fuses for LED luminaires shall be slow blow.","Orient the liner with the arrow pointinch of the core from the liner with the plunger.","No Eligible Multiple Dwelling that is operated as a Hotel shall be eligible for Affordable New York Housing Program Benefits.","HPD will reimburse a Relocatee whose possessions are moved from the Former Apartment to a storage facility, a Standard Apartment, or lawful dwelling unit for his or her moving expenses in an amount determined by HPD.","These Rules set forth the procedures for Site and Sponsor selection for Projects.","JG is also dismissed for the reasons already discussed.","Removethe top six inches of contamined soil and rototilcleansoil into the area.","Ceilings shall be repaired with matching materials.","The material shall meet one of the options in the soil plasticity table below.","Moreover, the city refers these fines to private collection agencies.","Messenger hanger and wire entrance fittings for Type P, Q, R, and S mounts.","With respect to common areas in public or commercial buildings that contain childoccupied facilities, the childoccupied facility encompasses only those common areas that are routinely used by children under six, such as restrooms and cafeterias.","County Council and County Executive shall constitute the terms of a Contract or Agreement with Jefferson County, Missouri, subject to any further Amendments, Memoranda or other documents or specifications which must be set forth in writing and signed by all parties.","Collecting samples from a single pile.","The commitment letter may require, among other things, that the Sponsor and its contractors and all of their respective principals obtain necessary City approvals and clearances as a condition precedent to the closing of the Loan.","You are more likely to get the records through courteous persuasion and tact than through stressing the force of law.","Household, the sum of Monthly Fees, monthly utility allowances, Mortgage Payments and monthly property taxes, if applicable.","Department of Buildings, provided, however, that there shall be no doors or openings in the wall between the buildings served by such balconies other than windows in fireproof airshafts.","Union Pacific Railroad Co.","Dismissal Request in the Code Enforcement Borough Office.","The Alternate Site List may be incorporated into the text of, and will in any event be deemed to be incorporated by reference in, the Alternate Site Notice.","After inspection, plaster boards or perforated rock lath may be applied directly over the existing plaster face of partitions on hall side.","Federal information systems, but such standards and guidelines shall not apply to national security systems without the express approval of appropriate Federal officials exercising icy authority over such systems.","Acceptance of qualifying documents.","Following up with contractors to ensure that necessary warranty work is completed as XXIII.","Termination of Relocation Services will be stayed pending a determination of the appeal.","Is the building a residence?","RRP Rule would apply.","In addition to a certified renovator, a person certified by EPA as a risk assessor or lead inspectormay use an EPArecognized lead test kit to determine that regulated leadbased paint is not present in ahome.","State or political subdivision thereof; any interstate body; and any department, agency, or instrumentality of the Federal Government.","Therefore, the court will not consider extrinsic evidence, such as deposition testimony.","The due datefor audit and retrospective premiums is the dateshown as the due date on the bill.","CD that can be Purged and rewritten multiple times.","Mixing the dried waste.","The housing company shall give immediate notice to HPD of the occurrence of any damage to its property caused by fire or any other hazards, whether or not covered under any of the above insurance coverages.","The maximum number of grid points in a composite sample taken from a subsequent compositing area is eight.","If such Claimant fails to provide such notice, such offer will be permanently withdrawn.","An educational organization is eligible if it normally maintains a regular faculty and curriculum and normally has a regularly enrolled student body in attendance at the place where its educational activities are regularly carried Medical Cost and Work Related Reimbursements.","The physical requirements shall be tested on weekly intervals for four weeks and thereafter on monthly intervals.","SAMPLE SENT TOChoose appropriate lab from the list of values.","Must I provide separate notice to the tenants for each one of these activities or is there any way to avoid such duplication?","Compactors shall be located entirely within the enclosure of the refuse room and former combustion chamber where the latter is retained, except that motors, pumps and controls may be installed in adjacent rooms.","This includes all post that do not fit into the two types indicated above.","As required by statute.","There shall be unobstructed aisles providing access to all required means of egress in all dormitories.","Atlanta Center for Tobacco Analysis.","Where other methods of shipment do not suffice, larger samples may be shipped certified or first class as a last resort.","If a general contractor and one or more subcontractors are involved in a single renovation project, which persons or entities are responsible for preparing, retaining and making available the necessary records?","Department of Housing Preservation and Development of the City.","January first and no later than January sixteenth, provided, however, that if such notice is enclosed with the January rent bill, such notice may be delivered no sooner than December fifteenth and no later than January sixteenth.","Mostriments is not by itself a reliable indicator thatthey are justified, nor is it itself what justifies them.","Repayment of the loan by the borrower.","KENNER attached to the certificate.","Prior to the submission deadline, the Agency may, but shall not be required to, hold an open conference where Agency staff answer questions about submission and Project requirements.","How do I know when I need to comply with the RRP Rule?","Owners of the Pilot Program Building who are authorized to sign on behalf of and bind such Owners.","Submit all suspect samples to laboratory for confirmatory analysis.","Respondent: Because either side could withdraw without any claim forbreach of contract from the other.","City and the Contractor which is not disposed of by the final agreement shall be decided by the City Manager.","No research was ever published, although in the speech pathology scientific community there was some knowledge of it.","Provide other advisory services to displaced persons in order to minimize hardships to such persons in adjusting to relocation.","Are there any financial assistance programs available to subsidize needed repairs?","Securing personal judgments against owners has provided the city with substantial leverage, partly because of the effect an outstanding judgment can have on individual credit reporting.","The Department may limit the granting of such benefits to situations in which the relocatee has selected a permanent accommodation and the dwelling is not yet ready for occupancy.","Select surface sample locations using representative sampling or a census.","HPD as additional insured parties.","He testified that each sample had a unique bar code.","However, a firm acting only as a subcontractor may be included as a subcontractor for two or more bidders submitting a bid for the work.","Depending upon the number of people served by your water system and the levels of lead and copper found in sampling, your water system may also install corrosion control treatment.","Cover the area with a tarp to deflect the rainwater away from the work site.","The presiding officer may also appoint nonmembers of the committee to serve on subcommittees.","The City and the Agency shall not be obligated to pay, nor shall they in fact pay, any costs or losses incurred by any Applicant at any time, including, but not limited to, the cost of responding to the RFQ.","Strapping shall encircle the pile once and be tensioned as tightly as possible.","IN WITNESS WHEREOF, the parties hereto have executed this Agreement in triplicate on the day and year first above written.","The affiant may be reluctant to sign a statement, which reveals his or her identity.","Required Amount of Contribution to Affordable Housing Fund.","Wehat the court below should, in thecircumstancesd that the consent of the parentwas necessary.","PCB waste at all times.","Neill and Autun to complete the project and should not be held responsible for any errors the construction professionals committed.","Flashers, flash transfer relays, conflict monitor, AC isolators, DC isolators, discriminator modules, program modules, modem modules, breakers, buses, police panel switches, receptacle requirement, vent fan and auxiliary control panel switches shall conform to the requirements noted in the TEES.","Assignment was based on whether the property was currently being used as a residence.","Painted steel, painted or anodized aluminum is not allowed.","The method of analysis.","Hilary Gafford, Weston Solutionshilary.","Tell the client to clean the workarea before the clearanceexamination.","Imposing more rigid maintenance requirements on units with children may increase reluctance by landlords to rent to such households.","Contractor provides testing and certification for toxicity characteristics to the Engineer.","Control of emission of the gaseous combustion products.","If the cooperator in residence vacated the apartment any time during the depreciation period, he or she would be reimbursed for the remainder of the period by the incoming cooperator.","Describe whether the labeling was sent to the dealer by the shipper of the goods or if the dealer prepared the labeling himself or if it originated from another source.","Such real property interests shall include, but shall not be limited to, ground leases, easements, future interests, and other conveyances of less than the entire fee title to a Site.","You must be a trained and certified renovator in order to perform the work, and certified as a leadsafe firm.","Finally, Signature moves to dismiss any cross claims against it for breach of contract for failure to procure insurance.","For the twenty year benefit period, the eight years beginning in the thirteenth year after completion of construction.","Cast iron fittings may be used with ductile iron pipe.","Supplier, Contractor, and Seller and includes designated representatives.","Eligible Multiple Dwelling that is part of such Application unless all of the Eligible Multiple Dwellings in such Application that were previously granted such benefits remain in full compliance with all of the eligibility requirements for such benefits.","EPA consider before deciding to require that all water systems include educational lead information in their CCRs?","PCB waste handling at the facility.","Subgrantees that use their own employees to perform any or all of the weatherization services in the home, such as the subgrantees in the first two categories, must be RRP certified firms.","Do not use permanent type markers when identifying subs in absorbent containers if the ink may penetrate into the product thus contaminating the sample.","Tenant Association without prior written approval of HPD upon any default in the lease.","The storage shall be managed so that the PCB Items can be located by this date.","Hard swells may explode.","OJT and regularly directing other workers, a firm acting as a general contractor my satisfy this requirement by hiring another certified irm that in turn assigns a certified renovator to the job.","Oil, gas, or combination burner.","PCB remediation waste or porous surface at the cleanup site, there are two options.","Trees supplied and delivered in a nursery fabric bag will not be accepted.","Where rooms have more than one window, the window to be sampled should be alternated from room to room to avoid bias in sampling.","AWWA Standards for such castings.","The method of attachment shall ensure that the light does not separate from the drum upon impact.","The Contractor must provide a binder for each employee to sign in and sign out each shift and to note any problems or repairs needed.","Examples of deteriorated paint include: cracking, scaling, peeling, or chipping paint or any visible dust, debris or paint chips.","The actual or intended use of a property is often made apparent by the type of building features it contains.","This information allowed us to analyze how implementation of the local lead law interacts with controlling law, local and state government agencies, and relevant state and federal laws.","Numerals or letters shall be of a color which will contrast with the background.","The agency may undertake actions for any public purpose, provided that all actions undertaken in connection with the tax syndication sharing program are authorized by applicable laws.","EPA during normal business hours, and each owner or operator of a facility subject to these requirements shall know the location of these records.","Monies in the Fund may be used by the Commissioner only to support Departmental accreditation, certification, licensing, education, and training activities related to this chapter.","Any further documentation of variances should be on forms approved by and submitted the original Certificate of Conformance.","Including renovation notices in, or as an attachment to, a preexisting newsletter is acceptable provided that the cover of the newsletter prominently indicates that leadbased paint renovation notices are contained in or attached to the newsletter.","Recleaning, if necessary, should be performed as soon as possible after receiving dust sampling results because dust lead on failed surfaces can migrate to other surfaces that successfully cleared.","Sanitization performed via a remote wipe should be treated as a Clear operation, and it is not possible to verify the sanitization results.","At least once a year, using methods recommended by the Department, thoroughly clean all interior horizontal surfaces, except ceilings, in common areas accessible to tenants.","Label each tube with its own identification number to be recorded on thesample collection form.","Agency to be appropriate upon admission to the auction.","In implementing the Notice, the Office of Healthy Homes and Lead Hazard Control contracted with Destiny Management Services, LLC, of Beltsville, MD, to process your payment requests.","GEA, do not meet the affordability requirement, are contiguous and are under common ownership.","MO ANY ADDENDA IF ISSUED LIABILITY INSURANCE The awarded contractor shall provide proof of insurance prior to commencement of work in accordance with the insurance requirements stated within the invitation for bid.","Flexible bends shall be prefabricated.","The Respondent: if the participant had no reason to expect that the results would be forthcoming sooner.","Renovators who recertify by taking a refresher training course from an accredited training provider will have certification that lasts for a period of fiveyears from the date of training.","Cause and the proposed Revocation Date, identifying the Property and Tax Benefit affected, briefly describing the alleged Cause for Revocation of such Tax Benefit, stating the Comment Period, and providing an address for the submission of Comments during the Comment Period.","Compliance with this policy creates a presumption against both enforcement action for penalties and the need for further cleanup under TSCA.","Asbestos control and abatement.","Enter complete Sample Number here.","The depreciated appliances would become the property of the housing company.","Do not apply bonding adhesive to seam area of flashing.","Apply lap sealant and seal exposed edges of roofing membrane terminations.","Metropolitan Statistical Area as determined by HUD.","Occupied Rehabilitation Program waestablished preferences.","Page Keeton et al.","Placed upon a foundation or base capable of providing support to the liner and resistance to pressure gradients above and below the liner to prevent failure of the liner due to settlement, compression, or uplift.","Shortly thereafter, when the project was compared to World War II experiments, it was terminated.","Light source shall be such as a hand flashlight held close to the eye.","This definition constitutes the minimum requirements for an appropriate wipe testing protocol.","American and, in the vernacular of the time, charity patients.","Bannon explained that all data was collected on a central computer managed by Brian Rooney, the data manager, who could print out reports such as these showing all data generated from a particular house.","This category of clearance is acceptable following a to complete.","If allowed to deteriorate, lead from paint can threaten the health of occupants, especially children under sixyears old.","HRC may deny an application for certificadetermines that the applicant has not demonstrated the ability to comply fully with applicable requirements established by these Regulations.","However, inline and finished product subs such as doughs, etc.","Exeffectively sealing, shall be removed and replaced with new material.","This license number should be used for any shipments of radioactive products to WEAC.","The RRP Rule, because it sets a clear standard of care and allows contractors to demonstrate that they meet that standard by taking appropriate training and using proper work practices, could eventually lead to insurance premiums that reflect that proactive stance.","Agency has reliable information the carrier regularly carries FDA regulated articles, and the facility where the sampling is contemplated is subject to FDA inspection.","The owner of record of any facility or any person who exercises control over a facility to the extent that said person contracts for or permits renovation to or demolition of said facility.","All books and records of the owner, contractors, subcontractors, laborers and materialmen involved in the rehabilitation shall be made available to representatives or agents of the Department and other governmental agencies having jurisdiction, for review or audit.","Commercial or professional tenants may be required to deposit as much rent as security as the housing company requires.","The State Materials Laboratory is informed of the preapproval testing sufficiently in advance in order to attend and observe.","Certain items, specifically, those noted as once a month or twice per year, will require manhours in addition to the hours specified for nightly cleaning.","From the outside of the bag, push the Spongestick to the upper portion of the bag.","HPD will consider any timely comments received from Tenants.","PCB disposal activity may be returned either to the physical location where the samples were collected or a location where other regulated PCBs from the physical location where the samples were collected are being stored for disposal.","Does it matter whether the stucco has been painted?","Unreported Opinion the alleged errors concerning expert testimony on alternative sources of causation were harmless.","Reinstall items in locations indicated.","This plan is for use by FDA for regulatory purposes.","We will have a clearance examination conducted following moand that dust lead hazards are not left behind.","PCB Container or PCB Article Container, the serial number if available, or other identification if there is no serial number, the date of removal from service for disposal, and weight in kilograms of the PCB waste in each PCB Article.","If the date of manufacture and the type of dielectric fluid are unknown, any person must assume the transformer to be a PCB Transformer.","The test will not be performedif uncorrected paint conditions are present or clean up has not been completed.","Applicable surfaces include deteriorated, impact, friction, chewable surfaces and surfaces to be disturbed.","Seed mixes shall be commercially prepared and supplied in sealed containers.","HPD, preference shall be given upon the opening of the waiting list to such veterans or surviving spouses that are selected in the lottery for such opened waiting list.","PCB surface concentration of the unsampled segment to be the arithmetic mean of the PCB surface concentrations measured in the two equidistant, sampled, pipe segments.","Insert the trier the full length of the bag when sampling bagged premixes, or complete feeds.","He then revises his work specs to include work on all hazards identified and finalizes his cost allocation document.","More than half of these children are living with their families in rental units.","Use materials whose installed performance equalsor surpasses that of existing materials.","The agenda for each committee meeting shall include an item entitled public comment under which any person will be allowed to address the committee on matters relating to committee business.","Tests have shown the following amounts of dry ice will be adequate when this For samples already in frozen state: \ufb01ve to ten pounds of dry ice depending on sample size is normally suf\ufb01cient.","Please attach the product name listed from the CDC web site.","As aevel rental properties containing lead based paint in Baltimore had beensimplynd left vacant.","Gaskets shall be composed of material capable of withstanding the temperatures involved and shall be securely held inplace.","The respective parent should also have been clearly informed that in order for the measurements to be most helpful, the child needed to stay in the house until the conclusion of the study.","The owner shall establish a program to ensure that the refuse chute and the refuse room and appurtenances will be treated as often as may be necessary to prevent infestation with insects and rodents.","Spin coupling mating sections forward to bottom.","Donations, including donations of materials or of the time of volunteers, are not compensation.","Funds Obligated not required to complete work that is already in progress will be halted.","It cannot be raised to the level ofa standard of duty under the law.","Joint strength shall be equal to or greater than the tensile strength of the pipe.","LOCKS missing weights shall be furnished and installed.","The Agency may decline to enter into negotiations with any and all Applicants which submit applications.","You also have the option of repeating the reclassification process.","The unit shall be wired in a manner such that the signal will revert to flash if the conflict monitor is removed from service.","If HPD determines that there is reasonable cause to believe that harassment has occurred after the date that HPD issued a certification or a waiver, HPD may suspend such certification or waiver.","Amount of tax exemption.","Common Expenses, funds from the Operating Reserve Account may be used to cover operating deficits.","There is usually little need to discuss payment when requesting nominal use of labor or equipment.","SELECTION AND CLEARANCE OF CONTRACTORS tation Program, except in the Major System Repair Program, is the responsibility of the homeowner with guidance from the Bureau of Housing staff, as requested by the homeowner.","Toise, to turn over human and legal ethical concerns solely to thescientific, is to risk embarking on slippery slopes, that all to often in the past, hereandre, have resulted in practices we, or any community, should be ever unwilling toaccept.","HPD that the requirements of this paragraph have been met.","Real Property Tax Law as amended.","The top member of the bracket must go through the wall, and when the wall is of brick, must be anchored as specified for brackets in new buildings.","The same test samples will be used for the ten hits.","As such, data protection level is a complementary consideration to organizational control.","While often performed for asbestos abatement projects, air sampling does not appear to be a useful tool for determining if clearance has been achieved in lead hazard control work.","Si hubiera un riesgo de al\u00e9rgeno en su apartamento, el propietario debe solucionarlo, utilizando las pr\u00e1cticas de trabajo seguro establecidas por la ley.","City of New York Department of Housing Preservation and Development.","The fracture requirement shall be at least one fractured face and will apply the combined aggregate retained on the No.","We may disturb paint on the hinges and bolts but do not otherwise disturb a painted surface.","Commissioner, and shall be substantial, rigid and durable in construction.","The submission date of an Electronic Certification shall be the date that such certification is electronically time stamped by HPD.","At the discretion of the Dept.","All evidence demonstrated that KKI informed Ms.","Routine cleanup of renovationrelated dust is not abatement, even if the dust is known to be above the dust lead hazard standard.","The thread used to sew permanent erosion control geotextiles, and to sew geotextile seams in exposed faces of temporary or permanent geosynthetic retaining walls, shall also be resistant to ultraviolet radiation.","Before turning to the case at hand, we repeat that, in Maryland, Stateaccredited lead inspectors must use dust wipes fortheir inspections to certify compliance with the risk reduction standard.","PCB waste first handled after effective date of this subpart.","Is there a medical surveillance program?","The type, material, and identification mark for bolts and nuts shall be provided.","LED signal module, and the installation date shall be indicated on a separate label with an indelible ink marker.","The relocatee is otherwise ineligible.","Annually investigate units where children under six reside as well as common areas in the property to find peeling paint, chewable surfaces, deteriorated subsurfaces, and friction and impact surfaces.","However, it may provide information as to the value of the goods, carrier, date of shipment, etc.","PCB bulk product waste from processes that continuously generate new waste.","The training provider shall submit a resume of each instructor and guest speaker who will participate in the conduct of any asbestos training course to be approved by the department.","Department shall determine, which shall be stated in such waiver or exemption.","Moreover, in our view, parents, whether improperly enticed by trinkets, food stamps, money or other items, have no more right to intentionally and unnecessarily place children in potentially hazardous nontherapeutic research surroundings, than do researchers.","EPA and State of Maryland guidelines.","If unclear consult with your Supervisor or servicing laboratory to confirm that practicable preservation techniques are not available before relying on this exception.","If the Tenant pays to the DAMP Lessee less than the full monthly rent, any subsequent payments shall first be applied to arrears.","For example, when referring to a bill of lading, indicate that it was collected to document the interstate movement of the product.","Certification is applicable to all objects of conformity assessment except for conformity assessment bodies themselves, to which accreditation is applicable.","Unlike the lead concentration analysis in dusttesting, testing were typically available to KKI in a matter of days.","In cases where the alternative to partial sanitization is not performing sanitization at all, partial sanitization provides benefits that should be considered.","Individuals carrying out the work must meet leadsafe work practices training requirements.","County, or, if not ordered to specifications will be fit and sufficient for the purpose intended, and that all items will be new, merchantable, of good material and workmanship, and free from defect.","Questions on sample analysesassignments, laboratory capability, or otherwise can be directed to the Office of Regulatory Science contacts listed at that site.","Initials ______ The day porter shall sign in and out with security or an authorized County representative as well as complete task checklists each day.","The method of determining the retention of the preservatives shall be by assay.","Such Site selection revocation document, if any, may be in any of the forms permitted for a Site selection document.","Board of Estimate or City Council resolution and the temporary certificate of occupancy and permanent certificate of occupancy, or any other documents requested by HPD.","Resale of Cooperative Shares.","Whenever asbestos abatement is the primary or principal purpose of any asbestos activity in a public building it must be performed by an asbestos abatement contractor licensed under these sections.","Portable high pressure boiler operating engineer licensed by the City of New York.","The top of tubular posts shall be closed to prevent moisture or debris from entering.","Prior to the lead dust wipe inspection, gently clean window wells and sills with one of the above suggested cleaners.","All lavatories shall be be properly maintained in working order.","The miobioogial es ay iluof patho Food Rheology and other Physical Tests: Food laboratories performing testing in this area may performtesting on the characteristics of the material, such as viscosity, elasticity, color or color appearance.","Write this near the bottom and within the body of the affidavit.","Nothing in this section shall be construed to limit the right of the Commissioner or any agency or instrumentality of the State of Vermont to seek remedies available under any other provision of Vermont statutory law.","KKI, the compensated researcher, if children remained in the houses over the period of the study even after the presence of lead dust in the houses became evident.","Any configuration options limiting the ability to access the entire addressable area of the storage media should be reset prior to applying the sanitization technique.","Mop uncarpeted floors thoroughly, using a mopping method that keeps the wash water separate from the rinse water, such as the twobucket moppingmethod, or using a wet mopping system.","Closets are not considered to be separate rooms unless they are unusually large.","Higgins and Myron Higgins.","If new, must satisfactorily sound unit.","The objective of this subpart is not to search for new contamination.","The Estate points us to Maryland and extrajurisdictional cases stating indirect contact should support a battery claim.","This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure.","Is a signed statement by the occupant sufficient?","Asbestos abatement work includes any activity which will disturb ACBM.","The research study was to be composed of two main components and a total of five groups of study houses.","The HEPA vacuum must be equipped with a beater bar when vacuuming carpets and rugs.","PCB Transformer poses an exposure risk to food or feed.","Nuremberg Code, at least in significant part, was the result of legal thought and legal principles, as opposed to medical or scientific principles, and thus should be the preferred standard for assessing the legality of scientific research on human subjects.","The experience in Washington, DC, illustrates how the effectiveness of such designated funding approaches may nonetheless be limited by the local budget adoption process.","Meter box covers shall include a reading lid.","This is not a best practice, but it is allowable under OSHA rule.","Using the tabs on both sides of the wired band, pull gently to open the bag.","Mixtures of terpene hydrocarbons and terpene alcohols.","THE RAMP END LANDING MUST PROVIDE FOR EASY TRANSFER OF USER FROM LANDING TO A TRANSPORTATION VEHICLE.","Under these procedures we may anticipate that the number of compliance samples collected in followup to a violative finding may diminish appreciably and, in most cases, will be limited to occasional audit samples.","The homeowner will be required to initial each item on the work write up to indicate ement of the type of work that will be performed at their residence.","It could also be a removable cartridge containing one or more magnetic disks.","Media Sanitizationmay be available: The OVERWRITE service action.","Always pack liquid products in sufficient cushioning and absorbent material to absorb any breakage which might occur.","If you make an entry, you must enter a laboratory.","Sampling technicians should check with their state\u00d5sagency responsible for lead before conducting sampling.","PCB bulk product waste is released from the waste generator onto a pile or into a receptacle container before the waste reaches the pile or receptacle container.","The mortgage may provide that with the consent of the Agency a mortgagor may prepay the principal amount of the loan together with interest then due.","Cover with asphalt or cement.","Safe Housing for Appellees.","All soil samples should be composite samples.","Collect the water and dispose of it.","The homeowner must be given the opportunity to present written or oral objection to the standing determination.","Must it be placed behind a locked barrier?","Consignee and delivery point.","YES Are emergency actions immediately necessary to safeguard against imminent danger to human life, health or safety, or, to protect the property from further structural damage?","Aeriaall tiermind ifhe mehod dos notfiteria.","If you have policy questions, please contact Dr.","Clearances from Combustible Materials.","Withthese considerations in mind, we turn to the instant cases.","Property whose mortgage interest in such Property is clearly recorded in the office of the City Register in the applicable borough.","Regional Administrator on a frequency of no less than once every six months after final closure of the disposal area.","General Administrators are initially responsible for resolving any Program work related disputes.","Do I have to also be certified by EPA?","Use of existing combustion chambers.","If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Architect and Owner.","The following list indicates the modified object requirements for these objects.","Court in matters relating to children.","PCB levels according to the following table.","What should I look for when purchasing a HEPA vacuum?","Information and its supporting medium.","Topsoil Type CTopsoil Type C shall be native topsoil meeting the requirements of Topsoil Type B but obtained from a source provided by the Contractor outside of the Contracting Agency owned right of way.","For small or irregularly shaped surfaces or large nearly flat surfaces, if the surfaces are contaminated by a single source of PCBs with a uniform concentration, composite a maximum of three adjacent samples.","The \ufb01scal clerk will notify the consignee and consignor that a sample has been collected so the owner can, if desired, bill FDA for the sample.","City Council, acting singly or in combination in accordance with the powers vested in them by the City Charter.","The Contractor shall commit a minimum number of manhours at each location as outlined in General Requirements.","Such other reasonable expenses as determined by the head of the Department of Housing Preservation and Development, including expenditure incurred by and in behalf of the City incidental to the move.","If you discover that the PCB concentration of the fluid in a reclassified transformer has changed, causing the reclassified status to change, the transformer is regulated based on the actual concentration of the fluid.","Change orders must be requested prior to commencement of the proposed changed work in order for such costs to be reimbursable.","In response to Kimberly Armstead has since changed her name to Kimerly Smith.","Replacement shall be of a reasonable conforming pattern, type, and color.","Lamps shall mount horizontally.","The sock shall be clean, evenly woven; free of encrusted concrete or other contaminating materials; free from cuts, tears, broken or missing yarns; free of thin, open, or weak areas; and free of any type of preservative.","HPD, and must provide evidence of completion of such course to the Administering Agent.","HPD notifies the Tenants of any such additional factors.","If a clearance report shows that the lead levels found in the tested areas of the unit are lower than the Federal clearance thresholds, then the unit passes.","All shim edges shall be ground or otherwise treated so that no sharp edges remain.","Mortgage and debt limitations.","Childoccupied facilities may be located in public or commercial buildings or in target housing.","If the project involves both a renovation and demolition portion check the one which will be occurring last as far as project dates are concerned.","The responsible party shall initiate cleanup of all visible traces of the fluid on hard surfaces and initiate removal of all visible traces of the spill on soil and other media, such as gravel, sand, oyster shells, etc.","Operating and Capital Reserve Accounts.","Please be advised that you must calculate your fee based on the options you choose at the end of this form.","After a discussion regarding the nature, purpose, scope, and benefits of the study, Ms.","The affordable units must remain as rent stabilized units for twenty years or the length of the real estate tax benefits on such affordable units, whichever is longer.","The amount, if any, which will compensate such displaced person for any increased interest costs which such person is required to pay for financing the acquisition of any such comparable replacement dwelling.","Submission of written comments.","Cost estimates and all reports are to be provided to CHFA with the project application.","PCBs the quantity of the batch and date the batch was added to the container.","Disposers and commercial storers of PCB waste.","In such a case, EPA recommends that afirm document and keep records of the specific circumstances surrounding the impossibility.","In addition to these documents, the homeowner is required to procedures and signs a statement indicatterms and conditions.","Bannon did not perform any further review of the data Mr.","If a document is more than one page in length, it must be numbered or attached in a manner that will allowfurther reviewers to determine if anypages are missing.","The most recent annual audited financial statement for the housing company.","Eligible Improvements and under the Major System Repair Program.","Plants originating in Canada must be accompanied by a phytosanitary certificate stating the plants meet USDA health requirements.","For the ten year benefit period, the ten years beginning in the first year of exemption after completion of construction.","This applies to all properties regardless of whether or not a lead inspection has ever been performed.","Do not use cutting torches until work area is cleared of flammable materials.","Check Post Office and carrier for regulations, precautions, or restrictions before shipping products in this type container.","Removecontaminated soil and replace with cleansoilc.","Class B multiple dwelling.","About which house does thisreference?","RRP Rule is whether that activity disturbs a painted surface.","Safe Drinking Water Act.","That was not what she complained of in her complaint.","PCB household waste stored in a unit regulated for storage of PCB waste must not be commingled with PCB waste.","Example: If EBL or housing data show that most lead poisoning occurs in one section of a city, the lead law could target that area.","Property Owner ____Residents ____Contractors Is painting accompanied by scraping, sanding or paint removal?","Windows components provided removal of lead is performed off the Premises.","Hearing Notice to the Taxpayer by the method provided herein for delivery of notices.","Recommendations on the conditions for safe storage, including any incompatibilities.","Homeownership Affordable Housing Unit which is provided to an Eligible Buyer who is purchasing a Dwelling Unit for the first time.","Bureau of Housing has contract documents are given tothe contractor with the final payment.","The blocking of all floor drains in the vicinity of the transformer.","Office, the number of rooms as certified by a licensed architect.","When the inspectional evidence indicates the probability of under processed lots, or lots with excessive defective units, conduct a visual examination of warehouse stock.","What Ever Happened to Policy Implementation?","Asbestos exposed as a result of spot repairs shall be suitably enclosed or encapsulated.","Engineer may be furnished for performing the absorption test.","Seymour Property and vent hot steam, gases, and odors into their rear yard and through a kitchen window that provides ventilation into the Seymour Property.","Prior to the submission deadline, the agency may, but shall not be required to, hold an open conference where agency staff answer questions about submission and program requirements.","Allmating surfaces shall be machine finished to ensure a nonrocking fit.","For PCB Transformers located in commercial buildings, PCB Transformer owners must register the transformers with the building owner of record.","Owner who is authorized to sign on behalf of and bind such Owner.","New Construction Homeownership Affordable Housing Unit is issued a temporary or permanent certificate of occupancy.","AIHA LAP, LLC receives application from laboratory.","Owner Responsibilities for CO Alarms for Private Dwellings.","At a minimum, these activities include the removal and replacement of allinterior and exterior painted surfaces, including windows.","SIGN ON Sign Relay shall energize.","LICENSURE: ASBESTOS PROJECT MANAGER.","The major reservoirs for Salmonellae are raw meats, poultry and eggs; the organism is also isolated from aquaculture products and fruits, vegetable and nut meats.","Reentry is permitted only after such activities are completed and the unit has passed a clearance examination.","Shackle rods shall be coated with two coats of asphalt varnish.","PCB waste are held during the normal course of transportation.","The leachate should be either treated to acceptable limits for discharge in accordance with a State or Federal permit or disposed of by another State or Federally approved method.","Repair of Damaged Paint Surface: Repair shall include the application of a protective coating or paint.","The majority of these lead laws focus primarily or exclusively on rental units.","Eligibility rules for Cooperatives and Condominiums.","Ten percent of the total surface area on an interior or exterior type of component with a small surface area like windowsills, baseboards, and trim.","The facility owner, and the agent to whom the task of notification has been delegated, are jointly and severally responsible for the accuracy and timeliness of the notification.","Preliminary Certificate, for each rental dwelling unit in the building.","This may require up to The cost of clearance testing will be added to the closing costs.","Grading and reporting of examination scores.","The cabinet shall contain shelving, brackets, racks, etc.","Act, then the abatement shall equal the amount of the real property tax that would have been due but for such full or partial exemption.","The inspection staff is not required to give advance notice of their inspections.","Occupied Rehabilitation Program Policy Manual warning, that is detrimental to health or safety, and requires immediate action.","Friction surfaces shall include, but not be limited to, window frames and jambs, doors, and hinges.","Each officer shall serve until the next regular election of officers.","If items the Contractor is not responsible for disposing of are left in hallways, such as broken chairs, broken furniture, etc.","Prevailing Wage Requirement Orders.","In any event where the Contractor is called back to any location to correct a service deficiency, there shall be no additional charge to correct said deficiency.","MIH Application is submitted to HPD for the community district in which the MIH Development is located.","Whilerily create a duty, werecognizeis study was both foreseeableandeme.","Once organizations decide what type of sanitization is best for their individual case, then the media type will influence the technique used to achieve this sanitization goal.","Each optical unit shall be listed by and bear the label of a Nationally Recognized Testing Laboratory.","The written agreement with the Department will be amended to provide a new completion date, after which the Department shall have the authority to use the proceeds of the Letter of Credit to complete the construction.","It can be taken online.","Alternate stiffeners acceptable to the gabion manufacturer may be used.","Class F fly ash by total weight of the cementitious materials.","Administrator shall prepare a Risk Assessment Report using a qualified member of its fulltime staff.","Architectwill return incomplete applications without action.","ASBESTOS ADVISORY COMMITTEE The committee.","For determining the presence of PCBs in samples, chemical analysis includes: sample preparation, sample extraction, extract cleanup, extract concentration, addition of PCB standards, and instrumental analysis.","In light of our opinion, we do not address this issue further.","PCB remediation waste has the burden of proving the date that the waste was placed in a land disposal facility, spilled, or otherwise released into the environment, and the concentration of the original spill.","The seat opening of the valve must permit a diameter cut no less than inch smaller than the valve size.","The mold shall either snap together or use stainless steel hose clamps.","Unison annually notifies and describes to EPA its attempts to have samples analyzed abroad.","This may require two days.","This means a large number of properties are being repeated.","The commercial invoice contains a description of the lots in the shipment and will serve as a guide in the selection of the lots to be sampled.","New York or his or her designee.","Occupied Rehabilitation Program and the City of Atlanta adopted codes, the XIII.","Do not use water when it may damage existing construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.","New York State corporation experienced in the management of low income housing and approved in writing by the Department in accordance with the purpose of this section.","Conduct and Maintenance of Lodging Houses.","Neither Alymernor called to account in a world that puts expediency overethics, and exalts progress over human rights.","Recommendations for immediate medical care and special treatment needed, when necessary.","One reason, perhaps, is that there was little opportunity.","She testified, along with Dr.","Division of Alternative Management Programs, or any successor division, of the Department of Housing Preservation and Development.","The sponges on a stick reduce manual contact with the sponge during the sampling procedure and are good for accessing tight spaces.","Alimony and Child Support.","Article XI of the Private Housing Finance Law which is not incorporated as an HDFC as defined in such Article XI.","Collect a portion of unstained container as a separate subsample for a control.","After revocation of any Site selection, the Agency may select the Site for any other Project in accordance with these Rules.","Such review shall be conducted by the Commercial Rent Restructuring Committee.","Because each site will present unique circumstances, CHFA requires the applicant to consult with their EPA Regional PCB Coordinator and CT DEEP regarding the application of encapsulation measures prior to the submission of a funding application.","The question is not so much whether we can afford to honor our commitment to human dignity, free from subterfuges.","Flashmemory chips already present challenges with occasional damage to grinders due to the hardness of the component materials, and this problem will get worse as grinders attempt to grind the chips into even smallerpieces.","The parties, in their respective appeals, presented almost identicalissues Prior to consideration by that court, we grantedcertiorarilar issues.","Me defined as any hole \u215binch or larger in diameter or depth.","USDA Certification is for quality only.","Case Manager, within three business days after such notification, stating any facts which in his or her opinion would constitute grounds for a determination that the accommodations have not been Prepared for Occupancy.","For the purposes of this exclusion, the placingof frames, borders or links, or advertising, foryou or others anywhere on the Internet, is notk.","Armstead admitted that the case worker sat with her and read each paragraph of the Consent Form with her.","City leadership announced additional efforts to assist and support residents in the surrounding area.","Except as otherwise provided in this subdivision, upon such notification, HPD will terminate Relocation Services on the moving date.","All relevant and material evidence shall be admissible.","Department, to make their books and records available for inspection by representatives or agents of the Department.","The Contractor shall not combine trash and recycling in the same waste stream repeated corrections of this policy may result in breach of contract and cancellation of services.","EMP have been completed, and that a current EMP compliance statement has been filed with the Department.","The initials and dates of all participating design professionals.","Operating sashes are to be properly weather stripped to minimize entrance of air and moisture.","If the cleanup site is irregularly shaped and this intersection falls outside the cleanup site, select a new pair of sampling coordinates.","However, if the nature of the contamination or adulteration is such that regulatory action may be warranted, the interstate nature of the sample should be documented.","This service is required at no additional compensation.","Administrative Code by written determination of the Department.","Do you find that Defendant Kennedy Krieger Institute, Inc.","You should confer with your supervisor before requesting a voluntary embargo on perishable items.","Allow to drain one minute after stream breaks into drops.","Both cases allege that the children were poisoned, or at least exposed to the risk of being poisoned, by lead dust due to negligence on the part of KKI.","It is also essential to recognize that the various tools used by different cities are interdependent and must be logically combined.","Perhaps among these the factor deemed most important is foreseeability.","Commissioner shall adopt by rule.","KKI filed a notice of suggestion of death.","Business expenses and interest payments on loans may be deducted.","Passageways required by the Multiple Dwelling Law which provide egress from yards and courts shall, at all times, be kept clear and unobstructed.","Those various federal or state conditions, recommendations, etc.","Included in the diagram shall be an intersection sketch identifying all heads, detectors, and push buttons; and a phase diagram.","PCB remediation wastes and porous surfaces must do so in accordance with subpart O of this part.","The CT DPH licensed lead consultant shall report their findings to CT DPH and the local director of health through the submission of the CT DPH Lead Inspection and Testing Summary Form.","Continue to select pairs of sampling coordinates until three are selected for each type of bulk PCB remediation waste or porous surface at the cleanup site.","Loans may be made irrespective of the current status of control, stabilization or decontrol of dwelling units and shall not have any effect upon such present or future status of the units.","Each Administrator choosing to use the HETL shall establish a direct account.","Severity Level II covers violations that are significant and which, if not corrected, could threaten public health and safety.","The dust samples collected by dust wipe methodology in July and November showed areas above the clearance levels and KKI did inform Ms.","New York State income tax returns, utility bills, and voter registration data.","See Centers for Disease Control and Prevention.","If the unit is not occupied, providing prerenovation education to the owner of the unit is sufficient.","Exterior iron columns, steel railings, etc.","The punch list is a detailed list of all items remaining to be completed.","Upon completion of a lead abatement project, a code enforcement official employed by a local health department shall issue a postabatement inspection report.","HPD which takes effect after Project Commencement.","The income calculation must be done atthetime of Application to determine Gross Household Income for purposes of income eligibility.","New or replaced washer connections must be recessed mounted box in the wall with proper drain and vent piping, hot and cold water supply including valves.","HPD shall be named as an Additional Insured.","At the option of the Engineer, additional testing may be requested if subsequent field testing of installed pipe indicates difficulty in obtaining properly joined pipe.","Unless otherwise noted in the contract documents, the Contractor shall abide by specific manufacturer instructions and recommendations on installation and operation.","At the threshold, we note that the very few Maryland cases that address a similar issue support the principle that a court must ascertain whether the proposed expert testimony and exhibits would assist the jury in understanding the evidence.","Living Unit is to receive assistance.","The department may enter any facility to inspect and investigate conditions to determine compliance.","In addition, HPD will make an effort to place such notice beneath the doors of individual units in such properties.","Only those specific pipe sizes and gasket materials, if any, approved under the qualification test will be accepted.","Returnable containers shall be capable of easily discharging their contents by gravity.","For mutual housing companies.","Displacement is made necessary by the acquisition of such real property by the City of New York.","Architectural Sheet Metal Manual.","PCBs, not the calculated weight or volume of only the PCB molecules contained in the material.","Use of decontaminated materials.","This site offers advice, regulations, and standard publications related to sanitization, disposal, and donations.","Does the RRP Rule apply to this renovation?","The female leg of panel is snapped over the male leg of panel.","All interior door butts shall be a minimum of three inch x three inch in size, with a minimum of two hinges to each door.","Shall mean a platted lot or part thereor structure thereon.","All asbestos building surveys or inspections must be signed by the licensed inspectors performing the inspections and the consultant or management planner.","The project required that small children be present in the houses.","You should only enter one firm with the firm type you designate as the responsible firm type.","For purpose of these regulations, economic rent is defined as the amount of rent the displaced tenant would have had to pay for a similar dwelling unit in areas not generally less desirable than the dwelling unit to be acquired.","Colorshall be natural or black.","Detailed information must be provided in all spaces, including the age and size of the building or facility.","Numbers for the lots from which the samples are taken.","However, nothing in this section shall limit the liability of the trust estate for such claims and those claims may be asserted against the trustee as a fiduciary of the trust estate.","Where the Agency deems it to be necessary or desirable, a Sponsor may be selected for a Project via an RFQ.","Is furniture removed from the work area?","Schedules and plans for complying with the approval requirements of this regulation.","Itttle moment that an entity is an institutional volunteer in a community.","The class of castings to be furnished shall be that designated in the Plans or in the Special Provisions.","Finally, the judicial system in which the Philadelphia law will be enforced may add to the likelihood of its success.","Conflicts of interest prohibited in mutual housing companies.","Itemized Cost Breakdown Schedule.","If it is dif\ufb01cult to read, \ufb01lling in the tracing with a marker, may highlight the tracing.","Portland or blended hydraulic cement, water, and fine aggregate.","Circuit Courts erred ingranting These cases should be remanded for furtherproceedings.","This charge must be made payable to the housing company.","See Section VIII, below, for further guidance.","The lower section shall be untreated, and the upper section shall be creosote treated.","Sample site selection for pipe segment removal.","Farfel testified that the Study was aimed at protecting children.","BRM Sampler to measure air flow was problematic.","We have already determined that the underlying data is admissible under Reedearlier and we conclude that through Dr.","Construction Survey Report, NYSCEF Doc.","However, not every intrusion will constitute a nuisance.","Couplers shall be of the same material as the valve body with stainless steel double guide lugs to fit the worm slots.","PCBs and PCB Items in service or projected for disposal.","How can I find a leadsafe certified firm?","Renovator refresher training and recertification is valid for five years from the date of training.","Applicants shall be required to submit estimates showing the nature and cost of each item of the rehabilitation or improvement.","However, the implications of random clearance sampling should be understood fully before it is used.","The letter may require the applicant to unconditionally accept the designation within a time period for acceptance established therein.","The remaining claims are severed and shall continue.","The Contractor shall be afforded the opportunity to be heard and offer evidence in support of the claim.","Contractor is eliminate or reduce the need for change all measurements and ordering of materials.","Supplier shall provide and maintain a quality assurance and control system acceptable to County.","Any material used to fill the space between the vent pipe and the thimble shall be incombustible.","If a recipient of tax benefits hereunder fails to substantiate claimed costs to the satisfaction of HPD, the CRC shall be reduced or revoked as applicable.","No TBRA contract can be effective or renewed until the unit passes the clearance test.","Lump sum or hourly fee, and hourly fee schedule.","PCBs, as measured on a dry weight basis.","If any member of the household violates aprogram.","Sample the first and last segments removed.","HPD reserves the right, in conjunction with HDC, to review and approve agreements with managing agents of refinanced developments.","Department in writing of his or her objection to such a charge before the due and payable date as indicated on the statement of account, the owner may not contest the charge in any subsequent judicial or administrative proceeding.","MSDSs for all products used in the construction and that none of those products contain ACBM and; therefore, the building materials do not contain asbestos.","Persons trained within the confines of this State by unlicensed providers shall not be licensed by the department.","KKI filed a Motion for Summary Judgment on the grounds that it did not owe any duty to appellants.","PCBs at the concentration prior to dilution.","Spills that contaminate vegetable gradens.","Careful attention should also be paid to any indication that the containers selected for sampling by the private sample collector have been staged for sampling.","The sample is procured by mail, telephone, or other means without disclosing any association of the requester or the transaction with FDA.","Do not reduce the number of subsamples when collecting import samples.","Any lumber grading bureau certified by the American Lumber Standards Committee.","LED luminaires must meet the requirements of this section.","Record Keeping; Revocation of Tax Exemption; Discrimination Prohibited.","This section addresses how to determine the number of samples to collect and sample collection locations for bulk PCB remediation waste and porous surfaces destined to remain at a cleanup site after cleanup.","The Agency may change any aspect of the information set forth in the advertisement at any time.","EMLAP labs performing direct exam may use Analytical Sensitivity in place of a Reporting Limit.","HPD may at its discretion require managing agent employees and members of the board of directors to attend housing education courses at the respective expense of the managing agent and the housing company.","Here, the Estate predicates its fraud claim on both.","Exterior clearance is not explicitly required by EPA and HUD regulations if the only work being done is on the inside of the building.","All asbestos abatement plans and specifications must be signed on every page that addresses the scope of work and all drawings related to the abatement work.","TSCA, since exposure to such Items may be significant, the Administrator further finds that a totally enclosed manner is a manner which results in no exposure to humans or the environment to PCBs.","An investigator shall seek such consent only under circumstances that provide the prospective subject or the representative sufficient opportunity to consider whether or not to participate and that minimize the possibility of coercion or undue influence.","Living Unit A comprehensive residential dwelling unit containing cooking, sleeping, and separate bathroom facilities, including a singlefamily home or an apartment unit.","Operating Documents of Mutual Housing Companies.","Each bidder shall carefully and thoroughly examine these bid documents for completeness.","Manufacture Within A Territory.","All mechanical ventilators shall be covered with a rainproof hood or cap of galvanized metal.","Ator subjects to prove it.","Office as to the application.","Duration and Extent of Benefits.","When it has been decided to induce a sample and you have discussed the procedures with your supervisor, prepare the order and obtain the money order, or payment document.","Individuals who may be assigned to collect samples should routinely obtain in advance, a supply of FACTS sample numbers, to be used by the collector to identify samples in the field, prior to accessing FACTS to prepare a sample collection record.","Such courses and seminars may not be used for refresher training credit.","HPD in writing at least three days before the proposed hearing date.","If the applicant is rejected, the owner will follow the same procedure for any other applicant he considers.","Each request shall specify the quantity or concentration requested or additional time needed for disposal and include a justification for each increase.","The EPA Protect Your Family From Lead booklet.","The unique number assigned by the generator identifying each PCB Article Container, a description of the contents of each PCB Article Container, such as pipes, capacitors, electric motors, pumps, etc.","Material upon which serious abrasions of galvanizing occur will not be acceptable.","PCBs are cleaned up in accordance with subpart G of this part.","Cleanup levels are based on the kind of material and the potential exposure to PCBs left after cleanup is completed.","At the soll discretion of the hearing officer, such decision may also contain a probationary period or opportunity to cure.","Sourionfor eature hallbe dumened.","EPA recommends consulting with state and local waste disposal authorities to learn about any additional requirements.","Secretary may, by rule, impose.","Wipe down the recovery probe, plscard the wipes.","Any exterior portion of a mechanical system used to condition interior space.","Provided that a proposal has passed all threshold criteria, the Agency shall consider such competitive criteria as are established in the RFP.","One of the identifying characteristics the lab looks for is the presence of rodent hairs in the pellets.","The nursery shall furnish a notice of shipment in triplicate at the time of shipment of each truck load or other lot of plant material.","Upon detecting a fault condition the conflict monitor shall immediately cause the signal to revert to flash and the controller to stop time.","If so, safe work practices and clearance are not required in that work area.","The width of stairways and passageways and other arrangement details affected by the permitted reduction in the width of balconies will be determined and furnished to contractor by the Department upon request.","For example, several cities use multiple triggers, and different triggers may initiate different kinds of inspections.","Applicant selected or approved by the Agency to enter into negotiations with the Agency regarding a Project.","Sanitization refers to a process that renders access to target data on the media infeasible for a given level of effort.","The classes of forgings to be furnished shall be those specified in the Plans or in the Special Provisions.","Retrofill the electromagnet, switch, or voltage regulator with fluid containing known PCB levels according to the following table.","It participates in or has participated in the Tax Credit Program.","Include in this section the demolition and renovation techniques to be used and a description of the areas and types of facility components, which will be affected by this work.","Enter the reason for collection.","Every year or whenever the unit is vacant.","If the Tenant refuses to pay the increased rent, the DAMP Lessee shall have the right to terminate the tenancy.","Application for Successor Tenancy.","HPD shall be treated on a par with each other regardless of the actual date of receipt of inquiry, application or deposit.","If the Agency elects to terminate negotiations with a Selected Applicant, the Agency shall notify the Selected Applicant of such termination.","Other residential occupants, such as squatters and licensees, are not Tenants.","Appellants amended their Complaint to add Chase Management, Inc.","The owner of this property is also required to provide tenants with a copy of the lead hazard information pamphlet.","Research not otherwise approvable which presents an opportunityaffecting the health or welfare of children.","The \ufb01elds described below are listed in alphabetical order to facilitate locating the instructions.","These firms do NOT need abatement certification.","Complaint or Injury Samples.","Study was not intended to remove all leadbased paint from the house.","The size, metal, and protective treatment shall be as shown in the Plans or in the Specifications.","An individual who is in direct charge of and responsible for the personnel, practices, and procedures of an asbestos abatement activity or project.","Specify for each sub and duplicate collected, the origin, manner in which taken, and the examination to be made Submit each portion of bagging or container portion, rodent pellets, material from beneath sampled area, control etc.","The Agency may revoke a Site selection where the Agency deems such revocation to be necessary or desirable.","Relocatee must accept or decline an offer of Relocation Services, as applicable, in whole or in part, in writing where a notice of eligibility has been issued by HPD.","CDBG, HOME, or ESG programs.","Multiple Dwelling Law and the Multiple Dwelling Code and the Housing Maintenance Code.","Unreported Opinion examination, that learance standards for lead risk assessment are measured using the wipe methoexplained that clearance testing is different fromrisk assessmentdemonstrated by the fact that clearance testing and risk assessment are treated in different hapters in the HUD guidelines.","The marking shall not adversely affect the performance or life of the sheeting.","DHCR or a court having jurisdiction has found that there has been harassment, unlawful eviction, or arson at the property during the inquiry period.","Certificate of Compliance shall be required and shall accompany the materials delivered to the project.","Davis, National Security Agency.","Lead Hazard Mitigation Standards.","The water repellent compound shall be approved by the State Materials Laboratory before it is used.","Bannon on the exhibit.","Import Samples are Of\ufb01cial Samples and require the same integrity as domestic Of\ufb01cial Samples.","Services, repairs, replacements and improvements.","Annual meetings and elections.","In addition, organizational management should also be consulted to ensure that historical information is captured and maintained where required by business needs.","Administrators shall prescreen potential applicants to assess eligibility.","The informed consent is just that.","An original signature is required on each notification form.","Id Based on the record before us, no degree of parental consent, and no degreeofnt at issue here, ethically orlegally permissible.","HPD approves the Certificate of Eligibility as stated therein.","Study itself at issue.","Mechanically fasten ridge end of metal roof panels and allow eave end free movement due to thermal expansion and contraction.","Existing loose or brittle caulking or oved and replaced with new material.","The covers shall be provided with a drain to expel any accumulated water.","Applications for rent increases shall be verified and submitted in quadruplicate.","The portion would be considered associated with the residential use of the property if it is in such close proximity that the renovation would pose a risk to those using the property for residential purposes.","Each contract between a contractor and a homeowner participation to contractors who fail to perform in a satisfactory manner.","All switches on the panel shall be marked with its associated Plan detector number.","Replacement for perimeter shall be engineered.","Therefore, grant of summary judgment was improper.","Report shipments made before the inspection or since previous inspection in the same canning season.","Expected Or Intended Injuryintended from the standpoint of the insured.","Initials ______ Special Cleaning Requirements The courthouse has several unique workspaces with special cleaning needs: All collected trash bags shall be thrown into a rolling cart and brought to trash receptacle located on street level.","Written permission shall be obtained from property owners and provided to the Engineer before cuttings are collected.","This section applies to facilities used to dispose of PCBs in accordance with the part.","The key to protecting yourself and your family during renovation is to use leadsafe work practices.","For DOC samples leave this \ufb01eld blank.","Cast integrally with the housing shall be two hinge lugs and one latch jaw.","Metal lath shall be galvanized or painted.","The laboratory shall submit, in writing, its request providing the reason and timeframe for the suspension.","The rfrduples e analal r meaementpren bution of ampln ororage intethe laboratory.","Service equipment and risers.","Appendix Fcontains a bibliography of sources and correspondence that was essential in developing this guide.","Galvanizing shall be in accordance with Section.","Any such notice will be deemed delivered when deposited in an official United States Postal Service receptacle.","Moisture on the plastic from precipitation can cause plastic sheeting to become slippery.","Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the products specified.","Such notice shall be included in the notice to such person of the imposition of such capital assessment or voluntary capital contribution.","Commissioner of HPD as eligible to acquire a property pursuant to the Third Party Transfer Process.","There is usually no need to prepare a documentary sample in these cases, however, records of interstate commerce should be collected and incorporated into the establishment inspection report in order to document FDA jurisdiction over products suspected to be in violation.","No person requesting access shall be required to complete a freedom of information request in order to view this database.","Type II sheeting for the background and Type III or IV sheeting for the letters, border, and symbols.","Any person or entity so debarred may appeal in writing to the Commissioner within ninety days of written notification of the debarment.","Consider such factors as location of theexamining lab, difficulty of the analysis required, turnover rate, storage conditions and the perishable nature of the merchandise.","The following \ufb01elds must be completed to save the sample information; Sample Class; Sampling District; Collector; Collection Date; Sample Basis; Sample Type; FIS Sample Number; Sample Description; Product Code; Product Description; Resp.","For instance, a company may have an engineering department and a sales department.","Additional information may be included separately.","Recovery data, such as an OEMprovided restoration image may have been stored in this manner, and sanitization may therefore impact the ability to recover the system unless reinstallation media is also available.","Must I comply with the Rule when removing the aluminum siding?","The lens and doorframe assembly, when closed, shall exert pressure against a gasket seat.","If the clearance area contains more than four rooms, the selection of four rooms for clearance dust sampling requires judgment.","At all times during the life of the mortgage, the owner shall keep and maintain the rehabilitated building and all fixtures and articles of personal property now or hereafter used in the building in good condition, order and repair.","Private Housing Finance Law, the Board of Directors shall be provided with written notice and affected directors shall be given an opportunity to appear and be heard before HPD with respect to any alleged violations.","Relocation Services and subject to termination.","Drop cloths prevent paint materials from falling on or marring any adjacent surfaces not be painted.","The managing agent shall verify the documentation submitted, and if a change in income is so determined, shall remove the surcharge and inform HPD of such action.","Manor Inn of Bethesda, Inc.","In the future, organizations will be using media types not specifically addressed by this guide.","Benefits granted under the Act may not be combined with benefits under any other section of the Real Property Tax Law or any local law or any Rule promulgated thereunder for the same tax lot.","Statement of Operations, with detailed income and expense subclassifications.","Furthermore, a firm must still comply with all feasible work practice standards and take precautions to ensure that the work area is properly contained.","However, all personnel, tools, and other items, including the exterior of containers of waste, must be free of dust and debris when leaving the work area.","HPD determines to be necessary or appropriate, including, but not limited to, provisions in any deed, land disposition agreement, regulatory agreement, note, mortgage, security agreement, lien, restrictive declaration, or other legal document.","Recently, several municipalities have passed local lead laws in an attempt to reduce lead hazards in these remaining areas.","The material shall be free of defects, cuts, and tears.","Injury and illness investigation samples from certain complaints where there is no Federal jurisdiction, or where the alleged violation offers no basis for subsequent regulatory action.","MAP, and to any other records which may be required by the department for the approval of asbestos training providers or the accreditation of asbestos training courses.","Compacting equipment shall be arranged to operate automatically when the level of rubbish is not higher than three feet below the lowest door.","An architect or professional engineer licensed in the State of New York shall certify that such construction commenced on such date and that such construction was thereafter completed without undue delay.","Maryland Code in respect to scientific research of the nature here present, federal regulations have been enacted that impose standards of care that attach to federally funded or sponsored research projects that use human subjects.","If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies mayrequire an endorsement.","Prior to the start of production of the precast concrete units, the Contractor shall advise the Engineer of the production schedule.","This subdivision shall not apply in the case of a rent increase application exclusively subject to the approval of HUD.","Every window aa state of maintenance and repair.","Lead Safe Housing Rule.","FDA metal seals may be broken and lots checked against invoice.","Signs at Incinerator Service Openings.","Cut concrete full depth at junctures with construction to remain and at regular intervals, using powerdriven saw, then remove concrete between saw cuts.","Nothing in these Rules shall be deemed to confer any rights or benefits whatsoever upon any party which are in addition to any rights deriving from applicable Laws or written contracts with the Agency.","Requests for reimbursement of expenses shall be made on official state travel vouchers prepared by department staff.","Determination of the number of samples to collect and sample collection locations.","In the event the controller is put in stop time during the pedestrian change interval, during the following two cycles the display shall show the programmed clearance or be blank.","This may result in either a uniform or a spotty increase in bacterial numbers.","This would be especially so when science and private industry collaborate in search of material gains.","Transparent tape such as Scotch Magic Transparent tape accepts ball point ink and may be used on glossy items such as glass, plastic, tin, etc.","Hydrant extensions shall also include the necessary hydrant operating stem extensions.","FREQUENTLY ASKED QUESTIONS ABOUT LEAD MITIGATION What is lead?","Applications, financial data and information with respect to qualifications shall be in such form and substance as HPD shall, from time to time, require.","All application forms, subscription agreements, occupancy agreements, receipts, and all other forms proposed to be used by the housing company must be approved in writing by HPD before they are used.","Adjustments for interim interest.","Jobs such as demolition, window replacement, opening walls, etc.","Scrubbers and absorbent pads used to wash contaminated surfaces must not be reused.","Such notification may be in such form and delivered in such manner as the Agency deems to be appropriate.","This is an option in lieu of installing electrical protective equipment or removing the transformer from service.","The sign panel shall contain no residue release agents on the surface of the laminate so neither migrating constituents or release agents will be present in amounts which will interfere with any subsequent bonding operations.","Mechanically Fastened Insulation: Install each layer of insulation and secure to deck using mechanical fasteners specifically designed and sized for fasteningspecified boardtype roof insulation to deck type.","Clearly identify the specific lots which are the subject of the request, the firm and the individual to whom the request is given.","The following general work practices are minimum requirements for protection of public health, and do not constitute complete or sufficient specifications for an asbestos abatement project.","ENGINEER to perform Work in an environment that requires that specific coverage.","The availability to the issuer of the necessary organization, experience, operational controls and technical skills, and the necessary technical equipment and facilities required for performance of the clearance examinations.","Any person disposing of these PCB liquids must ensure that the solvent flushing procedure is conducted in accordance with applicable safety and health standards as required by Federal or State regulations.","Clean all of the sampling equipment including tape measure or ruler.","Investigator, Inspector, Analyst, etc.","Lead Hazard Mitigation, or abatement, as a court with jurisdiction against the Property Owner in the form of a court order to compel compliance with the requirements for Lead Hazard Control Standards or Lead Hazard Mitigation Standards.","Results of other environmental samples, including dust and soil, will be evaluated and classified as meeting or exceeding the most stringent regulatory standard in effect at the time of the evaluation.","The agency shall determine, in its sole discretion, whether to apply syndication funds for the benefit of any geographical area in New York City or for the benefit of the citizens of the city as a whole.","The department compliance inspection staff are not required to give advance notice of their inspections.","Obtain it from the documentation you collected to document interstate movement of the product.","Department of Housing Preservation and Development in accordance with the New York City Rent and Rehabilitation Law and the regulations promulgated thereunder.","POLICYJudicial Actions are defined as those actions that involve the judicial system.","In determining whether a party is entitled to judgment under this rule, the court must view the facts, including all inferences, in the light most favorable to the opposing party.","City inspectors are authorized to gain access to units by virtue of an existing local requirement for periodic inspections to be carried out in conjunction with the issuance of certificates of compliance for rental units.","Lead poisoning in young children may produce permanent neurological damage, including learning disabilities, reduced intelligence quotient, behavioral problems, and impaired memory.","Renters In New Construction Homeownership Affordable Housing.","Use for pesticide samples to aid in later communication with State officials in the event of a violative result.","THE COURT: Well, that depends on what opinion he offers about that.","You should make sure that any firms you hire are certified renovation firms.","The renovation firm to perform dust clearance sampling at the conclusion of a renovation covered by this subpart.","Grates and covers shall be seated properly to prevent rocking, including the replacement of existing covers with solid metal covers.","One police access panel shall be installed on the right side of the cabinet, as viewed from the front.","In this instance, the new shipment may be sampled on a DOC basis since another physical sample and examination is not required.","Painted or anodized aluminum is not allowed.","Affidavit of Work Authorization.","PCB Article, PCB Container, or PCB Equipment has any PCBs on any portion of its external surface.","EDA until such conditional designation is terminated, a requirement of the agency or the city is not satisfied, or an EDA is executed.","Examples include modifying painted doors, surface restoration, window repair, and surface preparation activity like sanding and scraping that may generate paint dust.","All three samples must be composited.","Specific requirements for relatively clean surfaces.","Premiums for insurance during construction.","Attach a copy to the copy of the FACTS Collection Record.","The training may include courses in building management, maintenance, and managing building finances.","The renovation firm must use precautions to ensure that these components are free from dust and debris before they are removed from the work area.","Once we have determined that the facts and circumstances of thepresentnsidered in a light most favorable to the nonmoving parties, are susceptibleton of the party opposing summary judgment, we aremandatedt the granting of summary judgment in the lower court was improper.","Administering Agent for approval.","Supply light bulbs of the appropriate type for all fixtures.","Such causes shall be deemed to include fires, floods, earthquakes, strikes, and acts of the public enemy.","Substantially larger loads will require additional probing or larger samples taken from falling grain during loading or unloading operations.","Such unauthorized use or the submission of a false Electronic Certification may result in revocation of such enrollment and may subject such Authorized Certifier to applicable fines and penalties, including fines and penalties under the Housing Maintenance Code.","Tenant Association must notify the Tenants of a meeting at which HPD will discuss the Program.","Occupancy of the housing accommodation by the Tenant is illegal because of the requirements of law, or such occupancy is in violation of contracts with governmental agencies.","As an example, in cases where the records are readily available and the site is located a long distance from an FDA of\ufb01ce, it may be better to collect copies of the records at the time the sample is collected.","RRPM activities for compensation without first obtaining a license from the Commissioner.","Exempt Cooperatives and Condominiums.","Flash and seal panels with weather closures where metal soffit panels meet walls and at perimeter of all openings.","For a dwelling unit, the visual assessment of interior spaces and exterior surfaces should be exhaustive, covering the entire clearance area, before any sampling of rooms or other spaces or exterior surfaces is considered.","The Agency may from time to time promulgate additional rules for certain Programs, which rules shall preempt and supersede these Rules to the extent of any conflict, inconsistency, or ambiguity.","The single chemical analysis of a composite sample results in an averaging of the concentrations of its component samples.","Through, Submetering, Direct Metering.","Form for Notices for CO Alarms.","Look for the typical droplet pattern because rodents commonly urinate while in motion.","Continued use of porous surfaces contaminated with PCBs regulated for disposal by spills of liquid PCBs.","EPA before they complete the required training, or must the application be submitted after the training is complete?","Health Polit Policy Law.","If the affiant still does not sign the affidavit, you should write a statement noting the refusal situation.","SCSI Express Partial sanitization is not supported in this section.","Issuance of judicial warrant is authorized to gain inspections if needed.","Books and records of the contractor and of subcontractors relative to the rehabilitation shall be subject to audit by the Agency.","As few persons as possible should handle the sample to reduce the likelihood of compromising sample integrity.","PCB Transformer ruptures from sustained high current faults must be completed in accordance with good engineering practices.","Program or other programs of the City.","Requirements of Law Survive Revocation.","For example, when EBL rates in a neighborhood decline below a certain threshold, that area might be removed from targeted enforcement.","Any conveyance of a property to a Third Party shall be for an existing use.","In addition, it is important to properly dispose of waste water used during pressure washing.","Interior window sills and window troughs should be sampled separately.","All testing must be conducted in accordance with the HUD Lead Guidelines and DEP Lead Management Regulations.","In accordance with applicable Building Code, or follow DMC Engineering Report for specifications for deck attachment.","Follow up may be necessary as directed by your supervisor.","The Director may use the information contained in the response to the sworn statement in making a determination of issuer nonresponsibility.","Enter an identifying number and date for invoices, freight bills, bills of lading, etc.","If the displaced person, of his own volition, purchases and occupies a decent, safe and sanitary dwelling at a price less than the acquisition price of the acquired building, no differential payment shall be made.","Device log data is retained by the device following Cryptographic Erase.","The record shall also include the date, quantity, and disposition of any batch of PCBs removed from the container.","State of New York Homes and Community Renewal.","Do not allow children or pregnant women into the work area.","BYPRODUCTS FOR ANIMAL FEEDS.","Regardless of the reason for selective sampling, record the basis for sampling each lot in your examination report.","General Treasurer, State of Rhode Island.","Eligibility for homeowners replacement housing.","Nail holes and hairline cracks are not considered deteriorated paint.","The choice regarding whether to apply the optional components depends on the level of confidentiality of the data and assurance of correct implementation of the nonoptional portion of the sanitization procedure.","How do I resolve an HPD violation?","Even when a dedicated sanitization command addresses these areas, their presence may affect the ability to reliably verify the effectiveness of the sanitization procedure if left in place.","When this happens, the whole area must be cleaned.","Prevent children from playing in bare soil; if possible, provide them with sandboxes.","Housing Justice in the United States: Report of the ABA Special Committee on Housing and Urban Development Law.","Right of Access and Requirements for Notification.","Is there adequate funding for enforcement?","RUN In the run position the LEDs shall illuminate for the duration of each call to the controller.","This Consent Form refers to repairs that were to be made to the Monroe Street property.","All waterclosets, washbasins, baths, windows, fixtures, fitting and painted surfaces shall be at all times kept thoroughly clean and in good repair.","PCB manifest continuation sheet.","Destroy: Incinerate disks and diskettes by burning in a licensed incinerator or Shred.","Top rail must go through the wall.","Controller ID numbers shall conform to the NTCIP requirements for address numbers.","Voluntary certification program requires inspection by private certified private risk assessor; EBL child triggers inspection by Div.","In the event that a housing company decides to employ a Public Adjuster for the purpose of negotiating a settlement with its insurance company, the housing company must request approval from HPD in writing.","Aluminum coating shall be Class II.","The Department may waive any of this chapter where the nature of the rehabilitation or improvement or other circumstances warrant such exception.","If no postal meter is available, use the resident post postage scale to weigh the envelope or package and add the proper postage using postage stamps.","For DOC samples, youmust leave this field blank.","We had a reader on each analytical instrument, a little bar code pen reader that scanned in the bar code.","Although your sample assignment may not specifically request the collection of accompanying labeling, determine if such labeling exists, and if it is present, collect it.","Existing damaged areas shall be removed and new flooring or ceiling of the same type shall be applied.","Procurement Policy and Procedures OFFICIAL BID TABULATION AND OFFICIAL NOTICE OF AWARD After review of the bids, an Official Bid Tabulation will be posted, followed by an Official Notice of Award upon contract execution.","PROCEDURES FOR FUMIGATIONPlace a small amount of fumigant, in an airtight container.","The second is a representative sampling verification, applied to aselected subset of the media.","Wooden pound or putty.","This may be performed concurrently with a code enforcement official.","Interim controls are acceptable on the exterior.","QC purposes shall be available.","Commissioner of Finance to deliver a deed conveying a tax delinquent property to a qualified Third Party after final judgment is rendered in an in rem foreclosure action.","ADULTS permitted to sleep in this room.","Occupied Rehabilitation Program Policy Appendices Write a report presenting the ance examination.","Area of Work: Insert information.","Installation of Lights in Rear Yards, Side Yards, Front Yards and Courts.","After the visual assessment is passed, it may also be useful to take dust samples for quick onsite analysis before calling the clearance examiner.","In lieu of containers, amendments may be furnished in bulk.","No lease for an Affordable Housing Unit can be executed until the Agency verifies the eligibility of the proposed tenants.","The court first appointed as guardian ad litems an attorney to represent the donor twin, and another person to represent the recipient twin.","Fully informed consent is lacking in these cases.","Every toilet and every bath shall be contained in a room or within separate rooms, which affords privacy to a person within said room or rooms.","The term includes any such interior space during a period of vacancy, including the period during preparations prior to actual demolition.","Under the state criteria, all the zip codes in Chicago are defined as high risk.","The Court: Because you were testing for something the landlord was not obliged to abate, namely dust.","PERFORMANCE BOND: The successful bidder will be required to provide a performance bond payable to Jefferson County, Missouri to guarantee satisfactory performance.","There shall be kept available on the premises at all times a sufficient supply of extra sprinkler heads and also a sprinkler wrench for use to replace promptly any fused or damaged sprinkler heads.","Each conductor shall have a different insulation color.","Location and type of activity.","The agency may negotiate with one or more applicants who have submitted proposals pursuant to an RFP, and may negotiate with parties which have not responded to the RFP.","Substitution for Central Heating or Hot Water Supply.","City Homes and Ms.","These records will be available for inspection and review by the owner, HPD or other interested parties as permitted by statute or rules of HPD.","The burden of proof in such matters is the responsibility of the applicant; the department must reject unverifiable documentation.","Sampling liquid PCB remediation waste.","Pack sample into an insulated shipping container with ice packs to keep sample cool in transit.","Third Parties may be qualified and selected to acquire property from the Commissioner of Finance pursuant to a judgment rendered in an in rem foreclosure action.","To effectively use this guide for all media types, organizations and individuals should focus on the information that could possibly have been recorded on the mediarather than on the media itself.","In a commercial building, only EPA accreditation is required as specified in this section.","Return adjacent areas to condition existing before selective demolition operations began.","Photographs or other copies must be made in this case.","Landlords must notify tenants of the clearance test results.","If this system adds new or revised treatment, must the system resume lead and copper sampling as a new system?","Live branch cuttings shall have flexible top growth with terminal buds and may have side branches.","The Agency shall have the power and authority to initiate and undertake Projects for any public purpose, provided that all Agency Activities to be undertaken in connection with any Project are authorized by applicable Laws.","Therefore, all requirements of the RRP Rule apply including, but not limited to, those for firm and renovator certification, containment, waste disposal, cleaning and verification, and recordkeeping.","Lead Hazard Prevention and Control Ordinance; San Diego Mun.","Hearing, identifying one or more Factual Issues to be addressed at such Hearing, and informing the Taxpayer that he or she may be represented by counsel and may present witnesses and other evidence at such Hearing.","For a surface originally contaminated by a single source of PCBs with a uniform concentration, it is permissible to composite surface wipe test samples and to use the composite measurement to represent the PCB concentration of the entire surface.","The date upon which it is estimated that initial occupancy will commence.","Capital Repair and Replacement Reserve Account.","All curb in which cracking is in evidence immediately after removal from the molds will be rejected.","Smooth with a finishing tool dipped in an approved solvent.","Do not use the post office box number as contract carriers may not deliver to PO Box numbers.","KKI maintains that the purpose of the testimony was toresponddirectlyto the testimony of a witness for Cecil, Dr.","In that event we reserve the right to require, on a case by case basis, a higher amount for bodily injury.","Certificate of Compliance shall be required showing the aggregate source and the gradation.","HDC will be provided to HPD.","Service records or other documentation indicating the PCB concentration of all fluids used in servicing the equipment since it was first manufactured.","If there is excess buffer, squeeze it back into the whirl pack bag and continue until you have sampled the entire sampling site.","There are sufficient blanks for listing up to three invoices and up to three shipping records covering the lot in question.","Degaussing must not be performed as a sanitization technique on flash memorybased storage devices.","Example: Filth Exhibits of gnawings, pellets, wood splinters, etc.","Such adjustment shall be applied equally on a per room per month basis, except that a greater adjustment may be allowed for vacant units.","Unlabeled or Partially Labeled The regulations provide for controlled shipment in IS commerce of unlabeled goods.","If a renovation is to be performed on such a common area, EPA believes it appropriate to provide notice only to the truly affected units: the subset of tenant users.","Ramp surfaces shall be slip resistant.","The reflective sheeting shall be sufficiently flexible to be cut to shape easily and permit application over, and conform to, moderate shallow embossing characteristic of certain sign borders and symbols.","CRYPTOGRAPHIC ERASE service action.","Each cabinet shall be equipped with a fully operable controller equipped as specified in the Contract Provisions.","Unreported Opinion be done at unit turnover in order to maintain properties in compliance with the housing code.","In those situations where a mutually satisfactory agreement cannot be reached between or among the parties, bindingarbitration will be required.","Subchapter B: Tripartite General Order No.","Pl is usully the delibmixing of violative grain blow the surface o in isolpocket of grain.","Rather than admit that the consent does not and could not justify the act, we denigrate the consent and, necessarily, the consenter as well.","Flashing and Trim: Provide flashing and trim as required to seal against weather and to provide finished appearance.","Permit to be displayed.","Failing to recognize that subjects who volunteer for the sake of theadvancement of science are differently situated from patients who stand tobenefitpurpose ofdisclosure.","It was thus a compensated researcher.","Rents for vacant apartments shall be set by Lessee, subject to HPD approval.","State the quantity of such labeling on Location of Labeling Report the location of each different piece of literature and how much of each is at that location.","Do not collect rodents or animal tissues unless speci\ufb01cally instructed.","Refresher Training Course Approval.","If only one, two or three rooms in the clearance area were work areas, those rooms should be selected, and then additional rooms should be selected according to where young children spend time.","Supplier shall not resubmit rejected goods to County without prior written approval and instructions from County.","Incomplete forms will be returned to you and your certificate will not be issued.","Such a report can also be used to confirm that the RRP Rule would not apply to renovationactivities in that home.","Note: The compliance program for radioactive drugs directs the manufacturer to ship samples via their normal mode of transportation to WEAC.","Box, home address, General Delivery, or other address.","Letters shall be of such width and whatever as will provide the greatest legibility.","Retention of manifest records.","It is the verified incomethat is used to determine income eligibility.","The Monroe County Dept.","The applicant, its principals, and its key employees responsible for the establishment or operation of the commercial storage facility are qualified to engage in the business of commercial storage of PCB waste.","Thus, the court dismisses that claim as well insofar as asserted against Signature.","Commissioner of the Department of Housing Preservation and Development or his or her designee.","SCHEDULE A below is a single sample plan for use in collecting samples for examination in the district lab or other location where it is impossible or undesirable to return and obtain additional fish.","Payment must be remitted in the manner instructed on the invoice.","All trench or ditch work graded.","Successful use of a product in five other States may be considered in lieu of the field test requirement.","Acceptance Date: Insert date.","Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.","Use this sample letter to start you own letter.","Special warranty includes roofing membrane, base flashings, roof insulation fasteners substrateboard vapor retarder and other components of membrane roofing system.","If underlying earth materials are homogenous, impermeable, and uniformly sloping in one direction, only three sampling points shall be necessary.","Decontamination in accordance with this section does not require a disposal approval under subpart D of this part.","In the absence of acumstance, the researchers, and their scientificbasedriate to usechildrennt, where the success of anexperimentbe measured, in substantial part, by the degree to which the researchenvironments of poisons into the blood of children.","They also provide a means to monitor instrument baseline drift.","Use insulated shipping containers for shipping samples to the laboratory.","HPD shall submit a copy of the report and the bill for services of such professional or professionals to the housing company and to HPD at least seven days prior to the scheduled date of the hearing on such application.","The format for these exhibits and schedules is available from HPD.","Reedwe conclude the error was harmless.","Hands and toys can become contaminated from household dust or exterior soil.","Certified renovators are also responsible for providing training to noncertified workers on the work practices they will be using in performing their assigned tasks.","The owner has agreed to attend the samebrochures with the relevant information.","Project or Program, the place and time where the auction brochure may be obtained, the place and time where the auction will be held, and such other matters as the Agency deems to be relevant.","Certificate of Presumptive Compliance shall be deemed to be satisfactory for purposes of demonstrating compliance with the requirements of these regulations.","Open additional cases, if necessary to meet this requirement.","No special effort is needed to obtain copies of the label when it is on the individual units collected.","Statutory Authority Not Limited.","The secure erasecommand is not defined inthe SCSI standard, so it does not apply to media with a SCSI interface.","If coolants or dry ice were used, indicate so here.","Note: If you are a sole proprietor this number may be your Social Security Number.","The renovation firm is responsible for containing the work area so that no dust or debris resulting from the disturbance of a painted surface leaves the work area while the renovation is being performed.","Some examples of command sets include ATA, SCSI, and NVM Express.","Dust Testing for Lead Contamination.","Any person conducting decontamination activities under this section shall take necessary measures to protect against direct release of PCBs to the environment from the decontamination area.","Request for Reinspection and Dismissal of Violations.","Four years of experience in building construction and design or a related field.","You should explain what is being documented in the remarks section of the documents obtained screen in FACTS.","HPD shall promptly notify the Sponsor of all applicants for rental assistance and shall forward to the Sponsor copies of the applications, letters granting or denying rental assistance, Interim Payment Agreements entered into, and letters extending or terminating Interim Payment Agreements.","Include the name of the Country of Origin of the product and the Country Code if known.","Based Paint Poisoning Prevention Act.","HPD shall determine, which period and conditions, if any, shall be stated in such waiver or exemption.","Binding Arbitration If the parties to the Program workrelated dispute cannot come to a resolution of the matter, then the issue must be resolved through binding arbitration.","Ohio case law defining the limitations on that liability.","Texas law course prior to applying for the accreditation exam.","DHCR, the owner may collect the full amount of annual rent permitted pursuant to such rent adjustment.","You will need to include these descriptions on Collect a representative number of insects for laboratory con\ufb01rmation.","The type of action to be taken is within the discretion of the department.","Put the cuttings in a large enough container to avoid excessive folding of the cutting.","PCB Transformers that utilize either of the following risk reduction measures.","Warranties: Special warranties specified in this Section.","WAYBILLThe transportation company uses the Waybill in its own operations, and it accompanies the shipment during transit.","Additionally, if sanitization techniques are applied, the hard drive may not work as expected when reinstalled in the enclosure.","The decision of the City Manager shall be final and conclusive.","Include all material, labor and equipment required to complete caulking as hereinafter specified.","Junction boxes, cable vaults and pull boxes shall be tested by an independent materials testing facility, and a test report issued documenting the results of the tests performed.","Upon rejecting the PCB waste, the facility must consult with the generator prior to forwarding the waste to another facility that can manage the waste.","The requirement to submit annual reports to the Regional Administrator continues until the submission of the annual report for the calendar year during which the facility ceases PCB storage or disposal operations.","The photograph submitted to the department for licensing purposes must have a white background.","The initial rents for individual units will be determined by the managing entity, and must be affordable to low and moderate income families, as defined in this chapter.","Every watercloset shall be properly ventilated by an unobstructed opening to the outer air.","Any such lists must be signed by the owner.","Living room __________________ toys?","All neutral bars shall be at the same electrical potential.","Calculating Aggregate Floor Area.","Means a federal, state, or local housing program that is specifically forth in a regulatory agreement or zoning ordinance.","All plant material shall comply with State and Federal laws with respect to inspection for plant diseases and insect infestation.","There is always a potential substantial conflict of interest on the part of researchers as between them and the human subjects used in their research.","The Director, National Program Chemicals Division may grant approval without further rulemaking.","For environmental Salmonellasampling, it is preferable to sample before the plant conducts a wet cleaning operation.","An increase in assessed valuation resulting from an alteration, improvement or conversion other than one made pursuant to the Act shall not be exempt.","Do not place peeloff labels directly on cans for ACD samples collected for cause as these can interfere with the analysis.","Commissioner of the Department of Housing Preservation and Development or a person designated by him or her to exercise his or her powers set forth in this chapter.","Any room or group of rooms forming a single habitable unit occupied or intended to be occupied for sleeping or living, but not for cooking purposes.","If the cost seems exorbitant, check with your supervisor todetermine if the sample size can be reduced, or for further instructions.","The vaccine will be offered to all Chicagoans who want it as soon as larger quantities become available.","Kennedy did say that they were going to inform the parents of the result of the dust tests.","Lead Hazard Mitigation Inspectorperform independent clearance inspections.","Fittings shall have sufficient strength to withstand handling and load stresses normally encountered.","Regulatory Samplemples collected and analyzed by FDA for other federal, state, or local agencies of products over which the FDA has no jurisdiction.","Dimensions and arrangement of louvers shall be as shown in the Contract.","Thearch study was to be composed of two main components and a total of fivegroups The first component of the study concerned the first three groupsof houses.","Rhode Island Division of Taxation.","The Agency does not intend that the owner or operator of a facility whose procedures include waste analysis must perform that analysis before signing the shipping paper and giving it to the transporter.","If the above procedure does not enhance the copied document, pen and ink additions should be made.","Department which certifies that the bearer is entitled to the benefits of the Act for a specified number of units within the geographic exclusion area, provided that all program requirements have been met.","The occupancy agreement for each mutual housing company shall set forth the obligations of each shareholder with respect to the condition of the unit at the time that such shareholder vacates the unit.","The ollectionhallbe uat let monhlyepablindo be ued arthe rouine QC o moniin ure idion.","Administrative Code as amended.","Sampling of Wet Surfaces: Collect sample using aseptic technique using the dry swab in the same manner as noted above.","Applicant has been engaged in that field of employment, whichever is shorter.","The Contractor shall provide a black can liner for central deskside trash bins.","In all cases the vertical legs of the angle irons must be set tightly against the strings so that there will be no intervening spaces.","Signs on doors shall be located on the hall side and approximately five feet above the floor.","If the homeowner cannot meet the requirements for eligibility, the homeowner will be informed of the determination of ineligibility.","Note: Samples of standardized foods are not FS Samples.","Dust testing shall be performed to determine the extent, if any, of lead contaminated dust following the work.","Such Third Party shall make training available to such Tenants after such transfer.","It can be argued that the researchers intended that the children be the canaries in the mines but never clearly told the parents.","For purposes of removal for disposal of a pipe segment that has been sampled, the sample results for that segment determines its PCB surface concentration.","This person will be receiving the notification fee information.","Will any rental properties be exempted?","Tax Incentive Programs Unit of the Department of Housing Preservation and Development or any successor thereto authorized to administer these rules.","Provide adequate information to demonstrate that appropriate actions have been considered and can be implemented to control asbestos emissions adequately, including conformance with applicable work practice standards.","The Regional Administrator, however, retains the authority to disallow the encapsulation option for a particular spill situation upon finding that the uncertainties associated with that option pose special concerns at that site.","The use of such commands results in a tradeoff because although they should more thoroughly address all areas of the media, using these commands also requires trust and assurance from the vendor that the commands have been implemented as expected.","The responsible party must then utilize a statistically based sampling scheme to identify the boundaries of the spill area as soon as practicable.","Work in the interior of the unit will be completed within one period in eight daytime hours, the site will be contained, and the work will not create other safety, health, or environmental hazards.","Work that Disturbed Lead Based Paint or Paint of Unknown Lead Content.","What recordkeeping requirements would apply?","You may request that the owner provide you with a copy of any records required to be kept as a result of a visual inspection of your unit.","At least one member of each work crew shall be fluent in the English language.","The City may cancel, without liability to either party, any portion of the contract affected by the requested increase and any materials, supplies or services undelivered at the time of such cancellation.","Provide elbows at base of downspouts to direct water away from building.","In a disposal facility approved under this part.","These steps may provide extra protection for residents and renovation workers, but they also increase the cost of the work.","The first and thirdtestsst placed him in CDC Class III.","Owned Dwelling Units by Certain Vacate Orders.","If there is such a change, a new exemption petition must be submitted to EPA and it will be addressed through an exemption rulemaking.","If a child under six years of age resides in the unit you should also inform the owner immediately if you notice any peeling paint or deteriorated surfaces in the unit during the year.","Provisional License and Registration.","Unless otherwise required by law, the prices shall not have been knowingly disclosed by the Bidder prior to opening.","Iron or steel material shall be galvanized or aluminum coated as specified.","HPD is not a Standard Apartment will deliver a notice to his or her Case Manager specifically stating in writing the facts upon which such conclusion is based within one week after the referral of such dwelling unit.","Whiled its nature as a contract, the existenceorexistence of a special relationship, and whether the researchers performed theirfunc very inappropriateness of the research itself cannot beoverlooked.","Supervisors licensed under these sections shall require that operations at the asbestos job site cease whenever hazardousor unlawful situations are detected, so as to effect a remedy.","If soil hazards were controlled, a detailed description of the locations of the work and the methods used.","Unreported Opinion According to Dr.","Relocatee who declines an offer of Shelter Services may be eligible for other Relocation Services as provided in these Rules.","Fees Due and Payable.","Soil can be tracked into the home so it is important for workers to clean shoes or remove them before entering the home.","If the request for full reimbursement authorized by this section is denied, the applicant may then appeal to the commissioner of health for a resolution of the dispute.","Mitchell Iron Works, Inc.","Component Polyurethane sealant shall be compatible with the closed cell foam backer rod.","While GMS also moves for summary judgment dismissing all cross claims against it, it fails to adequately address the cross claims in its papers.","Cement may be tested using samples taken at the job site by the Engineer for submission to the State Materials Laboratory for testing.","Mill Test Report Number indicating full conformance to the Specifications.","Tax Benefit, to appear before HPD at the time or place designated in the summons or to produce such Records, and to give such testimony under oath as may be relevant or material to the Tax Benefit requested or granted.","Rules, and will apply to the Relocatee and his or her Family, if any.","Howeverhties inherent in any research study raise the prospectof In designing a research study an investigator must focuson which one can test important scientifichypotheses.","Certificate of Compliance shall accompany each delivery.","Typically, CE can be executed in a fraction of a second.","Both the contract and the general contractor or tradesman must be approved by the Agency and the Agency reserves unto itself the right to approve or reject a contractor.","Each licensee shall keep a complete record of each asbestos related activity or operation in public buildings to the extent of his or her participation.","His particular brand of the disease was under control.","Only sign in the signature block if the affiant signs the affidavit.","Any private or public drinking water sources or distribution systems.","Comply with installation requirements for new materials and equipment.","Reimbursement for the cost of materials is not compensation.","No plumbing specification sheet or plumbing repair slip need be filed with such a building notice.","Only one instructor is required for courses with five or fewer students.","Make a diagram of the entire lot and note your findings as you examine the individual containers.","ASEPTIC SAMPLEAseptic sampling is a technique used to prevent contamination by your sampling method.","Shall be of new wood of proper height and width for the particular opening, and suitable for interior usmaximum.","Certified Clearance Inspector will incorrect the defective paint.","County will accept or give notice of rejection of goods delivered within a reasonable time after receipt.","Additionally, there are conflicting views in respect to nontherapeutic research, as to whether consent, even of a person capable of consenting, can justify a research protocol that is otherwise unjustifiable.","Avoid this procedure if at all possible.","The Certification will include a statement certifying Specification compliance for the product shipped.","Note: This ordinance also provided for the renumbering of former Art.","Attachment: See DMC Engineering Report for size and spacing of fasteners.","Sample Form Summary of Presumption.","Fects in which there is no potential benefit Tocallct a normal control is to indicate that there is no real benefit to bereceived.","Program funds to an owner of a multifamily building or a rented singlefamily home, with no principal or interest payments required.","Replacing a window from the inside or outside.","If bidder is a corporation, write State of Incorporation, and if a partnership, give full names of all partners.","Place subs in a clean, airtight container, preferably clean glass jars.","However, for the purpose of Renovation, Repair, and Painting regulation, a contractor should choose one or more layers of plastic sheeting of a sufficient thickness to prevent puncture based on the circumstances of the particular project.","Eligible items of work: ordinary repairs.","Mathe age of six suffer from lead poisoning.","Commissioner and has a current license issued by the Department to perform abatement work.","Implements and sample containers used must be sterile.","Has legal title to any dwelling or child care facility with or without actual possession of the property.","Department, insuring the premises against loss or damage by fire, with the usual extended coverage endorsement, and such other hazards as may reasonably be required by the Department.","Wooden handled sampling instruments are particularly susceptible to bacterial contamination, are dif\ufb01cult to sterilize, Be extremely careful when using a propane torch or other \ufb02ame when sterilizing tools and equipment.","Each Fee Tier is associated with a different Affordable Housing Fund contribution amount.","Submit samples for filth analysis, microbiological examination, sterility, etc.","VDC shall be wired through resistor.","Therd was not obligedto abate, namely dust.","The community group lacks the necessary expertise, administrative or other resources, or legal capacity to perform the project.","PCB remediation waste location, take a minimum of three samples for each type of bulk PCB remediation waste or porous surface at the cleanup site, regardless of the amount of each type of waste that is present.","An increased visual inspection frequency of at least once every week applies to any PCB Transformer in use or stored for reuse which poses an exposure risk to food or feed.","EPA Lead Disclosure Form What happens if my property fails an inspection?","When lots appear actionable, determine recent sales from the lot in question.","KKI experts spent a lot of time talking about alternative sources.","It shall be considered as an integral part of the sealer system.","An agreement that changes or amendments made to any document included in this plan must obtain the prior approval of the Department.","Limited Profit Housing Company.","Inspections on request by tenants if paint is deteriorated.","Apply roofing membrane withside laps shingled with slope of roof deck where possible.","Building in the period following the Interim Rent Increase, as reflected in such statement, and shall implement an Interim Rent Increase based upon such calculation.","All couplers shall have standard male pipe threads at the top.","If unable to collect separate subsamples, assure that the total amount collected for each sample subsample, or the total amount collected from an undivided sample, is at least twice the amount estimated to be sufficient for analysis.","No person may use the alternate method of destroying PCBs or PCB items prior to obtaining permission from the appropriate EPA official.","Application which omits material information.","All items listed in Section A will be performed and appropriate documents will be attached.","When a certified renovator uses an EPArecognized leadtest kit or performs paint chip sampling to determine the presence of lead, can the results be grouped?","In this situation, would each business participating be required to follow the rules and assign a separate certified renovator to supervise their portion of the work including separate containment?","Si usted no rechaza los protectores por escrito, el propietario tratara de ponerlos a su disposicion.","The City reserves the right to accept or reject items offered as an equal.","So why then should Kennedy have to have a higher duty than the landlord?","Contractor will also be responsible for any damage incurred while rendering services.","Compliance with the technical rules of evidence shall not be required.","Temporary Posting of Emergency Information.","Six insulation fasteners of each type, length, and finish.","All portions of the magnetic tape should be overwritten one time with known nonsensitive signals.","Occupants were not allowed in the kitchen and bedroom and the outside work area during this activity.","Properly tool joints and clean excess grout or mortar from masonry surface.","Act is received by the Office, even though Certificates of Occupancy may have been issued for portions thereof as private dwellings.","For purposes of the RRP Rule, onlya certified renovator, inspector or risk assessor can make this determination.","My firm removes and replaces garage doors.","Describe which areas are encrypted and which areas are not encrypted.","All of this is especially so when the subjects of research are children.","Responsibilities of Board of Directors.","With proper techniques, a firm may meet the performance standard by using vertical containment in conjunction with ground containment.","Grout and seal joints.","The installation shall be a separate circuit or connected to the house line servicing the public halls.","Such other conditions as deemed necessary by EPA to ensure that the operations of the PCB storage facility will not pose an unreasonable risk of injury to health or the environment.","The City may provide Assistance to Sponsors in order to facilitate Project Activities in such amounts and types as are determined by the Agency to be necessary or desirable.","PCB bulk product waste is regulated for disposal based on the risk from the waste once disposed of.","No research was ever published, although in the speech pathology scientificcommunity was some knowledge of it.","Meeting arrangements shall be made by department staff.","These multiple sources of information were integrated narrative case study descriptions of three to five pages.","The Contractor shall arrange for all facilities necessary for the inspection of material and workmanship at the point of fabrication of the rail element, and inspectors shall be allowed free access to necessary parts of the premises.","The box shall contain ten studs located near the centerline of the frame and box wall.","FACTS SAMPLE COLLECTION SCREEN.","HPD, and shall specifically indicate the type of capital improvements or repairs required, along with an estimate of probable cost and the timetable for completion of the proposed program.","Crew Size Hours to Complete LIST OF SUBMITTALS All bid and quotation submittals must be attached to the bid and submitted before the bid opening stated within the invitation for bid.","If a vacancy occurs, a person shall be appointed to serve the unexpired portion of that term.","Administering Agent Reserve Accounts.","Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the manufacturers specified.","Prior to the adoption of the local lead law, there was neither a state nor local requirement that these certificate of occupancy inspections include an examination for lead paint hazards.","The Cases We now discuss more specifically the two cases before us, and the relevant law.","Do not leave the lot in any condition, When collecting from either full cases or bulk containers, replace sampled units by back \ufb01lling from a container selected for that purpose.","If you have any questions abcontact __________ at _____________.","Caps shall be threaded to fit the corresponding nozzles and shall be fitted with suitable neoprene gaskets of positive water tightness under test pressures.","You will approve the final list of work before asking contractor to bid on the job.","This record is prepared by the transportation company for the purpose of collecting freight charges.","The ratings in this section are based on the number of standard deviations above the average at the time of evaluation.","Note: The invoice for the notification fee will be sent to the owner of the building at the address listed in this section after the project is completed.","Please note official samples can be either compliance or surveillance, and INV samples can also be either.","Every issue bearing on liability or damages remains open for further factual development, and any relevant evidence not otherwise precluded under our rules of evidence is admissible.","HRSA to ship GWQAP drug samples directly to the home district for processing and analysis.","If you furnish this office the name of the trucking company, they will be able to provide the address and phone number.","Sanitize and disinfect areas daily.","Portland cement or an equivalent material and plugged with Portland cement to effectively prevent percolation of surface water into the well bore.","Agency determines are necessary or desirable to transfer fee title or any other real property interest in the Site, enforce the obligations of the Sponsor, effectuate the purposes of the Project, and otherwise protect the best interests of the City.","DPH certified lead inspector or lead inspector risk assessor and shall be employed by a current DPH licensed Lead Consultant in order to perform final clearance activities.","Occupied Rehabilitation Program Policy Appendices uniform joints.","State hazardous waste codes to these wastes.","Fee Rule for Abatement and RRP Programs apply nationwide?","Debris must be disposed of properly each day and s and dust should be removed.","Lead pipe and exposed galvanized pipe shall be replaced with copper pipe.","That the new owner has demonstrated, by his or her past and present conduct, that there is a substantial probability that he or she will utilize a postponement to achieve correction of each violation for which a stay is sought.","If payment of the item was by personal check or credit card number, attach a photocopy of the canceled check or credit card receipt if available.","Department of Housing Preservation and Development of the City of New York or any successor agency.","The evidence and documentation you collect and develop will be used to showby a preponderance of evidencethat conditions at the firm have resulted, or could result in adulteration.","If one does not exist, FACTS will assign one to the firm.","Internal cabinet wiring shall not utilize the field side connections of the terminal strip intended for termination of field wires.","In a rental development which does not have a duly constituted and recognized Tenants Association, the rental housing company shall maintain copies of the operating budget and financial reports in the management office on site.","Thus the local ordinance gives local health officials considerable latitude to use EBL or any other indicator they may deem relevant to conduct inspections.","If your firm is located in one of these states, you should contact them for information on their certification requirements.","Partitions in altered old law tenements.","HPD determines that the Building no longer meets the eligibility requirements of the program.","The public building owner shall rmaintenance activity in the manual, including the date of activity, the persons performing the activity, complete description of the activity, including methods used to prevent the emission of asbestos fibers, and the amount of asbestos removed.","Although the age of the structures may exceed the normal useful life expectancy, there could be little structural deterioration due to the original quality of construction and subsequent property maintenance.","Six times the monthly rental.","For example, a user may have received an SED that was always encrypting, and simply turned on the authentication interface.","This investigation must be conducted more often if the owner knows about a condition that may cause a lead hazard, or the occupant complains about such a condition.","No experiment should be conducted where there is a prior reason to believe that death or disabling injury will occur; except, perhaps, in those experiments where the experimental physicians also serve as subjects.","Paint chip analysis will be performed only in the case that the XRF testing would produce inconclusive results, as required by the testing protocol.","Mechanically or adhesively fasten roofing membrane securely at terminations, penetrations, and perimeter of roofing.","Designated Play Area e play equipment, sand boxes, or are otherwise designed for use by children.","House side shields shall be included when required by the Contract.","Collect DOC Samples of products processed without required MFA approval.","FIRM NAME Quality Wholesale Drug Co.","Rules in English and Spanish and such other language as HPD deems necessary will also be made available in the offices of Case Managers.","Resale price of shares.","The argument ignoresthe possibility of accumulation of lead in the blood of the children from various sources.","The cleaning, cleaning verification, and recordkeeping requirements still apply.","Bureau items under the Major System Repair Program and therefore cannot be added System Repair Program change order item.","Factory Food Sampleline sampling should be conducted as directed or based on inspectional observations.","Respondent: There was no standard at the time for what constitutes a hazard with respect to lead dust in homes.","The issue of media disposal and sanitization is driven by the information placed intentionally or unintentionally on the media.","Are the rebuilding and recovery efforts organized by this committee subject to the RRP Rule?","Title searches will be obtained on all properties, except the Major System Repair Program.","Must my nonprofit organization become an RRPcertified firm?","Telephone number of superintendent, janitor or housekeeper.","The device does not support escrow or injection of the keys at or below the level of the sanitization operation.","Solvents may include kerosene, xylene, toluene, and other solvents in which PCBs are readily soluble.","Faced with seemingly knowledgeable and prestigious investigators engaged in a noble pursuit, participants may simply assume that research is socially important or of benefit to them individually; they may not be aware that participation could be harmful to their interests.","Englishtranslation and their credentials are written in the narrative section of the affidavit.","The agency shall give due consideration to any comments made by such community group, but shall retain the sole discretion whether to revoke the termination, set specific conditions for a revocation of the termination, or retain the termination.","We will proceed through the building and take questions as we go.","Compositing offers only limited amount of information.","The following definitions are provided for purposes of clarity and are not to be taken as exhaustive lists of situations and materials covered by the policy.","Homeownership Affordable Housing Unit is executed.","This guide does not claim to cover all possible media that an organization could use to store information, nor does it attempt to forecast the future media that may be developed during theeffective life of this guide.","This third criterion was added in response to public comments on the proposed rule.","The Contractor shall inspect the building and note the operations.","Evaluating Lead in Interior Dust.","EPA approval until EPA issues the new approval to the transferee.","Cleanup in accordance with this policy means compliance with the procedural as well as the numerical requirements of this policy.","Department shall prescribe, all or a designated portion of the rents collected from the multiple dwelling during the period of construction.","Neill, which it properly fulfilled.","This study is intended to monitor the effects of the repairs and is not intended to replace the regular medical care your family obtains.","Additionally, under Maryland law, to the extent parentalconsentis nature, the parents may not have beensufficientlyon project, may have invaded thelegal rights of the children subjected to it.","The CP may require the collection of additional copies so that various offices can review the labeling simultaneously.","Changes in ownership, operating plans, or facility design affect the existing closure plan.","Alan Johanns, Lead Safety and Healthy Homes, City of San Diego, pers.","Department of Housing Preservation and Development, the written offer by the tenant to accept a stipulated amount, and the written approval, prior to the move, from the Department of Housing Preservation and Development.","Nozzles shall be fitted with cast iron threaded caps with operating nuts of the same design and proportions as the hydrant stem nuts.","Drexel Metals Association Regional Manufacturers.","Displaced tenants who rent shall have the right to elect to use either a Schedule Method or a Comparative Method to determine the payment due them.","Equipment shall be the correct size to accommodate the square footage cleaned and designed to perform the kind of work prescribed in this specification and kept in good operating order.","Prec Closeness of agreement between indications or measured quality values obtained by replicate measurement on the same or similar objects under specified conditions.","The Department shall serve a notice of hearing by regular mail upon the Applicant and any other individual or entity as determined by the Department, in the manner prescribed by the Office of Administrative Trials and Hearings.","Pulverization A physically Destructive method of sanitizing media; the act of grinding to a powder or dust.","To identify an official sample comprised of documents and photographs, collected without a physical portion.","The agency shall notify all successful applicants of their conditional designation as community groups.","Repaired or new, material shall be of a select grade of white pine or equivalent.","Department, to compensate for the number of bedrooms and square footage which would have been obtained had the bedroom requirement been met.","All charges shall consist of pieces of the same species that are similar in form, size, moisture content, and receptivity to treatment.","The Commissioner shall make a final determination whether to rescind such certification, and shall provide the applicant with written notice of such determination.","Receipt of Social Security Disability or Supplemental Security Income can also be used as verification of disability.","File or directory not found.","Segment snippet included twice.","The approval will state all requirements applicable to the approved incinerator.","The Respondent: A problem is a lead hazard.","The Agency shall render a decision on acceptability of the tenant within three working days of receipt of the Tenant Selection Review Form.","SUBMISSION OF QUOTE All quotes are to be submitted to the location indicated on the front page of the Request for Quotation form.","So while the Cleveland law does not create a true primary prevention system, it has the potential to carry out primary prevention inspections for lead paint hazards before a child is poisoned.","In no instance will the homeowner be eligible for an additional forgivable rehabilitation loan for the same property address.","The end sections shall be bulkheaded and restrained against internal pressure.","Overwriting cannot be used for media that are damaged or not rewriteable, and may not address all areas of the device where sensitive data may be retained.","How should my firm fill out the record keeping checklist if not all of the requirements are followed?","Plastic end caps shall utilize a threaded stud with seal and wing nut.","The provider shall furnish adequate equipment in good working order for each training session.","WOOD SIDING AND TRIM ry watertight condition.","Daof mplemof ges will.","Appellant, in Case No.","Boiler Room Enclosure for Multiple Dwellings with Central Heat.","Hovnanians are liable to plaintiffs for breaching their obligation under the license agreement to repair or pay for the damage their construction project causes.","EPA will use its enforcement authority to ensure compliance by enforcing work practice standards and their associated recordkeeping requirements against all renovators and firms.","Print your name same as signature.","Documentation required of all applicants.","State of Texas, a certificate of authority issued by the Texas Secretary of authorizing the corporation to do business in the state.","The terms and conditions of all licenses or registration shall be subject at any time to revision, amendment, or modification by rules or orders issued by the Texas Department of Health.","Clearance examiners and their clients may, if they wish, choose to collect dust samples in more than the minimum number of four rooms.","The certified renovator is responsible for providing training to noncertified workers on the work practices they will be using in performing their assigned tasks, including transporting waste off site.","Attach a copy to the printed FACTS Collection Record.","Agency deems to be necessary or desirable to effectuate the purposes of the Project.","Is there an occupational safety and health plan for maintenance workers?","Clear, Purge, and Destroy are actions that can be taken to sanitize media.","The Project addresses a housing need which has not been and is not likely to be fully alleviated by the operations of the private housing market, and the Site is appropriate for inclusion in the Project.","If you work in more than one state, you may need both EPA federal and state certifications.","Areas of responsibility and liability.","Narcotic and Controlled Rx Drugs.","The TAHPR requires that a DSHS Licensed Transporter transport ACBM from the public building removal site to the waste disposal site.","The temperatures of the incineration process shall be continuously measured and recorded.","Second, once the offer is accepted, the general contractor is obligated to perform a renovation in accordance with the terms of the contract, whether written or oral.","Bureau of Housing or the implementing agency will then process a full application with the applicant to verify the information provided and to confirm that the applicant meets all HUD program requirements.","Former Apartment, the address of the lawful dwelling unit, and the names of the Relocatee and his or her Family.","AND THE TEXAS DEPARTMENT OF HEALTH FOR THE REGULATION OF ASBESTOS.","Qualified manufacturers and approved joints are listed in the Qualified Products List.","The fee, which includes mechanical engineers fees will be paid directly to the architect in three parts.","See IOM It is your responsibility to collect your own samples using techniques and methods which will provide the most ideal sample, yet not be objectionable to management.","As such, I have knowledge of purchasing and receipt of products at the market.","Property Owners for meeting and maintaining the Lead Hazard Mitigation Standard through visual assessments and dust testing.","What PHAs Need to Know III.","SIGNATURE SHALL INDICATE COMPLIANCE WITH ALL SPECIFICATIONS, TERMS AND CONDITIONS CONTAINED IN THE REQUEST FOR QUOTATION AND ANY SUBSEQUENT ATTACHMENTS OR ADDENDUM.","Payment will not be made for any work, which cannot be documented by an approved, signed checklist.","The type of PCB waste activity engaged in at the facility.","References will be submitted on a form provided by the department which will be completed by the person providing the reference and mailed directly to the department for inclusion with the instructor application.","Department, at its option, may declare the entire loan immediately due and payable.","Choosing the type of lead assessment has significant cost implications.","Any work requiring skirt removal or closure awork, also requires that all stored, unused, items, etc.","The day porter shall sign in and out with security or an authorized County representative as well as complete task checklists each day.","An applicant desiring to be an asbestos management planner agency shall designate one or more individuals licensed as asbestos management planners as their responsible persons, who shall have responsibility for the asbestos activity.","Government Bill of Lading, it is important to give a full and accurate description of the sample for rate purposes.","We will not use the cookies without your explicit consent, which you may grant or decline by clicking the appropriate link on this page.","Note that if you work in more than one state, you may need both EPA federal and state certifications.","Equal Employment Compliance Fee.","OFFERORS ARE RESPONSIBLE FOR THE TIMELY RETURN OF THIS QUOTATION.","Further exceptions to assessed valuation limit.","For example, divide the area into top and bottom halves or left and right halves.","EPA accredited school to this affidavit.","Never place more than one sample in the same officially sealed package.","Live insects were observed exiting bag and two were collected upon exit.","Participants in the program must be informed of this right.","This corroborating witness should have personal knowledge of the facts and be available if the principle witness cannot testify in a legal proceeding.","Ownership of or by a Third Party referred to in this definition includes beneficial ownership effected by ownership of intermediate entities.","Study was to monitor the effects of the remediation, and that the repairs were not nded to remove all lead.","For samples requiring only to be refrigerated: A minimum of ten pounds of dry ice is sufficient.","Department of Finance prior to commencement of work, and no additional fee or penalty shall be due and owing HPD at the time of issuance of a certificate of eligibility and reasonable cost for failure to file such notice of intent.","MCLPPP investigators will conduct the ead nspection unless the Administrator is asked to perform the ead nspection on behalf of MCLPPP.","Where do young children spend their time?","SCRIE application and portability request prescribed and made available by HPD.","Site from the City to a Sponsor.","Conditions requiring a mandatory asbestos survey for ACBM.","Such affidavit shall include the date and time of such actions.","This section shall not restrict or enlarge the liability of any person under any applicable law.","Leave a portion of the stain intact but take a cutting large enough to provide good identification.","Tunnel visors shall be provided for all indications.","RRPM training program approved by the Commissioner and, if performing services for compensation, has a current license issued by the Department.","Organizations are encouraged to review all draft publications during public comment periods and provide feedback to NIST.","If there is deteriorated paint in theclearance area, record the locationsshould be repaired to preventpossible lead exposure.","Should an estimate be submitted after all funds are committed, the Contractor will put the request for funds on a wait list.","Wood surfaces shall be properly prepared by removal of e unsound material.","Some these ay be evaluated by Type A evaluation of measurement uncertainty from the statistical distribution of the quality alues from series of measurementsand can be characterized by standard deviation, evaluated from probabilitydensity function based on experienceor other information.","HPD may require, as a condition of admission or substitution of general partners all such information regarding any proposed new general partner as it deems necessary.","Determine if there is a labeling agreement and obtain copies of pertinent correspondence.","It would have been kept on a central computer, yes.","Target Data have been appropriately protected.","The firm must hollicense.","Further information about Radon Resistant New Construction can also be found at www.","Exposure to leadbearing dust is particularly hazardous for children because handmouth activity is recognized as a major route of entry of lead into the body and because absorption of lead is inversely related to particle size.","Railroads prepare Freight Bills at their destination offices, where copies can be made.","Cleaning and verification take placeand containment is removed and properly disposed of.","The lights shall be encased in a metal guard or shatterproof globe.","Divide the total number of segments by six.","All inspections shall be made in the course of normal business hours.","LICENSURE: INDIVIDUAL ASBESTOS MANAGEMENT PLANNER.","Your assessment and documentation of the evidence observediagrams, photos and sample collectionswill determine what actions may be required by either the establishment, the Agency, the Court, or all three to correct the problem.","These forms are to be maintained in the file.","Filing of applications, eligibility, investigation of applicants, waiting lists.","Dampen the area before scoring.","Select at least two nonoverlapping pseudorandom locations from within each subsection.","LLC APPROVED EXTERNAL PROFICIENCY TESTING PROGRAMAIHALAP, LLC reviews and formally approvother proficiencytesting programs for its accreditation programs and accepts data from these approved programs.","Include in this appendix, the solvent used to make the spiking solution, the PCB concentration of the spiking solution used to contaminate the surfaces in the validation study, and all of the validation study testing parameters and experimental conditions.","Both you and the consumer can readily see it is insect infested.","Such receptacles shall not be placed so as to obstruct egress or create a nuisance.","Risk assessment needed to obtain certification for EBL children.","The behavior and methods to bypass freeze lock or other limitations on command availability vary between computers, so refer to the computer manufacturer for details about the behavior of specific models.","Cryptographic Erase has different verification considerations than procedures such as rewriting or block erasing, because the contents of the physical media following Cryptographic Erase may not be knownand therefore cannot be compared to a given value.","Bolts, nuts, washers, and screw buckle swivels.","Such location shall be one to which collection vehicles have safe and convenient access and which shall be suitably equipped, adequately lit and of sufficient size for the safe loading or emptying of the containers.","Nationally, lead poisoning rates in the United States have dropped dramatically over the past three decades.","YES NO I have evaluated the site and property, the work specifications, and interviewed the occupants.","Place subs in clean airtight container, preferably clean glass jars.","The examination will cover the topics included in the training course for that license category.","HPD and the housing company shall submit staffing plans to HPD for its review and approval, if required by HPD.","Article V of the Private Housing Finance Law.","If the job does not involve sanding, scraping, repainting, repair, replacement or reconditioning of the fascia surface, is it covered by the RRP Rule?","The maximum diameter for steel reinforced polyethylene storm sewer pipe shall be the diameter for which a manufacturer has submitted a qualified joint.","The Director, National Program Chemicals Division, may defer the authority described in this paragraph, upon request, to the appropriate EPA Region.","My firm is replacing windows in a condominium.","It shall be unlawful to keep such doors open.","Cecil responded by offering the testimony of Dr.","If the device supports encryption, the Cryptographic Erase command.","Counseling and Assistant Unit, and such other indicators of experience which may be contained in the records of the Department.","This would be considered as one episode because only one commodity is involved.","The cost of acquisition shall in no event exceed the appraised value of the property prior to rehabilitation.","Though these instructions only apply to surveillance samples, they may also be considered for illness investigations or for cause sampling but are not required.","Department and shall be for a period or periods of time that will provide the new owner with a reasonable time to achieve correction of each violation which is the subject of the application for a stay.","Take the standard wipe test samples of the entire selected sixth half.","New York may file an application for such lease or such purchase of shares.","PCB remediation waste disposal within the confines of the operating conditions of the respective approvals.","The trial court agreed with the representatives of the subjects, granting a partial summary judgement to that effect.","Removal shall be done in such a manner as to cause a minimum amount of damage to the surrounding structures and landscaping.","Some sanitization procedures feature additional optional methods.","The eight local lead laws utilize a wide range of lead inspection tools incorporating procedures developed by federal agencies, as well as innovative variants on existing inspection protocols.","If not handled properly, release of these media could lead to an occurrence of unauthorized disclosure of information.","We understand that the Estate does not accept that KKI did enough to warn Ms.","Lead from paint, paint chips, and dust can pose health hazards if not managed properly.","Single stream recycling includes paper, cardboard, aluminum cans, plastic containers and rinsed food containers together in one recycling container.","HPD shall publish a notice in The City Record and such other publications as HPD shall determine seeking public comment regarding whether there has been harassment of the lawful occupants of the property during the inquiry period.","In this case, the rehab specilist has two options.","There are two procedures for compositing bulk PCB remediation waste samples.","The cover and seat shall be machined so as to have perfect contact around the entire circumference and full width of bearing surface.","Combined Form for Notice for Smoke Detecting Devices, Notice for Carbon Monoxide Alarms, and Notice for Suspected Gas Leak Procedures.","If EBL cases are more dispersed, it might be more appropriate to target all rental housing, or all units occupied by children.","Any future changes to the FACTS database reference tables, such as the firm files, employee name, data codes, etc.","This guidance focuses on the media sanitization component, which is simply data sanitization applied to a representation of the data as stored on a specific media type.","Each channel of the detector unit shall be capable of operating up to three sensing probes.","Accordingly, it is a living document and the answers may be periodically revised and updated.","In order to supervise workers, supervisors must know how to carry out worker activities.","NOTE: Each window, door and staircase to be disturbed must be separately tested, even if in the same room.","Type VI reflective sheeting shall consist of unmetallized microprismatic lens formed on a flexible vinyl material.","Bannon could not recall ever seeing this particular document prior to his deposition.","Project Operation Prior to Disposition if HPD Temporarily Leases the Building to the Sponsor.","Study and other efforts to combat the lead poisoning scourge.","Any person may use this subpart for validating either a chemical formulation or a product with a trade name whether or not the constituents of the product are proprietary.","So it was below what the laboratory could detect on the wipe sample.","These subsamples should be collected from beneath unstained portions of the container.","Owners of spilled PCBs who have delayed cleanup because of these types of circumstances must keep records documenting the fact that circumstances precluded rapid response.","All bare root plant materials shall have a heavy fibrous root system and be dormant at the time of planting.","Initials ______ Work listed in the Times per Year column shall be scheduled with the Facility Maintenance Manager or other authorized County representative.","Refusal To Permit Access To Records In Possession Of Common Refusal to permit access to and copying of all records showing interstate movement of articles subject to FDA jurisdiction is unlawful provided the request for such permission is issued in writing.","Notification of changes in Board of Directors, officers, managing agents, attorneys and accountants shall be provided promptly to HPD and HDC.","Rental surcharges collected by the owner are paid to the Agency by check made out to the order of the City of New York and are used to reimburse the City for any tax exemption or abatement granted to the owner.","This reduces the likelihood that a sanitization tool that only sanitizes a subset of the media will result in verification success in a situation where sensitive data still remains.","The hearing will be confined to the factual and legal issues raised in the notice of intended termination of Relocation Services.","Receipt of an incomplete application shall not toll the time period for correction of the violation.","Tenant ineligible for rental assistance.","It may well be that in the end, the trial courts will determine that no damages have been incurred in the instant cases and thus the actions will fail for that reason.","Marked cases that are consistent with the submitted lab package.","Procedural Guide Set of instructions, guidelines, terms and conditions for the origination of Loans and Grants, including all amendments and supplements hereto.","This guidance applies to Legacy Magnetic media only, and it is critical to verify the media type prior to sanitization.","The plane of the ends of the pipes shall be perpendicular to their longitudinal axes.","US Treasury Department Form No.","Department of Finance sends to owners of real property.","If located on the front or rear wall of the building and properly connected with stairs with proper openings.","The Compliance Program, Field Assignment, or approval will provide sample information and instructions for shipping to the appropriate CFSAN laboratory.","Department has previously denied an application pursuant to these rules.","HPD will not reimburse a Relocatee if he or she is entitled to payment of moving expenses from another governmental agency or other source.","Environmental Firm shall hire a CT DPH Licensed Lead Consultant, employing a CT DPH certified plannerproject designer, to develop a lead abatement plan and a lead management plan.","In both of the above instances the address of the premises and the location of the room must be shown, in addition to the number of persons permitted to sleep in such room.","Best six pin CX series core.","Based Paint Hazard Violation.","VALID SAMPLEA valid sample is the starting point and keystone for most administrative and legal actions.","Because of this, Cecil would most likely only find lowskilled to unskilled jobs with low wages.","Ensure that all work is performed by an EPA licensed firm and all required safework practices are followed.","And all of that was for the benefitof society at large and these children.","YES NO Is this dedicated elderly housing?","PCB Capacitors at the protected location.","Dust samples shall be wipe samples and shall be taken on floors, excluding open porches, and interior windowsills and window troughs that have a paint history.","Attachments such as visors, backplates, or adapters shall conform and readily fasten to existing mounting surfaces without affecting water and light integrity of the signal.","In Philadelphia, landlords must additionally certify compliance with the law when applying for a new or renewed rental license, and Burlington requires a similar periodic certification by the owner of compliance with local requirements.","The SAISO is responsible for ensuring that the requirements of the information security policy with regard to information disposition and media sanitization are implemented and exercised in a timely and appropriate manner throughout the organization.","From the context, Dr.","Intent to Sell a Homeownership Affordable Housing Unit.","Living Units, and all of the associated interior common areas and exterior areasas well as any associated laboratory results.","Interim controls include, but are not limited to, repairs, painting, temporary containment and specialized cleaning.","If no EIR is involved such as when collecting a sample and the dealer specifically requests a receipt, attach it to the original Collection Record.","The process occurs at ambient temperature.","From the marked length distance on the bottom of the area, move perpendicularly up from the bottom of the area into the area for the distance randomly selected for the width.","As in Baltimore City andotherross the country.","The area of the common outlet pipe shall not be less than the combined areas of the outlet pipes joined by the Y fitting.","Department of Buildings or previously approved by the Board of Standards and Appeals, or other corrosion resistant materials satisfactory to the superintendent, all so connected as to prevent leakage at joints.","The paint shall show no cracking, flaking, or loss of adhesion.","Material, equipment and workmanship shall be subject to the inspection and approval of HPD or its duly authorized agent at the discretion of HPD during the progress of the work and before final payment is made on the contract.","Where the light from the fixture at the highest story provides adequate illumination, in the opinion of the department, no lighting fixture shall be required at the roof level of the stair bulkhead.","All signed manifests generated or received at the facility during the calendar year.","Harper M, Hallmark TS, Bartolucci AA.","Appliances in Sleeping Rooms.","The contractor will not discriminate against any employee or applicant for employment because of race, creed, color, national origin or sexual orientation.","All parts shall be of iron or stone.","Clearance testing is among the new ree new lead rule.","Septic system inspections are not currently required by law at the time of property transfer, but are strongly recommended.","Conformance shall be valid for two years from the date of Certification or until the next turnover of the dwelling unit, whichever is longer, provided that no more than one Clearance Inspection shall be required in any twenty four months.","Conversion of manual to automatic.","In no event shall a demolition start or be completed on a date other than the dates entered in this section.","Formerly licensed in Texas.","Thoroughly vacuum using a HEPA vacuum.","The apartment shall not be, in whole or in part, arranged, designed or intended to be used for single room occupancy.","Use the most economical method of shipment consistent with the need for special handling.","Clean entryway doors from fingerprints and other debris.","RRP firm certification application?","Federal Home Loan Mortgage Association and the Federal National Mortgage Association that is quoted, for Sale or Resale, in the month that the Homeownership Affordable Housing Unit is marketed for Sale or Resale.","Already being used in Mahoning County as part of an aggressive special prosecution initiative, the state law has the potential to be extremely effective.","Failure to maintain essential services.","EPA shall provide the owner or operator with a detailed written statement stating the reasons why he believed closure was not conducted in accordance with the approved closure plan.","City of New York that were acquired through tax foreclosure and other means.","Fifth, all surfaces shall be inspected to ensure that all surfaces have been cleaned and all visible dust and debris have been removed.","Landlords must properly remove and dispose of chipping, peeling paint from reachable surfaces.","Agency for the payment of utilities where the tenant of an Affordable Housing Unit is required to pay all or a portion of the utility costs with respect to such unit in addition to any payments of rent.","State and Federal laws.","Making cutouts in walls.","Considerations for Sampling Soil After the Work Neither EPA nor HUD requires any soil sampling as part of a clearance examination.","The opening and closing speed of the valve shall be a minimum of five seconds for closure and a minimum of three seconds for opening with a constant rate of opening and closing.","If the informal conference produces a resolution the dispute, the Administrator shall prepare a document signed by alparties involved that plainly states the agreed upon resolution.","The increasing availability of rapidly applicable techniques, such as Cryptographic Erase, provides opportunities for organizations to reduce the risk of inadvertent disclosure by combining sanitization technologies and techniques.","The Agency may impose such additional threshold criteria in the RFP as it deems necessary or desirable.","Apparently, the children and their parents involved in the cases sub judice were from a lower economic strata and were, at least in one case, minorities.","That portion of backfill retained on a No.","Documentation Required under Records Audits.","This inspection shall not relieve the Contractor of any responsibility for identifying and replacing defective material and workmanship.","Article XI housing development fund company organized pursuant to Article XI of the Private Housing Finance Law.","We are constrained, therefore, to feel that the court below should, in the circumstances we have outlined, have instructed that the consent of the parent was necessary.","Rights Retained by Agency.","The court may order that they be produced in court.","Lead poses a serious health risk, particularly to children, and can cause permanent damage to the brain and other organs.","If the Commissioner of HPD determines that the parcel is not a Distressed Property, then the tax lien on the parcel may be included in such sale.","The sample is taken to determine if reconditioning was satisfactorily performed.","And the house complied with the regulatory definition of lead safe?","What is the confidentiality requirement for the data stored on the media?","The exterior requires paint stabilization on all leaded components.","DPH Licensed Lead Consultant shall perform clearance activities and issue a letter of compliance.","For those insurance policies that I am conssupervision?","PCB concentration of the fluid in a reclassified electromagnet, switch, or voltage regulator has changed, causing the reclassified status to change, the electromagnet, switch, or voltage regulator is regulated based on the actual concentration of the fluid.","NIST does not conduct an evaluation of any tool set to verifyits ability to Clear, Purge, or Destroy information contained on any specific medium.","The vertical or longer axis of the elliptical section shall be clearly marked before shipping.","Inspection for approval of castings will be made by the Engineer after the finished castings have been anodized as noted in the Plans.","The sign panel shall not contain visible cracks, pinholes, foreign inclusions, or surface wrinkles that would affect implied performance, alter the specific dimensions of the panel, or otherwise affect its serviceability.","If your unit fails an inspection, the inspector will issue a report identifying which areas of the inspection failed.","AMPLING SCHEDULE FOR LOWACID CANNED AND ACIDIFIED FOODS.","Usually the violation is concealed and must be found by laboratory methods.","United States Department of Housing and Urban Development for dwelling units in a project with a HAP Contract.","Once final clearance criteria areachieved, the local health department shall conduct a visual assessment of the property to ensure compliance with the lead abatement plan.","GENERAL REQUIREMENTSreasonably cleanable type for sanitary maintenance; shall adequately protect surfaces and upon completion shall be free of stains and other foreign matter other than preexisting.","The identity of the transporters, commercial storers, or disposers known to be involved with the transaction.","The User Data Erase command.","It is a requirement that the department notification form be filled out completely and properly.","CE See Cryptographic Erase.","Can we perform these lead tests without being a certified renovator?","Higgins of the fact that her house had elevated lead levels.","The Sequential Plan can only be used where additional fish are immediately available for cutting.","Qualification for each manufacturer of steel reinforced polyethylene culvert pipe requires an approved joint system and a formal quality control plan for each plant proposed for consideration.","Changes in ownership or operational control of a commercial storage facility.","There was a robotic system for doing the analysis.","The Lead Hazard Mitigation Law will also help rental units have regular minor and maintenance when needed to remain lead safe.","Contact your local servicing laboratory or MSDS for the appropriate protective gear and handling of fumigants.","Insurance verification through submission of insurance certificates, forall Subcontractors.","In no circumstance will the decision of the hearing officer violate any HUD regulatory XXV.","Bids received late will be rejected and returned unopened to the Bidder.","For damage to the vehicle itself, comprehensive fire and theft shall be obtained.","FEI, which identi\ufb01es the manufacturer of the product sampled.","Gaskets are required for all storm sewer installations.","WEST TREMONT: The area bounded by West Fordham Road; East Fordham Road; Webster Avenue; Cross Bronx Expressway; George Washington Bridge; and the Harlem River.","Stop work and clean up the work site before rain begins.","HEPAvacuumed before they are removed from the work area.","Attach service logs and completed task list, if required.","HPD reserves the right to disapprove the action of the housing company.","If the complete traffic controller defined in the Special Provision requires NTCIP compliance the following are the minimum requirements for NTCIP operation.","Failuhallult inlaoratory halliredmitomped aplior ion.","Removal with subsequent action.","The Agency may also mail copies of such advertisement to potential Applicants, including, but not limited to, Applicants who have done prior business with the Agency or who have requested to be on a mailing list for such purpose.","New in all dwelling units.","Stakes for compost socks shall be made of wood from untreated Douglas fir, hemlock, or pine species.","It is not necessary to submit moving estimates.","Department for review and determination of exempt status.","Any other person in contact with the convicted person.","In no event shall a licensee fail to have the required coverage at the time of engaging in asbestos activities.","Spalling of the concrete.","Carefully scrape off the surface of the product with a sterile device and aseptically draw the sample from the material below.","Armstead admitted that she knew that the remediation would not remove all lead.","Do not remove the label from bulk containers such as drums, barrels, and large bags, if this results in misbranding the article.","Manufacturers and be listed on the NTPEP audit program website displaying that they are NTPEP compliant.","Follow DOT and IATA guidelines when shipping or mailing samples with preservatives as stated under Samples collected for label review only should be of\ufb01cially sealed in clear plastic bags.","In either case, the estimated useful life of the multiple dwelling after rehabilitation shall not be less than the term of the loan.","If a proposed new loan will increase the amount of Mortgage Payments, the Administering Agent shall require the Homeowner to show that the Monthly Housing Costs are affordable to such Homeowner in accordance with the Program.","The signature and name of the authorized payroll person.","Medium Material on which data are or may be recorded, such as paper, punched cards, magnetic tape, magnetic disks, solid state devices, or optical discs.","Copies of authorizations and licenses from authorities having jurisdiction for performance othe Work.","This places your child in CDC Class IIB.","Seal side joints where recommended by metal roof panel manufacturer.","HPD regarding the creation of inclusionary housing in accordance with any applicable provision of the Zoning Resolution.","Affidavit is attached hereto.","The EPA Regional Administrator may include any conditions to such approval deemed necessary to protect health or the environment.","Recycled steel furnace slag shall not be placed below the ordinary high water mark of any water of the State.","When directed by your supervisor, you may use an of\ufb01cial seal to seal questionable or suspicious bioresearch records encountered during an inspection or investigation to prevent tampering or to preserve their integrity.","Use the back of the page as necessary.","Do not collect leakers, but report the number observed.","Jefferson County on company letterhead.","No other material may be used unless same is acceptable to the Department of Buildings.","New York the opportunity to correct violations while being assured that legal actions will not be brought against such new owners and that civil penalties accruing to the Department of Housing Preservation and Development will be stayed during the correction period.","COUNSELAnd also you are familiar with Mr.","Lead Law: Evaluation of a Local Environmental Health Policy Innovation.","The Contractor shall use the widest panels possible.","The shipper is the \ufb01rm responsible for causing the interstate Enter the last two digits of the \ufb01scal year.","Safe work practices and clearance were not required when activities do not disturb painted surfaces below minimis thresholds defined below.","Such types of security may include, but shall not be limited to, surety bonds, letters of credit, or cash.","YES, it is familial status discrimination.","Each luminaire shall include leveling reference points for both transverse and longitudinaladjustment.","This will tell you the areas in your home where leadsafe work practices should be used for renovation, repair, or painting jobs.","Such schedule shall contain a listing of all items of indebtedness, the amount thereof, the source of payment thereof and the anticipated date of payment, plus the amount of money anticipated to be paid to the City from the remaining surplus.","The Agency may require the deposit of loan advances in a separate escrow account, in a bank designated by the Agency, subject to withdrawal only upon the joint signatures of the borrower and a representative of the Agency.","PLEASE READ IT CAREFULLY.","Document Type, Document Number, Document Date and Remarks for any records collected to support a violation or show interstate movement of the product sampled.","Program, the Site, the selection process, and such other matters as the Agency deems to be relevant.","If all attempts fail to produce a resolution, the parties shall participate in a binding arbitration process as soon as possible after the informal conference.","Disposition, Sponsor shall register with DHCR the rent charged to each Tenant in the Building at the time of Disposition.","Therefore, HPD reserves the right to determine, on a case by case basis, what amount is sufficient.","His opinion was that the BRM Sampler was not properly validated and that the test results were not reliable and accurate.","This potential vulnerability can be mitigated through proper understanding of where information is located, what that information is, and how to protect it.","IMPORTED WHITEFISH SAMPLING GENERALThis Sample Schedule objective is to maintain import lot integrity from time of importation thru FDA inspection or examination and final action.","What exactly can it tell us?","If the papers submitted to HPD are in form sufficient to warrant consideration by such agency, the applicant shall be notified in writing.","The name and address of the client.","Hinges shall not have removable hinge pins.","The initial compositing area has sides three grid intervals long.","Tenant of the DAMP Lessee.","In describing photographs, do not mark the face of the print.","The carbon monoxide concentration and the excess oxygen percentage in the stack of the boiler when it is operated in a manner similar to the manner in which it will be operated when low concentration PCB liquid is burned.","Exceptions to dollar limit.","Typically, the asbestos abatement containment and waste handling requirements are more stringent than the RRP Rule provisions, so compliance with the asbestos requirements will also serve as compliance with the RRP requirements.","Living Unit or an owneroccupied unit in a multifamily building, the owner mustpay the difference.","When delay and extension timing with gate is required, the unit shall provide both delay and extension timing features as noted above with the additional capability of inhibiting delay while enabling extension upon application of an external signal.","In order to determine such compliance the Department reserves the right to interview or confer with any employee at any time, on a rehabilitation site or in the office of the contractor or subcontractor.","Fully document every physical Official Sample at the time of collection unless instructed otherwise by the programor assignment.","Each head shall have two anchors and each jamb shall have three anchors.","Note: When documenting specific situations in a plant, you may need to vary this procedure to mimic the actual conditions used by the firm.","If the Contractor fails to provide the daily minimum required cleaning hours, the deficit will be deducted from the monthly invoice.","In general, the older your home, the more likely it has leadbased paint.","Firms may also incur additional costs related to training and certification, such as the time spent on the activities, and for traveling to and from the training.","Some examples of fixed patterns include all zeros or a pseudorandom pattern.","Collect a sample at each point if the grid falls in the cleanup area.","EDA in form approved by the law department and in form and substance acceptable to the agency.","Refusal To Permit Access To Records In Possession Of Common Carriers.","The area of inference from a composite sample is the total of the areas of the individual samples included in the composite.","The drain wire shall be uninsulated.","Visible paint chips should be picked up with a vacuum or by hand before soil sampling.","The site is secure.","Code and has not defaulted in its obligations thereunder.","Clearance examiners and their clients may, if they wish, choose to collect dust samples in more than four rooms.","They shall be manufactured as integral units or so formed that they can be readily assembled and erected in place.","Commencement of new construction.","Upon conclusion of such hearing, the hearing officer shall make a recommendation to the Commissioner whether or not the Certification of No Harassment or waiver should be rescinded.","Temporary wiring, extension or zip cords shall not be used as permanent wiring.","Emergency Operations due to the lack of confidence in the analytical methods and the results associated with certain samples.","In the absence of primary prevention inspections by the county health departments, there were no inspections for lead hazards until a child had already been poisoned.","Certificate is not applicable.","All renovation firms involved in a project share the responsibility for retaining and making available to EPA all records necessary to demonstrate compliance with the RRP Rule for a period of three years following completion of the renovation.","Persons seeking to be licensed as an asbestos consultant or accredited as a project designer under these sections shall complete the approved project design training course as described in this subsection.","As part of the rulemaking process, EPA estimated the labor, equipment, and supply costs for these work practices.","Rules, the Commissioner may at any time waive in writing such provision or provisions of these Rules with respect to any Project.","These signs must be posted in areas where they are likely to be seen by the occupants of all of the affected units.","Asphalt coating shall not be used on aluminum end sections.","Number of PCB Transformers and the total weight in kilograms of PCBs contained in the transformers.","All marketing efforts must meet equal opportunity and fair housing guidelines.","Sanitization For storage devices containing magnetic media, a single overwrite pass with a fixed pattern such as binary zeros typically hinders recovery of data even if state of the art laboratory techniques are applied to attempt to retrieve the data.","Furthermore, as long as courts continue to interpret the doctrine of informed consent in experimentation as it applies in the context of treatment, the uniqueness of the protection needed for human research subjects will be overlooked.","INSPECTION, ACCEPTANCE AND APPROVALS: Goods shall at all times and places, including the period of manufacture, are subject to inspection and test by County.","HIGGINS, a minor, etc.","Be sure the container is insulated on all six sides and tape all edges securely to assist in insulating the carton.","There is a change in the expected date of closure, if applicable.","Public Service Commission with respect to such conversion.","EPA further recommends that the firm document and keep records of the specific circumstances surrounding the impossibility.","Wash all windows inside and outside in spring and fall.","The failures in the informed consent process lead to serious inequities in research, specifically for the poor and less educated who bear most of the research burden.","This will hold the evidence in place and prevent possible loss of microscopic evidence due to static charges.","Building Permit Any permit needed for proper rehabilitation or construction of a project under the Program.","The asbestos abatement start date is the date that asbestos will be disturbed.","Kennedy informing the participant what it intends to do.","Dates of completion and of occupancy.","And the reason it mattered to Ms.","If the Applicant is not an Access Authorizer, the application shall also be executed by an Access Authorizer.","It is a violation to interfere with or delay an inspection or investigation conducted by a department representative.","Application for Payment or a Payment Requisition are required for all subcontracted work.","Participate in identifying the priority of all work items essential for bringing the structure to city code.","Where developers and community groups entered into agreements which provided for the payment of syndication funds directly from the developers to the community groups, the agency shall seek to enforce these rules to the extent practicable.","This should be ongoing, as controls y have to be adjusted as the system and its environment changes.","No more than four different wipes should be inserted into a single container for a composite sample.","For a DOC sample, leave this \ufb01eld blank.","What rightdoesknowingly expose a child not in need of therapy to health risks orotherwise danger, even if it can be argued it is for the greater good?","If, because of your assignment, you are aware the sample should be forwarded to a second laboratory after the \ufb01rst analysis is complete, include that information in the Collection Remarks \ufb01eld.","Rodriguez also explained that Cecil had impaired executive function, including problems with planning, organization, reasoning, and mental flexibility.","One from an interior window sill or window trough, if present, alternating from sill to trough between rooms.","Unreported Opinion including the rear exterior, had leadbasedpaint surfaces that were chipping.","Scale and scope limits direct application as model.","It is a violation of this chapter for a person to interfere with, deny, or delay an inspection oinvestigation conducted by a department representative.","Type of soil and impact surface.","Submit broken seal with sample records.","The second option, however, reflects the tension between the other two.","If a property has been remodeled, it is not exempt from this section unless the full requirements of this section have been met.","Detroit requires an annual risk assessment.","New York City Department of Housing Preservation and Development or its successor.","Did you recently complete any building renovations?","An organizationmay ask a product vendor for assistance in identifying storage media that may contain sensitive data.","The asbestiform varieties of chrysotile, amosite, crocidolite, tremolite, anthophyllite, and actinolite.","Do not collect the actual labeling if only copy is available.","IRB members, their degrees, representative capacity, experience, and employment relationships between the member and the research entity.","Nuremberg Code, all the more important.","The width of alphanumeric characters shall be appropriate for the font.","Determine the identity of the owner or his agent and estimate the value of the goods sampled.","Clean using a good household detergent.","Roberts Rules of Order, Newly Revised, shall be the basis of parliamentary decisions except where otherwise provided by law or rule.","Closing of Sale; Notice.","Removal of architerequired when accessibility into and through the house is either requested by the client or and approved by the homeowner.","If no units containing less than declared volume are found, no further determinations are required.","The agency may take actions and otherwise act for the purposes of an in accordance with the procedures described in these rules.","City water and sewer charges, City and state taxes on the transfer of real property, recording taxes and fees, and any other tax or governmental imposition which a Sponsor may be required to pay in connection with a Project.","In the event that a housing company employs or contracts with any person or entity in which any partner of such a partnership is directly or indirectly an interested party, the partnership shall disclose such fact to HPD.","Emergency actions; weather conditions.","At no time were we responsible for the means and methods of construction.","If I mist and HEPA vacuum the plastic sheeting used by my firm for interior containment, can I move and use plastic sheeting on the same day and job?","Your assessment, and documentation of the evidence you observe by diagrams, photos and sample collections will determine what actions may be required by either the establishment, the Agency, the Court, or all three to correct the problem.","The clearance examiner must exercise professional judgment in selecting rooms that may have been contaminated during the work.","Thus, the Estate reasons that because Dr.","When the first coat has dried, the second coat of water repellent compound shall be applied.","Any portico or covered exterior hallway or walkway.","Based Paint Inspector None.","The test load shall be applied and released ten times on each axis.","Two light strips shall be provided.","Washing shall begin with the ceiling and proceed down the walls to the floor.","AIHALAP, LLC may also request that the package forwarded for TAP Reivew.","The Inspector shall have the authority to reject materials or workmanship which do not fulfill the requirements of these Specifications.","Rights retained by agency.","Whether to use order blanks contained in the promotional package, advertisement, or promotional activity; or whether false ones will be used.","Use the standard report format.","CHANGE ORDER: County may make changes within the general scope of this contract.","When identifying whether sanitization is necessary, both the organizational control and data protection level should be considered.","To select a sample of the waste and prepare it for chemical extraction and analysis, there are three required levels of random sampling.","The inside shall be smooth and free from burrs, which could damage cable during installation.","The date of any cleanup, containment, repair, or replacement.","The lid is operational.","Documentary samples are not required to support advisory or administrative actions.","As an aside, the Department of Health and Mental Hygiene has a list of certain companies prohibited from performing lead paint testing, lead paint and dust analysis, or lead abatement work.","EPA estimates that this costs per person trained.","Samples collected from pairs of coordinates.","Where heating or cooling is needed and permanent enclosure is not complete, provide insulated temporary enclosures.","Successful completion of three contracts removes thmay have more than one rehabilitation project at any given time.","Lead from paint chips, and dust can pose serious health hazards if not taken care of properly.","Resumes of key employees to be assigned to the project.","All other requirements shall be the same as for untreated piling, except that the ring count requirement will be waived.","Personal Protection This section indicates the exposure limits, engineering controls, and personal protective measures that can be used to minimize worker exposure.","Containers shall not allow their contents to spill from tears or punctures.","Insurance premiums covering loss and damage of personal property while in storage or transit.","No such contract or agreement shall exist, and no such rights shall be created, until the city and the community group enter into an EDA approved as to form by the law department and duly executed by both parties.","Complete visual assessment formin this chapter.","Records obtained or reviewed reveal the product originated in a foreign country.","The selected method should be assessed as to cost, environmental impact, etc.","Take steps to minimize exposure of product, sampling equipment, and the Use only sterilized equipment and containers.","The box shall be of cast iron, two piece slip type standard design with a base corresponding to the size of the valve.","Support posts shall be in accordance with the Standard Plans.","Adulteration Or Misbranding In Interstate Commerce.","During inspections of manufacturers such as canneries, bottling plants, milling operations, etc.","Texas licenses provided that they are valid and are verifiable by the department.","No exceptions shall be made.","The holes in the plate shall be slotted to facilitate erection and to permit expansion and contraction.","Make sure the sample is centered on the bottom of the pipe segment; that is, sample an equal area on both sides of the middle of the bottom of the pipe segment for the entire length of the sample.","It also affords tenants an opportunity to raise concerns and ask questions about the renovation.","For FDA to initiate formal legal action, interstate jurisdiction must be established.","Include the name and title of person signing any affidavits in the Remarks field.","English and Spanish as such owner believes will be of assistance in ensuring communication of the content of such notice to the occupants of the multiple dwelling.","The hearing officer shall make a recommendation to the Commissioner.","Cabinet wiring shall be trimmed to eliminate all slack and shall be laced or bound together with nylon wraps or equivalent.","PREPARATIONThere is no prescribed format for composing the statement.","Copies of building permits and other required permits.","HPD of acceptance, may be made in writing to the person designated by the Commissioner of HPD, if it is received within ten days of the date of the denial letter.","Compactor: new or refuse chute.","PCB Transformers, PCB waste in PCB Large High or Low Voltage Capacitors, PCB waste in PCB Article Containers, and PCB waste in PCB Containers remaining in storage for disposal at the facility at the end of the calendar year.","Lead Hazard Clearance Examination.","Disposal of PCB bulk product waste.","However, failure to reject the curb at that time will not ensure its final acceptance.","Transmit each Application for Payment with a transmittal form listing attachments and recording appropriate information about submission.","Moreover, defendants have failed to establish that they have a meritorious defense to this action.","All necessary documents for an import sample collection must be completed.","Requirements for PCB spill cleanup.","Fees must be paid to the department prior to the taking of the examination.","KKI as a defendant.","Benefits and any successor to such applicant, including, but not limited to, any Owner, or any employer of Building Service Employees for such applicant, successor or Owner, including, but not limited to, a property management company or contractor.","Collection and disposal of refuse within premises.","Elevator shafts in such tenements shall be completely enclosed with fireproof or other incombustible material and the doors to such shafts shall be fireproof or shall be covered on all sides with incombustible material.","LICENSURE: ASBESTOS TRAINING PROVIDER.","Affidavit of Gabriel Seymour, NYSCEF Doc.","Each EDA shall include a scope of work describing the project in form and substance satisfactory to the agency.","Any person cernotify the commission in writing before making any changes which would amend the information contained in their application.","Final Selection, HPD shall notify the Tenants of a Building that the Project has commenced, unless the Tenants have applied for another HPD disposition program that accepts applications from Tenants within such time period.","Certain parts of prison facilities and juvenile detention centers that house incarcerated persons are housing.","Untreated Piling Except where specifically provided otherwise, untreated timber piling shall be Douglas Fir, Western Red Cedar, or Larch.","Network Devices may contain removable storage.","After the Department determines that a request for Written Agreement is complete and satisfies all requirements of this section, the Department shall approve the request for a Written Agreement.","Progress payments on work completed shall be made on the basis of sworn statements as herein provided, subject to review and approval by the Agency.","Disposal includes spills, leaks, and other uncontrolled discharges of PCBs as well as actions related to containing, transporting, destroying, degrading, decontaminating, or confining PCBs and PCB Items.","This schedule was developed with the assumption that color distributionin the lot will be homogeneous.","Healthy Homes Program, Cleveland Department of Public Health, pers.","Assets shall include checking, savings, other bank accounts, stocks, bonds, CDs, ehold member.","HPD shall respond in writing.","The rea laboratoing accrediion.","The RRP Rule does not prohibit a firm from extracting, salvaging or reusing building materials that contain leadbased paint.","HPD to be qualified.","Usually assistance will be available on the premises, or arrangements can be made with management to employ outside professional help.","The Contractor will pay all expenses in connection with the sale, delivery, storage, protection and insurance of Materials granted to the Owner.","Crixeplichurning must be avoided.","Any and all such improvements or alterations shall, upon installation, become the property of the DAMP Lessee at the option of the DAMP Lessee, if approved by HPD.","To try andabate more properties in Baltimore City.","The records must include the sources and the annual amounts of PCBs received if imported and the type and annual amount of PCBs that were manufactured.","The average values shall be used to show thepercent change in tensile and elongation.","Of Enter the number of cases, and number and size of units per case in the lot.","Whatprimary importance to be gleaned in the Hrespect to some of their minor children, but that was therapeutic to other of their children.","Increase visibility, consistency, and your bottom line.","All aluminum windows shall meet current City of Atlanta requirements.","Destruction facility or for recycling measures.","EPA recommends that you check with stateor local housing authorities if it is unclear whether a particular property meets this definition.","Additional copies of the notice to tenants shall be kept by the applicant for inspection by tenants requesting same.","The spiking mustbe performed on an appropriate matrix.","The agency may reject any and all applications.","If lead is determined not to be present, we accept and proceed normally.","Payment of the balance of this fee shall be made no later than ninety days after approval of the application for a Preliminary Certificate of Eligibility.","Commissioner and has a current license issued by the Department to prepare lead abatement project designs, occupant protection plans, and abatement reports.","However, any enforcement action taken by, or application submitted to, the HRC prior to the effective date of these rules and regulations shall beand regulations in effect at the time the enforcement action was taken, or application filed.","Jefferson County, Missouri and its designated representatives.","Your state or local public health department will also be able to provide information about lead.","Surcharge records shall be kept available by the housing company or its managing agent for inspection by HPD.","This section must be completed, even if no asbestos was discovered in the survey.","MCE filters in conducting cassettes with extension cowls.","California may indeed need flexibility to authorize such a wide variety of enforcement mechanisms given the great variations in the size and characteristics of its municipalities.","Collect specimens of any shipping case labels and any labeling which accompanied the original Obtain evidence showing how the lot was labeled at the time of receipt; how the misbranding occurred, and who was responsible.","On the first question, we hold the circuit court did not err in its determination, following a Reedvacuum samplingis a generally accepted method fevaluating trends in levels of lead dust over time.","Be careful not to touch the opening of the broth container to any nonsterile surface before or during this transfer.","Limitation on Collection of Arrears.","Loosen setscrews or lock nut ring on coupling and spin back to allow for insertion.","The amounts listed should always TOTAL amount removed during the project.","The consent agreements do not so provide.","PCB remediation waste that is not in a container and porous surfaces.","We note that there was little suggestion of actual permanent injury to the children involved with these two cases.","The Dwelling Units to be inspected shall be selected by the inspector.","Is this type of exterior work considered work in a common area, and if so, must other owners and occupants be informed about the job?","Local housing policy tools, and particularly adoption of local laws, may be the key to addressing these remaining pockets of high lead poisoning rates.","Applicants for abatemensupervisor licenses must furnish contacts or sources that can fully verify the documented experience.","These working days are usually Monday through Friday of each week.","Joints on the exterior faces shall be struck and shall be provided with a smooth finish.","Homeownership Affordable Housing Unit under the terms of the legal documents pertaining to such unit that were executed at the previous Sale Date.","Funds will be deposited into the account of your choice automatically and on time.","State of Maryland Lead Dust Clearance Standards shall be used.","Compositing is a method of combining several samples of a specific type of bulk PCB remediation waste or porous surface from nearby locations for a single chemical analysis.","Safe Work Practices and achieved clearance.","HUD Lead Guidelines governing such inconclusive readings.","If there is no storm window, the window trough is the area that receives both the upper and lower window sashes when they are both lowered.","Be sure to describe the reason each document attached to the collecon record was obtained.","The Intake Rent and the rationale therefore shall be kept on file by HPD and be available for public inspection.","Such rents shall be the higher of the rents in effect when the Written Agreement for Creation of Affordable Housing is entered into or when construction of the affordable housing units commences.","New York City Administrative Code.","Signal head displays shall be either hard wired or controlled by radio signal.","Training providers may provide a person who objects to having his or her picture taken because of sincerely held religious beliefs with the equivalent of a certificate without a picture.","All attendees shall wear face masks, pass thermal temperature screening and sign in by the start of the tour.","In addition, HPD may approve the use of funds from the Capital Reserve Account to pay for repairs to Homeownership Affordable Housing Units.","Railing repairs will be historically sensitive.","Appendix Clisttools and external resources that can assist with media sanitization.","It is important to shower and change clothes before going home.","Cables shall be gel free, loose tube, low water peak, and all dielectric with no metallic component.","Documenting a number of lots which meet the criteria helps establish the widespread nature of the adulteration.","Temporarily unoccupied or vacant housing is not exempt from the requirements of the RRP Rule.","Approval of construction contract.","Regulatory Agreement in which such Eligible Owner has agreed to continue to subject the dwelling units in such Real Property to the restrictions of the Tax Credit Program.","Pillori is also dismissed for the reasons already discussed.","Describe the equipment you plan to reclassify, the alternative reclassification method you plan to use, and test data or other evidence on the effectiveness of the method.","Use scrubbers and absorbent pads that are not dissolved by the solvents or cleaners used, and that do not shred, crumble, or leave visible fragments on the surface.","XRF test prior to issuing such violation.","April and ending on the last day of June.","The Tenants Association may invite local elected officials or other representatives to participate.","Grant to be approved, the bid amount must be within Program limitsor the property owner mustpay the difference between the Program limits and the bid amount.","The ethical face of the research subject can be obscured by such factors.","Clean and repair items to functional condition adequate for intended reuse.","The CONTRACTOR shall not be deemed to be an employee of the CITY.","Units during the entire Extended Affordability Period.","For a NESHAP abatement or demolition, the notification form may be signed by the legal owner or the operator of the site.","Call your doctor or local health department to arrange for a blood test.","Approval of an incinerator will be in writing and signed by the appropriate EPA official.","If the scope of the work or the estimated cost changes materially, applicants must file a revised form with the Department of Finance.","Morote presented her expert opinion that Cecil had the potential to learn and that he had the cognitive capacity to acquire a GED.","WEIGHING RESULTS TARE NO.","NSA states that he products on these lists meet specific NSA performance requirements for sanitizing, destroying, or disposing ofmedia containing sensitive or classified information.","HPD reserves the right to conduct a physical inspection of each development at any time.","Training facilities used will be those commonly used and accepted as classrooms or conference rooms.","The street address of the building consisting of the house number and the street shall be placed on each sign by the owner or his representative.","In addition, the recipient must be allowed to withdraw this consent and be informedof the procedures for withdrawing consent.","From the outside of the sponge bag manipulate the handle toward one side.","Finally, implementation resources may change over time.","Check with your supervisor about the technical aspects of this procedure.","CAHA, LLA pocedllassocitit her n epecancs.","Owner Responsibilities for CO Alarms for Class A Multiple Dwellings.","Unfortunately, the majority chooses to go far beyond the narrow question presented in these appeals and addresses a number of ancillary issues in dicta.","This type of survey is also required prior to any demolition work occurring.","Commissioner shall comply in all respects with applicable Laws.","This procedure is not appropriate where complete, intact, labeled units are desired for exhibit purposes, even though there is no intention of analyzing the units obtained.","Additionally, other similar projects were halted elsewhere.","Transfer of each affected Lot.","Only laboratories licensed by the State of Texas may be used to evaluate samples taken from within public buildings in Texas.","All such gas appliances shall be of types approved also by the American Gas Association.","Additionally, the soil plan is for use during onfarm investigations requiring the sampling of soil for the presence of Salmonella.","Do not permanently identify articles that are borrowed and will be returned to the dealer.","Department under this chapter.","Calculate the total volume of solvent circulated by multiplying the pump rate by the time of pumping.","PCBs which may present an unreasonable risk to human health or the environment.","EPA Region; or to the Director, Office of Resource Conservation and Recovery, for sampling, cleanup, disposal, or storage occurring in more than one EPA Region.","There are suf\ufb01cient blanks for listing up to three invoices and up to three shipping records covering the lot in question.","Relocatee must keep HPD informed of his or her current address, telephone number and other contact information.","In addition, dust, water and bare soil shall be tested.","Study and then the landlord, was there testing done by dust wipes to ensure the clearance standards were passed?","Type II reflective sheeting shall contain an identifying marking, such as a water mark, which is visible after sheeting application.","STATE APPLICANTS AND OU.","When the owner of the building occupies one of the units, he will be liable for rent surcharges the same as any tenant.","HPD, the period commencing with the submission of an application for such tax credits to HPD and ending one year after the date of issuance by HPD of the Low Income Housing Credit Allocation and Certification form to the applicant.","In addition to submission of the application form and portability request, proof of income and proof of previous rent and subsidy are required.","Violations shall be placed in one of the following severity levels.","Simply stopping killing mold not remove People react mold whether the mold insulation, carpeting, other porous materials must be removed.","Study, placing the Study itself at issue.","As a practical matter, the entire property of most urban and suburban residential lots is normally considered to be associated with residential use.","HPD or the commissioner of any successor agency or her or his designee.","Perhaps even more important is the ancillaryissuether a parent in Maryland, under the law of this State, can legally consent toplacingn a nontherapeutic research study that carries with it any risk of harm to thehealth of the child.","As used in this chapter, the following terms shall have the following meanings.","Cabinets and hardware shall be repaired if feasible; new hardware can be wood or metal knob or pull with approved type latcmatch existing as nearly as possible.","It is better to have the bag on its side while pulling the spout so any dust in the opening falls outside the bag.","It is especially important that children not enter the area.","What RRP requirements, if any, apply during a whole house gutrehabilitation project?","It also requires site photographs or other evidence satisfactory to HPD documenting the installation of the item.","EPA requirements, in which case the State or Tribal requirements must be followed.","The name, address, and EPA identification number of the facility covered by the annual document log and the calendar year covered by the annual document log.","Once work on the defective paint surface is completed and the surrounding area inspector will conduct a clearsamples will be sent to a certified laboratory for testing.","Sample for Labora Analy.","When testing a property for the presence of lead prior to beginning a renovation using an EPArecognized lead test kit, must I test every component affected by the renovation?","The attesting individual need not be a certified renovator.","When viewing the cabinet from the back, the panel shall be located on the upper left hand side of the cabinet.","The information in this publication, including concepts and methodologies, may be used by Federal agencies even before the completion of such companion publications.","Glass, such as bottles, vials and ampoules, may be identified by using a very fine pointed felt or nylon marking pen and covering the identification with transparent tape for protection.","Each objection to a charge on a statement of account shall be received by the Department prior to the due and payable date of such charge.","Ability to carry out projects on schedule and to complete projects as assigned by the Department of Community Development.","To qualify for this exclusion, however, the work site must be in an area which is enclosed by a wall, fence, or other permanent or temporary physical barrier which truly prevents access by tenants and other building users.","In no event may the insurance coverage be less than shown below.","Degaussing, a fundamental way to sanitize magnetic media, no longer applies in most cases for flash memorybased devices.","Housing Maintenance Code must submit proof of such authorization satisfactory to the Department in order to submit a Dismissal Request.","By comparing the approaches and experiences of these eight case studies, several lessons emerge for those contemplating designing, implementing, or evaluating local lead laws.","What they do is make rulings on the facts that are before them, not factual findings, but legal rulings based on the facts before them.","Advancing Program funds to contractors for uncompleted work is prohibited.","However, the drive could be configured in a vendorspecific manner that recludes sanitization when removed from the enclosure.","HUD and EPA have suggested optional wording as provided in Exhibit A below.","And, again, the wipe was sent off to a laboratory to analyze it for lead content.","The laboratory willall iawiitnt bapremined ule.","Frame walls will removed.","Allocation of management expenses.","The bands shall be fabricated of the same material as the pipe, and with the same metallic protective treatment as the pipe.","The first component of the study concerned the first three groups of houses.","Timely completion of work, capacity, and financial strength of the organization.","PCB waste described on the manifest.","One type of work must be checked.","Such information shall be posted at the entrance to the dwelling and at the entrance to the dwelling unit.","The University of Iowa, however belatedly, has acknowledged the impropriety of that experiment and apologized for its involvement.","Health and Safety Code to provide specific authority for local jurisdictions to address lead paint hazards.","Each bidder shall be required to comply with all of the eligibility criteria established in the bid solicitation.","Compliance with the requirements of the Private Housing Finance Law shall continue to be supervised by HPD.","Selection sample collection sites.","PCBs for purposes of disposal and for purposes of use, except where use involves sale for distribution in commerce.","Send bioindicator analysis samples to WEAC.","Organizations are encouraged to seek products that they can evaluateon their own.","As such, it has failed to satisfy its prima facie burden on these branches of its motion.","Familiarity of the firm with problems applicable to lead based paint inspections and risk assessments.","Certificates of Partial Substantial Completion issued previously for Owner occupancy of designated portions of the Work.","Any finding and waiver under this paragraph must be stated in writing and included as part of the approval.","No push button device shall be more than six feet from the floor and the speaking and listening device shall be installed to be not less than four feet and not more than five feet from the floor.","What is the total amount of federal assistance dollars per unit?","Contractor shall provide for a neat, clean, and safe environment at all times during all work, as determined by the City of Rockville.","Also, the clearance examiner should consider taking one or more of the second wipe samples in unsampled rooms, if any, unless no work was done in those rooms.","During the first eight years, the exemption shall equal the amount of the assessed value attributable exclusively to the physical improvement.","Buildings with exterior walls constructed of material other than masonry.","Practice represents the utilization of knowledge, while research amounts to its creation.","Upon disconnect, the connector shall remain in the load side of the kit.","Office Equipment supplies may also pose health risks, and should be handled using appropriate procedures to minimize exposure to the print components and toner.","In the about page, there will be a reset your phonebutton at the bottom of the page.","Date for New Construction Rental Affordable Housing.","Additionally, other similar projects were haltedelsewhere.","All container grown plants shall be handled by the container.","Use in and servicing of circuit breakers, reclosers and cable.","RFP shall be made available to all potential applicants prior to the submission deadline.","Theeligibility of an owner of residential rental property for Program funds will be based on the income of the tenantoccupying the Living Unitto receive lead hazard reduction work at the time the pplication is completed and submitted.","Monday through Friday, excluding legal holidays.","The Respondent: It sounds like Your Honor is looking at this informed consent as a contract where each side is getting something out of this.","The fund shall be placed in a blocked account which will be administered by the Department.","Respondent: To say that the appellant in this case did not get any benefit from the study is pretty disingenuous.","Records shall be maintained for all PCB disposal operations and shall include information on the PCB concentration in liquid wastes and the three dimensional burial coordinates for PCBs and PCB Items.","Reasonable expenses incurred by such displaced person for evidence of title, recording fees and other closing costs incidents to the purchase of the replacement dwelling, but not including prepared expenses.","Occupied Rehabilitation Program Policy Appendices damage.","Draw aseptic sample in same manner as in step above.","HPD shall have clearly marked thereon the reason for disapproval and shall be kept for a period of time as HPD may direct, and shall be available for examination by HPD.","When handles are included as an integral part of the valves, the Contractor shall remove the handles and give them to the Engineer.","In her Complaint filed in the Circuit Court for Baltimore City, Ms.","For example, Chicago has produced periodic reports on its program but does not have annual public reporting requirements.","The composite measurement represents an arithmetic mean of the composited samples.","Department of Sanitation on behalf of itself, the Department of Housing Preservation and Development and the Department of Health.","These notices must include a valid EPA accreditation number for the leadbased paint activities course being offered.","The building paper, metal lath and cement or gypsum mortar shall be carried at least halfway up on the sides of the beams.","Real estate taxes, assessments, water and meter charges and sewer rents.","If disputes cannot be resolved satisfactorily, the dispute will proceed to binding arbitration.","Occupied Rehabilitation Program Policy Appendices atement by contractors and bloodas well as holding lead abatementclasses with all workers performing abatement.","The floors, walls and ceilings of all rooms, passages, and stairways must be at all times kept clean and in good repair.","Any commitment issued shall be conditioned upon full and timely compliance with the requirements of these Rules and Regulations, the availability of funds to make the loan and such other terms and conditions as the Department may require.","This identification shall be in a plainly visible location when the ring and cover are installed.","ASBESTOS MANAGEMENT IN FACILITIES AND PUBLIC BUILDINGS.","The tenant of a commercial unit for which a new rent has been determined shall have the right to state their objections to the Appeals Committee in writing.","The bell and intercommunication system shall be located at the required main entrance door so that a person may readily reach the door when the unlocking buzzer is activated.","PORT RICHMOND: The area bounded by the Kill Van Kull; Jewett Avenue and its prolongation; Forest Avenue; and the Willow Brook Expressway.","Lenses shall be either red or amber, glass or polycarbonate as noted in the Plans.","This has been the subject of comment in a constitutional context, in dissent, in a case involving the use of psychiatric medication on mental patients without their consent.","The RRP Rule applies to activities that result in the disturbance of painted surfaces.","Products containing cellulose fiber produced from paper or paper components will not be approved or accepted.","Before the public educational requirements, consumers may not have been receiving sufficient information on how to reduce their exposure to lead.","HPD will provide an Alternate Site Notice to the Garden Contact Person and Alternate Garden Contact Person.","The dust clearance samples are required to be collected by a certified inspector, risk assessor, or dust sampling technician.","When reported by vendors, this information also helps purchasing authorities make informed decisions about which storage devices to acquire based on the availability of suitable sanitization functions and approaches.","What must I submit?","Theadditive shall be specifically designed and manufactured for lead paint abatement.","The person performing the inspection.","The new building should be tested for radon after construction is completed and is ready for occupation.","Alternatively, all the unsampled units could be sampled individually to determine which need recleaning.","Saddles used on PVC pipe shall be formed for PVC pipe and have flat, stainless steel straps.","Using aseptic technique unwrap and place a sterile glove upon the hand you will use for swabbing.","In addition, the agent is responsible if the seller or lessor fails to comply.","KENNER reserves the right to require a complete copy of all policies, forms and endorsements, if it is deemed necessary.","However, the renovator is the person with the expertise and experience to make this determination on a casecase basis.","No public announcements of any kind with respect to the housing company development shall be made by the sponsor without prior written formal approval of HPD.","Rodent Contaminated Pet Foods.","Hot water heater or hot water tank.","VEBL Venous elevated blood level.","Of course, the asbestos abatement must be designed and conducted by persons accredited in accordance with the Model Accreditation Plan.","Federal, State and Local laws, rules and regulations.","Use other methods of freezing, if frozen shipment is necessary.","Most were mental patients and included both adult and minor subjects.","The Department must make a determination in writing, including the reasons therefor, on whether the postponement shall be granted or denied.","The aim of the research study wastoead paint abatement in reducinglevels of lead dust present in these houses.","Does the RRP Rule apply to this work?","For purposes of this policy, certain words and phrases are used to denote specific materials, procedures, or circumstances.","Monthly Fees and Special Assessments.","Living Units, the relevant Occupant Protection Plan must indicate alternative entrances and exits that do not require passage through such common area, or the Certified Abatement ontractor shall create an uncontaminated passageway through such common area.","Description of the sample matrix.","Send all other condom and glove samples to WEAC.","In a mutual housing company, the operating budget and financial statements shall be supplied to all shareholders.","Tenants may also request stove knob covers even if they do not have a child under age six residing with them, by marking the appropriate box on this form.","Steinberg, Esquire, Tara Andrews, Esquire, Public Justice Center, Baltimore, MD.","Commercial, Community Facility and Accessory Use Space no benefits shall be available pursuant to the Act.","Existing handrails and support posts Existing driveway and sidewalk surfaces Landscaping, trees, shrubs etc.","The Bureau of Housing or the implementing agency is Communicating with the homeowner and coall administrative the work on behalf of the homeowner.","Whatever construction techniques are used, the containment must completely isolate the work area and prevent any dust and debris fromleaving the work area tosatisfy the performance standard.","This is one of the only specific requirements for evaluation we found in the laws studied.","Department of Buildings may accept a gooseneck ladder in lieu of a regulation stairway.","PCB bulk product wastes.","The signal pole and mast arm assemblies shall be of the collapsible type, which can be erected and extended at the job site.","Such notice shall be provided in English, Spanish, and such other language as the owner deems necessary to adequately provide notice to the tenants.","Each individual must successfully complete the handson skills assessment and receive a passing score on the course test to pass any course.","If accompanying literature is involved, describe and state the amount on hand.","This preventive measure is with regard to termites or other destructive insects, etc.","In no event shall the term of any loan exceed the useful life of the rehabilitation or improvement.","Take a photograph of each area where samples are collected and indicate the location and subsample number on a diagram of the field.","We affirm the judgments of the circuit court.","Packaging Control: Collect a portion of unstained container, which does not fluoresce, as a separate subsample for a control.","Garden to an alternate site.","This requirement shall be made a part of the specifications for an asbestos project.","Any application added to the waiting list after the official closing date shall be rejected by HPD.","Coverage will be verified by the Bureau of Housing the Bureau of Housing before contract execution.","Results revealed metals in the form of arsenic, barium, lead and mercury, consistent with expectations of the site, as well as with background levels found in soil throughout the city.","Court Order or Decree.","They ruled that this identical contract was, in fact, a contract.","The mitigation inspection report and certificate must be completed and presented to the tenant before the tenant enters a lease.","We would contact you to discuss a summary of house test results and steps that you could take to reduce any risks of exposure.","Procedure for request of increase.","National Center for Healthy Housing.","An advisory committee shall be appointed under and governed by this section.","Vulnerable populations could potentially drink water with high levels of lead before knowing of the risk.","All workers involved in lead hazard reduction activities must either be supervised by an EPA or State of _______Abatement Supervisor or have Article VII Occupant Protection During Lead Hazard Reduction enter the work site during the lead hazard reduction activities.","When collecting samples using aseptic technique and the subs are collected using presterilized containers and equipment, submit a number of control subs.","Obtain this information from invoice or other records.","An owner may object on the basis that he or she has attempted and failed to gain access to make repairs to the dwelling unit that is the subject of this fee.","The Baltimore City Health Department and Maryland Department of the Environment also collaborated in the study.","Representative on this project will be Buster Neel, who is authorized to sign contracts and other legal documents related to this project on behalf of the Owner.","On the issue of causation, Cecil called Dr.","An organized group of individuals who maintain a Garden and are collectively represented by the Garden Contact Person.","It met the acceptable standard at the time.","Thesechildren were not to be mentally retarded or severely handicapped in any waythat would limit their physical movement.","The theretofore unstuttering orphans that had been conditioned to stutter remained stutterers for their entire lives, experiencing severe lifelong problems because of the experiment.","What cleaning methods do you use?","The Contractor shall be responsible for compliance on date of contract acceptance and shall provide written proof to the County upon request.","Determine the second parameter s of the location for each sample.","Supplementary means of egress.","Admission and eligibility requirements for occupants.","OF THE CIRCUIT COURT FOR BALTIMORE CITY AFFIRMED.","See for special situations.","Verify federal work authorization program.","Reasons for abatement method used for each component.","The official MIB Module referenced by the device functionality.","Sufficiently mixed or penetrated with liquid to prevent the release of particulates.","Contractor prior to use.","CT DPH licensed lead consultant to perform lead abatement.","PCBs, comparison study samples would have to contain concentrations of these amines at the same levels found, or at the highest levels expected to be found, in the PCB remediation waste.","HPD for its review and written approval; said schedule to be prepared and certified to HPD by an independent certified public accountant acceptable to HPD.","Is there a preventive maintenance program?","Tenants Association retains an accountant, architect or engineer to review a rent increase application which has been submitted by a housing company to HPD and approved as to form by HPD.","Containers shall have been evaluated and approved by the Department of Sanitation pursuant to the performance standards and specifications of the Department for the approval of refuse compactor systems.","Liability Insurance: The ENGINEER shall purchase in its name and maintain at its sole cost and expense such liability and other insurance as set out in the insurance requirements of this Contract.","Because these homes were in disrepair.","EPA will take into account that there are limits on the power of a grab sample to dispute statistically based sampling of the type required of the responsible party.","To help ensure receipt of email correspondence, we recommend you add the lead.","Low and moderate income.","The service shall be limited to cleaning, dusting, floor preparation, and finishing work described in the specifications.","Execution of the Tenant Interim Lease.","Housing companies or their managing agents shall submit a copy of the surcharge information tabulation sheets, and all changes thereto, together with copies of the income affidavits for HPD review and evaluation.","The fiscal clerk will notify the consignee and consignor that a sample has been collected so the owner can, if desired, bill FDA for the sample.","For purposes of this definition, a lease, sublease, license or any other form of rental agreement for a period of less than one year shall be deemed to be a short term rental.","Nominal maximum size for concrete aggregate is defined as the smallest standard sieve opening through which the entire amount of the aggregate is permitted to pass.","If HPD determines that the alleged Cause for Revocation of the Tax Benefit is curable and that the Taxpayer has proposed a practicable cure, HPD may enter into a Cure Agreement with such Taxpayer.","Residential Building, as evidenced by a Temporary or permanent Certificate of Occupancy, must take place within three years of Commencement of Construction.","The diagram shall show in detail all circuits and parts.","Owner assumes no responsibility for condition of areas to be selectively demolished.","All values certified shall be based on test values and actual sectional areas of the material being certified.","LED light strips shall be provided for cabinet lighting.","Commissioner shall order liability insurers to provide or continue to provide liability coverage or to participate in any other appropriate remedial program as determined by the Commissioner, provided the prospective insured is otherwise in compliance with the provisions of this chapter.","HPD will not reimburse a Relocatee if he or she is entitled to payment of storage expenses from another governmental agency or other source.","In addition, do not use visionoffice or resident post as a return address when ordering products or literature.","The companion drawdown color sample shall be labeled with the product number, batch number, and size of batch.","Certificate of Conformance and Database The Certificate of Conformance A Certificate of Conformance is evidence of a passed lead inspection for the rental unit.","We did a jurisdiction by jurisdiction Westlaw search using traditional legal research techniques to determine what case law in that city or state might affect implementation of the local law.","The process has secondary containment to prevent any solvent from being released to the underlying or surrounding soils or surface waters.","In contrast, the certified mail option provides a receipt to the sender and a record of delivery is maintained by the Postal Service.","DOCUMENTATIONCollect both unlabeled and relabeled units or specimens of the label to be af\ufb01xed.","Zoning Resolution, Regulatory Agreement and this Chapter.","These hazards will be fixed before the job is considered complete.","RRP Rule and therefore not subject to any RRP requirements.","So the only benefit to the parent was the remuneration that wasgivena part of this study?","The city can help you identify properly trained contractors.","BELFASTHALL ROOF REPLACEMENTand shall fully reimburse the obligee for all outlayand expensewhich said obligee may incur in making good any default of said principal, then thisobligation shall be null and void; otherwise, it shall remain in full force and effect.","Sample Shipment to Outside Agencies.","Engineer may require further testing.","RESPONSIBILITYIt is your responsibility to collect your own samples using techniques and methods which willprovide the most ideal sample, yet not be objectionable to firm management.","Occupant protection; worksite preparation.","And what is that opinion?","The Contractor shall provide as part of the conduit submittals a certificate of compliance with these coefficient of requirements.","Monthly interest on the amounts advanced under the loan during the period of construction.","In this case, both the general contractor and subcontractor must become certified firms.","To reduce lead poisoning or the risk of lead poisoning to children and families; To educate families about lead poisoning prevention; and housing programs.","Rules, technical violations of these Rules shall not invalidate any action taken pursuant to these Rules, nor shall such technical violation give rise to any rights, claims, or causes of action.","Housing Assistance Programs as assigned.","LICENSING AND REGISTRATION: CONDITIONS.","HPD shall approve or disapprove applications, and, if it approves, shall issue a written notification to such head of household and to the affected housing company indicating the total amount of SCRIE subsidy available pursuant to this subdivision.","Any surplus remaining in the account upon completion of HPD approved repairs or improvements shall be added to the reserve fund.","Appeal from the Circuit Court for Baltimore City pursuant to certiorari to the Court of Special Appeals.","The Engineer shall have free access to all testing and records pertaining to material to be delivered to the job site.","Container plants shall be free of weed or foreign plant growth.","City at time of application, the Applicant must provide proof of payment or evidence that the outstanding charges are being paid in timely installments pursuant to a written agreement with the Department of Finance or other appropriate agency.","Every foundatiinterior wall must be reasonably weather tight, watertight, and damp free, and surfaces, other than decay resistant woods, must be protected from the elements and decay by paint or other protective covering or treatment.","In its review, the Agency will consider on a casecase basis the provisions made by a training program to ensure the quality of its course materials.","This Court made that clear in Whit.","PCB wastes shall have a detailed estimate, in current dollars, of the cost of closing the facility in accordance with its approved closure plan.","The presiding officer shall appoint members of the committee to serve on subcommittees and to act as subcommittee chairpersons.","Complete the bottom portion of the sticker and note the amount of dry ice in kilograms.","If there is lead in your water, you may want to consider buying a water filter.","Rutland Avenue, and the red line is the blood lead levels, what does this, if anything, indicate to you?","Toning pigments shall be laminar silicates, titanium dioxide, and inorganic oxides only.","Scribing, mitering, ately and neatly.","If a renovation activity removes or otherwise disrupts a painted component in a way that destroys or ruins the component, the activity is a demolition.","Where the Agency deems it to be necessary or desirable, a Sponsor may be selected for a Project without any competitive process.","Containers shall be free of jagged or sharp edges.","Persons listed on the external waiting lists by apartment size in strict chronological order by date of receipt of application or order of selection by lottery, as applicable.","Bid or Proposal wherever it deems it advisable or necessary so to do and such changes shall in no way invalidate the contract nor affect the bid prices for any item or remaining work.","If necessary, a firm should be prepared to verbally convey the information in the pamphlet.","This shall be accomplished by cutting into existing surfaces, forming, to edge of ramp end point.","Theconsentdo In light of our opinion, we do not address this issuefurther.","One composite interior window sill sample, with one subsample collected from each of the four selected rooms.","The rating system used will be as indicated by NTPEP procedures.","Cryptographic Erasethroughthe use of dedicated, standardizeddevice sanitizecommands at apply mediaspecific techniques to bypass the abstraction inherent in typical read and write commands.","This choice replaces actual moving expenses and related expenses.","Tax Benefit, including the land and all improvements thereon.","Certificate of Compliance with each lot of waterproof membrane.","HPD shall provide the applicant with written notice of the final determination.","Annual report to City Council on number of inspections, passage rate, and program cost.","Plaintiff Cecil Harris through his mother and that Plaintiff Cecil Harris, through his mother, reasonably relied on that negligent misrepresentation?","KKI does not argue the facts as appellant presents them.","Proof of completion of partial conversion within three years shall be submitted with an application for a Certificate of Eligibility for full exemption and abatement benefits pursuant to the Act.","The house has eight rooms that were treated, four of which are carpeted, and all of which have windows.","He believed that criticism by parents, and others, during childhood years, caused children to lose confidence in their ability to communicate by speech, resulting, in the worst cases, in stuttering.","Employee Safety: The Contractor shall put in place safety measures to reduce or eliminate the risk of injuries in the performance of work.","If violative, the Official Sample provides a basis for administrative or legal action.","He testified that it was his expert opinion that Cecil was qualified as disabled under the Americans with Disabilities Act; specifically, that Cecil had a reading disability, and that he was cognitively disabled.","Sufficient lighting shall be provided to make the certificate of inspection visits legible at all times.","Engineer for thepurpose of making tests.","An interior or exterior accessible painted surface that a young child can mouth or chew.","Mortgage Foreclosure Action; Notice.","Even children who appear healthy can have dangerous levels of lead in their bodies.","The body shall have provisions for anchoring to concrete.","OPERATIONS: GENERAL REQUIREMENTS FOR PUBLIC BUILDINGS.","An example of a composite sampling scheme is as follows: A house has undergone an abatement job involving extensive interior paint removal and has passed a visual examination.","The new agreement is subject to negotiation by the housing company within the maximum established above.","No member of an IRB can havea conflicting interest.","PCBs and PCB Items may be exported for disposal in accordance with the requirements of subpart F of this part.","Are workers trained in lead hazard recognition?","Number of affordable units required to be created.","Such meeting shall take place at the development at a time mutually convenient to the Tenants Association and the housing company, and shall be held on a monthly basis unless the Tenants Association chooses to meet on a less frequent basis.","United States Department of Housing and Urban Development or any successor agency.","Customresuls to makeratiost efectie decsions nd neo uderstand reliabilityresults eallythey approulatorylimis.","Financial eligibility shall be determined at the time an apartment is offered.","The training provider shall maintain the records in a manner that allows verification of the required information by telephone.","The goal of this analysis is to inform future local policy innovations that can effectively reduce childhood lead poisoning.","Paper bags or other suitable containers capable of holding more than one quart of sample and do not use canvas bags.","PCBs will not present unreasonable risks to human health or the environment.","Generally, haffirmed, in his affidavit, that the BRM Sampler was never scientifically validated nor generally accepted within the scientific community.","Inthoe cses rigorus stimationis not posibthe laboraoryst mae a reable attempttoevaluate the unintyreslts.","Chemicals Division to exceed the limitations established by this provision.","The proposal must comply in all respects with all material terms of the RFP.","Parents should plant grass on areas of bare soil or cover the soil with grass seed, mulch, or wood chips, if possible.","HPD within thirty days of its preparation.","Unless otherwise specified in the Plans or Special Provisions, metal surfaces shall not be painted.","Report the results of the warehouse stock examination in the EIR and in FACTS.","FMR for the area in which the Building is located.","Landrigan PJ, et al.","Rochester lead law, we identified contextual variables, structural features, and types of implementation resources that could be used to describe, compare, and contrast each law in depth.","With the positive lead dust result, are we required to comply with the RRP Rule?","Method of sweeping regulated.","For the defense, Dr.","Thus, City Homes agreto apply the agreedupon remediation level for each dwelling.","DHCD through the Lead Paint Abatement Program established by the General Assembly.","Regardless of whether units and common areas are sampled, sampling of rooms within dwelling units should follow the guidance provided in Section IV.","Dust sampling should not be performed until the examiner observes that the paint repair and cleanup has been satisfactorily done.","The Agency may impose such competitive criteria for the comparative evaluation of bids in the bid solicitation as it deems necessary and desirable.","PCB Items, storage units, or transport vehicles so that the marks can be easily read by any persons inspecting or servicing the marked PCB Items, storage units, or transport vehicles.","Denial The decision not to grant a laboratory initial accreditation.","The lens shall not allow any light output above degrees nadir.","Technicians A DOH licensed Environmental Lead Inspsuccessfully complete the Lead Mitigation Inspector class in order to become a Lead Hazard Mitigation Inspector.","This rule does not affectother state and federal provisions regarding the obligations and responsibilities of lenders.","Inappropriate experimentation in this country involving children as subjects is not new.","Private residences and apartment buildings with no more than four dwelling units are excluded from coverage by these rules.","This area represents the minimum area assumed to be contaminated by PCBs in the absence of precleanup sampling data and is thus the minimum area which must be cleaned.","Baltimore City Code, Art.","Reporting and recordkeeping of the PCB concentrations in samples.","Bureau of Housing or the implementing agency such information as determined Certification of income and assets will be required to determine program eligibility ation of income and assets means the applicant certifies that all information provided is true and correct.","KKI further states that Mayor Schmoke had personal knowledge of housing conditions in Baltimore City and the risk of lead exposure to childdue to the housing conditions.","ERRORS IN BIDS When an error is made in extending total prices, the unit price will govern.","They will, however, still need to be removed and destroyed.","PCB storage facility has been closed in accordance with the approved closure plan.","United States for disposal.","Demolition of a building performed pursuant to a declaration of an immediate emergency or emergency demolition order issued by the Department of Buildings.","No practical purpose would be served by either collecting or examining such a sample.","EPA will approve the plan, require additions or modifications to the plan, or disapprove the plan.","TSI shall include insulation on boilers, water tanks, air handling equipment and ducts, piping, pipe fittings or valves.","Procedu Specified way to carry out an activity or a process.","Samples must be packed with shock absorbing materials to protect against breakage of containers or damage to Official Seals.","COMPLIANCE: REPRIMAND, SUSPENSION, REVOCATION, PROBATION.","The Traffic Signal Control side of the cabinet shall contain the Traffic Signal Controller assembly and shall be furnished with equipment as described in the contract specifications.","Renovations in common areas of multiunit target housing, such as condominiums, must be performed in accordance with the requirements ofthe RRP Rule.","Tax Abatement for Failure to Substantiate Claimed Costs and Declaratory Rulings.","Trust and agency account.","Most provisions in this part apply only if PCBs are present in concentrations above a specified level.","The timing of proactive inspections is one of the most varied aspects of these local laws.","Coupling shall be epoxy coated.","DSHS license application, if the company has more than one office.","The Engineer shall determine the Suitable Shape, Approximate Size, and Grading of the load before it is placed.","Distance from lowest balcony to ground.","Agency, but not earlier than the date of filing the loan application.","He further testified that chain of custody was observed so that the samples would not be misplaced, and that this was an automated system.","Do not fumigate samples intended for potency analysis, drug carryover or crosscontamination.","Expenditure of funds authorized above shall require prior written approval of HPD.","The sampling schedules estimate lot quality more precisely, thereby reducing the likelihood of passing a lot which should be detained, or vice versa, due to an inadequate sample.","In each hall, room, cubicle, watercloset, washroom and bathroom of every lodging house there shall be provided a sufficient number of cuspidors or spittoons.","Can a homeowner use an EPArecognized lead test kit to check for leadbased paint?","For Examination in Other Than Laboratory.","Both might be within the same confidentiality categorization, but contextually different and with different internal and external rules regarding necessary controls.","If the block erase command is not supported, Secure Erase or the Clear procedure could alternatively be applied.","All areas and all parts of the premises upon which any dwelling or dwelling units are located, and all areas adjacent thereto and a part of the premises, shall be maintained and kept in a clean and sanitary condition.","The foregoing is sufficient to satisfy the elements of a private nuisance claim.","In such cases, a risk assessment It is unwise to assume on abatement jobs.","Evergreen plants shall be well foliated and of good color.","The Director, National Program Chemicals Division, may grant approval without further rulemaking.","Temporary Partitions: Erect and maintain dustproof partitions and temporary enclosures to limit dust and dirt migration and to separate areas from fumes and noise.","Therefore, these paint chips should be considered a part of the soil.","Board members must exercise judicious control of the premises entrusted in their care, including community rooms and public spaces.","The Bureau of Housing or the implementing agency will evaluate the bid documents to determine which bids are eligible.","Do not use mothballs or moth flakes containing naphtha or naphthalene.","For rental Dwelling Units located in a condominium building or structureinspection requirements shall be limited to the interior of the Dwelling Unit.","The Agency may impose such additional threshold criteria in the RFQ as it deems necessary or desirable.","Building pursuant to a lease with the City or with a Tenant Association that has entered into a Tenant Interim Lease.","If a product is capable of supporting microbial growth and is not being handled expeditiously, sample before and after this particular processing step.","Do not use unrelated materials such as clay soil or dredged sediments in place of sandy soil.","The conveyance of a Lot for the purpose of devoting such Lot to a use other than as a garden or open space.","Lessee has received copies of all information listed above.","Every exit from every dwelling unit shall comply with the following requirements: It shall be kept in a state of maintenance and repair.","The time and place for such conference, if any, shall be indicated in the public advertisement for the auction.","Deliver Pamphlet to Owner.","Vent connectors shall consist of galvanized iron of not less than No.","An estimate of the amount of dielectric fluid released from any leak.","Do samples like these need to be taken by certified abatement personnel or a dust sampling technician?","Clean up thoroughly by using a HEPA vacuum and wet wiping to clean up dust and debris on surfaces and wet mopping the floors with plenty of rinse water before taking down plastic over doors, windows, and vents.","Answer Firehouses and police stations are not targethousing.","Abatement is the intentional and permanent elimination of leadbased paint and leadased paint hazards.","What Landlords Need to Know IV.","Avoid getting chemicals on hands or clothing.","Materials shall be new, in good condition, and of specified in the bid document.","Trailers shall have a leveling jack installed at all four corners.","To successfully complete training requirements, persons seeking certification just complete the training asstudents rather than as instructors.","Many public water delivery systems still have old lead piping through which the water must pass before it reaches the home.","New York State Division of Housing and Community Renewal.","Training course sponsors shall permit department representatives to attend, evaluate, and monitor any training course without charge.","Specifications shall be furnished with each shipment.","Cecil was put into an appropriate GED program and provided assistance, he could complete the GED and would be employable in the fieldhe was most interested in, which was construction.","Upon request, EPA will provide to the accredited training provider the logo for their use.","The business must be a leadsafe certified firm, and employ at leasone certified renovator to perform the covered renovations.","How do I submit my course schedule and student information?","The children of middle class or rich parents apparently werenot involved.","Additional passes may be used.","Therefore, if deconstruction or salvage activities occur in conjunction with total demolition of the property, the RRP Rule would not apply.","March first of that year the owner has made reasonable attempt to gain access to the dwelling unit and was unable to gain access, the owner shall notify the department of health and mental hygiene of that circumstance in writing.","Report this information on the CR.","Such additional information as the Department may require.","Usually \u00f2 inch around the holes is suf\ufb01cient to allow manipulation during the lab exam.","What we can determine is that there was simply no evidence of any misrepresentation by KKI, or of any intent to deceive or conceal generated by the evidence before the circuit court.","Collection of composite soil samples, dust wipe samples and water samples per HUD guidelines.","All rejected geosynthetic shall be replaced at no additional expense to the Contracting Agency.","City of New York Department of Buildings or to perform emergency repairs.","All signs, except internally illuminated signs, shall be reflectorized.","The land improved by a building with a Certificate of Eligibility and Reasonable Cost shall not be exempt from an increase in assessed valuation.","Verify that wood blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.","Each section shall have serrated rings top and bottom so when used with proper brackets, each section may be adjustable in respect to an adjoining section, and the hangers shall be locked securely to prevent moving.","Administrative Code, HPD shall not suspend such certification or waiver pursuant to the preceding sentence unless HPD determines that there is reasonable cause to believe that such harassment occurred before commencement of substantial work.","CROWN HEIGHTS: The area bounded by Pacific Street; Vanderbilt Avenue; Atlantic Avenue; Ralph Avenue; East New York Avenue; Utica Avenue; Winthrop Street; Flatbush Avenue; Parkside Avenue; Ocean Avenue; Empire Boulevard; Washington Avenue; Eastern Parkway; Grand Army Plaza; and Flatbush Avenue.","Services involve construction activities to bring the property into compliance with the local building code and housing quality standards.","Fcking in these cases.","Designated person to complete and signed the Weather Variance Form, approved by HRC, and maintain a copy on records.","The side opposite the hinge shall be secured with quarter turn screws or slide latch.","Documented proof that a laboratory can perform a given Field of Testing and, using it, obtain results having the accuracy and precision appropriate for that FOT.","She was very successful.","Particular kinds of monitoring are important based on the features of each lead law.","Degaussing the media in a storage device typically renders the device unusable.","Each disbursement of syndication funds from the escrow account to a community group for a project shall be made in accordance with such EDA.","If relocation is warranted, the family must be moved prior to beginning lead hazard reduction activities.","Maintenance of sleeping, bath and toilet roomscontaining two or more sleeping rooms shall have such room arrangement thataccess to a bathroom or toilet room intended for use by the occupants can behad oom or bathroom or toilet room.","Lead is poison when it gets into the body.","Further, EPAauthorized state programs may have different requirements, including additional requirements for hazard determinations.","PAYMENT: County will pay Supplier for goods upon delivery to, submission of certified invoices with attached tipping fee receipts and acceptance.","The trial court will not determine any disputed facts, but rather makesaof law.","Departamento de Preservacion de Viviendas y Desarrollo de la Ciudad de Nueva York en www.","Conversely, if only a portion of the property ideconstructed, and the above two criteria are met, then the activity is a renovation and the requirements of RRP Rule apply.","Suchsweepingnd the question presented in these appeals, and their resolutionby the Court, at this time, is inappropriate.","Rhode Island Department of Health of any change in the answers to these questions after this application and this Affidavit is signed.","The sample is collected from the owner of the article or his agent, and the article bears no label, or if it bears a label, no person is named thereon.","NEMA standards except only optically isolated load switches will be allowed.","Knowledge, familiarity and previous work experience of the firm with the Community Development Block Grant, HOME or other HUD programs.","All housing companies must make timely submission of all data required to enable HPD to make such certification.","If the application or the criminal background practices, crimes involving prohibited sexualburglary, and crimes against the the contractor may be denied the letter of proposed denial is then mailed to the Contractor.","This will identify these copies of labeling if they are introduced in court later.","Does the rule apply to a unit of student housing made up of two bedrooms, a living room, and kitchen?","If permissable, all dealer sampling must be done with your direct oversight.","After evaluationof the situation and prior to allowing dealer sampling, contact your supervisor for appropriate guidance and concurrence.","Whether or not there is a duty, the Court has to look at several factors.","Be sure to place all disposable items used in the repair and clean up into plastic waste bags.","If the display is composed of individual character modules, the space between modules must be minimized so alphanumeric characters of any size specified below can be displayed at any location within the matrix.","Destroy A method of Sanitization that renders Target Data recovery infeasible using state of the art laboratory techniques and results in the subsequent inability to use the media for storage of data.","For each element of the job, the contractor will need to determine which standards are more stringent and comply with those standards.","Department to create through new construction or substantial rehabilitation Single Room Occupancy units to be rented to persons of low and moderate income as defined by these rules at rents to be determined by the Department pursuant to this section.","Commercial Rent Restructuring Committee.","Certification of superintendents and boiler technicians.","The shareholder shall transfer his or her shares to the housing company and shall thereafter surrender possession of the apartment at the agreed upon time pursuant to arrangements made with the housing company.","County, where County is forced to get services from another provider, County may charge back any additional service costs to Contractor.","All measurements shall be made when panels are at ambient temperature.","Occupants shall be instructed by the owner and contractor to avoid entering the work area until final clearance levels have been achieved.","Notice to Proceedotherwise approved by the homeowner and accepted by the Bureau of Housing or the implementing agency.","Agency deems such method of selection to be necessary or desirable, and the Agency shall not be required to select any Applicant solely because such Applicant has been selected by any other entity.","Ultimately, responsibility for the success of an organization lies with its senior managers.","If no sample number is available, ask the \ufb01rm to identify the bill with your name as the collector to help the \ufb01scal unit match the bill to the sample record in FACTS.","Very few of the cities we studied had systematic evaluation plans built into their lead laws.","PCBs have been thoroughly drained.","This will be accomplished through the following.","Representative of the lot from which collected.","SAMPLING: PREPARATION, HANDLING, SHIPPING.","Update the laboratory as soon as the sample number is available.","Members shall serve after expiration of their term until a replacement is appointed.","Shall be installed with proper fall and with free flowing operation and with connection to municipal system.","Use aseptic technique when sampling from bulk containers.","Place the specimens in a vial or other rigid container to prevent crushing.","The following links provide more information about applying for accreditation as an abatement or renovation trainer.","Guest speakers must be qualified on an individual basis of professional expertise for the purpose of teaching their specialty, such as law, medicine, insurance, etc.","If possible, provide a copy of any maps, photos or other additional documentation to the laboratory.","Reasonable grounds for believing that a bidder is interested in more than one bid for a solicitation both as a bidder and as a subcontractor for another bidder, will result in rejection of all bids in which the bidder is interested.","First, if the landlord does the renovation him or herself, then the landlord must have firm and renovator certification.","Do not collect leakers, but report the number noted.","The licensee shall not supervise any activity for which the primary purpose is asbestos abatement.","Demolition of structures including accessory buildings, sheds, barns, garages, fences, etc.","Direct metering of electricity.","Top rails must go through the wall.","The investigator will take enough cash to cover the cost of the samples collected and not ask the farm to bill FDA as may be done in other sampling situations.","All interior rooms and exterior window troughs must be decontaminated to below clearance levels.","Brush, alcohol wipe, and remove stitching as described.","Such information shall be posted adjacent to the work area.","This will include the duties and responsibilities of the project manager and the air monitoring requirements.","ELIGIBILITY REQUIREMENTS Qualification of applicants is determined by the Bureau of Housing or the implementing agency according to the following guidelines.","Circuit Courts erred in granting summary judgments to appellee.","AIHALAP, LLC during the accreditation process.","Notes: Verification must be performed for each technique within Clear and Purge as described in the Verify Methodssubsection.","In the event that such corporation is or shall become the mortgagee, all fees required by this section shall be paid to the corporation rather than to the City of New York, except as the Agency may otherwise prescribe.","An executed Monitoring Contract for a Rental Project.","Tape the protective paper or heavy clear plastic securely around the edges so it cannot come loose and expose the official seal.","Cuttings may be collected.","Training providers offering the initial management planner training course must reasonably confirm that students have met the prerequisite of possessing valid inspector accreditation at the time of course admission.","This probability may result from a consumer complaint, a downstream consignee laboratory analysis, or other evidence of the presence of the allergen.","This part applies to all persons who manufacture, process, distribute in commerce, use, or dispose of PCBs or PCB Items.","The hearing shall be presided over by such hearing officer as may be designated by HPD for such purpose.","Failure to comply with this subsection shall result in a mandatory civil penalty.","Brush and alcohol wipe the area around the spout and carefully pull it out to reveal the opening.","Valves shall be nonrising stem type, open counterclockwise, and be equipped with an O ring stuffing box.","The results were negative for lead paint but positive for lead dust.","Areas that failed the clearance examination showed lead levels in dust at or above Federal or state standards.","Site during the term of negotiations regarding a Project or prior to the Disposition of a Site shall not be deemed to be a Binding Agreement.","The Court: Could you answer my question?","The agency may negotiate with applicants and may negotiate with parties which have not submitted applications.","STAPLETON: The area bounded by Victory Boulevard; the Upper New York Bay; Vanderbilt Avenue; Van Duzer Street; Cebra Avenue; and St.","AIHAPAT Program, LLC proficiency testing program for laboratories involved in bulk asbestos analysis.","Even small amounts of lead can cause very serious harm to the brain and other parts of the nervous system.","Record and keep the results of the validation study as an appendix to the SOP.","The material shall be of good quality and approved by the Engineer before use.","The bolts and rods shall be tested by the manufacturer in accordance with the requirements of the pertinent Specification and as specified in these Specifications.","The analytical method used to detect the presence of asbestos must be checked.","The location, type, make, and capacity of all such appliances previously installed or to be installed in a building shall be specified.","There are no restrictions on the variable testing parameters described in this section which may be used in the validation study.","Approval by HPD must be confirmed in writing to the housing company.","Standard Practice for Field Collection of Dried Paint Samples for Lead Determination by Atomic Spectrometry.","Pack or crate items after cleaning and repairing.","Describe insects or larvae carefully, noting if they are dead or alive.","Identify any documents associated with the sample, andthe sample itself, with the corresponding prefix, if noted followed by the FACTS sample number.","IRS and New York State income tax returns for the immediately preceding year.","Such interim evaluation period shall end when any required rehabilitation of the property has been completed and permanent loan conversion has taken place, or at the conclusion of such shorter period as HPD shall determine with notice to the Tenants.","Six roof cover fasteners of each type, length, and finish.","The summary must include sample collection and analysis dates.","All internal modular components shall be connected by means of mechanical plug and socket type quick disconnects.","Specifications for Plastic Bags Used for Containing Uncompacted Refuse.","Ductile iron and gray iron castings shall not be painted.","Scope of work and cost estimates.","The warning tape shall be polyethylene with a metallic backing.","This will cause the electronic signature form to be activated.","Plaster boards or perforated rock lath shall be of type and manufacture acceptable to the Department of Buildings.","Signs shall be durable and shall be substantially secured to the door wall.","Relationship of loan to other mortgages.","For clearance to achieve its purpose there must be integrity in the process, in appearance as well as in fact.","Media Sanitizationoption may depend on architectural and implementation details of a particular device.","Clearance examiners must comply with those requirements if they are more stringent or protective than the applicable federal requirements.","We would also like you to respond to a short questionnaire every six months.","If the other methods discussed above are not appropriate, a GBL must be issued at the time of the shipment.","Owner Responsibilities for Smoke Detecting Devices for Class B Multiple Dwellings.","The fourth group consisted of houses, which at one time had lead present in the form of lead based paint but had since received a supposedly complete abatement of lead dust.","Thus, this branch of its motion is also denied.","No dampers, steel wool or other obstructions shall be placed in any vent pipe or flue.","Dispose of waste properly.","If HPD determines at any time that an application contains a material misstatement of fact, HPD may reject such application and bar the submission of a new application for a period not to exceed three years.","In this survey, destructive sampling may be required to uncover any hidden asbestos.","Be sure to review the CP to ensure you collect enough original copies of labeling.","In addition, sellers must give potential buyers an opportunity to checkthe home for leadbased paint or leadbased paint hazards.","Law Department and any successor agency, or its designee.","Describe excretapellets as carefully as possible, Note whether they appear dusty or shiny; soft or hard.","Do not fumigate sample when submitting samples for pesticide residue analysis.","Knobs, handles, dispensers, etc.","Mark appropriate block and enter suggested refrigeration temperature if necessary.","Place the folded wipe in the nearby tube or sampling container.","Divide each of the eight selected sixteenths into four equal parts.","Department of Finance of the City or any successor agency or department thereto.","City or the Department in the loan documents, withhold progress payments to the owner or disapprove the contractor or subcontractor for future work under this Program or other programs of the Department.","For signs with rounded corners, the borders shall be concentric with the rounded corners.","The DAMP Lessee may prepare a request to the appropriate DAMP Program Director for an interim increase in the rent level per Room for Tenants of a particular building.","Controls shall provide for resetting the start of the irrigation cycle at any time and advancing from one position to another.","That portion of a rent or carrying charge increase attributable to gas or electrical utility charges or an increase in dwelling space, services or equipment is excluded from exemption.","This short statement will be educational in nature and help to ensure that all vulnerable populations or theircaregivers receive information concerning how to reduce their exposure to lead in drinking water.","Where masonite or tempered tile is required, it shall be installed with metal, plastic, or wood trim and sealed properly to prevent entrance of moisture.","Whether money orders, your credit card numbers, bank checks, or your personal checks should be used for payment.","Financial assurance for closure.","Rather than admitthat the consentand, necessarily, the consenter as well.","Commencement Date for New Construction Homeownership Affordable Housing.","MOTIONFOR SUMMARY JUDGMENT IS VACATED AND CASEREMANDED TO THAT COURT FOR PROCEEDINGSCONSISTENT WITH THIS OPINION; COSTS TO BE PAIDBY KKI.","Class B dwelling unit, as applicable, due at the time of issuance of the Certificate of Eligibility.","Tenants and the procedures to apply for such assistance.","The results discussed above were obtained from dust samples collected by an experimental Cyclone vacuum dust collector.","Same Same Limit samples to those products meeting vitamin levels listed above.","Clean thwith a wipe.","Measurements of leadin dust samples in these houses were to be obtained atenrollmentlment.","San Francisco law may nevertheless provide a useful model to promote effective coordination.","Respirators were not necessary.","Appointment of replacement board of directors.","Do not start selective demolition work until utility disconnecting and sealing have been completed and verified in writing.","Fees shall not be imposed on any State or local government, agent of the State, or nonprofit training program and may be waived for the purpose of training State employees.","We answer that question in theaffirmative.","Customs seals may be broken only if authorized by Customs.","Ultimately, the owner must produce a clearance report from a certified private risk assessor.","Rehab Specialist will inspect for Our Program.","Such Negotiable Certificate shall provide that a specified number of dwelling units containing up to an average size of twelve hundred square feet to be constructed in the geographic exclusion area shall be eligible to receive benefits of the Act.","Installation procedures and test results for alternate fasteners shall be submitted forapproval.","Such reasons may include, but shall not be limited to, the number of Projects in, or the type or number of programmatic requirements of, any Program for which the Agency determines that additional rules are necessary or desirable.","First, assign a unique identifying sequential number to each kilometer or fraction of a kilometer length of pipe within the entire pipeline section.","However, the Federallyaccredited training provider must comply with federal leadbased paint program regulations, including the requirement that the training provider list the location of its facilities, including facilities in authorized States, in its original or amended accreditation application.","Our opinion is not directed to the matter of whether damages can be proven in the present cases.","The necessity of alteration of existing construction shall not in itself be deemed such a hardship.","Lead Poisoning among Young Children in Monroe County, NY: A Needs Assessment, Projection Model, and Next Steps.","If the pipeline section to be abandoned is between the pressure side of one compressor station and the suction side of the next compressor station downstream of the former gas flow, at a minimum, sample all ends of the abandoned pipe.","Signature asserts that, because Autun has not proven itself free from negligence, its cross claim for contractual indemnification must be dismissed.","Collecting samples from more than one pile.","These clear yellow plastic If the above procedure does not enhance the copied document, pen and ink additions should be made.","Such notice shall identify the service to be interrupted, the type of work to be performed, the expected start and end dates of the service interruption, and shall be updated as necessary.","Sanitary Code of the city relating to the heating of buildings, if such owner were required to furnish centrally supplied heat in such apartment.","Standards for new work shall be used as a guide for making repairs to existing mathe container, shall be easily mixed toproperties.","This responsibility is not limited to those organizations that are thoriginators or final resting places of sensitive data, but also intermediaries who transiently store or process the information along the way.","Where front rails are not rigid they must be braced with outside braces.","All information must be provided if a building was ordered to be demolished.","AWG wires fitted with spade tips.","HRC shall file a complaint with the city or town pursuant to the the Department of Health and the Office of the Attorney General.","Is this a permissible method of exterior containment?","Tapping valves shall be of the same type as other valves on the project.","HPD shall be authorized to charge and collect the fees set forth in this chapter.","Each course requiring approval according to the model accreditation plan shall require at least the minimum number of instructors for that course as specified by EPA.","Should existing conditions indicate infestation; select a treatment rminator.","The request is badly formed.","Rent and Eviction Regulations and the rules and regulations adopted pursuant thereto.","The signs must be accompanied by a posted copy of the pamphlet or information on how interested occupants can review a copy of the pamphlet or obtain a copy from the renovation firm at no cost to occupants.","Obtain evidence showing how the lot was labeled at the time of receipt; how the misbranding occurred, and who was responsible.","During exterior power washing, instead of plastic, canlandscaping fabric or a similar material be used to capture any paint chips or other debris, but permit the water to seep through?","Lead poisoning poses a serious public health threat to children and adults in the City of Rochester.","This opinion is uncorrected and not selected for officialpublication.","The Department will then inform the objecting owner of such determination in writing, including the reasons for that decision.","Clearance of unit achieved before reoccupancy was permitted.","At no time during the term of the Regulatory Agreement shall the Affordable Housing be without an Administering Agent.","City for the fiscal year immediately preceding the commencement of construction of alterations or improvements, and provided further that such assessed valuation test shall not apply if the alterations, improvements or conversion are carried out with substantial governmental assistance.","Asbestos abatement contractor licensees are specifically authorized to employ asbestos abatement supervisors and asbestos abatement workers who are currently licensed under these sections to carry out asbestos abatement or removal procedures.","ONLY hot water extraction method is approved please schedule carpet cleaning on Friday to allow weekend for drying.","Tax Law of the State of New York, including the procedure for filing an application for tax abatement and exemption and the issuance of Certificates of Eligibility by the Office of Tax Incentives of the Department of Housing Preservation and Development.","However, other statutes require the Agency to consider different or alternative factors in determining appropriate corrective actions.","Minimum Average Hourly Wage Act if distribution of the deficiency is limited to all Construction Workers whose wages equal less than the minimum average hourly wage applicable to such Eligible Site.","Housing Properties with more than VIII.","HPD has approved a Building for the Program.","WORKMANSHIP Defective or unsuitable materials or workmanship shall be rejected and shall be made good by the Contractor.","Leakage of water between the coupler and valve body when in operation shall not be accepted.","EPA headquarters will provide guidance to the EPA regions on the degree of certainty associated with various grab sample results.","The thickness of the lining over the crest of the corrugation shall not vary by an amount in excess of \u00bdinch over the entire area of the spun lining.","In addition to the copies the Contractor requires, one copy of the Bill of Lading including the Certification Statement shall be sent with the shipment for agency use.","Example: Depending on the jurisdiction, authority for local actions varies from being specifically authorized, to being preempted or limited, and in some cases is permitted but may require approval.","Tax abatement may not be received for repairs to any items for which benefits of tax abatement are already being received.","City of Atlanta be deemed to be a sale to a third party purchaser without the prior written acceleration and foreclosure retained in the Deed tosecuring the lien in the favor of the City of Atlanta.","City in regards to its various housing projects.","EMP requirements and abatement orders.","Ineligible Projects and Portions of Projects.","Only those specific pipe sizes and gasket materials approved under the qualification test will be accepted.","Engage a professional engineer to survey condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective demolition operations.","Name of housing company, location of development, date of organization and number of rental rooms.","At the completion of cleanup, the responsible party shall document the cleanup with records and certification of decontamination.","The administration and operation of a development shall be subject to examination at the discretion of HPD.","For small or irregularly shaped surfaces, composite a maximum of three adjacent samples.","Final Certificate of Eligibility: documentation.","Grant to be approved, the bid amount must be within Program limitsor the property owner mustpaythe difference between the Program limits andthebid amount.","Higgins of these elevated levels in the subsequent letters.","Only one cassette may be placed on a pump at a time.","The device encrypts all data stored in the LBAaddressable space except for a preboot authentication and variable area and the device logs.","You do not need to take an EPAaccredited initial training course or the third party exam.","Work under this Contract.","Such holes shall not interfere with the reinforcement.","Insulation shall be Type USE Chemically Cross Linked Polyethylene or Type UF, and shall be listed by a Nationally Recognized Testing Laboratory.","City owned building, occupied by tenants.","The jurisdiction may have to add this information to the report themselves or request it from the contractor if it is not included in the original clearance exam report.","Unless HPD exercises its rights under the mortgage to apply insurance proceeds to the mortgage, all checks in payment of losses shall clear through HPD Insurance Unit.","LC ehoo idenios ofnonity.","Perform Short Term Radon Tests on individual properties and provide written test results to the program; secondary tests are to be completed as needed.","The case studies we reviewed indicate a diversity of approaches and show the importance of tailoring local laws to local legal, housing, economic, and institutional contexts.","Note: Besides using tracing paper, it is possible to trace a label on a piece of plastic, similar to a document protector, using either a ball point pen or stylus.","No other materials may be used unless same are acceptable to the Department of Buildings.","EPA and State or Tribal programs authorized by EPA.","Return elements of construction and surfaces that are to remain to condition existing before selective demolition operations began.","Reliable information may come from agency files, the carrier itself, other customers of the carrier, etc.","Rdifferent levels of effectiveness over time.","Occupied Rehabilitation Program Policy Appendices eaned and dry prior to painting.","The selection of rooms to be tested, where applicable, shall include no less than one bedroom and the living room.","This notice must be signed by the owner or his or her representative, and state that he or she has complied with these requirements.","All cutting, boring, chamfering, routing, surfacing, and trimming shall be done prior to treating.","The unit was not properly cleaned prior to the inspection What do I need to know about repairing the property?","Unit, must be measured in the same manner.","Administrative Code referring to the sealing of vacant buildings, and make the buildings safe.","Root balls shall be free of weed or foreign plantgrowth.","The County may accept or reject alternate bids; whatever is most advantageous to the County.","Empty all recycle container and central recycling.","Shipment Of Hazardous Or Toxic Items.","PCB contamination by analyzing organic liquids collected at existing condensate collection points in the natural gas pipeline system.","We make no determination as to whether informed consent in a therapeutic medicalcontext can generate contractual obligations.","This simple element, readily duplicable in other jurisdictions, fills a basic gap in the primary prevention mission.","USDA recommendations for weights are not being followed.","PCB Capacitors shall be maintained by the owner or operator at the protected location.","The Agency may issue written bid solicitations for Projects at any time it deems appropriate and desirable.","Confirmation of completion of reconstruction.","Identification This section identifies the hazards of the chemical presented on the SDS, and the appropriate warning information associated with those hazards.","Agency, make the owner liable for the expense of finding a comparable housing unit for another applicant who is eligible under renting priorities set forth above and for any unusual cost in relocating such applicant in such comparable unit.","Higgins of thefact This was after her child, Myron, was diagnosedwith elevated levels of lead in his blood.","The following is guidance for determining completion of various types of lead hazard control work.","They seek an order directing specific performance of this obligation.","Act and that such units will be rented in compliance with all provisions of this chapter.","INCORPORATION OF DOCUMENTS: The terms of the Bid Invitation, Bid Specifications, Bid Form are and shall be incorporated into the contract as if fully setout therein.","CHEMICAL CONTAMINATIONCollect samples from lots suspected of dry chemical contamination in much the same manner as described for rodent urine.","LEAD or check leadlisting.","As a general guide, collect the controls from the opposite side of the bag or make the cutting large enough to separate the control area and the stain.","Oil burner installer licensed by the City of New York.","For example, guilty pleas must usually be supported by a factual basis, and be knowing and voluntary.","Description of testing apparatus and procedure.","Jefferson County unless the prospective Bidder provides proof that the Bidder does not owe delinquent real or personal property, or that the Bidder does not own any real or personal property in Jefferson County.","Late charges shall be considered additional rent.","Contractor shall make good such defect in a manner satisfactory to the City, without extra compensation even though said defect or injury may have not been due to any act or negligence of the Contractor.","Lead Inspector A DEP certified and licensed individual who conducts lead inspections, lead determinations, clearance examinations, and lead safe evaluations.","We then developed frameworks for describing each law that allowed us to compare and contrast the approaches used in each case study.","Thus, its motion is denied.","Through a competitive bid process, contractors will submit sealed bids based on the provided specifications and approved scope of work prepared by the Housing Program staff.","Labor and Prevailing Wage Compliance Fee.","Office of Code Enforcement by the new owner, or proof that registration is not required for or allowed to be filed by the applicant.","No bid may be withdrawn or award canceled when the result would be prejudicial to the interests of the City or fair competition.","Selecting pipe segments to sample.","Every heat duct, steam pipe, and hotdelivered where intended.","Do the asbestos abatement workers also need to comply with the RRP rule?","Rhizomes shall have a minimum of two growth points.","RFQ, change any of the terms and conditions of an RFQ, allow certain Applicants to make modifications or additions to their respective qualification statements, require certain Applicants to submit additional information or documentation, or withdraw individual Sites from an RFQ.","Affix proper postage to envelope or address label after using divisionor resident post postal scale and meter.","This is defined as the ability to resist pulling apart at any of the connections forming the panel when a single strand in a section of panel is cut.","Label the location of each sample area on the tube.","Appreciation Index on the Contract Date and the Appreciation Index on the previous Sale Date.","Agency, nor may the premises or any part thereof be conveyed, assigned or transferred without the prior written consent of the Agency.","PCBs remaining in the capacitors.","Interim applications of finish may be requested in areas subject to extreme traffic and wear.","Identify each subsample separately.","Such notification shall be sent to the tenants by ordinary mail or distributed under each apartment door and a copy shall be posted in a conspicuous public place on the lobby floor of each building affected.","Permanent dishing or deformation of the lid is \u00bcinch or less.","Similarly, while transporting the waste out of the work site for disposal or storage, waste must be contained to prevent releases of dust and debris.","Is the replacement of a window measuring less than sixsquare feet considered minor repair and maintenance?","The cover shall be removable and replaceable without the use of tools.","City of homeless households who meet the applicable income requirements and other eligibility criteria permitted by the marketing guidelines of the Department.","Ordinance and implementing regulations provide broad discretion to periodically revise protocols commensurate with resources.","Two site supervisors may be listed, if there are two work shifts, etc.","Plastic end caps utilizing a metal screw that may damage the cap if overtightened will not be allowed.","PERMITS AND REGULATIONS Unless stipulated elsewhere in these specifications, the Contractor shall be responsible for obtaining and paying for all applicable permits.","If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.","Compost and other organic amendments shall be accompanied with all applicable health certificates and permits.","Part IVAnalytical, there are instructions regarding the collection of samples.","This area is defined as the total area inside and outside.","Such notice shall state the date, time, and location of the hearing and shall inform the Applicant that he or she may be represented by counsel and may present witnesses and other evidence.","Both the training and the education and experience requirements of supervisors cover the same topics required of workers in addition to the topics specific to supervisors.","Administrative Code as an exempt program upon review and approval by the Commissioner.","Administering Agent must approve or disapprove the proposed refinancing product.","Relocation assistance and advisory services.","You should begin looking for available courses well before your current certification expires, because refresher courses may not be available in your area on a frequent basis.","Department may reduce the bedrooms requirements when, in the sole opinion of the Department, existing structural elements preclude compliance.","Input and output terminals shall be installed with a marking strip with field wire numbers noted in the Contract embossed on the strip.","The entire amount shall be applied against the first annual rent adjustment, including any retroactive rent adjustments which may be granted by the applicable DHCR order, unless the amount exceeds such adjustments, in which event the excess shall be carried forward.","Ideally, this activity is accomplished in the earliest phase of the system life cycle.","In other words, you must give them the same information that you are required to provide new tenants.","Where a representative of an owner seeks access to a dwelling unit, suite of rooms, or rooms, the authorization of the owner shall be in writing and the representative shall exhibit such authorization to the tenant when access is requested.","Claimant must advise HPD in writing of his or her acceptance of applicable Relocation Services after receiving the notice of eligibility for such Services.","Laps between the studs or joists shall be securely tied or laced.","In contrast, it is the questionof whether such duty was b made by the finder of fact after a trial on the merits on remand.","Wehey had any immediate plans to move.","Blanket Position Bond, in favor of the housing company and a copy of such Blanket Position Bond shall be submitted to HPD.","John Hopkins University, to be for the public good rather then asearch for profit.","They are generally collected to document observations, support regulatory actions or provide other information.","EPA may, at its discretion, take samples from any spill site.","Administrative Code, the Department shall not suspend such Certification or waiver pursuant to the preceding sentence unless it determines that there is reasonable cause to believe that such harassment occurred before commencement of substantial work.","Director, Office of Resource Conservation and Recovery, for decontamination activity occurring in more than one EPA Region.","Under the RRP Rule, is composite sampling acceptable for clearance in lieu of cleaning verification?","Recipient shall, commencing with the date such tax exemption ceases, and continuing until the expiration of the Benefit Period pursuant to the Act, receive the benefits to which such Recipient is entitled in the corresponding tax year pursuant to the Act.","Individuals requiring samplecollection data can query the system and retrieve data, based on the query parameters.","The agent must provide a fidelity bond in an amount and form and with a surety approved by HPD.","The smelter must have an operational device which accurately measures directly or indirectly, the temperature in the hearth.","Be alert to any identifying marks, which may later be used on the witness stand for positive identification.","How can I find out?","NOTE: For products not listed, check with your supervisor.","Department, be in arrears, provided all such arrears, including any interest and penalties thereon, shall be discharged by the owner subsequent to the loan closing pursuant to arrangements satisfactory to the Department.","Department of Parks and Recreation.","Dwelling Unit with lead dust hazards on the floor, shall be thoroughly vacuumed with HEPA vacuum or wet vacuum.","Defects, injury, and condition which renders the plant unsuitable for its intended use.","To qualify for a license, an applicant must demonstrate to the department that they meet the applicable requirements.","Feed Subject to MFA Approval Collect DOC Samples of products processed without required MFA approval.","Waste from these activities must be contained to prevent releases of dust and debris before the waste is removed from the work area for storage or disposal.","Copies are not given to the shipper or consignee, but can be obtained from the carrier.","All lighting fixtures shall energize automatically when any door is opened.","Federal and state laws have reduced rates of lead poisoning significantly in the past three decades.","Lead Safe housing rule requirements for acdeteriorated paint and passing clearance.","Test Methods for Evaluating Solid Waste, or a method validated under subpart Q of this part, for chemical extraction of PCBs from individual and composite samples of PCB remediation waste.","Then select five numbers using a random number table or random number generator.","In the case of a mutual housing company, such analysis shall be provided to the President of the Board of Directors or his or her designee.","Office equipment may have removable storage media, and if so, mediadependent sanitization techniques may be applied to the associated storage device.","Provide the DSHS Laboratory Number if the samples are collected from a public building.","The crank for the leveling jacks and trailer hitch shall be locked.","Precast Drywells may be produced using no steel reinforcement.","When multiple subs are taken from cases, bales, boxes, etc.","Instructors must be approved by the department before teaching courses for accreditation purposes.","Records and documents with personal references shall be made available to all persons employed at the site upon request.","In the process of assembling and binding the bid documents individual pages or drawings may have been inadvertently omitted.","The sample is being transported to a laboratory for the purpose of testing.","CONTRACTOR, his agents or employees, or by anyone directly or indirectly engaged or employed by him.","Lead Design Plan The lead hazard reduction design plan prepared for each property to be assisted with Program Funds in accordance with the Procedural Guide.","The restriction was intended to protect the most sensitive populations, children with elevated blood lead levels, from potential lead exposure during lead abatements conducted by untrained homeowners.","You may request or refuse stove knob covers by checking the appropriate box on the form below, and by returning it to the owner at the address provided.","In all cases, these facilities shall be properly maintained in working order.","Indicate the proficiency testing programs that the lab participates in: Attach a copy of the Quality Assurance Plan.","All Standard Duty Junction Boxes placed in sidewalks, walkways, and shared use paths shall have slip resistant surfaces.","The funding for such emergency change orders that are approved by phone will remain contingent upon receipt of written documentation and digital color photographs to serve as evidence of such change order.","PCB waste quantity to be handled at the facility.","Such fee shall not be deemed to be a rental or use and occupancy charge.","In that situation, the original seal must show the date it was broken.","Affordable Housing Plans and MIH Applications.","The Office of Grant Management is responsible for general oversight of the program, which include policy oversight and community relations issues associated with the program.","Therefore, determine how long the corn being sampled has been in storage.","And the Court said it is a contract.","Peepholes installed prior to the enactment of the legislation will be acceptable unless the cutout for the peephole has affected the adequacy of any stiffening member of the door.","Requirement for survey and management plan.","Requests for approval of alternate methods that will be operated in only one Region must be submitted to the appropriate EPA Regional Administrator.","Before the contractor submits the invoice for finalpayment less retainage, a lien release will be required for the partial drawpaid and final payment less retainage.","If asbestos is present, the chart must be completed.","Phase III Site Assessment may be required.","If building openings near the work area are not sealed or tightly closed, clearance must be conducted in interior spaces that may have been affected.","The Texas Board of Health or its successor.","SPECIFICATIONS Bidders are expected to be thoroughly familiar with all bid documents, including all addenda.","Mopping or other wet cleaning methods should be used instead.","More information will be provided closer to the effective date.","Diminution of tax exemption for excess commercial space.","Some external locally attached hard drives, especially those featuring security or encryption features, may also have hidden storage areas that might not be addressed even when the drive is removed from the enclosure.","The inner boundary of each further subsequent compositing area is the outer boundary of the previous subsequent compositing area.","On the unit exterior, there is a similar requirement to test every type of painted and varnished component.","They may be electrically controlled provided such sprinklers are approved by the Board of Standards and Appeals.","Determining the PCB concentration of samples of waste.","PCBs as a result of spills; and other chemical substances or combinations of substances, including impurities and byproducts and any byproduct, intermediate, or impurity manufactured at any point in a process.","Each mixing facility or plant utilizing ground granulated blast furnace slag shall be equipped with a suitable means or device for obtaining a representative sample of the ground granulated blast furnace slag.","Office issues a Certificate of Eligibility.","They will coordinate as necessary with Office of Enforcement and Import Operations and the Office Chief Counsel and provide further instructions.","RIGHTS AND RESPONSIBILITIES OF THE HOMEOWNER The applicant is responsible for submitting true and accurate financial and other information required to document eligibility for the program.","If additional representative samples were taken in a pipeline section, assume that the PCB surface concentration for the entire pipeline section is the arithmetic mean of the concentrations measured in all representative samples taken.","Pollution Prevention and Toxics, EPA, Washington, DC.","Ultimately, it is the professional integrity of those performing clearance that will determine whether the process succeeds.","New exterior stair towers or elevator shafts shall not be included, unless they substitute for existing stair or elevator space which is converted to residential space.","Subsamples should be obtained at random to ensure thatthe total sample is representative of the lot.","Handrails shall not rotate with their fittings.","Any Certificate of Eligibility and Reasonable Cost issued with respect to such application shall not include items of work claimed therein where, as determined by such BLDS Inspection, there has not been Completion of Construction.","Novalac Epoxy lining as indicated on the Plans or in the Special Provisions.","Division of Housing and Community Renewal of the State of New York.","Mineral wool, brick gypsum or other masonry fill will not be accepted.","Contract, the ENGINEER shall furnish to KENNER the certificates of insurance as required in this Contract.","The laboratory would find it insect infested, and the divisionwould merely report the same thing back to the complainant.","SAMPLE DELIVERED TOEnter to whom you delivered the physical sample.","Any curvature or rounding shall not significantly reduce the brightness value of the reflective sheeting.","Electronic solenoids shall have a stainless steel plunger and be directly attached to the valve bonnets or body with all control parts fully encapsulated.","IMPORTED WHITEFISH SAMPLING SCHEDULE.","In the case of disputes between subcontractors as to fault of problems, it is up to the Contractor to resolve these disputes or accept the cost of repair or replacement himself.","Restock soap, paper towels, and toilet paper.","The agreement shall provide for the termination of occupancy by the employee when his or her services are discontinued.","If in doubt, renovation firms can use tax assessments, property records, and similar information to determine the date of construction.","County Health Department coordinates with City Building and Fire inspectors for joint inspections under the authority of the existing city Rental Occupancy Permit requirements.","Severity Level III covers violations that are of more than minor significance and, if left uncorrected, could lead to more serious circumstances.","Lab Report, NYSCEF Doc.","Tenant in a Building.","Thus, to compare, contrast, and analyze the effectiveness of varied local lead laws, we needed to examine the larger context surrounding these laws.","Hard metal substrates and other materials that cannot be dented by the bite of a young child are not considered chewable.","Under these conditions, examine the lot and select the portions which will demonstrate theviolative nature of the lot.","While confirmed blood lead tests at that level do not by themselves trigger an obligation for the city to inspect under either the state or local law, it may nonetheless facilitate entry.","Standard, New Haven, CT.","AIHALAP is committed to providing impartial accreditation service to our customers.","Describe the location of the sample in relation to areas where food is exposed and any mechanical or human activities you observe that might cause an organism to be spread beyond this niche environment.","It is consequently relative and can have no existence apart from some duty expressly or impliedly imposed.","The requirement for HEPA exhaust control does not apply to the use of all power tools.","Note: This does not sterilize the bag as porous paper cannot be sterilized.","For abatement work, licensed abatement contractors are required.","While several of the first floor lead dust levels dropped in value, thissecondigures underthe clearance level in the first sampling, were markedly increased.","WHO CAN BORROW MONEY?","Any accidental stains caused by leaking bags should be cleaned immediately and without prompting.","The first three groups consisted of houses known to have lead present.","After termination, no amounts shall be owed except for work actually completed.","Debris can be scraped out using a sterile implement, such as a small metal spatula.","County authorized ID badge.","The unique number assigned by the generator identifying each PCB Container, a description of the contents of each PCB Container, such as liquid, soil, cleanup debris, etc.","The Declaration of Helsinki was crafted by the international medical profession, as preferable to the Nuremberg Code crafted by lawyers and judges and adopted right after the Second World War.","The factthateseeable does not itself impose a duty in negligenceterms.","Write down the measurements of the sample area.","The automatic controller housing shall have hasp and lock or a locking device.","The Bureau of Housing or the implementing agency the Bureau of Housing will not sign Certificate of Completion homeowner.","Thisrequirement does not necessarily have to be located in the bedrooms.","The closing of the Loan shall be made subject to satisfaction of all the terms and conditions contained in such commitment.","If the agency approves the proposed EDA, the agency may, but shall not be required to, proceed with the execution of the EDA.","Conditions may require a masonry or concrete sill to divert surface water away from structure.","Alternate gradations may be used if proposed by the Contractor and accepted by the Engineer.","They assert that the Seymours moved out of their home, not because of the toxic dust, but because of their advanced age and health conditions.","After the affiant signsthe affidavit that was written in their native language, you will sign the native language version as the affiant has sworn this statement to you.","Bare floors should be cleaned using a new mop head, a cleaner, and clean water for each room.","Marketing Monitor in form and substance approved by the Agency.","For example, two roommates would not be a family, but a couple, who live together as a family, even if not formally married, would be entitled to benefits as if they were married.","Rutland Avenue was a substantial source of exposure to lead for Cecil Harris?","Spills that may require more stringent cleanup levels.","Sponsor, or any other Agency Activity taken pursuant to these Rules, nor shall such technical violations give rise to any rights, claims, or causes of action in favor of members of the general public or potential sponsors.","Report coding of cans and shipping cases.","OR WITHDRAWAL OF BIDS: Bids may be modified or withdrawn prior to the exact hour and date specified for receipt of bids, provided the modification or withdrawal is in writing and is delivered in the same manner as a bid submission.","Sprinkler heads shall be designed so that spray adjustments can be made by either an adjustment screw or interchangeable nozzles.","The soak time used in the validation study, however, is a use requirement for subsequent decontamination using the solvent being validated.","Some contractors may choose to take additional precautions beyond those required by the rule.","However, printer and facsimile ribbons, drums, and platens are all examples of hard copy media.","Existing shall be structurally safe, durable, and smoke tight; repaint, repair and brace.","As at least one author has argued, this aspect of the review may be jeopardized if members who have institutional allegiances are caught between the desire to promote the interests of the institution and the need to protect the subject.","SDSs present lots of information, and may seem overwhelming at first glance.","In both cases, bare soil should be sampled preferentially.","EPA charge fees for accreditations and certifications?",